Call +44 800 9755 164

Public tenders for energy in Stare-babice Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyPolandstare-babice

Electricity, heating, solar and nuclear energy

Gmina Stare Babice | Published November 26, 2015
Winner
PGE Obrót S.A. Oddział w Warszawie
cpvs
09300000

1059, as amended. d.) to the consumption points Employer, municipal budgetary units and the Municipal Municipal Enterprise EKO - BABICE Sp. z oo indicated in Annex 2 to the Agreement. The contractor will be required to sign a separate agreement with the municipality Stare Babice, with every municipal budget unit and the Municipal Communal Enterprise EKO - BABICE Sp. z oo indicated in Annex 2 to the Agreement. 2016-31.12.2017 r. Is included in Appendices 2, 2a and to the Agreement. 8 March 6, 35-959 Rzeszow with a 3 month notice period. Included will be a new agreement on electricity sales to the objects listed in Annexes 2 and even to the Agreement with the selected contractor by tender. To perform the above mentioned activities shall receive appropriate authorization. The contractor undertakes to: 1) the sale of electricity to the Employer objects listed in Annexes 2 and even to the Agreement in accordance with the terms of this Terms of Reference; 2) provide the Employer access to information about the data metering and billing of electrical energy consumed by the Employer in different sampling sites; 3) balancing trade in the sale of electricity; 4) made on behalf of the Employer notice previously existing and future electricity sales contracts or the comprehensive agreement, based on the attached hereto attorney, attached as Appendix 1 to the Agreement; 5) to change the current tariff C11 to C12a for PPE (No. 53 sewage pumping station Okrężna 2 - Appendix 2 h to the Agreement); 6) a successful conclusion by the Purchaser of a distribution agreement with the DSO, in accordance with the attached hereto power of attorney; 7) immediately notify the OSD request to change energy supplier to the Purchaser objects referred to in Annexes 2 and even to the Agreement in such a time to allow for the introduction of these changes so that the force from 01.01.2016 r. 2 af and 2 h are included with the DSO for an indefinite period: 1) tariff C11 - indefinite; 2) tariff C12a - indefinite; 3) tariff C12b - indefinite; 4) The tariff C21 - indefinite; 5) tariff C22a - indefinite; 6) tariff C22B - indefinite; 7) tariff G11 - indefinitely 1) have comprehensive agreements for the purchase and distribution of electricity with a 3 month notice period (PGE Rotation). Changing the tariff groups will not affect the unit price of electricity, because the Purchaser changing the tariff group will make changes to the tariffs in force in the tender and specified in the tender documents.

Electricity, heating, solar and nuclear energy

Gmina Stare Babice | Published September 26, 2015  -  Deadline November 3, 2015
cpvs
09300000

1059, as amended. d.) to the consumption points Employer, municipal budgetary units and the Municipal Municipal Enterprise EKO - BABICE Sp. z oo indicated in Annex 2 to the Agreement. The contractor will be required to sign a separate agreement with the municipality Stare Babice, with every municipal budget unit and the Municipal Communal Enterprise EKO - BABICE Sp. z oo indicated in Annex 2 to the Agreement. A detailed description of the order containing the demand for electricity to individual objects in the period from 1 January 2016. 31 December 2017. Is included in Appendices 2, 2a and to the Agreement. 8th of March 6, 35-959 Rzeszow with a 3 month notice period. Included will be a new agreement on electricity sales to the objects listed in Annexes 2 and even to the Agreement with the selected contractor by tender. To perform the above mentioned activities shall receive appropriate authorization. The contractor undertakes to: 1) the sale of electricity to the objects Employer listed in Annexes 2 and even to the Agreement in accordance with the terms of this Terms of Reference, 2) provide the Employer access to information about the data metering and billing of electrical energy consumed by the Employer in the various sampling sites, 3 ) balancing trade in the sale of electricity, 4) made on behalf of the Employer notice previously existing and future electricity sales contracts or the comprehensive agreement, based on the attached hereto attorney, attached as Appendix 1 to the Agreement, 5) to change the current tariff C11 on C12a for PPE (53 WWPS Okrężna 2 - Appendix 2 h to the Agreement), 6) a successful conclusion by the Purchaser of a distribution agreement with the DSO, in accordance with the attached hereto power of attorney: 7) immediately report to the DSO request for a change of provider Employer energy to the objects set out in Appendices 2 and even to the Agreement in such a time to allow for the introduction of these changes so that the force from 01.01.2016. 2 af and 2 h are included with the DSO for an indefinite period: 1) tariff C11 - indefinitely 2) tariff C12a - indefinite duration, 3) tariff C12b - indefinitely 4) tariff C21 - indefinitely, 5) tariff C22a - indefinitely, 6) tariff C22B - indefinitely, 7) tariff G11 - indefinitely 1) have comprehensive agreements for the purchase and distribution of electricity with a 3 month notice period (PGE Rotation). Changing the tariff groups will not affect the unit price of electricity, because the Purchaser changing the tariff group will make changes to the tariffs in force in the tender and specified in the tender documents.

Construction work

Gminne Przedsiębiorstwo Komunalne „EKO-BABICE" Sp. z o.o. | Published May 16, 2015  -  Deadline June 23, 2015
cpvs
45000000, 45100000, 45111200, 45200000, 45210000, 45262700, 45400000, 45252100, 45231300

The Employer excluded from the development of the project entitled. "Sludge - an installation for the production of fertilizers from sewage" supply and installation of most equipment, supply forklift, construction of a packing of granules, execution of electrical installations and instrumentation. Object of the contract includes m.in .: 1) Construction of the sludge tank, 2) extension of the station building mechanical sludge dewatering and processing, 3) Construction of interconnecting piping related to: a) Design of a part of the sanitary-technological point 5.2, pkt.5.3: Section 9 a), b), d), point 6. from 1 to 6, 4) Provision of lime tank with a capacity of 45 m3 and equipment, lime conveyor and placing the anchor it on the reinforced concrete foundation (ob. 15.3), 5) Dismantling of existing equipment and installation of meters. al. lime tank, heating and ventilation system in sludge dewatering station, 6) Construction of the bath tank intermediate granules made of reinforced concrete, 7) surveying services. With design projects excluded: 1) Project Executive - part of the architectural and construction: Point II Objects: a) Hall granule packing (ob. No. 17.1) b) vehicle scale raids in the cloud. No 17 (ob. No. 17.3) 6 points from 1 to 6. A detailed description of the order is included in the technical documentation: 1) Project construction, 2) Executive design - part of the architectural and construction, 3) Project Executive - part of sanitary technology, 4) Project Executive - part of the construction, 5) Executive design - part of the land development, 6) STWiORB. Notes on the contract. The maximum downtime for the press sludge dewatering is 5 days. 2) Any work related to interference in the working sewage treatment plant should be reported eksploatatorowi at least 7 days before. 3) When the Contractor is getting any decisions and arrangements necessary for the proper performance of the contract. 4) In the event of a collision Contractor is obliged to rebuild the conflicting network in agreement with the Employer. The Employer may provide a place near wastewater treatment plants designated for facilities construction. 6) Providing energy for the time of construction lies with the Contractor. The steel elements from demolition save at the place designated by the Purchaser.

Construction work

Gminne Przedsiębiorstwo Komunalne „Eko-Babice” Sp. z o.o. | Published August 4, 2015
Winner
AGREGATY POLSKA Cezary Bielak
cpvs
45000000, 45100000, 45111200, 45231400, 45231000

Object of the contract covers the implementation of the main power supply (cable lines, switchgear RG2, supply and installation of the generator in a container version, the execution of the ATS along with reactive power compensation, power supply and cable connections - between the control unit and switchgear RG2, external lighting unit, install a ground area) . Object of the contract includes: Electrical Installations main power supply and backup: 1) Implementation of the main power supply - making the cable line of terminals of ZK-1 + 1SL With the connection and relevant measurements. The place of supply of energy, while the place delimitation of distribution terminals are on a strip of measuring system - clearing. Cable 240mm2 natural 2x4x YAKXS of about 55 mb with connection and relevant measurements (it may use the additional terminal board with terminals which will be introduced 2xYAKXS 4x240 cables from the switchgear RG2 and which will be introduced flexible cables type 2x4xLgY150 mm2 to the plate unit RG-A ). 3) power circuits own needs unit - making the power supply line YKY 3x4 mm2 cable with a length of about 55 m (according to the project documentation). 4) control circuits and signaling ATS - making the line of control and signaling YKSYżo10x2,5mm2 cable with a length of about 55 m (according to the project documentation). Switchgear Index: 5) Delivery and installation of the main switchboard RG2 (in accordance with the guidelines and project documentation): a) ATS automation system (Automatic Backup Power Supply) with analyzers; b) field drainage; c) the capacitor resistant to higher harmonics with automatic dual-function controller (selection of capacitors and reactors of the type of start-up phase to verify the measurements carried out, taking into account the ordered power, maximum power and headroom); d) the main circuit current (GWP). Aggregate: supply, assembly and commissioning of a container unit with a capacity of 385 kVA emergency (308 kW) and 350 kVA (280kW continuous operation) associated with the system ATS. 7) Specific requirements for the unit are described in the project documentation. Other installations 8) Implementation of a grounding system to the generator - the execution ground networks to the generator to ground the nozzle with compensatory connections (in accordance with the guidelines and project documentation). Lighting pole with a height of 6 m on the foundation of an LED luminaire supplied from the existing circuit. The baseplate 10) Execution slab under the generator as a reinforced concrete slab plate will be sunk in the ground 50 cm. 11) The weight of the container unit version (outer - Silenced) is about 5,600 kg. ROUTE 12) Implementing the driveway of concrete blocks (hardening of the area) to operate the generator with a length of 13.5 m and a width of 4.5 m along the paved shoulder with a width of 0.75 m. 13) The implementation of the internal road section of concrete blocks (hardening of the area ) - Episode maneuvering for service vehicles operating with a length of 8.2 m and a width of 3.5 m. 14) Execution of the band and the pavement of concrete blocks around the container unit. 15) The way the inner and driveway should shape it so that rainwater was discharged on the adjacent green area. Requirements ordering 16) Provision of geodetic services. 17) Provide a complete set of hardware, labels, manuals, collective means of protection in the field of safety and fire protection required by the provisions specific to the proper functioning of the main power supply, power generator and switchgear. 18) Execution of electrical measurements: insulation resistance measurement, measurement of earth resistance, loop impedance measuring the effectiveness of RCDs. 19) Develop movement instructions and operating the generator to the network RE Pruszkow Warsaw Branch 20) Execution of as-built documentation maintenance, in accordance with the terms of joining the generator 21) Conducting training on new facilities and installation of sewage treatment service staff. 22) Execution information plaques and commemorative accordance with the guidelines of the Ministry of Regional Development for projects under the Operational Programme Infrastructure and Environment. 23) Implementation of labeling objects and installations in accordance with the requirements of the Purchaser. 24) Implementation of commissioning of facilities and installations. 25) The notification made installations for the Polish Energy Group. Detailed Description of the order is included in the project documentation: 1) building-executive: Power sewage treatment plant. Notes on the terms of reference: The realization must be agreed with the Purchaser. 2) In the event of a collision Artist commitments

Construction work

Gminne Przedsiębiorstwo Komunalne „Eko-Babice” Sp. z o.o. | Published April 29, 2015  -  Deadline June 9, 2015
cpvs
45000000, 45100000, 45111200, 45231400, 45310000

Object of the contract concerns the implementation of the main power supply (cable lines, switchgear RG2, supply and installation of the generator in a container version, the execution of the ATS along with the reactive power compensation, power supply and cable connections - between the control unit and switchgear RG2, external lighting unit, install a ground area) . Object of the contract includes: Electrical Installations main and backup power supply: 1) Implementation of the main power supply - making the cable line of terminals of ZK-1 + 1SL With the connection and relevant measurements. The place of supply of energy, while the place of separation of distribution terminals are the terminals to measuring system - clearing. 2x4x natural YAKXS cable 240mm2 with a length of about 55 m including connection and relevant measurements (it may use the additional terminal board with terminals which will be introduced 2xYAKXS 4x240 cables from the switchgear RG2 and which will be introduced 2x4xLgY150 type of flexible cables mm2 to the plate generator RG-A ). 3) power circuits own needs unit - making the power supply line YKY 3x4 mm2 cable with a length of about 55 m (according to the project documentation). 4) control circuits and signaling ATS - performance line of control and signaling YKSYżo10x2,5 mm2 cable with a length of about 55 m (according to the project documentation). Switchgear Index: 5) Delivery and installation of the main switchboard RG2 (in accordance with guidelines and project documentation): a) ATS automation system (Automatic Power Reserve) with analyzers; b) field drainage; c) capacitor resistant to higher harmonics with automatic dual-function control (selection of capacitor banks and reactors of the type of start-up phase to verify the measurements carried out, taking into account the ordered power, maximum power and headroom); d) the main circuit current (GWP). Aggregate: 6) Power generator container version (external - Silenced according Delivery with installation and commissioning of a container unit with a capacity of 385 kVA emergency (308 kW) and 350 kVA (280 kW in continuous operation) associated with the system ATS. 7) Detailed requirements for aggregate are described in the project documentation. Other installations 8) Installation of the generator grounding - performance network for generator grounding to ground the nozzle with compensatory connections (in accordance with the guidelines and project documentation). Lighting pole with a height of 6 m on the foundation of an LED luminaire supplied from the existing circuit. The baseplate 10) Execution slab under the generator as a reinforced concrete slab album will be recessed in the ground 50 cm. 11) the aggregate weight of containerized version (external - Silenced) is about 5,600 kg. ROUTE 12) Implementing the driveway of concrete blocks (hardening of the area) to handle the generator with a length of 13.5 m and a width of 4.5 m with paved shoulder width of 0.75 m. 13) Type of internal road section of concrete blocks (hardening of the area ) - Episode maneuvering for operational service vehicles with a length of 8.2 m and a width of 3.5 m. 14) Execution bands and the pavement of concrete blocks around the container unit. 15) The way the inner and driveway shape it should be so that rainwater was discharged on the adjacent green area. Requirements ordering 16) Provision of geodetic services. 17) Provide a complete set of equipment, signage, instruction, collective means of protection in the field of industrial safety and fire protection required by the provisions specific to the proper functioning of the main power generator and switchgear. 18) Execution of electrical measurements: insulation resistance measurement, measurement of earth resistance, loop impedance measuring the effectiveness of RCDs. 19) Develop operating and maintenance instructions generator to the network RE Pruszkow Warsaw Branch 20) Execution of as-built documentation maintenance, in accordance with the terms of the connection generator 21) Conducting training on new facilities and installation of sewage treatment service staff. 22) Execution information plaques and commemorative accordance with the guidelines of the Ministry of Regional Development for projects implemented under the Operational Programme Infrastructure and Environment. 23) Implementation of labeling objects and installations in accordance with the requirements of the Purchaser. 24) Implementation of commissioning of facilities and installations. 25) The notification made installations for the Polish Energy Group. Detailed Description of the order is included in the project documentation: 1) building-executive: Power sewage treatment plant. Notes on the terms of reference: The realization

Miscellaneous special-purpose machinery

Gminne Przedsiębiorstwo Komunalne „EKo-Babice” Sp. z o.o. | Published September 16, 2015  -  Deadline October 22, 2015
cpvs
42990000, 42996900, 45310000, 45252200

Object of the contract does not include the performance hall granule packing with a bathtub intermediate tank granules. Object of the contract includes m.in .: 1) equipment including sludge tank the following equipment and systems: the decanter floating, vertical propeller stirrer, aeration panels and installations holiday overflow drains, drain the liquid supernatant of the decanter, compressed air pipeline DN 100; 2) mechanical dewatering station equipment and processing sludge m. Al. the following devices: positive displacement sludge pump, metering panels fertilizer additives in the fluid discharge and dosing system fertilizing additives in the form of powders, piston compressor, conveyor (Section 5.3, paragraph 3, 4, 5, 6, 7, 8 of the draft executive part of the sanitary technology); 3) making the installation of the station building extensive mechanical dewatering and sludge processing: connecting cables Metering panels, plumbing, installation of water vapor from the granulator, ventilation, heating and ventilation (paragraph 5.3, section 9 c, e, f, g h, Section 5.3, paragraph 10 of the draft executive part of sanitary technology); 11, lit. and detailed design part of sanitary technology); 5) Connect technological and electrical equipment ordering: a) the granulator (high speed reactor), b) of the dispenser lime with hopper and support structure. 6) Delivery forklift; 7) Execution of the electrical part and I & C equipment for facilities: a tank sludge, mechanical dewatering station and the processing of sludge with a garage, lime tank along with the integration of SCADA system in accordance with the project documentation; 8) The notification of devices subject to technical inspection at the Office of Technical Inspection (along with incurring all the necessary administrative fees related to the above application); 9) Provide a complete set of hardware, labels, manuals, collective protection measures in the field of safety and fire protection required by the provisions specific to the proper operation of the sewage treatment plant in the area of ​​new buildings and installations; 10) The execution of the operation of sewage treatment plants and work instructions Operating and maintenance facilities necessary for the proper operation of sewage treatment, work instructions safety in terms of new buildings and installations; 11) Conduct training on new facilities and installation of sewage treatment service staff; 12) Implementation of labeling objects and installations as required by the Contracting Authority; 13) Type of start-up equipment and installations in accordance with STWiORB; 14) The Purchaser will provide the ingredients for booting dispensing part-ons powder and liquid; 15) Carry out the boot device and obtaining the final product (granules) with the features: a) the size of granules 2 - 5 mm, b) a dry matter content of about 90%; These designations should be performed by an external laboratory. 16) the implementation of biological research, specifying the sanitary condition of manure produced; 17) Providing software that controls operation of a plant for the production of fertilizers and license. With design projects excluded: 1) Project Executive - part of sanitary technology: 4: supply of excess sludge, bringing filtrate discharge homogenized sediment - item 5.2 1, 2, 9 point a, b, d - point 5.4 - point 5.5 - point 5.6 - point 5.7 - paragraph 6 2) Project Executive - part of the electrical and I & C - section 4.6 - point 5, is 17 - item 6.5 18 and 19 - instrumentation for the facility nr 17 - hall granule packing detailed order in the documentation: 1) Project construction, 2) Project Executive - part of sanitary technology, 3) Project Executive - part of sanitary technology data sheets of equipment 4) Project Executive - part of the land use, 5) Project Executive - part of the electrical and I & C 6) STWiORB. Notes on the contract. The realization agree with the Employer. If you need to disable installation by the Contractor to the dewatering of sludge for more than five days - Contractor is obliged to provide replacements at your expense. 2) Any work related to interference in the working sewage treatment plant should be reported eksploatatorowi at least 7 days before. 3) In the event of a collision Contractor is obliged to rebuild the conflicting network in agreement with the Employer. The Employer may provide a place near wastewater treatment plants designated for facilities construction. 5) Ensuring energy during construction lies with the Contractor. 6) Under the contract the Contractor is obliged to organize and disposed of at its own expense, all the waste arising from the implementation of the contract Elements of steel from demolition save the place designated by the Employer. Order
  • 1