Call +44 800 9755 164

Public tenders for energy in Rybnik Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Petroleum products, fuel, electricity and other sources of energy

SP ZOZ Państwowy Szpital dla Nerwowo i Psychicznie Chorych w Rybniku | Published November 24, 2015  -  Deadline December 30, 2015
cpvs
09000000, 09120000, 09123000, 65200000, 65210000

The contract is for a complete delivery including the sale and distribution of natural gas-rich objects SP Health Care Centre of the State Hospital for Mental Diseases in Rybnik. A detailed list of collection places and declared gas consumption by months contained in Appendix No. 9 to the SETC. Pick of natural gas will be followed with connections to the needs of the boiler house equipped with the following devices Gas: 1 with thermal capacity of 1400 kW; 2 with thermal power 1750 kW and a second connection for the needs Kitchen and flats. It consumption is only indicative, serving comparing tenders and in no way represents the part of the Employer's obligation to purchase natural gas in the stated amount. The Contracting Authority estimates the number of gas for collection during the contract on the basis of consumption in 2014. The contractor will make all actions and agreements with the Distribution System Operator (DSO) and other conditions necessary to carry out switching and effective start selling gas, in particular: termination of existing contracts comprehensive report to the DSO new gas sales contracts. 1059, as amended. d.), hereinafter distances EP Act, regulations or European Union standards. The Contracting Authority reserves the right to without cost deviations from the expected consumption by at least +/- 20%. Toll rates distribution of gas collection points must come from the current tariff of the local OSD and during performance of the contract can be changed only if the local tariff will change the OSD. The unit price of gas can be changed only if the statutory change of VAT rate or the statutory change of taxation on natural gas excise duty.

Research and development services and related consultancy services

Śląska Kompania Przemysłowo – Handlowa „STEF-POL” Sp. z o.o. | Published January 19, 2016  -  Deadline February 24, 2016
cpvs
73000000

Subcontracting of research for the development of technologies for producing nutritious energy fuels based on low-energy municipal waste (SRF) and fine-grained carbon assortments using the method biocementacji with the construction of a demonstration plant.

Electricity

Miasto Rybnik | Published October 15, 2016  -  Deadline October 31, 2016
cpvs
09310000, 09300000

The contract is for the sale of electricity within the meaning of the Energy Law of 10 April 1997. (Dz. U. of 2012. Item. 1059, as amended) for organizational units and cultural institutions of the City of Rybnik and other selected individuals.

Electricity

Miasto Rybnik | Published October 14, 2016  -  Deadline October 20, 2016
cpvs
09310000, 09300000

The contract is for the sale of electricity within the meaning of the Energy Law of 10.4.1997 (Journal of Laws of 2012. Item. 1059, as amended) for organizational units and cultural institutions of the City of Rybnik and other selected individuals.

Research and development services and related consultancy services

Śląska Kompania Przemysłowo – Handlowa „STEF-POL” Sp. z o.o. | Published March 16, 2016  -  Deadline April 25, 2016
cpvs
73000000

Subcontracting of research for the development of production technology of fuel (pellets) based on low-energy municipal waste (SRF) and fine assortments of coal using the method biocementacji.

Electricity

Energia Optimum Sp. z o.o. | Published January 15, 2016
Winner
PGE Obrót S.A.
cpvs
09310000

Purchase electricity within the meaning of the Energy Law for joint Orderers a total estimated volume of 38 316.9 MWh (+/- 10%) during the delivery period, ie. From 1.9.2015 until 31.12.2018 year, subject to other terms for some of the objects specified in detail in Appendix 2, but no earlier than the effective termination date of existing contracts energy supply and positively change the present procedure seller. Supply of electricity will take place for the objects classified into 2 groups according to the following classification: Group 1 - Road lighting, Group 2 - Places and objects other than road lighting. Sales of energy will take place on the basis of contracts concluded separately by each joint Orderers, but in relation to the authorities: Municipality Gaszowice, Gorzyce, Municipality Jejkowice, Municipality Kornowac, ​​Municipality Krzanowice, Municipality Krzyżanowice Commune Racibórz Smithy, Municipality Lubomia, Municipality Lyski, Commune Misery, District of Rybnik, Municipality of Rudnik, Municipality of Veliko Pietrowice also on the basis of contracts concluded separately by local government agencies.

Electricity

Energia Optimum Sp. z o.o. | Published January 16, 2016
Winner
PGE Obrót S.A.
cpvs
09310000

The contract is for the purchase of electricity within the meaning of the Energy Law for joint Orderers a total estimated volume of 101 457 MWh (+/- 10%) during the delivery period, ie. From 1.1.2016 to 31.12.2017, subject to the other terms for some objects, but not earlier than the effective termination date of existing contracts energy supply and positively change the present procedure seller. Supply of electricity will take place for the objects classified into 2 groups according to the following classification: Group 1 - Road lighting, Group 2 - Places and objects other than road lighting energy sales will take place on the basis of contracts concluded separately by each Orderers, while in compared to Orderers: Commune of Alwernia, Municipality of Andrychów, the municipality Babice municipality Brzeszcze Commune Brzeźnica, Municipality Chelmek, Municipality of Kalwaria Zebrzydowska, City of Oswiecim, Municipality Mucharz, Municipality of Osiek, Municipality Lea Great, District Chrzanowski County Auschwitz, Wadowice County, Municipality Przeciszów, Spytkowice Municipality, Municipality Stryszów, Municipality Tomice, Trzebinia, Municipality of Wadowice Zator municipality also on the basis of contracts concluded separately by local government agencies.

Electricity

Energia Optimum Sp. z o.o. | Published September 16, 2015  -  Deadline October 23, 2015
cpvs
09310000

The contract is for the purchase of electricity within the meaning of the Energy Law for joint Orderers a total estimated volume of 101 457 MWh (+/- 10%) during the delivery period, ie. From 1.1.2016 to 31.12.2017, subject to the other terms for some facilities specified in detail in Appendix 2 to the ToR, but not earlier than the effective termination date of existing contracts energy supply and positively change the present procedure seller. Supply of electricity will take place for the objects classified into 2 groups according to the following classification: Group 1 - Road lighting, Group 2 - Places and objects other than road lighting energy sales will take place on the basis of contracts concluded separately by each Orderers, while in compared to Orderers: Commune of Alwernia, Municipality of Andrychów, the municipality Babice municipality Brzeszcze Commune Brzeźnica, Municipality Chelmek, Municipality of Kalwaria Zebrzydowska, City of Oswiecim, Municipality Mucharz, Municipality of Osiek, Municipality Lea Great, District Chrzanowski County Auschwitz, Wadowice County, Municipality Przeciszów, Spytkowice Municipality, Municipality Stryszów, Municipality Tomice, Trzebinia, Municipality of Wadowice Zator municipality also on the basis of contracts concluded separately by local government organizational units described in detail in Appendix 2 hereto.

Electricity

Energia Optimum Sp. z o.o. | Published June 13, 2015  -  Deadline July 20, 2015
cpvs
09310000

Purchase electricity within the meaning of the Energy Law for joint Orderers, with a total estimated volume of 38 316.9 MWh (+/- 10%) during the delivery, ie. From the date of 09.01.2015 till 31.12.2018 year, subject to other terms for some of the objects specified in detail in Appendix 2, but not earlier than after the successful termination of the previously existing energy supply contracts and positively change the present procedure seller. Supply of electricity will take place for the objects classified into 2 groups according to the following classification: Group 1 - Road lighting, Group 2 - Places and objects other than road lighting. Sales of energy will be carried out on the basis of contracts concluded separately by the individual joint Orderers, with respect to Orderers: Municipality Gaszowice, Gorzyce, Jejkowice Municipality, Municipality Kornowac, ​​Krzanowice Municipality, Municipality Krzyżanowice, City Racibórz Smithy, Lubomia Municipality, Municipality Lyski, Poverty Municipality, District of Rybnik, Municipality of Rudnik, Municipality of Veliko Pietrowice also on the basis of contracts concluded separately by the local government organizational units described in detail in Appendix 2 hereto.

Electricity

Miasto Rybnik | Published January 6, 2017
Winner
Energa-Obrót S.A.
cpvs
09310000, 09300000

The contract is for the sale of electricity within the meaning of the Energy Law of 10.4.1997 r. (Journal of Laws of 2012. Item. 1059, as amended) for organizational units and cultural institutions of the City of Rybnik and other selected individuals.

General requirements

1. The Contractor shall perform the object of the contract in accordance with the provisions of the Terms of Reference and the applicable laws and legal acts.

2. Compliance with the quality standards of customer service.

3. Acceptance of the Purchaser requests and complaints.

4. Settlement for electricity will take place on the basis of the indications of the measurement and settlement and permanent use of flat, provided by the OSD.

5. Estimated amount of energy supplied to all consumption points in total during delivery: 42,130.14 MWh (+/- 15%) - (Total and second year of the contract)

6. Sales of electricity will take place through the distribution network belonging to Tauron Distribution SA, the Purchaser shall have concluded a contract for the provision of such services.

7. The Contractor agrees to act as the entity responsible for commercial balancing electricity sold in the framework of this agreement.

Roadworks

Miasto Rybnik | Published October 2, 2015
Winner
SKANSKA S.A.
cpvs
45233140, 45111000, 45233290, 45233221, 45232000

The material scope of the order: includes reconstruction of the street. Rudzka Phase VI - Class G 1.3 km stretch between the intersection of ul. Pniowską to the intersection of ul. Steel in Rybnik. Part of the road includes the demolition of the existing surface and substructure of the road with sidewalks, execution ground stabilization with cement foundation of broken aggregate, the foundation of mineral-bituminous binder layer of asphalt concrete, surfaces with a mixture of SMA development curbs and edges of concrete, execution of sidewalks, downhill and the bike path, performed by marking horizontal and vertical. In addition, the project includes the construction of storm water drainage, street lighting, security, and reconstruction of the existing infrastructure and underground networks in the field of telecommunication and energy.

Roadworks

Miasto Rybnik | Published July 8, 2015  -  Deadline July 27, 2015
cpvs
45233140, 45111000, 45233290, 45233221, 45232000

The material scope of the order: includes the reconstruction of the street. Rudzka Phase VI - Class G on 1.3 km stretch between the intersection of ul. Pniowską to the intersection of ul. Steel in Rybnik. Part of the road includes demolition of the existing surface and substructure of the road with sidewalks, execution of ground stabilization with cement, crushed aggregate base course, the foundation of mineral-bituminous binder layer of asphalt concrete, pavement with SMA mix, building curbs and concrete edges, and execution of sidewalks, descents and bike path, and execution of horizontal and vertical markings. In addition, the project includes the construction of storm water drainage, street lighting, security and reconstruction of the existing infrastructure above and underground networks in the field of telecommunication and energy.

Meal-preparation services

Samodzielny Publiczny Zakład Opieki Zdrowotnej Wojewódzki Szpital Specjalistyczny nr 3 w Rybniku | Published February 28, 2017  -  Deadline March 14, 2017
cpvs
55321000, 55322000, 55520000, 55521100, 55521200

1. The contract is for: catering service in the preparation and distribution of meals, including the lease of kitchen object.

2. The specification of the service given in Annexes:

Appendix 1A - Price Form,

Annex 1.B.1. - A detailed description of the contract,

Annex 1.B.2. - Detailed description of the required diet,

Annex 1.B.3. - Info on facilities and equipment, which are the subject of the lease.

Annex 1.B.4. - Info on energy utilities and conditions of technical cooperation.

Annex 1.B.5. - Info about the people for whom the Contractor from the date of commencement of the service is in accordance with art. 231 Kp party to the existing labor relations.

1.B.5.1. The letter Impel Catering "Company"

1.B.5.1. The letter Impel Catering "Company"

1.B.5.2. Work Regulations Niro

1.B.5.3. Remuneration Regulations Niro

Annex 1B.6. - Sketch wydzierżawianej estate

Annex 1B.7. - ON specifies how the settlement of fees for municipal waste disposal.

Annex 1B.8. - Environmental Policy

In detail description of the document.

Natural gas

Energia Optimum Sp. z o.o. | Published January 19, 2016
Winner
DUON Marketing and Trading S.A.
cpvs
09123000, 60300000

Object of the contract includes a comprehensive sale of natural gas-rich symbol E with a total estimated volume of 18 730 670 kWh delivery period, ie. From 01.10.2015 to 31.12.2016, to the entities listed in Annex A hereto. Start of supply will occur no earlier than after the successful termination of the existing comprehensive contracts for sale of gas from the current Seller. The Contractor shall make all actions and agreements with the DSO (Distribution System Operator) necessary to carry out switching and effective start selling gas, including in particular: termination of existing contracts comprehensive report to the DSO new gas sales contracts. The Contractor shall perform these activities on the basis of the relevant powers of attorney granted by the contracting authority with the conclusion of contracts for the sale of gas. Gaseous fuel supply must meet technical standards in accordance with the provisions of the Energy Law, regulations or European Union standards. Predicted consumption of gas is an estimate. The Contracting Authority reserves the right to no-cost deviations from the expected consumption by at least +/- 15%. The indicated tolerances must be understood as the right option established by the Employer within the meaning of the provisions of art. 34 paragraph. 5 of the Public Procurement Law.

Natural gas

Energia Optimum Sp. z o.o. | Published July 8, 2015  -  Deadline August 14, 2015
cpvs
09123000, 60300000

Object of the contract includes a comprehensive high-methane natural gas sales for the symbol E with a total estimated volume of 18 730 670 kWh in the period of delivery, ie. From 10.01.2015 to 31.12.2016, to the entities listed in Annex A hereto. Start of deliveries take place no earlier than after the successful termination of the existing comprehensive contracts for sale of gas from the current Seller. The Contractor shall make all actions and agreements with the DSO (Distribution System Operator) necessary to carry out switching and effective start selling gas, including in particular: termination of existing contracts comprehensive report to the DSO new gas sales contracts. The Contractor shall perform these activities on the basis of the relevant powers of attorney granted by the contracting authority with the conclusion of contracts for the sale of gas. Gaseous fuel supply must meet technical standards in accordance with the provisions of the Energy Law, regulations or European Union standards. Expected gaseous fuel consumption is an estimate. The Contracting Authority reserves the right to without-cost deviations from the expected consumption by at least +/- 15%. The indicated tolerances must be understood as the right option established by the Employer within the meaning of the provisions of art. 34 paragraph. 5 of the Public Procurement Law.

Meal-preparation services

Samodzielny Publiczny Zakład Opieki Zdrowotnej Wojewódzki Szpital Specjalistyczny nr 3 w Rybniku | Published March 10, 2017  -  Deadline March 21, 2017
cpvs
55321000, 55322000, 55520000, 55521100, 55521200

1.Przedmiotem order is: catering service in the preparation and distribution of meals, along with the lease of kitchen object

2. The specification of the service given in Annexes:

Appendix 1A - Price Form,

Annex 1.B.1. - A detailed description of the contract,

Annex 1.B.2. - Detailed description of the required diet,

Annex 1.B.3. - Info on facilities and equipment, which are the subject of the lease.

Annex 1.B.4. - Info on energy utilities and conditions of technical cooperation.

Annex 1.B.5. - Info about the people for whom the Contractor from the date of commencement of the service is in accordance with art. 231 K p party to the existing labor relations.

1.B.5.1. The letter Impel Catering "Company"

1.B.5.1. The letter Impel Catering "Company"

1.B.5.2. Work Regulations Niro

1.B.5.3. Remuneration Regulations Niro

Annex 1B.6. - Sketch wydzierżawianej estate

Annex 1B.7. - ON specifies how the settlement of fees for municipal waste disposal.

Annex 1B.8. - Environmental Policy

In detail description of the document.

Meal-preparation services

Samodzielny Publiczny Zakład Opieki Zdrowotnej, Wojewódzki Szpital Specjalistyczny nr 3 w Rybniku | Published February 17, 2017  -  Deadline March 14, 2017
cpvs
55321000, 55322000, 55520000, 55521100, 55521200

1.Przedmiotem order is: catering service in the preparation and distribution of meals, along with the lease of kitchen object

Specification of services given in Annexes:

Appendix 1A - Price Form,

Annex 1.B.1. - A detailed description of the contract,

Annex 1.B.2. - Detailed description of the required diet,

Annex 1.B.3. - Info on facilities and equipment, which are the subject of the lease.

Annex 1.B.4. - Info on energy utilities and conditions of technical cooperation.

231 K p party to the existing labor relations.

The letter Impel Catering "Company"

The letter Impel Catering "Company"

Work Regulations Niro

Remuneration Regulations Niro

Annex 1B.6. - Sketch wydzierżawianej estate

Annex 1B.7. - ON specifies how the settlement of fees for municipal waste disposal.

Annex 1B.8. - Environmental Policy

In detail description of the document.

The contract is to provide patients SPZOZ WSS No. 3 in Rybnik adequate food and lease kitchens, where meals will be prepared.

As part of the implementation of the contract the Contractor will be required to:

- The service for 3 years (36 months) from the date of signing the contract,

- Ensure the food hospital patients in all hospital departments, including the following requirements

- Purchasing raw materials for prepared meals, except as described in Section II,

- Preparing meals,

- Distribute food system tacowym,

- Delivering meals to the troops and receive trucks with trays of branches,

- Cleaning and disinfection of trays and equipment,

- Systematic replacement of damaged insulation trays and vacuum flasks

- Keeping records of issued meals

- Maintaining an appropriate level of sanitary.

Rybnik: Delivery of fuel and operation of the boiler room in the building at ul.Hetmańskiej 5 in Rybnik

Zakład Gospodarki Mieszkaniowej w Rybniku | Published July 22, 2016  -  Deadline May 31, 2017
cpvs
09110000, 50721000

Hetmańska 5. Employer provides the duration of the heating season for a maximum period of 258 days (from 16.09.2016 r. To 05.31.2017 r.). Employer provides temporary suspension or resumption of the heating season depending on weather conditions causing the need for temporary cessation or the further supply of heat to warm the building. Purchaser in advance at least 1 day notify the Contractor (by phone or e-mail): 1) at the start and end of the heating season, 2) suspension of the heating season, 3) the resumption of the heating season. Hetmańska 5 in Rybnik, purchase of fuel, its supply to the boiler room, export, storage and disposal of waste generated in the combustion process, in accordance with applicable regulations in this regard. Hetman 1a, b, c, d, 5a, b and 7a. It is the responsibility of the Contractor should be: 25 - 30MJ / kg), 2) current supply of solid fuel, 3) current removal of slag, 4) securing constant maintenance boiler, 5) venting, 6) regular cleaning of the oven and burners with increasing pollution, regulation and professional maintenance of the heating system guarantees trouble-free, energy-efficient and environmentally friendly operation, 7) cyclic checking pressure instalacjach- complement of water, 8) verify the operation of safety valves, 9) to check activities of control devices and safety devices, 10) checking and ventilation and aeration for heating, 11) reporting failures and faults and their quick removal, 12) reporting renovation needs arising during operation, 13) make an inventory of spare parts, 14) running riot periodic, 15) maintaining the cleanliness of heating and boiler with facilities, 16) maintenance of code temperature in heated apartments, 17) keeping the notebook working boiler, 18) document in a notebook work boiler carried out activities with a brief description, the date and legible signature of the person operating the boiler, 19) execution of the contract in the use of boiler by person / s qualified to deal with the operation of equipment, installation and networks group 2 the position of operation and supervision in the amount consistent with the statement of the Contractor's offer, 20) submission of a list of persons engaged in the subject of the order in the use of boiler qualified to deal with the operation of equipment, and the installation of group 2 on the position of operation and supervision, along with a photocopy of the above. qualifications in terms of: a) the first term: 3 days from the date of the agreement, b) successive deadlines: for 5 days each month (in the period from 10.01.2016 r. to 05.31.2017 r.), 21) carrying out the operation for temperature maintenance water network in accordance with the table above mentioned booklet stamped and numbered pages provide Purchaser, 23) ensuring the performance of the above. order instigated a period not excluding public holidays, 23) providing for the contractual period of minimum reserves of solid fuel in the amount of 5 tons, which is to remain in the boiler room even after the end of the season, 24) having the entire period covered by the agreement, paid insurance policy civil liability in the scope of business for an amount of at least 100,000.00 zł, 25 - 30 MJ / kg) in tonnes for the period 16.09.2016 r. - 31.12.2016. in the period to 05.01.2017 r. and for the period 01.01.2017 r. - 05.31.2017 r. in the period to 06.06.2017 r. 26) execution of the contract for the period indicated by the Employer, the boiler room is equipped with 2 boilers with a capacity of 250 kW and the other 400 kW having facilities regulacyjno- security - collecting vessel open system.
  • 1