Call +44 800 9755 164

Public tenders for energy in Radom Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Radom: Retrofitting of the boiler room was built with the building forester forestry Rajec

 | Published July 13, 2016  -  Deadline November 30, 2016
1.Przedmiotem order to perform the full range of construction works in line with the project documentation on thermal modernization with boiler room was added to the building forester forestry Rajec. Access to the site of the municipal road. Modernization of the existing residential building includes min .: 1) Repair and thermo-modernization of the external walls 2) Replacement of window frames 3) Changing the door carpentry 4) Repair of the porch and external stairs 5) Repair interior walls 6) Retrofitting of the ceiling above the ground floor 7) Repair and revise existing fireplace 8) Energy efficiency floor 9) fire protection 10) equipment Installations building. Cultivation boiler room on the north side of a residential building. As part of the order will not be executed the following works: reconstruction of fencing, landscaping, installation of rainwater drainage, expansion of external lighting installation, generalization shelters for farm building. 25 June 68 documentation and design estimates documentation includes: a) Construction design and execution - Appendix 1 to the present terms of reference. b) the bill of quantities - Annex 2 to the present terms of reference. c) The technical specifications of performance and acceptance of works - Appendix 3 to the present terms of reference, and d) Collective specification of the project documentation - Appendix 13 to the present terms of reference drawn up by the Employer. 3.Do the scope of which is the subject of the contract are in particular: a. To draw up a plan of safety and health b. Execution of works, including preparatory works, terminating and order in this performance built inventory, inventory surveying. c.przygotowanie documentation necessary to make the acceptance of the agreement and put into use. d.inne necessary work in progress as long as the Terms of Reference provides otherwise.
  • 1