Public tenders for energy in Koleczkowo Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyPolandkoleczkowo

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published September 17, 2016
Winner
Novago Sp. z o.o.
cpvs
90514000

1.Odpad, which is a fraction of the product suspension sorting of mixed municipal waste - the fraction of energy, with a diameter of> 160/180 mm (waste zbelowany) classified under the code of waste 19 12 12 -Other wastes (including mixtures of materials) from mechanical treatment of wastes other than those listed in 19 12 11 Mg in an amount of 6,000 (+/-) 20 mg (quantitative differences may be due to technical and technological cycle of production of the weighing system and storage conditions).

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published September 2, 2016  -  Deadline September 14, 2016
cpvs

1. Waste classified under the code of waste 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11, which is a fraction of ballast waste energy from the sorting of mixed municipal waste, with a diameter of 80- 160 mm - zbelowany waste in quantities totaling not more than 7,500.00 Mg (+/-) 10 Mg (quantitative differences may result from the applied technical solutions and technological waste processing cycle, the weighing system and the conditions of storage).

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published October 4, 2016
cpvs
90514000

The contract is for the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11- fraction of the product suspension from the sorting of mixed municipal waste a diameter of> 160/180 mm (waste zbelowany); the waste may be subjected only recycled R12 as defined markings of this process in the Act on Waste of 14.12.2012 (Dz.U.2013.21 as amended. d.) / Annex IA to Regulation (EC) No 1013 / 2006Parlamentu European and of the Council of the European Union 14.6.2006 on shipments of waste (Dz.UUE. L 190/1, as amended. d.) - whereby the "recycled" means the start and end of the process. The waste, which is a fraction of the product suspension sorting of mixed municipal waste - the fraction of energy, with a diameter of> 160 / 180mm in the amount of 12,000 Mg (+/-) 20 Mg.

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published September 29, 2015
Winner
NOVAGO Sp. z o.o.
cpvs
90514000

The contract is for the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 - fraction of the energy, which is a fraction from shredding bulky waste, which include mostly waste wood - waste in bulk; the waste may be subject only recycled R12 as defined markings of this process in the Law on Waste from 14.12.2012 r. (Dz.U.2013 poz.21 as amended. d.) / Annex IA to Regulation (EC) No 1013/2006 of the European Parliament and of the Council of the European Union of 14.6.2006. on shipments of waste (OJ EU. L 190/1, as amended. d.) - wherein by "recycled" means the start and the end of the process. Note: In connection with the entry into force on 01.23.2013. Law of 14.12.2012 r. On wastes (Journal of Laws of 2013., Pos. 21) Purchaser deems proper administrative decisions including the processes of recovery / disposal in line of the Waste Act in its wording before 23/01/2013. 2. Type Waste 1. Waste - the fraction of energy, waste classified under code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned 19 12 11, which is a fraction from shredding of bulky waste, which include mostly waste wood - waste in bulk, at 2 500 Mg (+/-) 10 Mg (quantitative differences may result from the specific technical and technological production cycle system weighing and storage conditions).

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published October 10, 2015
Winner
Novago Sp. z o.o.
cpvs
90514000

Description of the order. 1. Object of the contract. The contract is for the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11- fraction of the energy, which is a fraction of the diameter 80-160 mm with the sorting of mixed municipal waste - waste packed; the waste may be subject only recycled R12 as defined markings of this process in the Law on Waste from 14.12.2012 (Dz.U.2013 poz.21 as amended. d.) / Annex IA to Regulation (EC) No 1013 / 2006 of the European Parliament and of the Council of the European Union 14.6.2006 on shipments of waste (OJ EU. L 190/1, as amended. d.) - wherein by "recycled" means the start and end of the process. Note: due to the entry into force of the Law of 14.12.2012 23.01.2013 Waste (Journal of Laws of 2013., Pos. 21) Purchaser deems proper administrative decisions including types of the recovery / disposal in accordance with the Waste Act in the version before 01/23/2013. 2. Type of Waste 1. Waste - energy fraction, which is a fraction with a diameter of 80-160 mm from sorting of mixed municipal waste (waste packaging), classified under the waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment wastes other than those mentioned in 19 12 11 in the amount of 15 000 Mg (+/-) 10 Mg (quantitative differences may result from the specific technical and technological solutions of the production cycle, the weighing system and storage conditions).

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published October 10, 2015
Winner
Novago Sp. z o.o.
cpvs
90514000

Description of the order. 1. Object of the contract The contract is the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11- fraction of the energy. representing a fraction of the diameter of 80-160 mm from sorting of mixed municipal waste - waste in bulk; the waste may be subject only recycled R12 as defined markings of this process in the Act on Waste of 14.12.2012 (OJ 2013 poz.21 as amended. d.) / Annex IA to Regulation (EC) No 1013 / 2006 of the European Parliament and of the Council of the European Union 14.6.2006 on shipments of waste (Dz. U. EU. L 190/1, as amended. d.) - wherein by "recycled" means the start and end of the process. NOTE: In connection with the entry into force of the Law of 14.12.2012 01.23.2013 Waste (Journal of Laws of 2013., Pos. 21) Purchaser deems proper administrative decisions including types of the recovery / disposal in accordance with the Waste Act in the version before 01/23/2013. 2. Type of Waste 1. Waste - energy fraction, which is a fraction with a diameter of 80-160 mm from sorting of mixed municipal waste (bulk waste), classified under the waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment wastes other than those mentioned in 19 12 11 in quantities of 9,000 Mg (+/-) 10 Mg (quantitative differences may result from the specific technical and technological solutions of the production cycle, the weighing system and storage conditions).

Refuse recycling services

„EKO Dolina” Sp. z o.o. | Published April 15, 2015
Winner
Zakład Usług Komunalnych "USKOM" Sp. z o.o.
cpvs
90514000

1. Object of the contract The contract is for the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11- fraction of waste the energy of the air separator type 'nestro' (waste zbelowane), the waste may be subject only to the below-mentioned processes: a) recovery - exclusively in the R12 as defined markings of this process in Annex 1 to the Act on Waste from 14.12 .2012 (Dz.U.2013 poz.21 as amended. d.) / Annex IA to Regulation (EC) No 1013/2006 of the European Parliament and of the Council of the European Union 14.6.2006 on shipments of waste (Dz. U. EU. L 190/1, as amended. d.) - and by "subjecting a recovery" means the start and end of the process. NOTE: Following the entry into force of the Law of 14.12.2012 01.23.2013 Waste (Dz. U. of 2013., Pos. 21) Purchaser deems proper administrative decisions including the types of recovery / disposal in accordance with the Law on Waste to the wording before 01/23/2013. 2. Type of Waste 1. Waste classified under code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11, which is a waste fraction of the energy of the air separator type 'nestro' ( zbelowane waste), in the amount of 3 000 Mg (+/-) 10 Mg (quantitative differences may result from the technique and technology of the production cycle, weighing system and storage conditions).

Generating sets with compression-ignition engines

„Eko Dolina” Sp. z o.o. | Published April 22, 2017  -  Deadline May 15, 2017
cpvs
31121100

The ordering party entrusts, and the Contractor accepts to perform the public contract. "Replacement of the cogeneration unit located in the segment of the use of biogas storage in RIPOK" EODOLINA "in Łężyce, consisting of, inter alia:

A) execution of the Design Documentation,

B) providing author's supervision,

C) delivery of the cogeneration unit;

D) installation of the said cogeneration unit in the biogas plant;

E) configuration of supplied devices;

F) tests at the manufacturer and functional tests -

G) obtaining for the Ordering Party the construction permit, the permit to use and the change of business permit, consisting in the production of hydroelectric power source, energy source, biogas power plant;

H) training of the Employer's personnel;

I) providing the service,

J) removal of defects and defects disclosed in the subject of the warranty and warranty period;

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published November 21, 2015  -  Deadline December 30, 2015
cpvs
90514000

Description of the order: 1. The object of the contract. The contract is for the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11- waste fraction of the energy content from the separator aircraft type "NESTRO" (waste zbelowany), the waste may be subjected to only the below-mentioned processes: L 190/1, as amended. d.) - wherein by "recycled" means the start and end of the process; 2. The type of waste. Waste classified under code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11, which is a waste fraction of the energy of air separator like "NESTRO" (waste zbelowany) in an amount 1.000 Mg (+/-) 10 Mg (quantitative differences may result from the applied technical and technological solutions of the production cycle, the weighing system and storage conditions); 2. reception of waste: a) the basis for the waste collection contract by the Contractor are separate prepared by the Employer and the Contractor delivered; 20 Mg to collect in one day; Landscape Park 99, 84-207 Koleczkowo; d) The reception will be followed by transport organized by the Contractor and at his expense, also in terms of transport costs, insurance during transportation and unloading; e) the loading will be carried out on vehicles substituted into RIPOK by the Contractor; f) the loading of waste on substituted by the Contractor vehicles is the responsibility of the Purchaser; g) loadings are possible from Monday to Friday, excluding public holidays, from 7:00 to 14:00; To determine the weight of waste received, the vehicle Contractor must be weighed before loading; i) above the weight is the weight of binding for settlements between the Employer and the Contractor; j) the gross weight of a single vehicle who enters (the empty vehicle loading) into the Company may not exceed 18 tonnes and the distance between the end axles of a single vehicle shall not exceed the length of 16 meters and the length of the vehicle must not exceed 18 m; Carriers; l) on the issue of waste Contractor [appointed by him to the Carrier] transferred to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, takes over responsibility for the waste for proper handling them and for the consequences of this may cause. 3. packaging waste: The transferor shall packaging waste transferred as follows: - the waste will be compacted and zbelowany - to zbelowania will be used steel wire, 75x100x110 cm; 4. documents related to the confirmation of the service which is the subject of contract and checking correct / fix the quantity of waste undergoing a process of recovery / disposal: 1) when service will be performed on Polish territory: a) the document issue of the magazine (FTU) - Purchaser will be exhibiting WZZ document each time you exit the vehicle loaded the Contractor from the premises VALLEY ECO in Łężyce; For each waste transfer card will be attached balance weighing a computer program that supports the weighing system at the plant operated by the Employer; c) a document confirming the execution of recovery / disposal - Contractor will be delivered by the Contractor evidence of recovery / disposal, drawn up in accordance with the model annexed to the agreement between the Employer and the Contractor; 2) when the service is performed outside the Polish territory: a) the document issue of the magazine (FTU) - The Employer will issue a document FTU at every exit laden vehicle from the premises of the Contractor VALLEY ECO in Łężyce; L 190/1 with later. d.); c) The Contractor shall be obliged to and shall be responsible for the execution of the following obligations: This document must comply with the requirements of the Regulation;

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published December 30, 2014
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Zakład Usług Komunalnych „Uskom” Sp. z o.o.</OFFICIALNAME></ORGANISATION><ADDRESS>ul. Płocka 102</ADDRESS><TOWN>Mława</TOWN><POSTAL_CODE>06-500</POSTAL_CODE><COUNTRY VALUE="PL"/><E_MAILS><E_MAIL>slawomir.szumkowski@uskom-mlawa.pl</E_MAIL></E_MAILS><PHONE>+48 236552244</PHONE><FAX>+48 236546468</FAX></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
90514000

The contract is for the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 and a fraction of the sorting of mixed municipal waste 80-160 mm in diameter, which is a waste of energy (bulk waste); the waste may be subject only to the below-mentioned processes: L 190/1, as amended. d.) - and by "subjecting a recovery" means the start and end of the process. Note: 21) The Purchaser deems proper administrative decisions including the types of recovery / disposal in accordance with the Waste Act in its wording before 01/23/2013. Type of Waste fraction with a diameter of 80-160 mm, which is a waste of energy, with the sorting of mixed municipal waste (waste in bulk) classified under the waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than mentioned in 19 12 11 10 000 Mg of an amount (+/-) 10 mg for each lot (quantitative differences may be due to technical and technological cycle of production of the weighing system and storage conditions). Waste Reception: Landscape Park 99, 84-207 Koleczkowo; b) the basis for the collection of waste by the Contractor, the Employer individual orders are routed to the Contractor; c) receipt shall be a shipping arranged by the Contractor and at his expense, also in terms of transport costs, transport insurance and unloading; d) the loading of waste on substituted by the Contractor is the responsibility of the Purchaser cars; e) due to the nature of the waste (waste in bulk) vehicles / containers must be able to load from the top; f) loadings are possible from Monday to Friday, excluding public holidays, from 7:00 to 14:00; To determine the weight of the waste received, the vehicle must be weighed Contractor prior to loading; h) the gross weight of a single vehicle who enters (empty vehicle loading) into the Company may not exceed 18 tonnes and the distance between the end axles of a single vehicle shall not exceed the length of 16 meters and the length of the vehicle does not exceed 18 m; The Contractor shall be responsible in particular for the acts and omissions of its staff and third parties, which was used to performing the contract, eg. Air carriers; j) on the issue of waste contractors [designated by the Carrier], transferred to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, he takes responsibility for the waste, for the proper handling of them and for the consequences of this result. Packaging waste: the Purchaser fails to packaging waste transferred, ie. They are loaded onto trucks Contractor bulk. Documents related to the confirmation of the service which is the subject of the contract and checking the correctness / determination of the amount of waste undergoing a process of recovery / disposal: 1) In the case where the service will be carried out on Polish territory: a) the document issue of the magazine (WZ) - The Purchaser will issue a delivery every time you exit the vehicle loaded from the premises of the Contractor Eco Valley in Łężyce; For each waste transfer card will be included in the balance weighing with a computer program that supports the weight system in a plant operated by the Employer; c) a document confirming the execution of recovery / disposal - Contractor will be delivered by the Contractor evidence of recovery / disposal, prepared in accordance with the model annexed to the agreement between the Employer and the Contractor. 2) In case the service is performed outside the Polish Contractor is obliged to and are responsible for carrying out the following obligations: a) the document issue of the magazine (WZ) - Employer shall issue a delivery every time you exit the vehicle loaded from the premises of the Contractor Eco Valley in Łężyce;

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published September 26, 2015
Winner
Zakład Utylizacji Odpadów Clean City Sp. z o.o.
cpvs
90514000

The contract is for the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11- fraction of the product suspension from sorting of mixed municipal waste with diameter> 160/180 mm (waste zbelowany); the waste may be subject only recycled R12 as defined markings of this process in the Law on Waste from 14.12.2012 (Dz.U.2013 pos. 21, as amended. d.) / Annex IA to Regulation (EC) No 1013 / 2006 of the European Parliament and of the Council of the European Union 14.6.2006 on shipments of waste (Dz. U. EU. L 190/1, as amended. d.) - wherein by "recycled" means the start and end of the process. NOTE: In connection with the entry into force of the Law of 14.12.2012 23.01.2013 Waste (Dz. U. of 2013., Pos. 21) Purchaser deems proper administrative decisions including types of the recovery / disposal in accordance with the Waste Act in the version before 01/23/2013. 2. Type of Waste 1. Waste, which is a fraction of the product suspension from sorting of mixed municipal waste - energy fraction of a diameter of> 160/180 mm (waste zbelowany) classified under the waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 in quantities of 10,000 Mg (+/-) 20 Mg (quantitative differences may be due to technical and technological solutions of the production cycle, the weighing system and storage conditions).

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published May 24, 2017  -  Deadline July 3, 2017
cpvs
90514000

L 190/1 with later. Zm.) - whereby by "subjecting the recovery process" is meant the beginning and completion of this process.

Waste classified under waste code 19 12 12 - Other wastes (including mixed substances and articles) from mechanical treatment of wastes other than those mentioned in 19 12 11, being a fraction of energy waste resulting from the disintegration of large-scale waste consisting mainly of furniture waste (Fraction after initialization of Terminator 3400) - bulk waste of 4,500.00 Mg (+/-) 10 Mg (quantitative differences may result from the weighing system and storage conditions).

Waste collection:

12 tons to pick up in one day.

Wejherowo [RIPOK] on working days [Monday - Friday excluding public holidays] between 7am and 2pm.

C) Collection of waste will be carried out by the transport organized by the Contractor and at his expense, including transport costs, insurance for transport and unloading.

D) Waste Collection will be carried out only with vehicles that meet the following conditions in aggregate:

- the gross weight of a single incoming vehicle (empty vehicle to be loaded) on the premises of the Employer may not exceed 18 tonnes

- the distance between the extreme axles of a single vehicle must not exceed 16 meters, the length of the vehicle must not exceed 18 m.

- the vehicle must have the ability to load "from the top",

This weight will be the binding weight for the settlements between the Parties.

Carriers.

G) At the moment of delivering the Contractor's waste, ie the Carrier indicated by him, the Contractor shall undergo all the benefits and burdens associated with them, and the danger of accidental loss or damage thereof, in particular assuming responsibility for the Waste disposed; For the consequences resulting therefrom.

Waste packaging:

The ordering party will not make the packaging of the transferred waste ie it will be loaded onto the Contractor's vehicles in bulk.

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published November 9, 2017  -  Deadline December 19, 2017
cpvs
90514000

L 190/1 as amended. -) whereby "submission of a recovery process" means the commencement and termination of this process.

Waste classified under waste code 19 12 12 - Other wastes (including mixed substances and articles) from mechanical treatment of wastes other than those mentioned in 19 12 11, constituting a fraction of energy waste resulting from the disintegration of large-scale waste consisting mainly of furniture waste (fraction after initial crushing of the Terminator 3400) - bulk waste in the amount of 6,000.00 Mg (+/-) 10 Mg (quantitative differences may result from the weighing system and storage conditions).

Collection of waste:

12 tons to receive in one day.

Wejherowo [RIPOK] on working days [Monday - Friday excluding public holidays] from 07:00 to 14:00.

c) The collection of waste will be carried out by the transport organized by the Contractor and at his expense, also in the cost of transport, insurance for transport and unloading.

d) Collection of waste will be carried out only with vehicles which fulfill the following conditions:

- the gross weight of a single incoming vehicle (empty vehicle to be loaded) on the premises of the Employer may not exceed 18 tonnes

- the distance between the axles of a single vehicle must not exceed 16 meters, the length of the vehicle must not exceed 18 m.

- the vehicle must be capable of loading from the top,

This weight will be the binding weight for the settlements between the Parties.

Carriers.

g) At the moment of delivering the Contractor's waste, ie the Carrier indicated by him, the Contractor shall undergo all the benefits and burdens associated with them and the danger of accidental loss or damage thereof, in particular he assumes responsibility for the Waste disposed of, for the consequences resulting therefrom.

Waste packaging:

The contractor will not make the packaging of the transferred waste, ie they will be loaded onto the Contractor's vehicles in bulk.

"Service recovery and / or disposal of waste identified in the classification of the waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 - fraction with a diameter of 80-160 mm (loose)" .

„Eko Dolina” Sp. z o.o. | Published October 11, 2014  -  Deadline November 17, 2014
cpvs
90514000

Object of the contract The contract is for the execution of the recovery and / or disposal received by the Contractor from the Employer waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 and a fraction of the sorting of mixed waste municipal diameter 80-160 mm, which is a waste of energy (bulk waste); the waste may be subjected to only the below-mentioned processes: L 190/1, as amended. d.) - while "the submission process of recovery" means the start and end of the process. Note: 21) The Purchaser deems proper administrative decisions including types of recovery / disposal in accordance with the Waste Act in the version prior to 01.23.2013. Type of Waste fraction with a diameter of 80-160 mm, which is a waste of energy, with the sorting of mixed municipal waste (waste loose) classified under waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than mentioned in 19 12 11 in quantities of 10,000 Mg (+/-) 10 Mg for each part of the contract (quantitative differences may result from technical and technological solutions of the production cycle, the weighing system and storage conditions). Reception of waste: Landscape Park 99, 84-207 Koleczkowo; b) the basis for the acceptance of waste by the Contractor are individual orders directed Employer to the Contractor; c) reception will be followed by transport organized by the Contractor and at his expense, also in terms of transport costs, transport insurance and unloading; d) loading waste on substituted by the Contractor cars is the responsibility of the Purchaser; e) due to the nature of the waste (waste loose) cars / containers must be able to load from the top; f) loadings are possible from Monday to Friday, excluding public holidays, from 7:00 to 14:00; To determine the weight of the incoming waste, vehicle Contractor must be weighed before loading; h) the gross weight of a single vehicle who enters (empty vehicle loading) into the Company may not exceed 18 tonnes and the distance between the end axles of single vehicles may not exceed a length of 16 meters and length of the vehicle does not exceed 18 m; Contractor shall be responsible in particular for the acts and omissions of its staff and operators, which was used by performing the contract, for example. Carriers; j) on the issue of waste Contractor [designated by the Carrier] go to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, takes on responsibility for the waste for proper handling of them and for the consequences of this result. Packaging waste: - Purchaser fails to packaging waste transferred, ie. They will be loaded on the vehicles of the Contractor in bulk. Documents relating to the confirmation of the service which is the subject of contract and checking the correctness / determination of the amount of waste subjected to the process of recovery / disposal: 1) In the case where the service will be performed on Polish territory: a) the document issue of the magazine (WZ) - The Employer will issue a delivery every time you exit the vehicle loaded Contractor from the premises ECO VALLEY in Łężyce; For each waste transfer card will be attached balance weighing with a computer program that supports the weight system in a plant operated by the Employer; c) proof of the execution of recovery / disposal - Contractor will be delivered by the Contractor evidence of recovery / disposal, prepared in accordance with the model annexed to the agreement between the Employer and the Contractor. 2) In case the service is performed outside the Polish Contractor shall and shall be responsible for performing the following obligations: a) the document issue of the magazine (WZ) - The Employer will issue a delivery every time you exit the vehicle loaded Contractor from the premises Eco Valley in Łężyce; This document must meet the requirements of the Regulation. c) As soon as possible but no later than 30 days after completion of recovery and no later than one year [or less if it resulted from a decision of the competent authorities] from the date of Waste Contractor, Installation Lecturer submit to the competent authorities - Conducting installation certificate confirming the recovery in the R12 meet the requirements of the Regulation and the Purchaser shall deliver certified copies of these documents for their compatibility with the original. d) Where Lecturer installation, provide waste to any subsequent interim or non-interim recovery or disposal operation to a facility located in the country of destination -

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published May 19, 2017  -  Deadline June 27, 2017
cpvs
90514000

L 190/1 with later. Zm.) - whereby by "subjecting the recovery process" is meant the beginning and completion of this process.

Waste classified under waste code 19 12 12 - Other wastes (including mixed substances and articles) from mechanical treatment of waste other than those mentioned in 19 12 11, a fraction of ballast waste of an energy value from mixed municipal waste sorting, of a diameter of 80-160 mm - waste in bulk in a total quantity of not more than 6,000 Mg (+/-) 10 Mg (quantitative differences may result from applied technical and technological solutions of the waste treatment cycle, weighing system and storage conditions).

Waste collection:

18 tons to pick up in one day.

Wejherowo [RIPOK] on working days [Monday - Friday excluding public holidays] between 7am and 2pm.

C) Collection of waste will be carried out by the transport organized by the Contractor and at his expense, including transport costs, insurance for transport and unloading.

D) Waste Collection will be carried out only with vehicles that meet the following conditions in aggregate:

- the gross weight of a single incoming vehicle (empty vehicle to be loaded) on the premises of the Employer may not exceed 18 tonnes

- the distance between the extreme axles of a single vehicle must not exceed 16 meters, the length of the vehicle must not exceed 18 m.

- the vehicle must have the ability to load "from the top",

This weight will be the binding weight for the settlements between the Parties.

Carriers.

G) At the moment of delivering the Contractor's waste, ie the Carrier indicated by him, the Contractor shall undergo all the benefits and burdens associated with them, and the danger of accidental loss or damage thereof, in particular assuming responsibility for the Waste disposed; For the consequences resulting therefrom.

Waste packaging:

The ordering party will not make the packaging of the transferred waste ie it will be loaded onto the Contractor's vehicles in bulk.

Waste classified under waste code 19 12 12 - Other wastes (including mixed substances and articles) from mechanical treatment of waste other than those mentioned in 19 12 11, a fraction of ballast waste of an energy value from mixed municipal waste sorting, of a diameter of 80-160 mm - waste in bulk in a total quantity of not more than 6,000 Mg (+/-) 10 Mg (quantitative differences may result from applied technical and technological solutions of the waste treatment cycle, weighing system and storage conditions).

Waste collection:

18 tons to pick up in one day.

Wejherowo [RIPOK] on working days [Monday - Friday excluding public holidays] between 7am and 2pm.

C) Collection of waste will be carried out by the transport organized by the Contractor and at his expense, including transport costs, insurance for transport and unloading.

D) Waste Collection will be carried out only with vehicles that meet the following conditions in aggregate:

- the gross weight of a single incoming vehicle (empty vehicle to be loaded) on the premises of the Employer may not exceed 18 tonnes

- the distance between the extreme axles of a single vehicle must not exceed 16 meters, the length of the vehicle must not exceed 18 m.

- the vehicle must have the ability to load "from the top",

This weight will be the binding weight for the settlements between the Parties.

Carriers.

G) At the moment of delivering the Contractor's waste, ie the Carrier indicated by him, the Contractor shall undergo all the benefits and burdens associated with them, and the danger of accidental loss or damage thereof, in particular assuming responsibility for the Waste disposed; For the consequences resulting therefrom.

Waste packaging:

The ordering party will not make the packaging of the transferred waste ie it will be loaded onto the Contractor's vehicles in bulk.

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published March 21, 2017  -  Deadline April 27, 2017
cpvs
90514000

L 190/1, as amended. d.) - whereby the "recycled" means the start and end of the process.

Waste classified under the code of waste 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11, which is a fraction ballast waste of energy sorting of mixed municipal waste, with a diameter exceeding 160 mm - zbelowany waste at 6,000 Mg (+/-) 10 Mg (quantitative differences may result from the applied technical solutions and technological waste processing cycle, the weighing system and the conditions of storage).

Reception of waste:

Landscape Park 99, 84-207 Koleczkowo.

b) the reception will be followed by transport organized by the Contractor and at his expense, also in terms of transport costs, transport insurance and unloading.

c) loading of waste on substituted by the Contractor vehicles is the responsibility of the Purchaser.

d) The basis for waste collection by the Contractor are individual orders routed Employer to the Contractor.

20 Mg to collect in one day.

f) loadings are possible from Monday to Friday, excluding public holidays, from 7:00 to 14:00.

To determine the weight of incoming waste, vehicle Contractors must be weighed before loading.

h) above the weight is the weight of binding for settlements between the Parties

i) gross weight of a single vehicle who enters (empty vehicle loading) on ​​the premises of the Company may not exceed 18 tonnes and the distance between the end axles of a single vehicle must not exceed the length of 16 meters and the length of the vehicle does not exceed 18 m.

Carriers.

k) on the issue of waste Contractor [designated by him to the Carrier], transferred to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, takes on responsibility for the waste, for the proper handling of them and the consequences of this result.

l) Loading will be carried out on vehicles / platforms substituted on the premises by the Contractor.

Packaging waste:

- The waste will be compacted and zbelowany

- To zbelowania will be used steel wire

750x1100x1000 mm.

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published July 28, 2015  -  Deadline September 7, 2015
cpvs
90514000

Object of the contract L 190/1, as amended. d.) - wherein by "recycled" means the start and end of the process. NOTE: 21) Purchaser deems proper administrative decisions including types of the recovery / disposal in accordance with the Waste Act in its wording before 1.23.2013 year. Type of Waste Waste - energy fraction, which is a fraction with a diameter of 80-160 mm from sorting of mixed waste municipal (waste packaging), classified under the code of waste 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 in the amount of 15 000 Mg (+/-) 10 Mg (quantitative differences They may result from the specific technical and technological solutions of the production cycle, the weighing system and storage conditions). Reception of waste: Landscape Park 99, 84-207 Koleczkowo. b) The basis for the waste collection contract by the Contractor are targeted individual Employer to the Contractor. 20 Mg to collect in one day. d) The reception will be followed by transport organized by the Contractor and at his expense, also in terms of transport costs, insurance during transportation and unloading. e) the loading of waste on substituted by the Contractor vehicles is the responsibility of the Purchaser. f) Loadings are possible from Monday to Friday, excluding public holidays, from 7:00 to 14:00. To determine the weight of the incoming waste, vehicle Contractor must be weighed before loading. h) The above balance will be binding for the settlement of the balance between the Parties. i) the gross weight of a single vehicle who enters (the empty vehicle loading) into the Company may not exceed 18 tonnes and the distance between the end axles of a single vehicle shall not exceed the length of 16 meters and the length of the vehicle must not exceed 18 m. The Contractor shall be responsible in particular for action and omissions of its staff and third parties, which was used to performing the contract, for example. carriers. k) on the issue of waste Contractor [appointed by him to the Carrier], transferred to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, takes over responsibility for the waste, for the proper handling of them and for the consequences of this may cause. Packaging waste: The Purchaser will package the waste transferred as follows: Waste concentrated, formed into bales bales wrapped mesh and foil, polyethylene estimated volume of a single bale of 1 to 1.5 m³ of waste marking is allowed - eg by placing the logo on packaging film Employer, print the information. Documents related to the confirmation of the service which is the subject of contract and checking correct / fix the quantity of waste undergoing a process of recovery / disposal: 1) In case the service will be carried out on Polish territory: a) the document release from the magazine (FTU) - The Employer will issue a document WZZ every time you exit the vehicle loaded the Contractor from the premises VALLEY ECO in Łężyce; For each waste transfer card will be attached balance weighing a computer program supports the weight system at the plant operated by the Employer; c) a document confirming the execution of recovery / disposal - Contractor will be delivered by the Purchaser evidence of recovery / disposal, drawn up in accordance with the model annexed to the agreement between the Employer and the Contractor. 2) In case the service will be performed outside the Polish territory: a) the document issue of the magazine (FTU) - The Employer will issue a document FTU at every exit laden vehicle from the premises of the Contractor VALLEY ECO in Łężyce; Contractor is obliged to and shall be responsible for the execution of the following obligations:

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published July 28, 2015  -  Deadline September 7, 2015
cpvs
90514000

L 190/1 with later. d.) - wherein by "recycled" means the start and end of the process. Note: 21) The Employer may deem proper administrative decisions including types of the recovery / disposal in accordance with the Waste Act in its wording before 1.23.2013 year. Type of Waste Waste - energy fraction, which is a fraction with a diameter of 80-160 mm from sorting of mixed waste waste (bulk waste), classified under the waste code 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 in quantities of 9,000 Mg (+/-) 10 Mg (quantitative differences may due to the particularities of technical and technological production cycle, the weighing system and storage conditions). Reception of waste: Landscape Park 99, 84-207 Koleczkowo. b) The basis for the waste collection contract by the Contractor are targeted individual Employer to the Contractor. 20 Mg to collect in one day. d) The reception will be followed by transport organized by the Contractor and at his expense, also in terms of transport costs, insurance during transportation and unloading. e) the loading of waste on substituted by the Contractor vehicles is the responsibility of the Purchaser. f) Due to the lack of packaging waste (bulk waste) Contractor vehicles must be able to load "from the top". g) Loadings are possible from Monday to Friday, excluding public holidays, from 7:00 to 14:00. To determine the weight of the incoming waste, vehicle Contractor must be weighed before loading. i) The above balance will be binding for the settlement of the balance between the Parties. j) the gross weight of a single vehicle who enters (the empty vehicle loading) into the Company may not exceed 18 tonnes and the distance between the end axles of a single vehicle shall not exceed the length of 16 meters and the length of the vehicle must not exceed 18 m. The Contractor shall be responsible in particular for action and omissions of its staff and third parties, which was used to performing the contract, for example. carriers. l) on the issue of waste Contractor [appointed by him to the Carrier], transferred to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, takes over responsibility for the waste, for the proper handling of them and for the consequences of this may cause. Packaging waste: the Purchaser fails to packaging waste transferred, ie. They will be loaded onto trucks in bulk Contractor. Documents related to the confirmation of the service which is the subject of contract and checking correct / fix the quantity of waste undergoing a process of recovery / disposal: 1) In case the service will be carried out on Polish territory: a) the document release from the magazine (FTU) - The Employer will issue a document WZZ every time you exit the vehicle loaded the Contractor from the premises VALLEY ECO in Łężyce; For each waste transfer card will be attached balance weighing a computer program supports the weight system at the plant operated by the Employer; c) a document confirming the execution of recovery / disposal - Contractor will be delivered by the Purchaser evidence of recovery / disposal, drawn up in accordance with the model annexed to the agreement between the Employer and the Contractor. 2) In case the service will be performed outside the Polish territory: a) the document issue of the magazine (FTU) - The Employer will issue a document FTU at every exit laden vehicle from the premises of the Contractor VALLEY ECO in Łężyce; Contractor is obliged to and shall be responsible for the execution of the following obligations:

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published July 28, 2015  -  Deadline September 7, 2015
cpvs
90514000

Description of the order. Object of the contract L 190/1, as amended. d.) - wherein by "recycled" means the start and end of the process. Note: 21) The Employer may deem proper administrative decisions including types of the recovery / disposal in accordance with the Waste Act in its wording before 1.23.2013 year. Type of Waste Waste - the fraction of energy, waste classified under code 19 12 12 - other wastes ( including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11, which is a fraction from shredding of bulky waste, which include mostly waste wood - waste in bulk, in the amount of 2.500 Mg (+/-) 10 Mg (quantitative differences They may result from the specific technical and technological solutions of the production cycle, the weighing system and storage conditions). Reception of waste: Landscape Park 99, 84-207 Koleczkowo. b) The basis for the waste collection contract by the Contractor are targeted individual Employer to the Contractor. 11 Mg to collect in one day. d) The reception will be followed by transport organized by the Contractor and at his expense, also in terms of transport costs, insurance during transportation and unloading. e) the loading of waste on substituted by the Contractor vehicles is the responsibility of the Purchaser. f) Due to the lack of packaging waste (bulk waste) Contractor vehicles must be able to load "from the top". g) Loadings are possible from Monday to Friday, excluding public holidays, between the hours of 7: 0-14: 00. To determine the weight of the incoming waste, vehicle Contractor must be weighed before loading. i) The above balance will be binding for the settlement of the balance between the Parties. j) the gross weight of a single vehicle who enters (the empty vehicle loading) into the Company may not exceed 18 tonnes and the distance between the end axles of a single vehicle shall not exceed the length of 16 meters and the length of the vehicle must not exceed 18 m. The Contractor shall be responsible in particular for action and omissions of its staff and third parties, which was used to performing the contract, for example. carriers. l) With the publication of Waste Contractors [appointed by him to the Carrier], transferred to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, takes over responsibility for the waste, for the proper handling of them and for the consequences of this may cause. Packaging waste: the Purchaser fails to packaging waste transferred, ie. They will be loaded onto trucks in bulk Contractor. Documents related to the confirmation of the service which is the subject of contract and checking correct / fix the quantity of waste undergoing a process of recovery / disposal: 1) In case the service will be carried out on Polish territory: a) the document release from the magazine (FTU) - The Employer will issue a document WZZ every time you exit the vehicle loaded the Contractor from the premises VALLEY ECO in Łężyce; For each waste transfer card will be attached balance weighing a computer program supports the weight system at the plant run by the Purchaser. c) a document confirming the execution of recovery / disposal - Contractor will be delivered by the Purchaser evidence of recovery / disposal, drawn up in accordance with the model annexed to the agreement between the Employer and the Contractor. 2) In case the service will be performed outside the Polish territory: a) the document issue of the magazine (FTU) - The Employer will issue a document FTU at every exit laden vehicle from the premises of the Contractor Eco Valley in Łężyce; Contractor is obliged to and shall be responsible for the execution of the following obligations:

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published July 8, 2015  -  Deadline August 14, 2015
cpvs
90514000

Object of the contract L 190/1, as amended. d.) - wherein by "recycled" means the start and end of the process. NOTE: 21) Purchaser deems proper administrative decisions including types of the recovery / disposal in accordance with the Waste Act in its wording before 23.01.2013r. Waste type Waste, which is a fraction of the product suspension from sorting of mixed municipal waste - the fraction of energy, with a diameter of> 160/180 mm (waste zbelowana) classified under code 19 12 12 waste - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those listed in 19 12 11 10 000 Mg in an amount (+/-) 20 mg (quantitative differences may be due to technical and technological cycle of production of the weighing system and storage conditions). Reception of waste: Landscape Park 99, 84-207 Koleczkowo. b) The reception will be followed by transport organized by the Contractor and at his expense, also in terms of transport costs, insurance during transportation and unloading. c) loading of waste on substituted by the Contractor vehicles is the responsibility of the Purchaser. d) The basis for the waste collection contract by the Contractor are targeted individual Employer to the Contractor. 20 Mg to collect in one day. f) loadings are possible from Monday to Friday, excluding public holidays, from 7:00 to 14:00. To determine the weight of waste received, the vehicle Contractor must be weighed before loading. h) above the weight is the weight of binding for settlements between the Parties i) the gross weight of a single vehicle who enters (the empty vehicle loading) into the Company may not exceed 18 tonnes and the distance between the end axles of single vehicles may not exceed the length of 16 meters and length of the vehicle does not exceeds 18 m. Carriers. k) on the issue of waste Contractor [appointed by him to the Carrier], transferred to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, takes on responsibility for the waste, for the proper handling of them and for the consequences of this may cause. l) Loading will be carried out on vehicles / platforms substituted on the premises by the Contractor. Packaging waste: - waste will be compacted and zbelowane - to zbelowania will be used 750x1100x1000 mm steel wire Documents related to the confirmation of the service which is the subject of contract and checking correct / determining the amount of waste undergoing a process of recovery / disposal: 1) In case the service will be performed on Polish territory: a) the document issue of the magazine (FTU) - The Employer will issue a document WZZ loaded every time you exit the vehicle from the premises of the Contractor VALLEY ECO in Łężyce; For each waste transfer card will be attached balance weighing a computer program supports the weighing system at the plant operated by the Employer; c) a document confirming the execution of recovery / disposal - Contractor will be delivered by the Purchaser evidence of recovery / disposal, drawn up in accordance with the model annexed to the agreement between the Employer and the Contractor. 2) In case the service will be performed outside the Polish territory: a) the document release from the magazine (FTU) - The Employer will issue a document WZZ loaded every time you exit the vehicle from the premises of the Contractor VALLEY ECO in Łężyce; Contractor is obliged to and shall be responsible for the execution of the following obligations:
  • 1