Call +44 800 9755 164

Public tenders for energy in Koleczkowo Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyPolandkoleczkowo

Generating sets with compression-ignition engines

„Eko Dolina” Sp. z o.o. | Published April 22, 2017  -  Deadline May 15, 2017
cpvs
31121100

The ordering party entrusts, and the Contractor accepts to perform the public contract. "Replacement of the cogeneration unit located in the segment of the use of biogas storage in RIPOK" EODOLINA "in Łężyce, consisting of, inter alia:

A) execution of the Design Documentation,

B) providing author's supervision,

C) delivery of the cogeneration unit;

D) installation of the said cogeneration unit in the biogas plant;

E) configuration of supplied devices;

F) tests at the manufacturer and functional tests -

G) obtaining for the Ordering Party the construction permit, the permit to use and the change of business permit, consisting in the production of hydroelectric power source, energy source, biogas power plant;

H) training of the Employer's personnel;

I) providing the service,

J) removal of defects and defects disclosed in the subject of the warranty and warranty period;

Refuse recycling services

„Eko Dolina” Sp. z o.o. | Published March 21, 2017  -  Deadline April 27, 2017
cpvs
90514000

L 190/1, as amended. d.) - whereby the "recycled" means the start and end of the process.

Waste classified under the code of waste 19 12 12 - other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11, which is a fraction ballast waste of energy sorting of mixed municipal waste, with a diameter exceeding 160 mm - zbelowany waste at 6,000 Mg (+/-) 10 Mg (quantitative differences may result from the applied technical solutions and technological waste processing cycle, the weighing system and the conditions of storage).

Reception of waste:

Landscape Park 99, 84-207 Koleczkowo.

b) the reception will be followed by transport organized by the Contractor and at his expense, also in terms of transport costs, transport insurance and unloading.

c) loading of waste on substituted by the Contractor vehicles is the responsibility of the Purchaser.

d) The basis for waste collection by the Contractor are individual orders routed Employer to the Contractor.

20 Mg to collect in one day.

f) loadings are possible from Monday to Friday, excluding public holidays, from 7:00 to 14:00.

To determine the weight of incoming waste, vehicle Contractors must be weighed before loading.

h) above the weight is the weight of binding for settlements between the Parties

i) gross weight of a single vehicle who enters (empty vehicle loading) on ​​the premises of the Company may not exceed 18 tonnes and the distance between the end axles of a single vehicle must not exceed the length of 16 meters and the length of the vehicle does not exceed 18 m.

Carriers.

k) on the issue of waste Contractor [designated by him to the Carrier], transferred to the Contractor all the benefits and burdens associated with them and the risk of accidental loss or damage, in particular, takes on responsibility for the waste, for the proper handling of them and the consequences of this result.

l) Loading will be carried out on vehicles / platforms substituted on the premises by the Contractor.

Packaging waste:

- The waste will be compacted and zbelowany

- To zbelowania will be used steel wire

750x1100x1000 mm.

  • 1