Public tenders for energy in Bydgoszcz Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyPolandbydgoszcz

Electricity, heating, solar and nuclear energy

Miasto Bydgoszcz | Published March 17, 2017  -  Deadline April 25, 2017
cpvs
09300000, 09310000

The contract is for the supply of electricity to 3 332 points, with a total estimated volume of 108 439.14 MWh in the period from 07.01.2017 r. To 30.06.2018 r., Including:

1) The premises and - category B - 46 208.81 MWh

2) The premises and - other tariff groups - 27 774.84 MWh

3) For the purposes of road lighting - 34 455.49 MWh.

The Contractor shall take into account the fluctuation of energy consumption

power level (+/-) 10%.

Rules and calculating tariffs and settlements in electricity Minister of Economy Regulation of 18.8.2011 r.

Number of measurement systems clearing the consumed electric energy 34 pcs.

A detailed description of the drawing points contracting published in Annex 1a to the Terms of Reference.

Estimated consumption of electricity during the contract period: 46 208.81 MWh, of which:

Zone I 14 817.97 MWh

Zone II 7 801.14 MWh

Zone III 23 589.70 MWh

The Contractor shall take into account the fluctuations of electricity consumption (+/-) 10%.

Deliveries will take place in the period from 07.01.2017 r. To 06.30.2018 r., Provided that details of the delivery dates for individual consumption points is described in Annex 1a column 'Period of supply. "

The commencement of electricity supply in the indicated (in relation to individual consumption points) within a successful implementation of switching procedure, have the recipient valid agreement for the provision of electricity distribution services and effective solution / expiry date of existing contracts for the sale of electricity / comprehensive agreements:

1) In the case of the comprehensive agreements or perpetual electricity sales contracts, the contracting authority (the recipient) submit (in relation to individual consumption points) appropriate statements about the termination of contracts with effect from the day prior to the planned start date of delivery (in Appendix 1a to the Terms of Reference column " delivery period "), and copies of denunciations will be transferred to the contractor whose tender is found to be most advantageous.

2) If you have forward sales contracts, their term of validity expires on the day preceding the planned date of commencement of supply (in Appendix 1a to the Terms of Reference column 'Period of delivery ").

In the case of the collection in which there was no longer separation agreements for sales and distribution (another change of supplier), contracting (customers) have distribution agreements.

Obligation to terminate the contract lies with the authorities (customers).

In the event that on the date of the contract of sale of electricity, contracting (recipient) will not be held major contracts electricity distribution or if during the term of the agreement will change the ordering party / customer, the contractor will be required to submit applications to conclude contracts distribution and to sign contracts on behalf of and for the authorities (customers) or submit on behalf of the authorities (customers) a declaration of consent to conclude distribution agreements with the Operator (as set out in IRiESD Operator), for which the contractor will be given the appropriate powers of attorney.

Measuring systems are tailored to the switching procedure.

4j paragraph 1 of the Energy Law of 10.4.1997 r. /.

Number of measurement systems clearing the consumed electric energy 1 764 pcs.

A detailed description of the drawing points contracting published in Annex 1b to the Terms of Reference.

Estimated consumption of electricity during the contract period: 27 774.84 MWh, of which:

Zone I 21 495.17 MWh

Zone II 6 279.67 MWh

Zone III 0,00 MWh

The Contractor shall take into account the fluctuations of electricity consumption (+/-) 10%.

Deliveries will take place in the period from 07.01.2017 r. To 30.06.2018 r., Provided that details of the delivery dates for individual consumption points is described in Annex 1b column 'Period of supply. "

The commencement of electricity supply in the indicated (in relation to individual consumption points) within a successful implementation of switching procedure, have the recipient valid agreement for the provision of electricity distribution services and effective solution / expiry date of existing contracts for the sale of electricity / comprehensive agreements:

1) In the case of the comprehensive agreements or perpetual electricity sales contracts, the contracting authority (the recipient) submit (in relation to individual consumption points) appropriate statements about the termination of contracts with effect from the day prior to the planned start date of delivery (in Appendix 1b to the Terms of Reference column " delivery period "), and copies of denunciations will be transferred to the contractor whose tender is found to be most advantageous.

2) If you have forward sales contracts, their term of validity expires on the day preceding the plano

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published February 16, 2017  -  Deadline March 23, 2017
cpvs
45000000, 45100000, 45200000, 45230000, 45231110, 45232140, 45233000, 45112710, 45236000

"The construction of heating connection for the project entitled. »Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task Pestalozzi / Jagiellonian house. No. 4 "implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes the construction of heating connection with sewers teletechnical to the proposed residential building No. 4 Street. Pestalozzi / Jagiellonian University in Bydgoszcz.

Connection from the point integration to the existing district heating network channel 2dn150 in plot no. 143 to the proposed substation room in Building 4 at ul. Pestalozzi / Jagiellonian plot no. 232/11.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 9, 2017  -  Deadline April 18, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task Stroma 33 36 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x42,4 / 110 length approx. 96 m with sewers teletechnical to multifamily residential building.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN150 the room node. Inclusion of connections to the network using the so-called. "Hot tapping".

According to the received conditional consent to the task on the plot No. 64/2, the work can be performed only on working days, this part of the plot trenchless method.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 14, 2017
cpvs
45000000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 42 69 Liberation implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x60,3 / 125 length approx. 47 m with sewers teletechnical to multifamily residential building.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN150 in the chamber K-2255 into the room node.

The section under the surface hardened perform trenchless method.

For the purpose of the task in the lane it is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 14, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 36 20 Commodity implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x33,7 / 90 with a length of approx. 27MB with sewers teletechnical to the building trade and service

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN300 the room node.

The inclusion of the planned connection method called. "Hot tapping".

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 13, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 35 Torun plot no. 14/3 - Stage II implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x60,3 / 125 length approx. 15 m with sewers teletechnical into a residential building. In the basement of the connection pipes SPIRO 2xDN50 / 125 length approx. 15 m, suspended from the ceiling.

The route designed connections from place to include the existing district heating network channel 2xDN150 the room node.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 3, 2017  -  Deadline April 12, 2017
cpvs
45000000, 45100000, 45200000, 45230000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 20 Leszczynski 18 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to multifamily residential building with insulated pipes 2x139,7 / 225 L - ok.64,5mb and 2x48,3 / 110 L - approx. 6.5MB

The route designed connections from place to include the existing district heating network preizolowanej2xDN150 in ko0morze K-4828 into the room node. Connection is designed partly in the area of ​​the roadway, the reconstruction of which is developed reconstruction project surface. In addition to the temporary occupation of land lane road is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 3, 2017  -  Deadline April 13, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the tasks 25 and 26 Pestalozzi / Jagiellonian plot no. 232/9 house. 5 and Pestalozzi / Jagiellonian plot no. 229/11 house. 6 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to residential buildings of pre-insulated pipes.

The route designed connections to the building number 5 from place to include the existing network of pre-insulated district heating 2xDN65 the room node.

The diameter of the planned connection 2x60,3 / 125, length approx. 40MB.

Connection to the building No. 6 by the inclusion of pre-insulated district heating network 2xDN80 the room node.

The diameter of the planned connection 2x60,3 / 125, length approx. 13MB.

Implementation of the tasks will be performed on the construction site of the emerging residential area.

Implementation of the task is planned in two stages - stage I connection to the building No. 5 in 2017, phase II of connection to Building No. 6 in 2018.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 2, 2017  -  Deadline April 11, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232130, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the terminal heating for the project entitled." Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration "for the job 27 square Kościeleckich plot no. 71, 72 carried out within the framework of the project entitled." Construction of the heating network in the city Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration ", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Encourage the use of high-efficiency cogeneration heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes with the installation of an alarm system pulse 2x76,1 / 140 length approx. 12 m with sewers teletechnical to the office building and shopping.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN400 in the lane (trench local) node to the room.

The project is located on plots of protected monuments and in the zone "W" archaeological protection, which is required to conduct archaeological research leading all earthworks.

The investor obtains a construction permit for the implementation of this project.

For the purpose of the task in the lane it is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 2, 2017  -  Deadline April 10, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231111, 45232140, 45233000, 45112710, 45236000

Construction of networks and connections for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task No. 6 Chodkiewicza plot no. 4/1 carried out within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to multifamily residential building with insulated pipes 2x76,1 / 140 length approx. 16 mb

The route designed connections from place to include the existing district heating network 2xDN150 the room node.

Connection is designed green area.

Repair and maintenance services

Oddział Zabezpieczenia Centrum Szkolenia Sił Połączonych Organizacji Traktatu Północnoatlantyckiego w Bydgoszczy | Published December 31, 2016  -  Deadline February 8, 2017
cpvs
50000000, 50532000, 50730000

The contract is a service based on system maintenance server cooling with ice-water and energy supply, located in the complex at ul. Szubinska 2 in Bydgoszcz, in the field and on the terms detailed in the tender documents and in accordance with applicable regulations.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 25, 2017  -  Deadline April 26, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "The construction of heating connection for the project entitled." Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration "for the job 22 Street. Stone / Forest plot no. 127/6, 111/14 implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Encourage the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes with the installation of alarm impulse with a total length of approx. 244.0 m to two substations in the newly built, the building together

the sewers teletechnical.

The inclusion of planned thermal connection 2x114 / 200 to ciepłociągu preinsulated 2x114 / 200 Street. Forest realize at the point C1 by axial welded into existing ciepłociąg.

The investment will be carried out on plots:

127/6, 111/4 precinct 0171 (a list of plots in the project)

Examination of welds to be carried out non-destructive (100% welds) minimum ultrasound, unless the project provides a method with higher accuracy (radiographic).

Electricity, heating, solar and nuclear energy

Komenda Wojewódzka Policji w Bydgoszczy | Published December 8, 2016
Winner
NOVUM S.A.
cpvs
09300000

1. The subject of the procedure is the sale of electricity to the Police units Kujawsko-Pomorskie.

Task No. 1: KWP Bydgoszcz, KMP Bydgoszcz, Inowrocław KPP KPP Mogilno, Nakło CPP, CPP Sępólno Krajeńskie, KPP World, KPP Tuchola, KPP Żnin with subordinate units,

Task No. 2: KMP Grudziadz, KMP Toruń, KMP Wloclawek, Aleksandrów CPP, CPP Brodnica, KPP Chelmno, KPP Golub-Dobrzyn, Lipno CPP, CPP Radziejów, Rypin CPP, CPP Wabrzezno, KWP Bydgoszcz with subordinate units.

Electricity sales for Police units Kujawsko-Pomorskie: KWP Bydgoszcz, KMP Bydgoszcz, Inowrocław KPP KPP Mogilno, Nakło CPP, CPP Sępólno Krajeńskie, KPP World, KPP Tuchola, KPP Żnin with subordinate units.

Electricity sales for Police units Kujawsko-Pomorskie: KMP Grudziadz, KMP Toruń, KMP Wloclawek, KPP Aleksandrów, KPP Brodnica, KPP Chelmno, KPP Golub-Dobrzyn, KPP Lipno, KPP Radziejów, KPP Rypin, KPP Wabrzezno, KWP Bydgoszcz with subordinate units.

Petroleum products, fuel, electricity and other sources of energy

Międzygminny Kompleks Unieszkodliwiania Odpadów ProNatura Sp. z o.o. | Published November 25, 2016  -  Deadline December 29, 2016
cpvs
09000000, 09134100, 09135100

In the case of damage to vehicles, machinery or equipment caused by the Employer offered poor quality fuel, any costs associated with the appointment of experts and technical assessment and repair costs will cover the Contractor.

Electricity, heating, solar and nuclear energy

Komenda Wojewódzka Policji w Bydgoszczy | Published October 6, 2016  -  Deadline November 3, 2016
cpvs
09300000

1. The subject of the procedure is the sale of electricity to the Police units Kujawsko-Pomorskie.

Electricity, heating, solar and nuclear energy

Uniwersytet Technologiczno-Przyrodniczy im. Jana i Jędrzeja Śniadeckich w Bydgoszczy | Published September 8, 2016  -  Deadline October 18, 2016
cpvs

The contract is for the purchase of electricity in accordance with the provisions of the Act of 10.4.1997 (OJ 2012 item. 1059 and 2013 pos. 984), the Energy Law and its implementing legislation (hereinafter: PE) by the Employer to the collection points of energy, in the period from 1.1.2017 to 31.12.2018.

Bydgoszcz: IMPLEMENTATION appraisal, INVENTORY DATA AND CERTIFICATES OF ENERGY REAL ESTATE LOCATED IN THE CITY OF BYDGOSZCZ

Urząd Miasta Bydgoszczy | Published August 26, 2016  -  Deadline August 25, 2016
Winner
Biuro Usług Technicznych i Wycen Nieruchomości Barbara Szylman, ul. Sanatoryjna 48, 85-474 Bydgoszcz, kraj/woj. kujawsko-pomorskie.
cpvs
70331000, 70332000, 70332300, 71250000

IMPLEMENTATION appraisal, INVENTORY DATA AND CERTIFICATES OF ENERGY REAL ESTATE LOCATED IN THE CITY OF BYDGOSZCZ.

Electricity, heating, solar and nuclear energy

Uniwersytet Technologiczno-Przyrodniczy im. Jana i Jędrzeja Śniadeckich w Bydgoszczy | Published September 3, 2016  -  Deadline October 18, 2016
cpvs

The contract is for the purchase of electricity in accordance with the provisions of the Act of 10 April 1997. (Journal of Laws of 2012., Pos. In 1059 and 2013. Pos. 984), the Energy Law and its implementing legislation (hereinafter referred to as PE ) by the Purchaser to the collection points of energy in the period from 01.01.2017 r. to 31.12.2018.

Electricity, heating, solar and nuclear energy

Komenda Wojewódzka Policji w Bydgoszczy | Published September 23, 2016  -  Deadline November 2, 2016
cpvs
09300000

Electricity sales for Police units Kujawsko-Pomorskie: KMP Grudziadz, KMP Toruń, KMP Wloclawek, KPP Aleksandrów, KPP Brodnica, KPP Chelmno, KPP Golub-Dobrzyn, KPP Lipno, KPP Radziejów, KPP Rypin, KPP Wabrzezno, KWP Bydgoszcz with subordinate units.

Bydgoszcz: EXECUTION AND appraisal of energy performance certificates PROPERTY LOCATED IN THE CITY OF BYDGOSZCZ

Urząd Miasta Bydgoszczy | Published July 14, 2016  -  Deadline July 5, 2016
Winner
Biuro Obsługi Nieruchomości BON s.c. W. Ligia Makarczyk, Adam Makarczyk, ul. Chodkiewicza 15 p.103, 85-065 Bydgoszcz, kraj/woj. kujawsko-pomorskie.
cpvs
70331000, 70332000, 70332300, 71250000

EXECUTION AND appraisal of energy performance certificates PROPERTY LOCATED IN THE CITY OF BYDGOSZCZ.