Public tenders for energy in Bydgoszcz Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyPolandbydgoszcz

Construction work

Rejonowy Zarząd Infrastruktury | Published August 4, 2015  -  Deadline September 1, 2015
cpvs
45000000, 71200000

Preparation of project documentation and execution on the basis of construction and assembly on "Construction and reconstruction of facilities in the military Szubinska 105 in Bydgoszcz, consisting of the following investments: Task 11330 -" Construction of sports facilities for Doctrine and Training Centre of the Armed Forces in Bydgoszcz " , Task 11331 - "Building conference room for Doctrine and Training Centre in Bydgoszcz Armed Forces 'Task 11332 -" Construction of multi-level parking for Doctrine and Training Centre in Bydgoszcz Armed Forces' Task 11340 - "Reconstruction of the hydrant system, water supply - sewage , central heating, energy and teletechnicznnej 1) Task 11330 - "Construction of sports facilities for Doctrine and Training Centre in Bydgoszcz Armed Forces' new building should be designed and built as a multi-purpose, free-standing, partial basement: - in the pool section - the right wing of the building - one or two-storey, - facilities administration and technical and socio-sanitary - two or three-storey. 15 m. The building will be divided into five main sectors: Sports hall with the audience: a) a pitch with dimensions of 50 x 30 m and a height of 11 m; b) The auditorium for 200 people (on the balcony or tribune at the pitch); c) The three changing rooms for training groups of sanitary facilities - hygienic (toilet, shower, seats, cabinets, racks, mirrors, ventilation); d) socio-sanitary node for spectators; e) storage of sports equipment (separately for new and damaged); f) Technical room for the manager of the facility; g) The room for air-conditioning equipment; h) the public welfare facilities (toilets for men and women, access for the disabled); i) offices and social service for 10 people; Swimming pool - swimming pool adapted for 60 people and 100 people practicing the audience: a) With dimensions of 25m x 12 m and a depth of 2.2 m; b) Two sauna, hot tub "Jacuzzi"; c) 6 of swimming circuits; d) Social facilities consisting of changing rooms with nodes sanitary - hygiene products; e) Ventilation; f) The audience for about 100 people, with social-sanitary facilities for spectators; g) Non aids in the form of magazines on sports equipment and technical facilities and offices including rescue workers and medical services; The team of external fields for team games - catered for 60 people exercising a) Soccer 6-seater with dimensions of 20 x 50 can be the type of artificial grass surfaces; b) the pitch for volleyball and basketball on synthetic surfaces (tartan) with dimensions of 20 x 30 m; c) the tennis court; d) social-sanitary facilities (changing rooms and showers) for people who exercise located in this building; e) lighting fields; f) the fencing around the fields with a height of 4 m; A team of three small gyms (the middle part of the building - adjusted for 60 people exercising) a) Small hall for combat; b) Health Club; c) Gym with sanitary facilities, consisting of changing rooms, with nodes sanitary - hygiene products; The team socio-sanitary and office - adapted for 10 people and 300 people use and the audience), 3 offices and social service for 10 people; b) The lobby and main hallway of dimensions to ensure a functional handle 400 people at a time; c) the locker room for an audience of 300 people involved; Objects to demolish a) Building No. 32: kitchen and dining room - one-storey building, brick 9 602 m3, consumption of 32%. 339 m2, volume approx. 2 633 m3 and consumption of 50%. 9 602 m 3, use 35%. 1 209 m3, the consumption of 50%. Task 11331 - "Building conference room for Doctrine and Training Centre in Bydgoszcz Armed Forces", newly designed building is to serve as a training and conference facility The present building should meet the main requirements for this type of building objects, and designed buildings and rooms division should result from the specific Basement building training procedures should be under the part adjacent to the auditorium. The proposed solution will cover and secure the needs of the civilian staff and soldiers eventually consuming the building in four main sectors: 260 people can be divided into two separate rooms, with facilities Office and socio-sanitary in the form of facilities for teachers, social room, rest room, the conference room, and washroom facilities. b) Part of the training and educational (back part of the building - adapted for 300 people) - in the proposed building should be provided 6 large training rooms and 1 large hall for computer simulation of a camera, without access to daylight. c) The office (front of the building - adapted for 20 people) - in the proposed building should be provided office space for faculty, a public office, a team of secret office space, meeting relaxing

Construction work for pipelines, communication and power lines

Komunalne Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. | Published February 27, 2015  -  Deadline April 8, 2015
cpvs
45231000, 45231100, 45231110, 45232142, 45111291, 45112710

165, plot no. 251/2, 103, 102/1, 102/3, 250, 106/1, 106/4 obr.178 in Bydgoszcz. The range also includes removal of existing underground chamber K-668 equipped with a shut-off valves, drain, vent and control - measuring technological work should be performed no later than 15/07/2015. The route network runs on the ground hardened (sidewalks, roadway) and uncured (lawns, green), therefore, perform all the necessary demolition and replacement surfaces and restore the land to its original state unpaved in the area lawns. Due to collisions with existing power grid, perform the reconstruction of power cables MV and LV as designed. Felling and planting new trees remains with the Employer. Note: Reconstruction of the surface in the plots No. 251/2, 103, 102/1 and 102/3 additional requirements not included in the project - (Annex 13 map): Oginski on plot 103 after the completion of the work on the network, you must rebuild the entire surface by rules: - 15 cm sand foundation - the base concrete C12 / 15 20 cm - Cement-sand ballast 3 cm - gray concrete blocks 8 cm 2 along the route lay new concrete rim dimension referring to the existing ones, in the same way to rebuild the section on plot No. 103 to the "A" Chopin is not subject to reconstruction - the area of ​​the completed work needs to be closed and sow grass 4 as part of the reconstruction of the surface must make a new pavement at teaching and administrative building USW as shown in Figure 5 preserving reconstruction parameters defined on Fig. 2 surface reconstruction project with a width of 1.5 m, along the pavement lay concrete rim 5. grassy area at the USW building should be rebuilt after the completion of the work in accordance with the design of the reconstruction of green as in Fig. 2 Chopin Description of the contract: Replacement of existing network heating system made in the traditional channel for the district heating network based on pre-insulated pipe technology and telecommunication cabling for data transmission. Created as part of the contract is obliged to draw up a plan BIOZ, ensure ongoing service geodesic business related to activity areas (including lane road) and pay the appropriate fees, notification owners (managers) property on the planned date of the work, such investigations and trial, execution-built geodesic inventory, restoring the site on work carried out to its original state. Object of the contract must be carried out according to documents held by the Purchaser executive, both in terms of technology works, reconstruction of power lines and replacement. The detailed scope of work specified in the Annexes to the ToR including: a) Annex 10 - detailed design - reconstruction of traditional network channel, b) Appendix 10A - detailed design - changes c) Appendix 11 - a project to restore the surface d) Appendix 12 - Temporary traffic organization project, e) Appendix 13 - map to changes not included in the project f) Appendix 14 - The Purchaser has agreed a valid permit for the reconstruction of the network. 4 and 5 of the Public Procurement Act - allows tenders of equivalent technical parameters, operational and performance are not worse than those indicated in the tender documents and annexes. As-built documentation should include a set of all documents related to the execution network and agreed and plotted deviations from baseline documentation. Built-in equipment and materials must be new and original manufacturers comply with the documentation and certificates must be documented. Offers that do not meet the requirements of the Employer will be rejected as contrary to the Terms of Reference. The Contractor shall on its own and at their own expense: a) prepare the ground for the construction and its label, b) protect the site from being accessed by third parties, c) provide surveying services fixed investment and geotechnical services, d) to address water and energy consumption power, e) organize the area after construction, the Terms of Reference. g) insure the building from damage that may occur and sudden mishap and civil liability work, equipment and construction equipment. 11. In the field of materials owned by the Purchaser, and from the decommissioning shall be as follows:

Roadworks

Województwo Kujawsko-Pomorskie, pl. Teatralny 2, 87-100 Toruń, w imieniu którego działa Zarząd Dróg Wojewódzkich w Bydgoszczy | Published March 4, 2017  -  Deadline April 14, 2017
cpvs
45233140, 45232452, 45221111

DISARMED. Dr at length. ok.15,997 km

g. to strengthen the existing surface to a capacity of 100 kN, a new pavement structure

DISARMED. intersections

forgiveness. and bud. conventions, existing and bud. new bus bays

repair and bud. pavements

house. of pedestrian - cycling

correction of non-standard technical parameters and vertical alignment of the road

restoration, cleaning and profiling of existing ditches, house. new roadside ditches, perf. pre-treatment devices

repair, forgiveness. existing and bud. new culverts

forgiveness. existing and bud. new culverts under downhills

house. or DISARMED. drainage and sewerage in the villages

house. pre-treatment equipment and DISARMED. road lighting

elimination of collisions with devices strangers

felling of trees and shrubs

forgiveness. bridge

repair of viaduct

house. footbridge for pedestrians and cyclists

house. space on the road weather stations

forgiveness. transition and bud. ring road

forgiveness. existing and bud. new parking places and parking lots,

house. places to weighing.

The scope of the contract:

15.997 km,

- To strengthen the performance of the existing pavement to a capacity of 100 kN,

- Construction of a new pavement structure (in the roadway widenings, correction curves piono-Outgoing and horizontal, vertical alignment correction, expansion junctions and in other cases where it is necessary to perform new construction)

- Extension of intersections with roads subordinate,

- Reconstruction and construction of public and private meetings,

- Reconstruction of existing and construction of new bus bays,

- Renovation and construction of sidewalks in the area resulting from the safe shaping pie-education in within the road

- Construction of pedestrian - cycling

- Correction of the non-standard technical parameters (horizontal curves and vertical inclinations of the road)

- Correction of the vertical alignment of the road,

- Restoration, cleaning and profiling of existing ditches, construction of new ditches roadside-tion, the execution of pre-treatment equipment,

- Repair, reconstruction of existing and construction of new culverts under the crown of the road,

- Reconstruction of existing and construction of new culverts under the downhills,

- The construction or expansion of drainage and sewerage in the villages,

- Construction equipment pre-treatment,

- The construction and expansion of road lighting at intersections and pedestrian crossings and in urban areas,

- Elimination of collisions with devices strangers

- Felling of trees and bushes colliding with the designed elements,

Szumiąca at km 34 + 228,

Rudzki Mill at km 28 + 501,

Terespol Pomorski at km 64 + 851,

Rudzki Mill at km 28 + 501,

Terespol Pomorski at km 64 + 851,

- Construction of a weather station for measuring and recording weather parameters of the connection energy,

Płazowo,

Płazowo length. About 1.8 km,

- Reconstruction of existing and construction of new parking spaces,

- Reconstruction of existing and construction of new parking lots,

- Construction of weighing,

Supervision of building work

Rejonowy Zarząd Infrastruktury | Published March 5, 2015
Winner
Konsorcjum firm: B-ACT Sp. z o.o., T4B Sp. z o.o., EKOCENTRUM Sp. z o.o.
cpvs
71247000, 71248000, 71310000

The present contract is the Service Contract Engineer for the project entitled. "The investment in the military at. Szubinska 105 in Bydgoszcz "for ten investments in the formula design and build the complex military Street. Szubinska in Bydgoszcz, ie .: Investment 1 - pn 11330 task. "The construction of sports facilities for Doctrine and Training Centre in Bydgoszcz Armed Forces" - the year of the end of 2019. The project 2 - 11331 pn task. "Building Conference Room for Doctrine and Training Centre in Bydgoszcz Armed Forces" - the year of the end of 2017 Investment 3 - 11332 pn task. "The construction of parking garages for Doctrine and Training Centre in Bydgoszcz Armed Forces" - the year of the end of 2017 investment 4 - 11333 pn task. "Building a repair workshop for the Field Aviation Workshop in Bydgoszcz" - the year of the end of 2015 investment 5 - 11336 pn task. "Construction magazine MPS for the Field Aviation Workshop in Bydgoszcz" - the year of the end of 2016 investment 6 - 11337 pn task. "Reconstruction of technical service and maintenance of the building No. 121 for the Field Aviation Workshop in Bydgoszcz" - the year of the end of 2016. The investment 7 - 11338 pn task. "Reconstruction of the building repair helicopters No. 52 for the Field Aviation Workshop in Bydgoszcz - the year of the end of 2016 investment 8 - 11340 pn task. "Reconstruction of the hydrant, water and sewage, which, energy and telecommunication in the complex" - the year of the end of 2016 investment 9 - 11640 pn task. "Reconstruction and construction of the car park and square with buildings 147 and 149" - the year of the end of 2016 investment 10 - 11608 pn task. "Reconstruction of Building No. 1 for Doctrine and Training Centre SZ" - the year of the end of 2016.

Construction work for pipelines, communication and power lines

Komunalne Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. | Published February 27, 2015  -  Deadline April 8, 2015
cpvs
45231000, 45231100, 45231110, 45232142, 45111291, 45112710

Jagiellonian in Bydgoszcz. The length of the proposed network w / in the episode does not change. Felling and planting new trees remains with the Employer. The Employer, work related to green to perform in a way that does not interfere with the construction works. Description of the contract: Replacement of the existing district heating network in the traditional system made channel for district heating based on pre-insulated pipe technology and telecommunication cabling for data transmission. Created as part of the contract is obliged to draw up a plan BIOZ, ensure ongoing service geodesic business related to activity areas (including lane road) and pay the appropriate fees, notification owners (managers) property on the planned date of the work, such investigations and trial, execution-built geodesic inventory, restoring the site on work carried out to its original state. Object of the contract must be carried out according to documents held by the Purchaser executive, both in terms of technological works and replacement. The detailed scope of work specified in the Annexes to the ToR including: a) Annex 10 - detailed design - reconstruction of traditional network channel, b) Appendix 11 - The Purchaser has agreed a valid permit for the reconstruction of the network. 4 and 5 of the Public Procurement Act - allows tenders of equivalent technical parameters, operational and performance are not worse than those indicated in the tender documents and annexes. As-built documentation should include a set of all documents related to the execution network and agreed and plotted deviations from baseline documentation. 8.Wbudowane equipment and materials must be new and original manufacturers in accordance with the documentation and certificates must be documented. Offers that do not meet the requirements of the Employer will be rejected as contrary to the Terms of Reference. The Contractor shall on its own and at their own expense: a) prepare the ground for the construction and its label, b) protect the site from being accessed by third parties, c) provide surveying services fixed investment and geotechnical services, d) to address water and energy consumption power, e) organize the area after construction, the Terms of Reference. g) insure the building from damage that may occur and sudden mishap and civil liability work, equipment and construction equipment. In terms of materials, owned by the Purchaser, and from the decommissioning shall be as follows:

Technical consultancy services and business in the management of the Department of Municipal Solid Waste Incineration for Bydgoszcz-Toruń Metropolitan Area.

Międzygminny Kompleks Unieszkodliwiania Odpadów ProNatura Sp. z o.o. | Published March 19, 2016
Winner
TME.E S.p.A. Teromeccanica Ecologia
cpvs
79400000

order description

The contract is consulting services in the following segments:

- Technical,

- Business.

These services relate to activities of the Department of Thermal Processing Municipal Waste in Bydgoszcz. The aim to achieve expected by the Employer is:

1) Maintaining a high reliability and availability ZTPOK,

2) optimization of the cost of repairs and maintenance,

3) Optimization of reagent consumption,

4) Minimize the cost of managing waste from flue gas purification process,

5) I Am minimizing development costs of slag and bottom ash,

6) Optimize revenue from the sale of heat,

7) Optimize revenue from sales of electricity,

8) Optimization of purchases of materials and energy.

These tasks will be implemented through ongoing advice for key management personnel ZTPOK employed by the Employer. The order must be carried out in accordance with current Employer law.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 9, 2017  -  Deadline April 18, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task Stroma 33 36 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x42,4 / 110 length approx. 96 m with sewers teletechnical to multifamily residential building.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN150 the room node. Inclusion of connections to the network using the so-called. "Hot tapping".

According to the received conditional consent to the task on the plot No. 64/2, the work can be performed only on working days, this part of the plot trenchless method.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 3, 2017  -  Deadline April 13, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the tasks 25 and 26 Pestalozzi / Jagiellonian plot no. 232/9 house. 5 and Pestalozzi / Jagiellonian plot no. 229/11 house. 6 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to residential buildings of pre-insulated pipes.

The route designed connections to the building number 5 from place to include the existing network of pre-insulated district heating 2xDN65 the room node.

The diameter of the planned connection 2x60,3 / 125, length approx. 40MB.

Connection to the building No. 6 by the inclusion of pre-insulated district heating network 2xDN80 the room node.

The diameter of the planned connection 2x60,3 / 125, length approx. 13MB.

Implementation of the tasks will be performed on the construction site of the emerging residential area.

Implementation of the task is planned in two stages - stage I connection to the building No. 5 in 2017, phase II of connection to Building No. 6 in 2018.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 2, 2017  -  Deadline April 11, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232130, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the terminal heating for the project entitled." Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration "for the job 27 square Kościeleckich plot no. 71, 72 carried out within the framework of the project entitled." Construction of the heating network in the city Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration ", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Encourage the use of high-efficiency cogeneration heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes with the installation of an alarm system pulse 2x76,1 / 140 length approx. 12 m with sewers teletechnical to the office building and shopping.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN400 in the lane (trench local) node to the room.

The project is located on plots of protected monuments and in the zone "W" archaeological protection, which is required to conduct archaeological research leading all earthworks.

The investor obtains a construction permit for the implementation of this project.

For the purpose of the task in the lane it is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 25, 2017  -  Deadline April 26, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "The construction of heating connection for the project entitled." Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration "for the job 22 Street. Stone / Forest plot no. 127/6, 111/14 implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Encourage the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes with the installation of alarm impulse with a total length of approx. 244.0 m to two substations in the newly built, the building together

the sewers teletechnical.

The inclusion of planned thermal connection 2x114 / 200 to ciepłociągu preinsulated 2x114 / 200 Street. Forest realize at the point C1 by axial welded into existing ciepłociąg.

The investment will be carried out on plots:

127/6, 111/4 precinct 0171 (a list of plots in the project)

Examination of welds to be carried out non-destructive (100% welds) minimum ultrasound, unless the project provides a method with higher accuracy (radiographic).

Advisory architectural services

Polska Spółka Gazownictwa Sp. z o.o. Oddział w Gdańsku | Published August 11, 2015  -  Deadline August 25, 2015
cpvs
71210000, 71221000

The contract is for service in the field of copyright exercise supervision over the implementation of the investment project entitled .: Construction of high pressure gas pipeline relations Brodnica - New Town Lubawskie with reduction station - measuring in meters. Kurzętnik - Stage II of the EU project entitled. "Construction of the gas network w / c relation Brodnica - New Town Lubawskie - Iława DN 300 and gasification of municipalities" No POIS.10.02.00-00-013 / 10, which is funded by the European Regional Development Fund as part of Measure 10.2 Construction of distribution systems natural gas in areas not supplied with gas and modernization of existing distribution networks Priority X Energy security including diversification of energy sources Operational Programme Infrastructure and Environment, 2007 - 2013. Supervision includes the construction of a gas pipeline with a length of about 5.9626 kilometers, in particular: - Episode I of Pz 11 ( Pz 11 + 50,9m) for Pz 15a (Pz 15 + 3.3 m) - the length of 0.2165 km DN 250 (pipeline construction project forming section II) - Episode II of Pz 43 + 24m to the Pz 47 + 0, 6m - the length of 0.4197 km DN 250 (pipeline construction project forming section III / 2) - Episode III of Pz Pz 68 to 87a (Pz 87 + 35,2m) - the length of 4.1368 km DN 300 (forming gas pipeline construction project sections IV / 1, IV / 2, IV / 3, IV / 4, V and railway line No. 208 relationship Działdowo-Chojnice) - Episode IV from Pz Pz 91a to 94 + 15m - the length of 1.1896 km DN 300 ( pipeline construction project forming sections VI / 1, VI / 2, VI / 3, VI / 4).

Advisory architectural services

Polska Spółka Gazownictwa Sp. z o.o., Oddział w Gdańsku | Published August 29, 2015  -  Deadline September 10, 2015
cpvs
71210000

The contract is for service in the field of copyright exercise supervision over the implementation of the investment project entitled .: Construction of high pressure gas pipeline relations Brodnica - New Town Lubawskie with reduction station - measuring in meters. Kurzętnik - Stage II of the EU project entitled. "Construction of the gas network w / c relation Brodnica - New Town Lubawskie - Iława DN 300 and gasification of municipalities" No POIS.10.02.00-00-013 / 10, which is funded by the European Regional Development Fund as part of Measure 10.2 Construction of distribution systems natural gas in areas not supplied with gas and modernization of existing distribution networks Priority X Energy security including diversification of energy sources Operational Programme Infrastructure and Environment 2007-2013. Supervision includes the construction of a gas pipeline with a length of about 5.9626 kilometers, in particular: - Episode I of Pz 11 (Pz 11 + 50.9 m) to Pz 15a (Pz 15 + 3.3 m) - the length of 0.2165 km DN 250 (pipeline construction project forming section II) - Episode II of Pz 43 + 24 m Pz 47 + 0.6 m - length of 0.4197 km DN 250 (pipeline construction project forming section III / 2) - Episode III by Pz Pz 68 to 87a (Pz 87 + 35.2 m) - the length of 4.1368 km DN 300 (forming gas pipeline construction project sections IV / 1, IV / 2, IV / 3, IV / 4, V and railway line No. 208 relationship Działdowo-Chojnice) - Episode IV from Pz Pz 91a to 94 + 15 meters - the length of 1.1896 km DN 300 (forming gas pipeline construction project sections VI / 1, VI / 2, VI / 3, VI / 4).

Business and management consultancy and related services

Międzygminny Kompleks Unieszkodliwiania Odpadów ProNatura Sp. z o.o. | Published November 11, 2015  -  Deadline December 17, 2015
cpvs
79400000

Description of the order subject of the contract are consulting services in the following areas: - Technical - Business. These services relate to the activities of the Department of Municipal Waste Thermal Processing in Bydgoszcz. The aim to achieve anticipated by the Employer is: 1) Maintaining high reliability and availability ZTPOK. 2) Optimize the cost of repairs and maintenance. 3) Optimization of reagent consumption. 4) Minimize the cost of managing waste from flue gas purification process. 5) Minimizing development costs slags and bottom ash. 6) Optimize revenue from the sale of heat. 7) Optimize revenue from sales of electricity. 8) optimization of purchase costs of materials and energy. This will be done through ongoing advice to key management personnel ZTPOK employed by the Employer. The order must be carried out in accordance with current Employer laws.

Bydgoszcz: Construction street Lunar including execution of pieszojezdni with parking bays, technical infrastructure (expansion of storm water drainage and energy and reconstruction of networks colliding with the investment) and to strengthen the slope on plots Reg. No. 100, 59, 52/1, 41 and 124 / 8 rpm. 65 in Bydgoszcz

Stowarzyszenie Budowy ulicy Księżycowej | Published July 27, 2016  -  Deadline October 31, 2016
cpvs
45233220, 45232400, 45316110

The scope of works includes in particular: 1) road works related to construction of the street Moon, including: a) demolition work, b) earthworks, c) executing the foundation, laying curbs and resistors and arrangement of surfaces including 8 cm - 1298.3 m2, 6 cm - 3.9 m2, - the construction of the parking lot of openwork plates 40x60x10 cm filled with aggregate broken 0-31,5 mm (10 parking spaces with the dimensions 2,5x6,0 m) - 159.0 m2, 8 cm - 18 2 m2, 8 cm - 63.2 m2, 6 cm - 56.1 m2, 6 cm - 11.3 m2, 16-18 cm or trylinki - 16.1 m2 - performing retaining wall - 19.2 m, 10 cm filled with humus with sowing grass - 63.9 m2, 10 cm - 536.3 m2, 2) work on the implementation of storm water drainage system in the building - street inlets concrete DN500 - 6 pcs., - installation of storm sewer pipes of polymer dn 355x52mm - 121.1 m, - installation of storm sewer pipes PVC-U solid śr.315x9,2mm SN8 - 136.6 m, - installation of storm sewer pipes PVC-U solid śr.200x5,9mm SN8 - 19.1 m - well reinforced fi 1000 with manhole cast iron type D400 - 1 pc., - well reinforced fi 500 with manhole cast iron type D400 - 6 pcs., - well plastic fi 800 - 4 pcs., 3) work related to the construction of road lighting including: - demolition of lighting columns - 3 pcs., - construction of lighting columns - 3 pcs., - dismantling cable lighting - 42.3 m, - laying cable lighting - 44.2 m, - laying pipes bipartite fi 110 - 3 0 m, 4) control and protection devices of the existing underground utilities, 5) installation of road signs and markings, 6) the execution and delivery of the Employer as-built documentation (including inventory geodesic as-built), work should be carried out in accordance with the design documentation, hereinafter referred to as technical documentation (part V - technical documentation) and the specification of the technical implementation and acceptance of works hereinafter referred to as the technical specifications (part III - Technical specifications). Making all fees and arrangements related to the implementation of investment resulting directly from the documentation, as well as necessary to perform the contract, for example. VAT, insurance costs, all the preparatory work, cleaning, management of the construction site, maintenance costs of facilities construction (repair, water, electricity phone, supervision of construction), the costs of occupation of the roadway, the cost of changing traffic organization, surveying services, employment manager of construction, as-built geodesic inventory, etc., belong to the Contractor and are its cost. In the course of the work the Contractor is obliged to preserve the health and safety regulations and reduce the burden of the works. These included documentation, product names / products pointing to a particular manufacturer are only examples of their use in the implementation of the contract and should not be construed as obliging, because in no way they bind the Contractor. 883 as amended.) And its implementing legislation and for general use in the construction industry. The Employer recommends that the contractor is familiar with the subject matter for proper and reliable preparation of the offer and conducted a site visit in order to get acquainted with the contract and the conclusion of the offer price of all costs for the works necessary for the proper performance of the contract. In order to prepare a proper valuation of the offer the Contractor is obliged to check the conformity of the scope of work (type and quantity of work) included in the documentation of the actual state. Transport of materials to the construction site (the place of performance of the contract) and the provision and maintenance of machines and equipment necessary for the proper performance of the contract be borne by the Contractor. 21, as amended.), And in particular is responsible and obliged to manage the waste. Employer allows the use of materials equivalent parameters not worse than indicated in the documentation. The Employer will not be checked or corrected estimate Contractor assuming correctly stated inclusive price total in the tender form.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published February 16, 2017  -  Deadline March 23, 2017
cpvs
45000000, 45100000, 45200000, 45230000, 45231110, 45232140, 45233000, 45112710, 45236000

"The construction of heating connection for the project entitled. »Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task Pestalozzi / Jagiellonian house. No. 4 "implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes the construction of heating connection with sewers teletechnical to the proposed residential building No. 4 Street. Pestalozzi / Jagiellonian University in Bydgoszcz.

Connection from the point integration to the existing district heating network channel 2dn150 in plot no. 143 to the proposed substation room in Building 4 at ul. Pestalozzi / Jagiellonian plot no. 232/11.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 14, 2017
cpvs
45000000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 42 69 Liberation implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x60,3 / 125 length approx. 47 m with sewers teletechnical to multifamily residential building.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN150 in the chamber K-2255 into the room node.

The section under the surface hardened perform trenchless method.

For the purpose of the task in the lane it is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 14, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 36 20 Commodity implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x33,7 / 90 with a length of approx. 27MB with sewers teletechnical to the building trade and service

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN300 the room node.

The inclusion of the planned connection method called. "Hot tapping".

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 13, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 35 Torun plot no. 14/3 - Stage II implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x60,3 / 125 length approx. 15 m with sewers teletechnical into a residential building. In the basement of the connection pipes SPIRO 2xDN50 / 125 length approx. 15 m, suspended from the ceiling.

The route designed connections from place to include the existing district heating network channel 2xDN150 the room node.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 3, 2017  -  Deadline April 12, 2017
cpvs
45000000, 45100000, 45200000, 45230000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 20 Leszczynski 18 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to multifamily residential building with insulated pipes 2x139,7 / 225 L - ok.64,5mb and 2x48,3 / 110 L - approx. 6.5MB

The route designed connections from place to include the existing district heating network preizolowanej2xDN150 in ko0morze K-4828 into the room node. Connection is designed partly in the area of ​​the roadway, the reconstruction of which is developed reconstruction project surface. In addition to the temporary occupation of land lane road is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 2, 2017  -  Deadline April 10, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231111, 45232140, 45233000, 45112710, 45236000

Construction of networks and connections for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task No. 6 Chodkiewicza plot no. 4/1 carried out within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to multifamily residential building with insulated pipes 2x76,1 / 140 length approx. 16 mb

The route designed connections from place to include the existing district heating network 2xDN150 the room node.

Connection is designed green area.