Repair and maintenance services

Oddział Zabezpieczenia Centrum Szkolenia Sił Połączonych Organizacji Traktatu Północnoatlantyckiego w Bydgoszczy | Published December 31, 2016  -  Deadline February 8, 2017
cpvs
50000000, 50532000, 50730000

The contract is a service based on system maintenance server cooling with ice-water and energy supply, located in the complex at ul. Szubinska 2 in Bydgoszcz, in the field and on the terms detailed in the tender documents and in accordance with applicable regulations.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published October 18, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of the heating connection for the project. "Construction of a district heating network in the city of Bydgoszcz enabling the use of heat energy produced in high-efficiency cogeneration" task 11 ul. Fordon 2 stage I.

Repair and maintenance services

Jednostka Wojskowa nr 4246 | Published May 19, 2016
Winner
ASSECO POLAND S.A.
cpvs
50000000, 50730000, 50532000

Object of the contract is a service based on system maintenance server cooling with ice-water and energy supply located within the complex on ul. Szubinska 2 in Bydgoszcz, in the field and on the terms detailed in the tender documents and in accordance with applicable regulations.

Bydgoszcz: Delivery of heat from district heating network to the building of the Regional Blood Center in Bydgoszcz ul. Ks. Markwart 8

Regionalne Centrum Krwiodawstwa i Krwiolecznictwa w Bydgoszczy | Published July 25, 2016
cpvs
09300000

The contract is for the supply of thermal energy complex, including the sale and provision of heat transmission for the building of the Regional Blood Center in Bydgoszcz located in Bydgoszcz Street. Markwart 8. The contract will be concluded for a fixed period - 3 years. The service will be implemented in the period from 01.09.2016 r. To 31.08.2019 r.

Heating-system design services

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published October 11, 2017
cpvs
71321200, 45000000, 45300000, 45310000, 45320000, 45321000, 45330000, 45331000

Design, construction, installation, connection and commissioning of the thermal node for the project. "Construction of a district heating network in the city of Bydgoszcz enabling the use of heat energy generated in high-efficiency cogeneration" task 34 ul. Hospital No. 18/2 building. AND.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published November 16, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Improvement of energy efficiency through the reconstruction and thermo-modernization of the district heating network in the city of Bydgoszcz - stage I ": reconstruction of the DN400 network to the DN500 network from the K-4008 chamber at Wojska Polskiego street to the K-4212B chamber at Glinki Street in Bydgoszcz (task No. 24- 26)

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published February 16, 2017  -  Deadline March 23, 2017
cpvs
45000000, 45100000, 45200000, 45230000, 45231110, 45232140, 45233000, 45112710, 45236000

"The construction of heating connection for the project entitled. »Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task Pestalozzi / Jagiellonian house. No. 4 "implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes the construction of heating connection with sewers teletechnical to the proposed residential building No. 4 Street. Pestalozzi / Jagiellonian University in Bydgoszcz.

Connection from the point integration to the existing district heating network channel 2dn150 in plot no. 143 to the proposed substation room in Building 4 at ul. Pestalozzi / Jagiellonian plot no. 232/11.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 14, 2017
cpvs
45000000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 42 69 Liberation implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x60,3 / 125 length approx. 47 m with sewers teletechnical to multifamily residential building.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN150 in the chamber K-2255 into the room node.

The section under the surface hardened perform trenchless method.

For the purpose of the task in the lane it is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 14, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 36 20 Commodity implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x33,7 / 90 with a length of approx. 27MB with sewers teletechnical to the building trade and service

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN300 the room node.

The inclusion of the planned connection method called. "Hot tapping".

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 4, 2017  -  Deadline April 13, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 35 Torun plot no. 14/3 - Stage II implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x60,3 / 125 length approx. 15 m with sewers teletechnical into a residential building. In the basement of the connection pipes SPIRO 2xDN50 / 125 length approx. 15 m, suspended from the ceiling.

The route designed connections from place to include the existing district heating network channel 2xDN150 the room node.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 3, 2017  -  Deadline April 12, 2017
cpvs
45000000, 45100000, 45200000, 45230000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the job 20 Leszczynski 18 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to multifamily residential building with insulated pipes 2x139,7 / 225 L - ok.64,5mb and 2x48,3 / 110 L - approx. 6.5MB

The route designed connections from place to include the existing district heating network preizolowanej2xDN150 in ko0morze K-4828 into the room node. Connection is designed partly in the area of ​​the roadway, the reconstruction of which is developed reconstruction project surface. In addition to the temporary occupation of land lane road is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 2, 2017  -  Deadline April 10, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231111, 45232140, 45233000, 45112710, 45236000

Construction of networks and connections for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task No. 6 Chodkiewicza plot no. 4/1 carried out within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to multifamily residential building with insulated pipes 2x76,1 / 140 length approx. 16 mb

The route designed connections from place to include the existing district heating network 2xDN150 the room node.

Connection is designed green area.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published April 20, 2017  -  Deadline May 29, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112700, 45236000

Construction of the district heating connection for the project entitled. "The construction of the connection of the heating for the project entitled." Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration "for the job 31 Street. Przodowników Work carried out in the framework of the project entitled." Construction of the heating network in the city of Bydgoszcz, which enables the use of energy heat generated in the conditions of high-efficiency cogeneration ", intended to be co-financed by the European Union from the European Cohesion Fund under the Operational Program Infrastructure and Environment for 2014-2020 Priority: Reducing Emissivities I Economy, Measure 1.6. Promote the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

building a network of heat insulated pipes of the pulse alarm system, with a total length of approx. 44.5 m, and the connection portion of the newly constructed building, including

teletechnical the sewers. Connection should be completed in the well valve.

Heating network designed to connect dn 80/160 should be made of existing network 2xdn100.

Bydgoszcz: Construction street Lunar including execution of pieszojezdni with parking bays, technical infrastructure (expansion of storm water drainage and energy and reconstruction of networks colliding with the investment) and to strengthen the slope on plots Reg. No. 100, 59, 52/1, 41 and 124 / 8 rpm. 65 in Bydgoszcz

Stowarzyszenie Budowy ulicy Księżycowej | Published July 27, 2016  -  Deadline October 31, 2016
cpvs
45233220, 45232400, 45316110

The scope of works includes in particular: 1) road works related to construction of the street Moon, including: a) demolition work, b) earthworks, c) executing the foundation, laying curbs and resistors and arrangement of surfaces including 8 cm - 1298.3 m2, 6 cm - 3.9 m2, - the construction of the parking lot of openwork plates 40x60x10 cm filled with aggregate broken 0-31,5 mm (10 parking spaces with the dimensions 2,5x6,0 m) - 159.0 m2, 8 cm - 18 2 m2, 8 cm - 63.2 m2, 6 cm - 56.1 m2, 6 cm - 11.3 m2, 16-18 cm or trylinki - 16.1 m2 - performing retaining wall - 19.2 m, 10 cm filled with humus with sowing grass - 63.9 m2, 10 cm - 536.3 m2, 2) work on the implementation of storm water drainage system in the building - street inlets concrete DN500 - 6 pcs., - installation of storm sewer pipes of polymer dn 355x52mm - 121.1 m, - installation of storm sewer pipes PVC-U solid śr.315x9,2mm SN8 - 136.6 m, - installation of storm sewer pipes PVC-U solid śr.200x5,9mm SN8 - 19.1 m - well reinforced fi 1000 with manhole cast iron type D400 - 1 pc., - well reinforced fi 500 with manhole cast iron type D400 - 6 pcs., - well plastic fi 800 - 4 pcs., 3) work related to the construction of road lighting including: - demolition of lighting columns - 3 pcs., - construction of lighting columns - 3 pcs., - dismantling cable lighting - 42.3 m, - laying cable lighting - 44.2 m, - laying pipes bipartite fi 110 - 3 0 m, 4) control and protection devices of the existing underground utilities, 5) installation of road signs and markings, 6) the execution and delivery of the Employer as-built documentation (including inventory geodesic as-built), work should be carried out in accordance with the design documentation, hereinafter referred to as technical documentation (part V - technical documentation) and the specification of the technical implementation and acceptance of works hereinafter referred to as the technical specifications (part III - Technical specifications). Making all fees and arrangements related to the implementation of investment resulting directly from the documentation, as well as necessary to perform the contract, for example. VAT, insurance costs, all the preparatory work, cleaning, management of the construction site, maintenance costs of facilities construction (repair, water, electricity phone, supervision of construction), the costs of occupation of the roadway, the cost of changing traffic organization, surveying services, employment manager of construction, as-built geodesic inventory, etc., belong to the Contractor and are its cost. In the course of the work the Contractor is obliged to preserve the health and safety regulations and reduce the burden of the works. These included documentation, product names / products pointing to a particular manufacturer are only examples of their use in the implementation of the contract and should not be construed as obliging, because in no way they bind the Contractor. 883 as amended.) And its implementing legislation and for general use in the construction industry. The Employer recommends that the contractor is familiar with the subject matter for proper and reliable preparation of the offer and conducted a site visit in order to get acquainted with the contract and the conclusion of the offer price of all costs for the works necessary for the proper performance of the contract. In order to prepare a proper valuation of the offer the Contractor is obliged to check the conformity of the scope of work (type and quantity of work) included in the documentation of the actual state. Transport of materials to the construction site (the place of performance of the contract) and the provision and maintenance of machines and equipment necessary for the proper performance of the contract be borne by the Contractor. 21, as amended.), And in particular is responsible and obliged to manage the waste. Employer allows the use of materials equivalent parameters not worse than indicated in the documentation. The Employer will not be checked or corrected estimate Contractor assuming correctly stated inclusive price total in the tender form.

Business and management consultancy and related services

Międzygminny Kompleks Unieszkodliwiania Odpadów ProNatura Sp. z o.o. | Published November 11, 2015  -  Deadline December 17, 2015
cpvs
79400000

Description of the order subject of the contract are consulting services in the following areas: - Technical - Business. These services relate to the activities of the Department of Municipal Waste Thermal Processing in Bydgoszcz. The aim to achieve anticipated by the Employer is: 1) Maintaining high reliability and availability ZTPOK. 2) Optimize the cost of repairs and maintenance. 3) Optimization of reagent consumption. 4) Minimize the cost of managing waste from flue gas purification process. 5) Minimizing development costs slags and bottom ash. 6) Optimize revenue from the sale of heat. 7) Optimize revenue from sales of electricity. 8) optimization of purchase costs of materials and energy. This will be done through ongoing advice to key management personnel ZTPOK employed by the Employer. The order must be carried out in accordance with current Employer laws.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 9, 2017  -  Deadline April 18, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the task Stroma 33 36 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes 2x42,4 / 110 length approx. 96 m with sewers teletechnical to multifamily residential building.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN150 the room node. Inclusion of connections to the network using the so-called. "Hot tapping".

According to the received conditional consent to the task on the plot No. 64/2, the work can be performed only on working days, this part of the plot trenchless method.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 3, 2017  -  Deadline April 13, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration" for the tasks 25 and 26 Pestalozzi / Jagiellonian plot no. 232/9 house. 5 and Pestalozzi / Jagiellonian plot no. 229/11 house. 6 carried out in the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Promoting the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with sewers teletechnical to residential buildings of pre-insulated pipes.

The route designed connections to the building number 5 from place to include the existing network of pre-insulated district heating 2xDN65 the room node.

The diameter of the planned connection 2x60,3 / 125, length approx. 40MB.

Connection to the building No. 6 by the inclusion of pre-insulated district heating network 2xDN80 the room node.

The diameter of the planned connection 2x60,3 / 125, length approx. 13MB.

Implementation of the tasks will be performed on the construction site of the emerging residential area.

Implementation of the task is planned in two stages - stage I connection to the building No. 5 in 2017, phase II of connection to Building No. 6 in 2018.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 2, 2017  -  Deadline April 11, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45231110, 45232130, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "Construction of the terminal heating for the project entitled." Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration "for the job 27 square Kościeleckich plot no. 71, 72 carried out within the framework of the project entitled." Construction of the heating network in the city Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration ", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Encourage the use of high-efficiency cogeneration heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes with the installation of an alarm system pulse 2x76,1 / 140 length approx. 12 m with sewers teletechnical to the office building and shopping.

The route designed connections from place to include the existing network of pre-insulated district heating 2xDN400 in the lane (trench local) node to the room.

The project is located on plots of protected monuments and in the zone "W" archaeological protection, which is required to conduct archaeological research leading all earthworks.

The investor obtains a construction permit for the implementation of this project.

For the purpose of the task in the lane it is drafted and temporary traffic organization.

Construction work

Komunalne Przedsiębiorstwo Energetyki Cieplnej Spółka z o.o. | Published March 25, 2017  -  Deadline April 26, 2017
cpvs
45000000, 45100000, 45200000, 45231000, 45232140, 45233000, 45112710, 45236000

Construction of heating connection for the project entitled. "The construction of heating connection for the project entitled." Construction of the heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration "for the job 22 Street. Stone / Forest plot no. 127/6, 111/14 implemented within the framework of the project entitled. "Construction of the district heating network in the city of Bydgoszcz, which enables the use of thermal energy generated in the conditions of high-efficiency cogeneration", intended to co-financing from the European Union from the European Cohesion Fund under the Operational Programme Infrastructure and Environment for 2014-2020 Priority: I Reducing Emissivities Economy, Measure 1.6. Encourage the use of high-efficiency cogeneration of heat and electricity on the basis of useful heat demand, Measure 1.6.2 District heating and cooling sources for high-efficiency cogeneration.

The contract scope includes:

construction of heating connection with pre-insulated pipes with the installation of alarm impulse with a total length of approx. 244.0 m to two substations in the newly built, the building together

the sewers teletechnical.

The inclusion of planned thermal connection 2x114 / 200 to ciepłociągu preinsulated 2x114 / 200 Street. Forest realize at the point C1 by axial welded into existing ciepłociąg.

The investment will be carried out on plots:

127/6, 111/4 precinct 0171 (a list of plots in the project)

Examination of welds to be carried out non-destructive (100% welds) minimum ultrasound, unless the project provides a method with higher accuracy (radiographic).

Advisory architectural services

Polska Spółka Gazownictwa Sp. z o.o. Oddział w Gdańsku | Published August 11, 2015  -  Deadline August 25, 2015
cpvs
71210000, 71221000

The contract is for service in the field of copyright exercise supervision over the implementation of the investment project entitled .: Construction of high pressure gas pipeline relations Brodnica - New Town Lubawskie with reduction station - measuring in meters. Kurzętnik - Stage II of the EU project entitled. "Construction of the gas network w / c relation Brodnica - New Town Lubawskie - Iława DN 300 and gasification of municipalities" No POIS.10.02.00-00-013 / 10, which is funded by the European Regional Development Fund as part of Measure 10.2 Construction of distribution systems natural gas in areas not supplied with gas and modernization of existing distribution networks Priority X Energy security including diversification of energy sources Operational Programme Infrastructure and Environment, 2007 - 2013. Supervision includes the construction of a gas pipeline with a length of about 5.9626 kilometers, in particular: - Episode I of Pz 11 ( Pz 11 + 50,9m) for Pz 15a (Pz 15 + 3.3 m) - the length of 0.2165 km DN 250 (pipeline construction project forming section II) - Episode II of Pz 43 + 24m to the Pz 47 + 0, 6m - the length of 0.4197 km DN 250 (pipeline construction project forming section III / 2) - Episode III of Pz Pz 68 to 87a (Pz 87 + 35,2m) - the length of 4.1368 km DN 300 (forming gas pipeline construction project sections IV / 1, IV / 2, IV / 3, IV / 4, V and railway line No. 208 relationship Działdowo-Chojnice) - Episode IV from Pz Pz 91a to 94 + 15m - the length of 1.1896 km DN 300 ( pipeline construction project forming sections VI / 1, VI / 2, VI / 3, VI / 4).