Call +44 800 9755 164

Public tenders for energy in Bydgoszcz Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity, heating, solar and nuclear energy

Komenda Wojewódzka Policji w Bydgoszczy | Published September 23, 2016  -  Deadline November 2, 2016
Electricity sales for Police units Kujawsko-Pomorskie: KMP Grudziadz, KMP Toruń, KMP Wloclawek, KPP Aleksandrów, KPP Brodnica, KPP Chelmno, KPP Golub-Dobrzyn, KPP Lipno, KPP Radziejów, KPP Rypin, KPP Wabrzezno, KWP Bydgoszcz with subordinate units.

Electricity, heating, solar and nuclear energy

Komenda Wojewódzka Policji w Bydgoszczy | Published October 6, 2016  -  Deadline November 3, 2016
1. The subject of the procedure is the sale of electricity to the Police units Kujawsko-Pomorskie.

Bydgoszcz: Construction street Lunar including execution of pieszojezdni with parking bays, technical infrastructure (expansion of storm water drainage and energy and reconstruction of networks colliding with the investment) and to strengthen the slope on plots Reg. No. 100, 59, 52/1, 41 and 124 / 8 rpm. 65 in Bydgoszcz

Stowarzyszenie Budowy ulicy Księżycowej | Published July 27, 2016  -  Deadline October 31, 2016
The scope of works includes in particular: 1) road works related to construction of the street Moon, including: a) demolition work, b) earthworks, c) executing the foundation, laying curbs and resistors and arrangement of surfaces including 8 cm - 1298.3 m2, 6 cm - 3.9 m2, - the construction of the parking lot of openwork plates 40x60x10 cm filled with aggregate broken 0-31,5 mm (10 parking spaces with the dimensions 2,5x6,0 m) - 159.0 m2, 8 cm - 18 2 m2, 8 cm - 63.2 m2, 6 cm - 56.1 m2, 6 cm - 11.3 m2, 16-18 cm or trylinki - 16.1 m2 - performing retaining wall - 19.2 m, 10 cm filled with humus with sowing grass - 63.9 m2, 10 cm - 536.3 m2, 2) work on the implementation of storm water drainage system in the building - street inlets concrete DN500 - 6 pcs., - installation of storm sewer pipes of polymer dn 355x52mm - 121.1 m, - installation of storm sewer pipes PVC-U solid śr.315x9,2mm SN8 - 136.6 m, - installation of storm sewer pipes PVC-U solid śr.200x5,9mm SN8 - 19.1 m - well reinforced fi 1000 with manhole cast iron type D400 - 1 pc., - well reinforced fi 500 with manhole cast iron type D400 - 6 pcs., - well plastic fi 800 - 4 pcs., 3) work related to the construction of road lighting including: - demolition of lighting columns - 3 pcs., - construction of lighting columns - 3 pcs., - dismantling cable lighting - 42.3 m, - laying cable lighting - 44.2 m, - laying pipes bipartite fi 110 - 3 0 m, 4) control and protection devices of the existing underground utilities, 5) installation of road signs and markings, 6) the execution and delivery of the Employer as-built documentation (including inventory geodesic as-built), work should be carried out in accordance with the design documentation, hereinafter referred to as technical documentation (part V - technical documentation) and the specification of the technical implementation and acceptance of works hereinafter referred to as the technical specifications (part III - Technical specifications). Making all fees and arrangements related to the implementation of investment resulting directly from the documentation, as well as necessary to perform the contract, for example. VAT, insurance costs, all the preparatory work, cleaning, management of the construction site, maintenance costs of facilities construction (repair, water, electricity phone, supervision of construction), the costs of occupation of the roadway, the cost of changing traffic organization, surveying services, employment manager of construction, as-built geodesic inventory, etc., belong to the Contractor and are its cost. In the course of the work the Contractor is obliged to preserve the health and safety regulations and reduce the burden of the works. These included documentation, product names / products pointing to a particular manufacturer are only examples of their use in the implementation of the contract and should not be construed as obliging, because in no way they bind the Contractor. 883 as amended.) And its implementing legislation and for general use in the construction industry. The Employer recommends that the contractor is familiar with the subject matter for proper and reliable preparation of the offer and conducted a site visit in order to get acquainted with the contract and the conclusion of the offer price of all costs for the works necessary for the proper performance of the contract. In order to prepare a proper valuation of the offer the Contractor is obliged to check the conformity of the scope of work (type and quantity of work) included in the documentation of the actual state. Transport of materials to the construction site (the place of performance of the contract) and the provision and maintenance of machines and equipment necessary for the proper performance of the contract be borne by the Contractor. 21, as amended.), And in particular is responsible and obliged to manage the waste. Employer allows the use of materials equivalent parameters not worse than indicated in the documentation. The Employer will not be checked or corrected estimate Contractor assuming correctly stated inclusive price total in the tender form.
  • 1