Public tenders for oil in Csolnok Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Heat energy development Csolnoki - Amendment No. 1 contract

Csolnok Község Önkormányzata | Published December 30, 2015
Winner
Wagner Solar Hungária Kft.
cpvs
45000000, 45350000, 42511110, 09331000

Heat energy development under the EEOP Csolnoki 2015-4.10.0 / U with code written to the tender submitted applications, such as conditional public tender. Part 1 Este Building Services Based on the 2014 accounts, clearing 945.1 GJ / year housing land in order to fully replace heat (+/- 5%) is required to install heat pumps. Based on the use of heat pumps in order to meet bathing facilities affected by the development process heat demand of some or all of the direct-drive electric heat pump systems with a seasonal performance factor after the primary energy usage (SPFprim) of at least 1.3 or higher. The recorded data, the monitoring system must calculate and record the COP values ​​as well as values ​​for the heating season SPFprim or automatically. The conversion specified in the table following primary energy factors are used: Table 1: Energy factors of primary energy Primary energy factor Electricity Gas 2.50 1.00 1.00 Fuel oil Firewood, biomass 0.60 0.00 Megújulóból generated waste heat from the process stream electricity 0 00 herein the SPF factor SPFprim factor from the primary energy usage thereof. Where the power company has geo-tariff or tariff-H, and the planned heat pump system is entitled to make use of one of them, there must conclude a contract with the power company and the environment is also to be implemented accordingly. This fulfillment can be checked on the basis of monitoring data. If undertaken by the applicant's primary energy consumption limits and the limits SPFprim the maintenance period is not met, the subsequent return of the amount of aid may incur. The main contractor carrying out the execution of the activities carried out for 5 year performance bond guarantee is required. Please note that the project may require extraordinary maintenance reporting period, the Ministry of National Development to the applicant. The offer is necessary to prepare that only the following are eligible to the tender activities should include: - the development of heat pump systems associated with the pool heat supply heat exchanger secondary sides - Heat pump equipment installation - design, installation and commissioning of primary and secondary sides - Geothermal Heat Response test - Monitoring developing and installing a system by which the COP, SPF values ​​can be calculated and verified in accordance with the Energy Study. - Must provide the heat pump's energy supply and energy tapping connection point (s) meet the development of heat pump systems should be installed in the Call for Proposals C1. The requirements of point that the submission of supporting documents no later than the due fulfillment along with the Implementation Documentation. Please note that the installation of air-to-air heat pump system are not eligible under this call! Full technical parameters and preparation of technical documentation required by the Offeror responsible for the fulfillment of the above conditions. In Part 2 of 50 kWp photovoltaic system - installation of 50 KVA solar system feeding power back to the top of the swimming pool and 67/2 u. Top properties under the swimming pool to replace the annual electricity needs. 50 kVA on the basis of the purpose of full or partial direct satisfaction of developing solar system (s) connected load below (HMKE size) technological electricity demand on the state of post-development bathing facilities affected by the development of solar systems and their locking systems, connection to the electricity grid and system technically necessary for safe operation of equipment, battery and network elements (for example solar panels, scaffolding, inverter, battery). The photovoltaic system to be installed should meet the following requirements are submission of supporting documents no later than the due fulfillment along with the Implementation Documentation: - A solar panel complies with EN 61730 standards. Submission of the certificate are required! - The solar power module manufacturers guarantee a minimum of 20 years, at least 80% power

Energy development Csolnoki swimming pool - information on results advertising

Csolnok Község Önkormányzata | Published October 9, 2015
Winner
Wagner Solar Hungária Kft.;Wagner Solar Hungária Kft.
cpvs
45000000, 45350000, 42511110, 09331000

Heat energy development under the EEOP Csolnoki 2015-4.10.0 / U with code written to the tender submitted applications, such as conditional public tender. Part 1 Este Building Services Based on the 2014 accounts, clearing 945.1 GJ / year housing land in order to fully replace heat (+/- 5%) is required to install heat pumps. Based on the use of heat pumps in order to meet bathing facilities affected by the development process heat demand of some or all of the direct-drive electric heat pump systems with a seasonal performance factor after the primary energy usage (SPFprim) of at least 1.3 or higher. The recorded data, the monitoring system must calculate and record the COP values ​​as well as values ​​for the heating season SPFprim or automatically. The conversion specified in the table following primary energy factors are used: Table 1: Energy factors of primary energy Primary energy factor Electricity Gas 2.50 1.00 1.00 Fuel oil Firewood, biomass 0.60 0.00 Megújulóból generated waste heat from the process stream electricity 0 00 herein the SPF factor SPFprim factor from the primary energy usage thereof. Where the power company has geo-tariff or tariff-H, and the planned heat pump system is entitled to make use of one of them, there must conclude a contract with the power company and the environment is also to be implemented accordingly. This fulfillment can be checked on the basis of monitoring data. If undertaken by the applicant's primary energy consumption limits and the limits SPFprim the maintenance period is not met, the subsequent return of the amount of aid may incur. The main contractor carrying out the execution of the activities carried out for 5 year performance bond guarantee is required. Please note that the project may require extraordinary maintenance reporting period, the Ministry of National Development to the applicant. The offer is necessary to prepare that only the following are eligible to the tender activities should include: - the development of heat pump systems associated with the pool heat supply heat exchanger secondary sides - Heat pump equipment installation - design, installation and commissioning of primary and secondary sides - Geothermal Heat Response test - Monitoring developing and installing a system by which the COP, SPF values ​​can be calculated and verified in accordance with the Energy Study. - Must provide the heat pump's energy supply and energy tapping connection point (s) meet the development of heat pump systems should be installed in the Call for Proposals C1. The requirements of point that the submission of supporting documents no later than the due fulfillment along with the Implementation Documentation. Please note that the installation of air-to-air heat pump system are not eligible under this call! Full technical parameters and preparation of technical documentation required by the Offeror responsible for the fulfillment of the above conditions. In Part 2 of 50 kWp photovoltaic system - installation of 50 KVA solar system feeding power back to the top of the swimming pool and 67/2 u. Top properties under the swimming pool to replace the annual electricity needs. 50 kVA on the basis of the purpose of full or partial direct satisfaction of developing solar system (s) connected load below (HMKE size) technological electricity demand on the state of post-development bathing facilities affected by the development of solar systems and their locking systems, connection to the electricity grid and system technically necessary for safe operation of equipment, battery and network elements (for example solar panels, scaffolding, inverter, battery). The photovoltaic system to be installed should meet the following requirements are submission of supporting documents no later than the due fulfillment along with the Implementation Documentation: - A solar panel complies with EN 61730 standards. Submission of the certificate are required! - The solar power module manufacturers guarantee a minimum of 20 years, at least 80% power
  • 1