Public tenders for oil in Brugge Belgium

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Oil, margarine and sweet spreads 2016

Ruddersstove | Published May 26, 2015  -  Deadline August 7, 2015
cpvs
15431100, 15332200, 15431000

The supply of oil, margarine and sweet spreads in the central kitchen of the CPAS Bruges and associations during the year 2016.

Deliver heating oil municipal buildings and industrial diesel for machinery OW / WEB 2016-2018

Gemeente Overijse | Published June 16, 2015  -  Deadline September 11, 2015
cpvs
09135100, 09134000

Deliver heating oil municipal buildings and industrial diesel for machinery OW / WEB 2016-2018

Jams and marmalades; fruit jellies; fruit or nut purée and pastes

Ruddersstove | Published March 28, 2017  -  Deadline July 4, 2017
cpvs
15332200, 15431000

The purchase of oil, margarine and sweet spreads for Ruddersstove and associations of CPAs Bruges in 2018 and 2019.

Framework agreement for the purchase of environmentally friendly fuels and oils.

Agentschap voor Natuur en Bos - Provinciale Dienst West-Vlaanderen | Published October 7, 2014  -  Deadline November 13, 2014
cpvs
09100000

Framework contract for the purchase of environmentally friendly fuel and oils.

Adjustments area road district Kortrijk - places separator with accompanying sewage and drainage works

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling West-Vlaanderen | Published October 9, 2014  -  Deadline October 20, 2014
cpvs
45232440

Adjustments area road district Kortrijk - places separator with accompanying sewage and drainage works Adoption mainly includes: - Preparatory work: grub planting, cutting + breaking pavement, breaking pipes / tubes - Supply and installation of oil separator, sampling pit and accessories - Execution of sewerage works and drainage of water - Installation of water ditches, concealed gutters and associated vanputten - directing work - maintenance of the work during the guarantee period

Sewage, refuse, cleaning and environmental services

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling West-Vlaanderen | Published February 2, 2017
Winner
Verhelle NV
cpvs
90000000, 90640000

Clean tunnels in District 311 and 315

The adoption includes mainly:

- The complete cleaning and removal of all drainage systems (drains, manholes, pumping stations, reservoirs, drainage troughs, oil separators, ...), cleaning wall coverings, ceilings, steps, stairways, safety shock absorbers, parapets, bridge decks and various accessories described tunnels / bridges this adoption.

All tunnels for vehicles, if so indicated, the cleaned overnight, all administrative burdens that come here are also a burden adoption. The contractor will not be paid extra for nightly performances.

If the works take more than one night, the contractor must remove all signs back to the dawn and completely clear the tunnel.

The tunnels for pedestrians and cyclists are always cleaned during the day. The users of the tunnels must always have the passage during the cleaning work, should, if necessary, the

contractor cease its operations to allow passage.

The supply of water for the cleaning work is also an adoption expense.

- The processing of dredged materials. The contractor is responsible for the transport and processing of clearance spoil. Transportation and processing should always be done in accordance with applicable environmental and transportation laws. The contractor is only paid on the basis of its weight vouchers, invoices and processing certificates. This post is only understood the transport and processing of the waste collected. Possible environmental charges for dumping or incineration shall be paid into the separate account provided for this purpose.

- Local / maintenance / removal of yard signs.

- The maintenance of the works during the guarantee period.

Clean tunnels in District 311 and 315

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling West-Vlaanderen | Published September 1, 2016  -  Deadline October 24, 2016
cpvs
90000000, 90640000

Clean tunnels in District 311 and 315

The adoption includes mainly:

- The complete cleaning and removal of all drainage systems (drains, manholes, pumping stations, reservoirs, drainage troughs, oil separators, ...), cleaning wall coverings, ceilings, steps, stairways, safety shock absorbers, parapets, bridge decks and various accessories described tunnels / bridges this adoption.

All tunnels for vehicles, if so indicated, the cleaned overnight, all administrative burdens that come here are also a burden adoption. The contractor will not be paid extra for nightly performances.

If the works take more than one night, the contractor must remove all signs back to the dawn and completely clear the tunnel.

The tunnels for pedestrians and cyclists are always cleaned during the day. The users of the tunnels must always have the passage during the cleaning work, should, if necessary, the

contractor cease its operations to allow passage.

The supply of water for the cleaning work is also an adoption expense.

- The processing of dredged materials. The contractor is responsible for the transport and processing of clearance spoil. Transportation and processing should always be done in accordance with applicable environmental and transportation laws. The contractor is only paid on the basis of its weight vouchers, invoices and processing certificates. This post is only understood the transport and processing of the waste collected. Any environmentally charges for landfilling or incineration to be paid into the separate account provided for this purpose.

- Local / maintenance / removal of yard signs

- The maintenance of the works during the guarantee period.

Sewage, refuse, cleaning and environmental services

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling West-Vlaanderen | Published September 6, 2016  -  Deadline October 24, 2016
cpvs

Clean tunnels in District 311 and 315.

The adoption includes mainly:

- The complete cleaning and removal of all drainage systems (drains, manholes, pumping stations, reservoirs, drainage troughs, oil separators, ...), cleaning wall coverings, ceilings, steps, stairways, safety shock absorbers, parapets, bridge decks and various accessories described tunnels / bridges this adoption.

All tunnels for vehicles, if so indicated, the cleaned overnight, all administrative burdens that come here are also a burden adoption. The contractor will not be paid extra for nightly performances.

If the works take more than one night, the contractor must remove all signs back to the dawn and completely clear the tunnel.

The tunnels for pedestrians and cyclists are always cleaned during the day. The users of the tunnels should the contractor must always have transit, if required during the cleaning work discontinue its work to allow passage.

The supply of water for the cleaning work is also an adoption expense.

- The processing of dredged materials. The contractor is responsible for the transport and processing of clearance spoil. Transportation and processing should always be done in accordance with applicable environmental and transportation laws. The contractor is only paid on the basis of its weight vouchers, invoices and processing certificates. This post is only understood the transport and processing of the waste collected. Possible environmental charges for dumping or incineration shall be paid into the separate account provided for this purpose.

- Local / maintenance / removal of yard signs.

- The maintenance of the works during the guarantee period.

  • 1