Nord Trøndelag fylkeskommune | Published May 17, 2017
cpvs
71314000, 71314200, 09310000, 65400000, 09330000

Energy supply for buildings and roads

Local energy production

Concession energy

Administration.

The future procurement can include supplies for the following segments:

* Stationary energy supply for buildings, etc.

* Stationary energy supply for road lights

* Local energy production.

* Concession energy

* Stationary energy supply for any municipalities entering into the agreement.

* Administration services.

Electrical energy.

Sunnhordland Interkommunale Innkjøpsforum (Sunnhordland Inter-municipal Procurement Co-operation) | Published June 3, 2015
Winner
Ishavskraft
cpvs
09300000

Electrical energy.

Prequalification — geoexchange energy systems for energy storage — air force base.

Forsvarsbygg (The Norwegian Defence Estates Agency) | Published December 26, 2015  -  Deadline January 21, 2016
cpvs
76431000, 24951110, 45262220, 76300000, 76411000, 76430000

Turnkey contract for a geoexchange energy system — intake system for a geoexchange energy system.

The contract will mainly consist of:

— A geoexchange energy system

— An intake system thereof

The geoexchange energy system is designed as a balanced energy storage where the outlet of heating and supply of surplus energy is almost identical. In stage 1, the system will require approx. 70 geoexchange wells with a depth of 250 metres (efficient drilling metres). The number of wells can be reduced by drilling each well deeper into the ground.

BIM (Building Information Modelling) drawings are required as part of the engineering design and MOM (Management, Operation and Maintenance) documentation.

In an s.

A framework agreement on consultancy services for energy/environment, ENØK (energy economising) and energy labelling/assessments.

Omsorgsbygg Oslo KF (Oslo Municipality, the Municipal Undertaking for Social Service Buildings) | Published July 1, 2015
Winner
Norconsult AS
cpvs
71314300

Oslo municipality, c/o the Municipal Undertaking for Social Service Buildings, henceforth referred to as the contracting authority, invites tenderers to a tender contest in relation to a framework agreement for consultancy services within energy/environment, ENØK (energy economising) and energy labelling/assessments. The Municipal Undertaking for Social Service Buildings is a municipal enterprise owned by Oslo kommune to develop, build, operate, and maintain purpose-built buildings. As of January 2011 the total building area is approximately 900 000 m2 divided between more than 658 properties and 1 150 buildings. The buildings mainly consist of nursing homes, residential — and rehabilitation centres, nursery schools, fire stations, as well as cultural centres. The framework agreement shall meet the contracting authority's requirements for consultancy services in relation to energy/environment, ENØK (energy economising) and energy labelling/assessments.

A framework agreement on consultancy services for energy/environment, ENØK (energy economising) and energy labelling/assessments.

Omsorgsbygg Oslo KF (Municipal Undertaking for Social Service Buildings) | Published April 23, 2015  -  Deadline June 1, 2015
cpvs
71314300

Oslo municipality, c/o the Municipal Undertaking for Social Service Buildings, henceforth referred to as the contracting authority, invites tenderers to a tender contest in relation to a framework agreement for consultancy services within energy/environment, ENØK (energy economising) and energy labelling/assessments. The Municipal Undertaking for Social Service Buildings is a municipal enterprise owned by Oslo kommune to develop, build, operate, and maintain purpose-built buildings. As of January 2011 the total building area is approximately 900 000 m2 divided between more than 658 properties and 1 150 buildings. The buildings mainly consist of nursing homes, residential - and rehabilitation centres, nursery schools, fire stations, as well as cultural centres. The framework agreement shall meet the contracting authority's requirements for consultancy services in relation to energy/environment, ENØK (energy economising) and energy labelling/assessments.

Energy and related services

Posten Norge AS | Published March 21, 2017  -  Deadline April 25, 2017
cpvs
71314000, 71314300

The contracting authority shall procure a web-based energy-efficient surveillance system (EOS) for its locations in first and foremost Norway and Sweden. However, Denmark and Finland may also be relevant The contracting authority prefers to enter into an agreement with one tenderer. The EOS shall monitor, register, report and analyse energy consumption and the energy effect history in the property portfolio from numerous different energy sources.

Further information: https://procurementportal.posten.no/Pages/RFxDetails.aspx?RFxId=60812

The contracting authority shall procure a web-based energy-efficient surveillance system (EOS) for its locations in first and foremost Norway and Sweden. However, Denmark and Finland may also be relevant The contracting authority prefers to enter into an agreement with one tenderer. The EOS system shall monitor, register, report and analyse energy consumption and the energy effect history in the property portfolio from numerous different energy sources.

Further information: https://procurementportal.posten.no/Pages/RFxDetails.aspx?RFxId=60812

Energy and related services

Posten Norge AS | Published April 6, 2017  -  Deadline April 19, 2017
cpvs
71314000, 71314300

The contracting authority shall procure a web-based energy-efficient surveillance system (EOS) for its locations in first and foremost Norway and Sweden. However, Denmark and Finland may also be relevant The contracting authority prefers to enter into an agreement with one tenderer. The EOS shall monitor, register, report and analyse energy consumption and the energy effect history in the property portfolio from numerous different energy sources.

Further information: https://procurementportal.posten.no/Pages/RFxDetails.aspx?RFxId=60812

Electrical energy.

Sunnhordland Interkommunale Innkjøpsforum | Published December 2, 2014  -  Deadline January 16, 2015
cpvs
71314000, 09300000, 71314200

Electrical energy with the accompanying services, portfolio management, invoicing and consultancy for Stord, Bømlo, Kvinnherad, Fitjar and Tysnes municipalities.

Energy management system — EOS

Jernbaneverket (The Norwegian National Rail Administration) | Published April 2, 2016
Winner
OneCo Solutions AS
cpvs
48326000, 38550000, 38551000, 38552000, 38554000, 48451000

Investment in an Energy management system (EOS) for the Norwegian National Rail Administration, henceforth abbreviated and referred to as JBV. The Energy management system, henceforth referred to as EOS, shall provide the users a clear, updated and reliable information, notify abnormal operational conditions, contribute to an increased consciousness about the actual energy consumption and facilitate analyses of the energy consumption.

Annually JBV uses approx. 110 GWh electricity for operation of infrastructure and own buildings, and approx. 2,5 GWh fossil fuel for heating buildings. JBV's action plan for energy efficiency in the period 2014-2017 gives guidelines for prioritising measures and funds during the period. JBV has since 2003 worked with energy efficiency and is now implementing the 4th energy efficiency project in cooperation with Enova. The following installations/buildings/facilities represent the largest consumptions of energy in JBV:

— Points heaters,

— Lighting,

— Ice melting systems on platforms/stairs,

— Technical systems/railway signalling plants,

— Building,

i. Stations,

ii. Train workshop halls,

iii. Engine sheds,

iv. Rooms for station controllers,

v. Electrical installation technical buildings,

vi. Other buildings.

At present JBV has 2 100 electricity meters, of which approx. 750 meters are measured every hour. These are electricity meters and they represent more than 80 % of the electricity consumption for The Norwegian National Rail Administration. All hourly measured electricity meters belonging to JBV shall in this project be registered in an energy management system with automatic transmission of consumer data on hourly basis. The data shall be collected from the Norwegian National Rail Administration Energy's settlement system, Elwin/Frost. The Norwegian National Rail Administration Energy is JBV's own energy company. 4 locations have already installed purpose divided measuring with individual meters. The hourly registrations from these meters shall also be collected from the energy management system and necessary equipment in order achieve this based on GPRS communication must be included. JBV will be in charge of installation and connection based on a circuit diagram from the supplier of the Energy Management System. Any configuration of the equipment shall be made by the supplier of the Energy Management System. The meters are manufactured by Scandinavian electric and have pulse output. The current meter structure is a mixture of various consumer groups.

Energy management system — EOS.

Jernbaneverket (The Norwegian National Rail Administration) | Published December 8, 2015  -  Deadline January 20, 2016
cpvs
38551000, 38550000, 38552000, 38554000, 48326000, 48451000

Investment in an Energy management system (EOS) for the Norwegian National Rail Administration, henceforth abbreviated and referred to as JBV The Energy management system, henceforth referred to as EOS, shall provide the users a clear, updated and reliable information, notify abnormal operational conditions, contribute to an increased consciousness about the actual energy consumption and facilitate analyses of the energy consumption. Annually JBV uses approximately 110 GWh electricity for operation of infrastructure and own buildings, and approximately 2.5 GWh fossil fuel for heating buildings. JBV's action plan for energy efficiency in the period 2014-2017 gives guidelines for prioritising measures and funds during the period. JBV has since 2003 worked with energy efficiency and is now implementing the fourth energy efficiency project in cooperation with Enova. The following installations/buildings/facilities represent the largest consumptions of energy in JBV: — Points heaters; — Lighting; — Ice melting systems on platforms/stairs; — Technical systems/railway signalling plants; — Buildings. o Stations; o Train workshop halls; o Engine sheds; o Rooms for station controllers; o Electrical installation technical buildings; o Other buildings. At present JBV has 2 100 electricity meters, of which approximately 750 meters are measured every hour. These are electricity meters and they represent more than 80 % of the electricity consumption for JBV. All hourly measured electricity meters belonging to JBV shall in this project be registered in an energy management system with automatic transmission of consumer data on hourly basis. The data shall be collected from the Norwegian National Rail Administration Energy's settlement system, Elwin/Frost. The Norwegian National Rail Administration Energy is JBV's own energy company. 4 locations have already installed purpose divided measuring with individual meters. The hourly registrations from these meters shall also be collected from the energy management system and necessary equipment in order achieve this based on GPRS communication must be included. JBV will be in charge of installation and connection based on a circuit diagram from the supplier of the Energy Management System Any configuration of the equipment shall be made by the supplier of the Energy Management System The meters are manufactured by Scandinavian electric and have pulse output. The current meter structure is a mixture of various consumer groups.

Energy supply contract 852023.

Forsvarsbygg | Published September 23, 2014  -  Deadline October 19, 2014
cpvs
09320000, 09321000, 09323000

The Norwegian Defence Estates Agency invites suppliers to submit tenders in a negotiated procedure with pre-qualification for the procurement of environmentally friendly energy and it is now inviting private actors to a cooperation for heating and cooling the Norwegian Defence Estates Agency's new and existing buildings and sites at Ørland air station. The Norwegian Defence Estates Agency is announcing energy services as this will provide cost efficient solutions, and efficient energy production operation. If the Norwegian Defence Estates Agency decides that constructing and running the energy services themselves will, in total, be more favourable than procuring from an external supplier, this will be preferred. Furthermore, it is a prerequisite that the granting authority approves the procurement of the energy services.

Aggregation OF FLEXIBLE ENERGY LOAD

Statnett SF | Published February 20, 2014  -  Deadline March 21, 2014
cpvs
32571000, 09310000, 31220000, 31230000, 32570000, 32573000, 48211000, 48213000, 48214000, 51110000, 51112000, 51112100, 51112200, 51210000, 51220000, 72200000, 72310000, 73100000, 73200000, 73300000

The projects objective is two test a technical proof of concept and evaluate the utilization efficiency of flexible energy load in the power system organized by energy load aggregation systems. Evaluation of the test should include the energy load input parameters and documentation of the Consequences of intermittency experienced. This is required after the test two enable Statnett and the Network Operators to better understand the viability of flexible energy load.

Delivery of electrical energy.

Romerike Avfallsforedling IKS (ROAF) | Published December 6, 2014
Winner
Eidsiva Marked AS880 258 192PB 4100Hamar 2307 firmapost@eidsivaenergi.nohttp://www.eidsivaenergi.no
cpvs
09310000, 09000000, 09300000

ROAF, hereafter called the contracting authority, shall establish delivery contracts for electrical energy with 1 energy supplier. The energy supplier shall see to the contracting authority's total need for electrical energy. The contracting authority would like to obtain price offers for the delivery of electrical energy to all sites that the company is responsible for. The sites are located in different places in the owner municipalities. The aim of this competition is to make it possible for the contracting authority to achieve competitive prices in the coming years and so that the supplier facilitates the delivery of the physical electrical energy that the contracting authority needs at any one time. The contracting authority expects to be treated as a major customer. The price of the delivery shall be calculated against the joint nordic energy exchange Nord Pool's daily area price out to the contracting authority's geographical location. The contracting authority would only like tenders for spot price based on Nord Pool's spot market with invoicing in arrears. The total consumption of electrical energy for the sites that the contracting authority uses is estimated to a minimum of 2 GWh/annum. The consumption of electrical energy is based on historical figures in the period 2013 up to and including September 2014. The stated volume is only a guideline and is not binding for the contracting authority. The amount is subject to changes in the real need and the number of stated measuring points. The supplier shall coordinate any change of supplier connected to the establishment of the contract. It is a prerequisite for the contracting authority that the supplier ensures that relevant information flow and key data is continually maintained, updated and properly stored at the supplier, and is available via a web portal. The supplier requirements are described in annex 1: ‘Specifications’ The annum need for electrical energy is calculated to approx. 2 GWh. The volume is subject to change, both up and down. The contracting authority currently has supplier contracts for electrical energy without being locked for a fixed period. The estimated volume in this procurement is meant to be used for evaluating the tenders. The contracting authority will choose 1 supplier for the entire delivery. The contract will start January 2015 and the contract period will be 2 years. In addition to the stated contract period there will be an option for 1+1 year. The contract shall not be locked for a fixed period. Standard energy delivery contract prepared by the Conumer Ombudsman and Energi Norge will form the basis for this delivery — Annex 4 ‘Standard energy delivery contract’.

Energy and related services

Kultur- og idrettsbygg Oslo KF (The Municipal Undertaking for Culture and Sports Facilities Oslo) | Published August 23, 2016  -  Deadline September 26, 2016
cpvs

Energy and related services

Energy and related services

Nordic Energy Research (Nordisk Energiforskning) | Published March 23, 2016  -  Deadline April 1, 2016
cpvs
71314000, 09300000, 65400000, 73220000

Energy and related services

Municipal Energy Fund Hordaland (KKH).

Meland Kommune | Published December 6, 2014  -  Deadline January 29, 2015
cpvs
09310000

Procurement of electrical energy on behalf of the Municipal Energy Fund Hordaland (KKH), which consists of Lindås, Masfjorden, Osterøy, Øygarden, Samnanger and Meland municipalities.

Framework agreement energy

UiT Norges arktiske universitet [The Arctic University of Norway] | Published July 20, 2016
Winner
Fjordkraft AS
cpvs
09300000

The Arctic University of Norway has entered into a framework agreement for the purchase of energy.

Framework agreement energy

UiT Norges arktiske universitet (The Arctic University of Norway) | Published March 24, 2016  -  Deadline May 6, 2016
cpvs
09300000

UiT would like to enter into a framework agreement with a supplier for the procurement of energy.

Energy Performance Contracting, Rissa municipality

Rissa kommune | Published September 2, 2013  -  Deadline October 14, 2013
cpvs
45200000

Energy Performance Contracting (EPC) for selected buildings in Rissa municipality with the opportunity to include energy labeling of buildings. CPV: 45200000.

Request for consulting services within energy management and energy efficiency — project 5200042

Kristiansand kommune [Kristiansand municipality] | Published November 17, 2016  -  Deadline December 21, 2016
cpvs
71314300, 71314000, 71314100, 71314200

Kristiansand Eiendom has a great focus on energy efficiency (Enøk), energy management and energy efficient buildings and operations

The results have been very promising and Kristiansand Eiendom is a leading capacity on this field in Norway.

Kristiansand Eiendom is the first municipality in Norway that is ISO 50001 certified for energy management.

Kristiansand Eiendom is responsible for approx. 360 000 m2 building area, divided into approx 125 purpose-built buildings. All these buildings are included in Kristiansand Eiendom's energy management system

The Contracting Authority requests tenders for energy management services for a contract period of 2 years + option for 1+1 year extension. The assignment manager's office will be situated in the Municipality's town hall and the manager shall work closely with Kristiansand Eiendom employees.

The contracting authority is free to reject all tenders if the price and/or quality does not meet our requirements.

Progress: The assignment shall be implemented immediately after the contract signing.