Construction work

Rijksuniversiteit Groningen | Published July 3, 2015
Winner
Cofely Noord BV
cpvs
45000000, 45210000, 45300000

The University of Groningen (RUG) and Hanze University Groningen work together on the construction of an institute for energy education, research and innovation; Energy Academy Europe (EAE). A special building that stands for sustainability. Not only are the activities that will take place entirely focused on sustainability in the building, the building itself will (obviously) are also extremely durable. The latter is evident from the BREEAM-NL ambition with a rating of "Outstanding". By a design team led by architects Broekbakema P and B, is working on the creation of the design. The size of the building is approximately 10 000 sqm GLA. The project will be tendered in 2 lots. The plot format is: - lot 1: construction activities, - lot 2: installation technical work.

Energy.

Noorderpoort | Published February 17, 2016  -  Deadline April 10, 2016
cpvs
09123000

The contract of one or two contractor (s) that can / can supply electricity and / or gas Noorderpoort in accordance with the functional and technical requirements specified by the contracting authority with which it is possible to spread the purchase of energy on several occasions.

Solar energy

Gemeente Groningen | Published January 11, 2017
Winner
Engie Services Noord BV
cpvs
09330000

This job provides information on the European public tender for Solar Park Vierverlaten. Client is the Board of Mayor and Aldermen of the City of Groningen by the SSC Procurement of the municipality of Groningen. Groningen wants to be energy neutral by 2035. Besides preserving buildings the municipality wants to play a leading role in the field of energy. Solar energy plays there at municipal level an important role. The construction of a solar park takes the municipality this role, which eventually can participate also residents of the city through a lot as Grunneger Power in a solar park project.

Solar energy

Gemeente Groningen | Published September 7, 2016  -  Deadline October 12, 2016
cpvs

This job includes information on the European public tender for Solar Park Vierverlaten. Client is the Board of Mayor and Aldermen of the City of Groningen by the SSC Procurement of the municipality of Groningen. Groningen wants to be energy neutral by 2035. Besides preserving buildings the municipality wants to play a leading role in the field of energy. Solar energy plays there at municipal level an important role. The construction of a solar park takes the municipality this role, which eventually can participate also residents of the city through a lot as Grunneger Power in a solar park project.

Other sources of energy supplies and distribution

WarmteStad BV | Published February 26, 2016
cpvs
65400000, 65410000

Other sources of energy supplies and distribution

Petroleum products, fuel, electricity and other sources of energy

Noorderpoort | Published August 19, 2015  -  Deadline September 24, 2015
cpvs
09123000

The contract is for the supply of electricity and / or gas in 2018 and 2019 with the ability to spread prijsfixaties on several occasions.

Petroleum products, fuel, electricity and other sources of energy

UMCG | Published November 15, 2016
Winner
Powerhouse
cpvs
09000000

University Medical Center Groningen

Purpose of the contract

The purpose of the tender is to conclude an agreement with one or more suppliers on the supply of energy (gas and electricity) at the University Medical Center Groningen.

Agreement

Type of contract: Framework Agreement.

Duration: 3 years.

Possibility of extension for 2 x 1 year.

Procurement 2012

In this tender, the (amended per 01.07.2016) Procurement Act 2012 apply.

The supply of gas to the following locations of the UMCG:

UMCG location: Hanzeplein

UMCG location: Rehabilitation Center Beatrixoord

UMCG location: Eemspoort

UMCG location: Bloemsingel

UMCG location: Proton Therapy Center Groningen.

Supply of electricity to the following locations of the UMCG:

UMCG location: Hanzeplein

UMCG location: Rehabilitation Center Beatrixoord

UMCG location: Eemspoort

UMCG location: Bloemsingel

UMCG location: Proton Therapy Center Groningen.

Other sources of energy supplies and distribution

WarmteStad BV | Published October 23, 2015  -  Deadline November 18, 2015
cpvs
65400000, 65410000

Production, operation and financing part of the production of geothermal heat for district heating Northwest.

Petroleum products, fuel, electricity and other sources of energy

Noorderpoort | Published October 3, 2015
cpvs
09000000, 09310000, 09123000

Aardolieproducten, brandstof, elektriciteit en andere energiebronnen

Research tele vulnerability smart meters.

Agentschap Telecom | Published March 8, 2016
Winner
CGI
cpvs
79720000

This study aims to investigate the social risks of smart electricity meters. The energy sector energy consumption can fast track with great resolution, this creates new applications for both the consumer and the energy sector. Consider management of the energy and energy conservation for the benefit of consumers. Additionally arise with the introduction of wireless connections for the energy sector, new dependencies and possibly new risks. What fails as smart meters? What are the risks, and the stakeholders are sufficiently aware of the risks ?.

Construction work

Rijksuniversiteit Groningen | Published September 10, 2016  -  Deadline October 7, 2016
cpvs
45000000, 45300000

The new building for the disciplines of physics and chemistry will comprise approximately 63 000 sqm gross floor area and are provided with a broad range of functions, such as classrooms, laboratories and offices. The University attaches great importance to functionality, flexibility, innovation and technology. These aspects are also woven into the design. The building must be expanded by approximately 10%. Durability is for the back is also an important aspect, without this going at the expense of functionality and flexibility. The design is based on the level BREEAM Excellent for the aspects Energy, Healthcare and Materials. Formal certification is not an issue.

The work will be awarded in one lot, the following subpercelen:

1. architectural implementation work, including the façade maintenance system and part of the demolition;

2. installation technical implementation work (mechanical and electrical, and including the transport and building maintenance units);

3. work related to the laboratory device; and

4. Work on the clean rooms.

Part of the contract is a maintenance period. Given the phased construction will be for the first phase involved an extended maintenance period, the match ends with the maintenance period of the second phase.

For the full description of the procurement process and project information, refer to the PQQ with characteristic RNN1504R003.

Solar panels

Waterschap Noorderzijlvest | Published September 14, 2016
Winner
BAM Bouw en Techniek BV
cpvs
09331000

The Noorderzijlvest Water searching with this tender a contractor acting as a strategic partner cost-effectively realize the following main objectives and related ancillary objectives.

Main objective:

Maximum solar power production over a period of 25 years.

Secondary objectives:

Harnessing effective and efficient of sites, buildings and installations for goal.

Harnessing effective and efficient of the SDE subsidy decisions received by the water board.

Solar panels

Rijksuniversiteit Groningen | Published November 11, 2015  -  Deadline December 16, 2015
cpvs
09331000

Until the scope of this contract for the purchase, installation and maintenance of a PV system include the following parts: supply and installation of a PV system that collectively can make a minimum amount of electrical energy from an average of 364.5 MWh per year . In a period of 15 years there is a total of at least 5 467.5 MWh of electrical energy to be worked up, counted from completion of the installation. The PV plant should be placed on a ground location near the Nuclear Physics Accelerator Institute (KVI CART) located at the address: the Grazing 25 in Groningen. This site is located at the Zernike Campus in Groningen. Construction of the electrical infrastructure to connect to a terminal group of the main distributor which is situated in the building of KVI CART. Above PV system should be maintained so that the uitgevraagde quantity of electrical energy to the above mentioned period is guaranteed. All the necessary construction and attachment means which are necessary in order to place the PV system. All the groundwork that is necessary to install the PV system on these matters and to realize the connection to the terminus of the main distribution. Replacing system components which are beyond the warranty as well as the replacement of stolen items. Note: On November 18th the University will organize a fireplace. To do this you must register no later than November 13th. For details, see the tender document.

Banking and investment services

Provincie Groningen | Published March 16, 2017  -  Deadline May 24, 2017
cpvs
66100000

Revolving fund.

The province wants projects aimed at enhancing the quality of life and contributing further to help the energy transition. For this, a revolving fund will be established from which loans are made to provide projects with (subordinated) loans funding. The target groups are organizations, associations, foundations, businesses and governments. The fund focuses on more local initiatives. It is not open to individuals. The fund has a term of 10 years and a capacity of 23 million euros. The money flows back into the fund can be re-used during the lifetime of the fund. The fund's energy part is complemented possible in 2017.

Concrete work:

- Implementing the goals and results of the foundation to achieve;

- The fund to market (eg website);

- Acquisition projects;

- With project owners (and other donors) jointly arrive at proposals for funding;

- Prepare proposals for the Board;

- Prepare meetings of the Board;

- Making an annual report and financial reporting (accountability);

- Coordination of projects in the province;

- Communicating the fund towards stakeholders and audiences.

Reprographic services

Alfa-college | Published July 5, 2016
Winner
Canon Nederland
cpvs
79520000

Contracting authority:

The Alpha course is Christian regional training center (ROC) for northern and eastern Netherlands. It provides secondary and vocational educational pathways in Groningen, Hoogeveen, Hardenberg, Assen and Leek. In addition, the corporate provides customized and various courses. There is the additional educational focus on the priorities Care and Housing and Sports and Vitality (Healthy Ageing), Entrepreneurship and Energy.

Objective of the contract:

The purpose of the tender is to conclude a framework agreement with one (1) contractor for performing common repro work for the Alfa college.

The assignment consists mainly of reproducing exams, individual assignments and documents of a similar nature.

Market research unlicensed equipment.

Agentschap Telecom | Published March 8, 2016
Winner
Strict
cpvs
79311400

The Ministry of Economy is working on the policy for the use of frequency spectrum in the Netherlands and Europe. Radiocommunications Agency guarantees, as executor and supervisor, the availability of modern and reliable telecommunications and the Netherlands. From this mission and commissioned by DG Energy Telecom Market and let Radiocommunications Agency research effort to market volumes of unlicensed equipment. This research aims to gain insight breakdown in market volumes of unlicensed equipment by frequency band and application and a translation thereof in a band for spectrum density. This insight helps the government in estimating future demand for unlicensed frequency bands and visualize where potential bottlenecks threaten in the spectrum.

EA Reproduction work.

Alfa-college | Published March 1, 2016  -  Deadline April 12, 2016
cpvs
79520000

Contracting authority:

The Alpha course is Christian regional training center (ROC) for northern and eastern Netherlands. It provides secondary and vocational educational pathways in Groningen, Hoogeveen, Hardenberg, Assen and Leek. In addition, the corporate provides customized and various courses. There is the additional educational focus on the priorities Care and Housing and Sports and Vitality (Healthy Ageing), Entrepreneurship and Energy.

Objective of the contract:

The purpose of the tender is to conclude a framework agreement with one (1) contractor for performing common repro work for the Alfa college.

The assignment consists mainly of reproducing exams, individual assignments and documents of a similar nature.

European non-tendering Bouwteam Selection internal cultivation location From By Veste - Foundation Hanze University Groningen

Stichting Hanzehogeschool Groningen | Published November 17, 2014  -  Deadline April 23, 2014
Winner
Geveke Bouw 02041666 Machlaan 35 Eelde, 9761TK Nederland
cpvs
45000000, 45000000

The project distinguishes outline the following subprojects: Subproject 1 The adjustment of the "head" of the building (H-wing). Subproject 2 new (expansion) of lab space for the benefit of LST. Subproject 3 The economic upgrading of the building. Subproject 4 The internal construction of B0 wing serving ABC Subproject 5 The internal construction of the C1 and D1 wing behalf IE Subproject 6 The internal construction of A0 wing for general educational spaces after relocation services company / Computerization has occurred. It should work according to a further mitres nuisance protocol. Be Special attention for the project are: • the coordination and cooperation with users plays a prominent role in the project; • construction -and installation carefully coordinate; • the contracting authority wishes to sustainability (including view materialization, energy consumption and operating costs) to achieve building; • the contracting authority wishes to achieve a building where the operating and maintenance costs are also taken into account from the design. These ambitions are to be realized: • within the available construction budget; • matching the available maintenance budgets; • fit within the target VDV. To carry out parts of the target image beyond the scope of this tender:
  • 1