Call +44 800 9755 164

Public tenders for energy in Netherlands

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyNetherlands

Services for techno-economic/socio-economic studies or modelling/simulation on European energy systems and hydrocarbon extraction

Europa-Kommissionen, Joint Research Centre, Institute for Energy and Transport, Resource Management Petten | Published March 12, 2016  -  Deadline November 29, 2019
Services for techno-economic/socio-economic studies or modelling/simulation on European energy systems and hydrocarbon extraction

PH16042 Heat transportation Sporenburg and KNSM Island (Amsterdam) - NV Nuon Energy

N.V. Nuon Energy | Published November 24, 2016  -  Deadline January 23, 2017
On behalf of NV Nuon Heat, hereinafter Nuon must Contractor two heat pipelines (supply and return) to be applied from (future) auxiliary heating plant (HWC) "Sluis Area" near IJburglaan the WOS Sporenburg and WOS Piet Hein on Sporenburg and also the branch in Wisselstraat to Hofhaus boiler house on the KNSM island in the municipality of Amsterdam.

EWTW-II - Wind Turbines - ECN Wind Energy Facilities B.V.

ECN Wind Energy Facilities B.V. | Published December 12, 2016  -  Deadline January 20, 2017
The design, engineering, manufacturing, transportation, installation, installation equipment, commissioning, construction, operation and maintenance of the 8 Wind Turbine Generators in the EWTW II project, including the foundations, the crane hardstands and the roads required for the installation and the maintenance of the Wind Turbine Generators.

Open procedure - 15385- Advisory services on behalf of energy dietary Hague (ERDH 2.0) - Empire Realty Company

Rijksvastgoedbedrijf | Published December 8, 2016  -  Deadline February 15, 2017
16 buildings in the downtown area of ​​The Hague, which belong to the building stock of the National Real Estate Company and The Hague, should be taken actually lead to reduced energy consumption of these buildings by 2040 in this area and is entirely fossil-free, taking ahead of European targets for energy saving and energy efficiency in 2050 (energy Empire Den Haag-ERDH). A necessary step is that the National Real Estate Company and The Hague before getting an overview of the measures which are open to achieve the end result. Based on this list, they can make strategic choices for the best (combination) of measures that can be realized ERDH. The Empire Realty Company and The Hague need an advisor who can provide this overview and strategy and thereby can advise.

Works contract for the construction and fitting out of an energy-efficient reception building with security, visitor and conference facilities at the main entrance of the JRC site

Europa-Kommissionen, Gemeenschappelijk Centrum voor onderzoek, directoraat Resources | Published November 19, 2016  -  Deadline March 14, 2017
Contract work for the construction and furnishing of an energy efficient building with reception facilities for monitoring, visits and meetings at the main entrance of the JRC-site

Maintenance of technical installations at Berlin mission. - Ministerie van Buitenlandse Zaken

Ministerie van Buitenlandse Zaken | Published December 20, 2016  -  Deadline January 23, 2017
The Contract relates to maintenance in the interests of safety, health, usability, energy performance and the environment of the Berlin Chancellery and Residence, including the surrounding plot with buildings. It concerns technical maintenance in the areas of electrical engineering, climate control, lifts and mechanical engineering.

Service provider for the energy project in the framework of the Regional Energy Alliance. - Municipality of Maastricht

Gemeente Maastricht | Published December 22, 2016  -  Deadline February 20, 2017
Het energiebesparingproject richt zich primair op het ontzorgen van particuliere woningeigenaren en woningeigenaren in verenigingsverband (VVE) bij het treffen van energiebesparende maatregelen. Deze energiebesparende maatregelen omvatten onder andere: 1.	Het plaatsen van zonnepanelen; 2.	het plaatsen van zonneboiler; 3.	dak-, gevel- en/of vloerisolatie; 4.	het plaatsen van hoog-rendement glas (HR++) in de buitengevels; 5.	het plaatsen van hoog-rendement combi ketel; 6.	het waterzijdig inregelen van de verwarmingsinstallatie (CV-verwarming); 7.	het verstrekken van een EPA gecertificeerd advies; 8.	het begeleiden van de eigenaar/bewoner in de renovatie naar een Nul-op-de-Meter woning (de zogenaamde MoM woning) (zie bijlage D10), en 9.	voor zover van toepassing het aanvragen van nationale- en/of regionale subsidies. De service provider richt zich primair op het maximaal ontzorgen van de particuliere woningeigenaar op het gebied van 1) de techniek (de keuze van de energiebesparende maatregel), 2) de financiering van de maatregel, 3) de organisatie van de uitvoering en 4) het beheer/onderhoud/ besparings-garantie van de maatregel. De hoofdkaders van het energiebesparingproject zijn als volgt: a.	De deelnemende gemeenten vervullen een intermediaire rol in dit project en behartigen gezamenlijk uitsluitend de ‘maatschappelijke’ belangen, en b.	De Service provider is hoofdaannemer en is technisch, financieel, organisatorisch en juridisch eindverantwoordelijk voor het project en beschikt over aantoonbare technische en/of organisatorische kennis en ervaring. Hierbij moet worden opgemerkt dat de service provider niet het ‘alleen recht’ heeft binnen de deelnemende gemeenten voor het aanbrengen van de energiebesparende maatregelen bij de particuliere woningeigenaar. De service provider is zelf verantwoordelijk voor het verkrijgen van opdrachten door het aanbieden van concurrerende (marktconforme) offertes, het maximaal ontzorgen en servicegerichtheid aan de particuliere woningeigenaar. De Gemeenten verlenen een concessie aan de service provider om het energiebesparingsproject uit te voeren, als zijnde een zelfdragende business case. Dit geheel voor eigen rekening en risico, zowel op technisch, financieel, organisatorisch en juridisch vlak.

Management and recording of energy labels - Havensteder

Havensteder | Published June 10, 2016  -  Deadline July 1, 2017
However Havensteder Foundation has drawn up its own procurement directive in order to comply with its own guidelines in the context of transparency. 

Havensteder
We remain alert to new developments and steer where necessary in the short and long term both to achieve our key tasks and goals.

Mission
We are strong in housing for people with limited income or a vulnerable position in the City of Rotterdam.

Vision
We are flexible; our organization and services change with time.
It is important to know the above vision to understand what goals we pursue.

command
The goal is to reach a framework agreement with a contractor that delivers the most economically advantageous tender.

This procurement procedure aims to achieve customer that signed a framework agreement using the DNR after evaluation of the tenders with a single provider.

Management and recording of energy labels - Havensteder

Havensteder | Published June 10, 2016  -  Deadline July 1, 2017
However Havensteder Foundation has drawn up its own procurement directive in order to comply with its own guidelines in the context of transparency. Havensteder We remain alert to new developments and steer where necessary in the short and long term both to achieve our key tasks and goals. Mission We are strong in housing for people with limited income or a vulnerable position in the City of Rotterdam. Vision We are flexible; our organization and services change with time. It is important to know the above vision to understand what goals we pursue. Mission The goal is to reach a framework agreement with a contractor that delivers the most economically advantageous tender.

Energy (supply Natural Gas and Electricity) - De Nederlandsche Bank

De Nederlandsche Bank N.V. | Published December 6, 2016  -  Deadline February 1, 2017
This contract is for the supply of gas and electricity for De Nederlandsche Bank (DNB). Within the contract the following supplies can be distinguished, namely: electricity, gas, Guarantees of Origin (GOs), CO2 credits. The total value of the contract is estimated at approximately € 1.5 million per year. The statements above are indications turnover per year excluding VAT. Indications are based on historical purchasing data and expectations of DNB and no rights can be derived from this information. At the tender using the digital tender platform Negometrix. For information about the use of Negometrix please refer to: Instructional offer digital.

Petroleum products, fuel, electricity and other sources of energy

Stichting Nederlands Scheepvaartmuseum Amsterdam | Published January 7, 2017  -  Deadline February 20, 2017

Foundation Dutch Maritime Museum Amsterdam

(The Maritime Museum) envisages the supply of renewable electricity and natural gas for the period from 04.01.2017; 0:00 pm to 31/12/2018; 24:00 spend with option years 2019-2020 for all connections.

The contract includes:

- The transfer of program responsibilities in electricity and shipper / program responsibility for natural gas, administrative processing and, on behalf of the contracting authority, running the prijsfixaties on the relevant trading markets.

- The provision of guarantees of origin, the renewable electricity 100% (wind, solar and / or biomass) generated in Europe.

- The supply of CO2 credits (VERs Gold Standard) for the purpose of offsetting the CO2 emissions from gas consumption.

Foundation Dutch Maritime Museum Amsterdam envisages the supply of renewable electricity and natural gas for the period from 04.01.2017; 0:00 pm to 31/12/2018; 24:00 spend with option years 2019-2020 for all connections.

Please note that delivery start date is 01/04/2017

The contract includes:

- The transfer of program responsibilities in electricity and shipper / program responsibility for natural gas, administrative processing and, on behalf of the contracting authority, running the prijsfixaties on the relevant trading markets.

- The provision of guarantees of origin, the renewable electricity 100% (wind, solar and / or biomass) generated in Europe.

- The supply of CO2 credits (VERs Gold Standard) for the purpose of offsetting the CO2 emissions from gas consumption.

Per year, this means approximately 1386 MWh Peak and 1212 MWh Offpeak.

154 821 Nm³).

Notification upcoming market consultation realize solar parks City of Rotterdam - Rotterdam Municipal

Gemeente Rotterdam | Published January 12, 2017  -  Deadline April 28, 2017
The city of Rotterdam is implementing this program Sustainable 2015 - 2018, Sustainable closer to Rotterdam. The program aims to Rotterdam produces more renewable energy in 2030 than consume the Rotterdam energy. Making renewable energy from solar and wind energy plus the energy costs for the Dutchman to be lower in 2030 than without the renewable energy transition. The municipality of Rotterdam puts the roofs of its municipal properties, but also sets where possible municipal land available for some time. The city of Rotterdam intends to grant multiple locations within the municipality of Rotterdam cooperate in the realization of a solar park.

Feasibility study, advisory service, analysis

Rijksvastgoedbedrijf | Published December 10, 2016  -  Deadline February 15, 2017

16 buildings in the downtown area of ​​The Hague, which belong to the building stock of the National Real Estate Company and The Hague, should be taken actually lead to reduced energy consumption of these buildings by 2040 in this area and is entirely fossil-free, taking ahead of European targets for energy saving and energy efficiency in 2050 (energy Empire Den Haag-ERDH). A necessary step is that the National Real Estate Company and The Hague before getting an overview of the measures which are open to achieve the end result. Based on this list, they can make strategic choices for the best (combination) of measures that can be realized ERDH. The Empire Realty Company and The Hague need an advisor who can provide this overview and strategy and thereby can advise.

Conducting research, providing strategic advice and delivering final advisory including implementation over a period of up to 26 weeks.

The purpose of the advisory task is:

1. To get an overview of options to meet the goal of ERDH;

2. recommend a strategy for achieving the best (combination) of measures that actually cause the energy consumption of these buildings in this area reduced appearance in 2040 and was completely fossil-free.

The advisory mission scope exists in view of the purpose of ERDH, in outline:

A. Identifying and analyzing information on energy issues in urban areas;

b. Findings and advice in final report;

c. Chosen advice translate into feasible implementation plan.

91 Supply Renewable Electricity Central Government - Public Real Estate Company

Rijksvastgoedbedrijf | Published November 25, 2016  -  Deadline February 7, 2017
The contract involves the supply of renewable electricity including Guarantees of Origin (solar and wind energy) for the central government. The agreement is valid for the period 1-1-2018 to 31-12-2020. The supply can be extended by 2 times 1 year. The tender is divided into six lots.

Cleaning ray work during maintenance stops, as well as for daily maintenance - Twence BV

Twence B.V. | Published December 14, 2016  -  Deadline January 31, 2017
Supplying various cleaning, maintenance work Distance serving the Waste Power Plant (AEC), the Biomass Energy Central (BEC), Bioconversion, Separation plant, etc. This during maintenance stops, as well as for daily maintenance. Concerns both use of various machines, as skilled employees. Average turnover 2012 - 2016; 550,000 euros per year. More information about Twence can be found on the website: www.Twence.nl

Electricity

Gemeenten Aalburg, Alphen-Chaam, Baarle-Nassau, Binnenmaas, Cromstrijen, Drimmelen, Etten-Leur, Gilze en Rijen, Halderberge, Korendijk, Moerdijk, Oud-Beijerland, Oosterhout, Steenbergen, Strijen, Werkendam, Woensdrecht, Woudrichem en Zundert | Published November 24, 2016  -  Deadline January 24, 2017

A collective of 20 municipalities and one regional archive of mainly West Brabant wish Guarantees of Origin and CO 2 buy in reduction certificates in order to preserve both its electricity and gas consumption.

The total energy of the participants was adopted in 2017 and 2018 at an estimated decrease of 43,428,438 kWh.

Participants have indicated in the Collective want to investigate whether it is possible to purchase licenses of local energy projects. For that reason it was decided to preserve by town initially 95% of the total volume of electricity by purchasing certificates. For the remaining 5% of the participants remain free to buy elsewhere certificates.

If you are unable participants to preserve the remaining 5% before 1 November of the delivery year by purchasing certificates from local energy projects, the remaining volume can still be preserved by purchasing certificates from the contractor.

In 2017, the estimated decrease in natural gas for the principal 2,784,011 m³. In 2018, the estimated decrease 2,908,647 m³.

The entire volume should be preserved through the purchase of REDD + certificates.

Sewage, refuse, cleaning and environmental services

Twence BV | Published December 16, 2016  -  Deadline January 31, 2017

Supplying various cleaning, maintenance work Distance serving the Waste Power Plant (AEC), the Biomass Energy Central (BEC), Bioconversion, Separation plant, etc.

This during maintenance stops, as well as for daily maintenance.

Concerns both use of various machines, as skilled employees.

Average turnover 2012-2016; 550 000 EUR per year.

More information about Twence can be found on the website: www.Twence.nl

Supplying various cleaning, abrasive blasting operations for maintenance serving the Waste Power Plant (AEC), the Biomass Energy Central (BEC), Bioconversion, Separation plant, etc.

This during maintenance stops, as well as for daily maintenance.

Concerns both use of various machines, as skilled employees.

31122519: Realizing Sound Measures St. Oedenrode-Paalgraven and Solar Highways - Department of Public Works Projects and Maintenance Programs

Rijkswaterstaat Programma's Projecten en Onderhoud | Published January 16, 2017  -  Deadline February 16, 2017
In 2015, the investigation has been completed following the noise problem of the A50 on the line St. Oedenrode to the Paalgraven node. In 2015 invited by the implementing order to work out the preferred variant and achieve. Also, the preparation has taken place in the European funded pilot project Solar Highways where noise barriers are used to generate solar energy. After an intensive search location U6 is the municipality Uden recommended as the most suitable. The pilot project Solar Highways is thus realized within the project "Realizing noise measures A50 St. Oedenrode - Paalgraven and Solar Highways. Tasks: The Contractor should primarily perform the following activities: • The six locations (B3 left U1 left V10 left, O4, O3 right and U6 right A50 between St. Oedenrode and the Node Paalgraven) realization of additional measures reduce noise; • The measure is implemented to realize the location U6 Solar Highways with a noise barrier (bifaciaal) which is also able to generate solar energy.

Best Value procurement "Realizing membrane filter press installation and coal dust dosing STP Garmerwolde" - Noorderzijlvest Water

Waterschap Noorderzijlvest | Published December 21, 2016  -  Deadline March 13, 2017
The scope of the contract includes the following work on the sewage treatment Garmerwolde; • The replacement of chamber filter presses by membrane filter presses. • Achieving a kolengruisontvang- and dosing. • Advising with respect to the energy infrastructure. (Determine whether expansion of the medium-voltage system (10 KV) for the new situation requires) • Advising on the management (including vulpompen) providing optimum overall result is achieved for the installation. • Arranging all relevant required permits.

IT services: consulting, software development, Internet and support

Ministerie van Binnenlandse Zaken en Koninkrijksrelaties | Published December 15, 2016  -  Deadline February 8, 2017

Tendered be (dedicated) managed hosting (and housing) services involving the installation, server capacity (hardware and virtual), the entire management (server, network, storage, backup), maintenance, licenses, development and all supplementary services belong to the order.

The standard service includes more broadly:

- Housing supply capacity / split a physical location on two data centers, including issues such as security, energy, infrastructure, etc .;

- Delivery of server capacity for hosting of applications / information systems Sale;

- Provision of all necessary licenses for the OS and infrastructure-related tooling;

- Delivery of all certificates required by the contractor for authentication;

- Migration and complete operating delivery of complete environments (development, test, acceptance and production) including all client applications with internal and external links;

- Services such as installation of ...

See descriptive document.