Call +44 800 9755 164

Public tenders for energy in Netherlands

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyNetherlands

Services for techno-economic/socio-economic studies or modelling/simulation on European energy systems and hydrocarbon extraction

Europa-Kommissionen, Joint Research Centre, Institute for Energy and Transport, Resource Management Petten | Published March 12, 2016  -  Deadline November 29, 2019
Services for techno-economic/socio-economic studies or modelling/simulation on European energy systems and hydrocarbon extraction

Nuon - Black Start Eemshaven - Civil works - NV Nuon Energy

N.V. Nuon Energy | Published November 4, 2016  -  Deadline December 19, 2016
Designing and building of foundation and building aid for placement gas turbine.

PH16042 Heat transportation Sporenburg and KNSM Island (Amsterdam) - NV Nuon Energy

N.V. Nuon Energy | Published November 24, 2016  -  Deadline January 23, 2017
On behalf of NV Nuon Heat, hereinafter Nuon must Contractor two heat pipelines (supply and return) to be applied from (future) auxiliary heating plant (HWC) "Sluis Area" near IJburglaan the WOS Sporenburg and WOS Piet Hein on Sporenburg and also the branch in Wisselstraat to Hofhaus boiler house on the KNSM island in the municipality of Amsterdam.

Energy and related services

Rijksvastgoedbedrijf | Published November 15, 2016  -  Deadline December 21, 2016

The work consists essentially of:

- Maintenance and inspection of the underground part of Soil Energy Systems (BES), the border is the TSA being transition from underground and above ground (building installation);

- Monitoring / assessment / evaluation of the power plant which is coupled to BES. The aim is to achieve a minimum SPF of 6 over one full year;

- Preparation of an evaluation report of each installation to set the current condition of the firm;

- Make an inventory / audit to give an overall view of the plant according to Table 4.5 from BRL 600-21.

See tender documents.

Renovation make energy neutral and maintenance of the FUMO building in Grou - City Leeuwarden

Gemeente Leeuwarden | Published October 26, 2016  -  Deadline December 22, 2016
Invitation Market Meeting "FUMO building full of energy." The FUMO building is located at the JW Visserwei to Grou and was built in 1978 and has different floor heights. The building has had partial renovations with a variety of materials. many steps can be put with a gross floor area of ​​approximately 3.300m² and a C energy. The tenant of the building is the FUMO (the Frisian Utfieringstsjinst Miljeu and Omjouwing) and owned by the municipality of Leeuwarden. The contract involves the renovation and maintenance of the FUMO-building for a period of 15 years and grow and transform the building with changing needs, the activity-related working (ARW) and possibly an increase in the number of FTEs which housed should be in the building as a result of expansion of the tasks of FUMO. Expected changes should lead to energy neutrality, healthier indoor environment, and circular use of materials and products.

Works contract for the construction and fitting out of an energy-efficient reception building with security, visitor and conference facilities at the main entrance of the JRC site

Europa-Kommissionen, Gemeenschappelijk Centrum voor onderzoek, directoraat Resources | Published November 19, 2016  -  Deadline March 14, 2017
Contract work for the construction and furnishing of an energy efficient building with reception facilities for monitoring, visits and meetings at the main entrance of the JRC-site

Inspection and / or maintenance: Soil Energy Defense - Empire Realty Company

Rijksvastgoedbedrijf | Published November 11, 2016  -  Deadline December 21, 2016
The work consists mainly of: - maintenance and inspection of the underground part of Soil Energy Systems (BES), the border is the TSA being transition from underground and above ground (building installation); - The monitoring / assessment / evaluation of the power plant which is coupled to BES. The aim is to achieve a minimum SPF of 6 for one full year; - Preparation of an evaluation report of each installation to set the current condition of the firm; - Make an inventory / audit to give an overall view of the plant according to Table 4.5 from BRL 600-21.

Maintenance of technical installations at Berlin mission. - Ministerie van Buitenlandse Zaken

Ministerie van Buitenlandse Zaken | Published November 18, 2016  -  Deadline December 22, 2016
The Contract relates to maintenance in the interests of safety, health, usability, energy performance and the environment of the Berlin Chancellery and Residence, including the surrounding plot with buildings. It concerns technical maintenance in the areas of electrical engineering, climate control, lifts and mechanical engineering.

Solar energy

Ons Middelbaar Onderwijs | Published October 25, 2016  -  Deadline December 12, 2016
Currently, 17 sites (approximately 14 500 panels) a positive SDE + decision (spring 2016, see Annex 7); for another 14 sites (approximately 10 000 panels) is joined with the autumn round of the SDE +. These 14 sites make subject to a positive decision SDE + part of the framework agreement.

Maintenance of technical installations Berlin

Haagse Inkoop Samenwerking (HIS) | Published November 18, 2016  -  Deadline December 22, 2016
The Contract relates to maintenance in the interests of safety, health, usability, energy performance and the environment of the Berlin Chancellery and Residence, including the surrounding plot with buildings. It concerns technical maintenance in the areas of electrical engineering, climate control, lifts and mechanical engineering. Type of Contract: Services

Maintenance of technical installations at Berlin mission

The Hague Procurement Partnership / Haagse Inkoop Samenwerking (HIS) | Published November 22, 2016  -  Deadline December 22, 2016

The Contract relates to maintenance in the interests of safety, health, usability, energy performance and the environment of the Berlin Chancellery and Residence, including the surrounding plot with buildings. It concerns technical maintenance in the areas of electrical engineering, climate control, lifts and mechanical engineering.

Repair and maintenance services of electrical and mechanical building installations

Haagse Inkoop Samenwerking (HIS) | Published November 26, 2016  -  Deadline December 21, 2016

The tender relates to maintenance in the interests of safety, health, usability, energy performance and the environment. It concerns technical maintenance in the areas of electrical engineering, climate control, lifts and mechanical engineering. The Warsaw Chancellery and Residence, including the surrounding plot with buildings, are built in 2003 and have a modern status of Netherlands architecture. This means that the maintenance and implementation of the work should be carried out with the greatest attention.

Management and recording of energy labels - Havensteder

Havensteder | Published June 10, 2016  -  Deadline July 1, 2017
However Havensteder Foundation has drawn up its own procurement directive in order to comply with its own guidelines in the context of transparency. 

Havensteder
We remain alert to new developments and steer where necessary in the short and long term both to achieve our key tasks and goals.

Mission
We are strong in housing for people with limited income or a vulnerable position in the City of Rotterdam.

Vision
We are flexible; our organization and services change with time.
It is important to know the above vision to understand what goals we pursue.

command
The goal is to reach a framework agreement with a contractor that delivers the most economically advantageous tender.

This procurement procedure aims to achieve customer that signed a framework agreement using the DNR after evaluation of the tenders with a single provider.

Management and recording of energy labels - Havensteder

Havensteder | Published June 10, 2016  -  Deadline July 1, 2017
However Havensteder Foundation has drawn up its own procurement directive in order to comply with its own guidelines in the context of transparency. Havensteder We remain alert to new developments and steer where necessary in the short and long term both to achieve our key tasks and goals. Mission We are strong in housing for people with limited income or a vulnerable position in the City of Rotterdam. Vision We are flexible; our organization and services change with time. It is important to know the above vision to understand what goals we pursue. Mission The goal is to reach a framework agreement with a contractor that delivers the most economically advantageous tender.

Petroleum products, fuel, electricity and other sources of energy

Gemeente Maasgouw | Published November 23, 2016  -  Deadline December 19, 2016
The municipality has also repaid the loan to the lender at the time. 

Purchasing renewable electricity

Gemeente Nijmegen | Published September 29, 2016  -  Deadline January 10, 2017
As part of the purchase of electricity for municipalities have given the municipalities the job from the region of Arnhem and Nijmegen to achieve the sustainability objectives and the supply of electricity. The municipalities in the Arnhem-Nijmegen region to link the purchase of electricity to the realization of additional generating capacity and sustainability in the region. This is due to the objective to be an energy-neutral region in 2050. Goal tender: So maximum possible additional regional sustainable energy generated to purchase at a reasonable price, so a substantial contribution to the sustainability objective. The ambition is to purchase 100% green additional regional energy generated as soon as possible. All power supplied is minimal green electricity from the Netherlands. Type of contract: Supplies

Optimization Sludge Digestion STP Tiel - Rivierenland Water

Waterschap Rivierenland | Published October 19, 2016  -  Deadline December 5, 2016
This contract contains the description of the conduct of the European tender (competitive procedure with negotiation) to come to award the contract for the design and realization of the sludge systems at the wastewater treatment plant (WWTP) in Tiel. Rivierenland Water wants to make the WWTP Tiel energy neutral. To this end the water board will optimize sludge digestion and expand in order to producren biogas and generate electricity with the biogas. Result of the project: Optimization of the sludge digestion system at the WWTP Tiel, making the STP is energy neutral.

Incentive measures in the field of durability / life cycle resistance - Province of Limburg

Provincie Limburg | Published November 10, 2016
The Province of Limburg wants by providing an attractive loan encourage owner-occupiers and tenants to adopt incentive measures to their existing property on the territory of the Dutch province of Limburg. The incentives should contribute to one or more policy objectives: • A reduction of energy use; • Increasing the share of renewables in the energy supply of existing housing; • To increase the life stability of the existing house; • The realization of the asbestos in so far as the as a preparatory measure is necessary for the realization of one or multiple targets as set out in one or more above-mentioned object (s).

91 Supply Renewable Electricity Central Government - Public Real Estate Company

Rijksvastgoedbedrijf | Published November 25, 2016  -  Deadline February 7, 2017
The contract involves the supply of renewable electricity including Guarantees of Origin (solar and wind energy) for the central government. The agreement is valid for the period 1-1-2018 to 31-12-2020. The supply can be extended by 2 times 1 year. The tender is divided into six lots.

Electricity

Gemeenten Aalburg, Alphen-Chaam, Baarle-Nassau, Binnenmaas, Cromstrijen, Drimmelen, Etten-Leur, Gilze en Rijen, Halderberge, Korendijk, Moerdijk, Oud-Beijerland, Oosterhout, Steenbergen, Strijen, Werkendam, Woensdrecht, Woudrichem en Zundert | Published November 24, 2016  -  Deadline January 24, 2017

A collective of 20 municipalities and one regional archive of mainly West Brabant wish Guarantees of Origin and CO 2 buy in reduction certificates in order to preserve both its electricity and gas consumption.

The total energy of the participants was adopted in 2017 and 2018 at an estimated decrease of 43,428,438 kWh.

Participants have indicated in the Collective want to investigate whether it is possible to purchase licenses of local energy projects. For that reason it was decided to preserve by town initially 95% of the total volume of electricity by purchasing certificates. For the remaining 5% of the participants remain free to buy elsewhere certificates.

If you are unable participants to preserve the remaining 5% before 1 November of the delivery year by purchasing certificates from local energy projects, the remaining volume can still be preserved by purchasing certificates from the contractor.

In 2017, the estimated decrease in natural gas for the principal 2,784,011 m³. In 2018, the estimated decrease 2,908,647 m³.

The entire volume should be preserved through the purchase of REDD + certificates.