Public tenders for energy in Napoli Italy

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Aid to improve energy efficiency in Complex St. Andrea delle Dame in Naples

Seconda Università degli Studi di Napoli | Published August 5, 2015  -  Deadline September 7, 2015
cpvs
45454000

Aid to improve energy efficiency in Complex St. Andrea delle Dame in Naples

ERDF Operational Programme for Campania 2007/2013, axis 3 – Energy. Operational objective 3.3. - 'Limitation and efficiency of the request' Energy efficiency programme: plan to promote and support energy efficiency in the region of Campania

Comune di Marano di Napoli | Published December 26, 2015
cpvs

ERDF Operational Programme Campania No 2007/2013 Axis. 3 - Energy. Operational Objective 3.3. - "Containment and efficiency of the application 'energy efficient program plan to promote and support energy efficiency of the Region of Campania

Contract for the service of integrated management systems Lighting and artistic monuments, Ventilation of road tunnels and Historical timepieces stradali- (IVO plants)? - Implementation of the Plan for the? Energy Efficiency. Duration twelve years.

COMUNE DI NAPOLI | Published November 10, 2015  -  Deadline December 16, 2015
cpvs
50232100, 45331211, 45454000

Contract for the service of integrated management systems Lighting and artistic monuments, Ventilation of road tunnels and Historical timepieces stradali- (IVO plants)? - Implementation of the Plan for the? Energy Efficiency. Duration twelve years.

Energy-management services

Città Metropolitana di Napoli — Direzione amministrativa — Gestione funzionamento edifici scolastici di secondo grado | Published October 10, 2015
Winner
Siram SpA
cpvs
71314200

Service exercise, run, control and maintenance of the heating of school buildings in use or ownership of the Metropolitan City of Naples.

Energy-management services

Città Metropolitana di Napoli — Direzione Amministrativa — Gestione funzionamento edifici scolastici di secondo grado | Published August 11, 2015  -  Deadline September 16, 2015
cpvs
71314200

Service exercise, run, control and maintenance of the heating of school buildings in use or ownership of the Metropolitan City of Naples.

Refuse transport services

Giunta Regionale della Campania — Direzione Generale per le Risorse Strumentali — U.O.D. 06 | Published December 29, 2015  -  Deadline February 18, 2016
cpvs
90512000, 90510000

Removal service, transport, and disposal in the Community and / or energy recovery at national or Community divided into 8 lots.

Building construction work

ASIA — Napoli SpA | Published August 11, 2015  -  Deadline September 24, 2015
cpvs
45210000

This open procedure relates to the execution of the works of construction of a public park in the energy issue with adjoining ecological island.

Supply of electricity on the free market. PA 411/2014. CIG 5987415B27.

ABC — Acqua Bene Comune Napoli — Azienda Speciale | Published November 15, 2014  -  Deadline December 23, 2014
cpvs
65310000

The contract consists in the supply of electricity supply, international and national origin, which is necessary for energy production sites and offices in Naples ABC special company.

Refuse transport services

Giunta Regionale della Campania — Ufficio speciale Centrale Acquisti — U.O.D. 01 | Published March 28, 2017  -  Deadline May 2, 2017
cpvs
90512000, 90510000

removal, transport and disposal in the field of Community as well as energy recovery and / or the subject in national and Community, in bales of waste stored at dedicated sites in the Campania region territory, divided into n. 5 lots.

Street-lighting maintenance services

Comune di Napoli — Servizio Grandi Reti Tecnologiche e Illuminazione Pubblica | Published November 18, 2016
Winner
RTI Citelum Société Anonyme/Elettrovit Srl — Partita IVA e Codice Fiscale: 04501140968
cpvs
50232100

Service contract with the execution also of public facilities upgrading works that are ancillary to the service and must be carried out in the performance of the same service - main category OG10 - Implementation of the Plan for Energy Efficiency. Duration 12 years.

Street-lighting maintenance services

Comune di Napoli — Servizio Grandi Reti Tecnologiche e Illuminazione Pubblica | Published November 7, 2015  -  Deadline December 16, 2015
cpvs
50232100

Service contract with the execution of redevelopment works also public facilities that are incidental to the service and must be carried out in the performance of that service - main category OG10 - Implementation Plan for Energy Efficiency. Duration twelve years.

Electrical machinery, apparatus, equipment and consumables; lighting

Fondazione Antonio Morra Greco | Published September 12, 2015  -  Deadline November 22, 2015
cpvs
31000000, 31710000

The supply of goods needed for the practical and technological activities of the Museum of Contemporary Art, the work required for setting up overall, as well as connecting to energy installations, including any plant integration.

Research consultancy services

Ministero delle Infrastrutture e dei Trasporti — Provveditorato Interregionale alle OO.PP. per la Campania, il Molise, la Puglia e la Basilicata — sede centrale di Napoli — Stazione Unica Appaltante — Ente delegato dal Comune di Ottaviano (NA) | Published December 24, 2015
Winner
Azzeroco2 Srl
cpvs
73210000

Service aimed at the drafting of the Plan of Action for Sustainable Energy of each municipality is part of the Strategic Plan it consists of the municipalities of Octavian as a leader municipality, Somma Vesuviana, San Felice a gate and Pollena Trocchia. CUP G81C13000080002 - CIG 6048247351 - Amount 397 098.38 euros.

Research consultancy services

Ministero delle Infrastrutture e dei Trasporti — Provveditorato Interregionale alle OO. PP. per la Campania il Molise la Puglia e la Basilicata — Sede Centrale di Napoli — Stazione Unica Appaltante — Ente delegato dal Comune di Arzano | Published November 12, 2015
Winner
AzzeroCO2
cpvs
73210000

Service aimed at the drafting of the Plan of Action for the Sustainable Energy for each municipality is part of the Strategic Plan North Naples, consisting of the towns of Arzano, as a leader municipality, Casavatore, Cardiff, Crispano, Melito-ERDF POR Campania 2007/2013 -Objective OS 3.3. "Containment and Efficiency of the Application."

Research consultancy services

Ministero delle Infrastrutture e dei Trasporti — Provveditorato Interregionale alle OO.PP. Campania-Molise-Puglia e Basilicata — sede centrale di Napoli — Stazione Unica Appaltante Comune Arzano (NA) | Published February 13, 2015  -  Deadline April 3, 2015
cpvs
73210000

Service aimed at the preparation of the Plan of Action for Sustainable Energy of each municipality, part of the Strategic Plan North Naples, consisting of the towns of Arzano, as joint leader, Casavatore, Cardiff, Crispano, Melito. POR Campania FESR 2007/2013 - Operational Objective 3.3 "Containment and Efficiency of the Application."

Refuse transport services

Giunta Regionale della Campania — Centrale Acquisti procedure di finanziamento di progetti relativi ad infrastrutture,progettazione-UOD 60.06.01 | Published April 22, 2016
Winner
RTI S.A.R.I.M Srl /BPS Srl
cpvs
90512000, 90510000

removal, transport and disposal in the Community and / or energy ecovery in national and Community contexts divided into 8 lots - Lot 1 - Giugliano - Lot 2 - Giugliano Masseria Republic of (A) - Lot 3 Giugliano Masseria of the Republic ( B) - Lot 4 Giugliano Masseria del Pozzo. - Lot 5 Villa Literno The Lotto Often A - Lot 6 Villa Literno The Often Lot B - Lot 7 - Villa Literno The Often Lot B - Lot 8 Aversa.

Custody of the executive planning, safety coordination during design and of? Performance of energy efficiency measures school complex? Antonio De Curtis? located in Casalnuovo di Napoli after obtaining the final project in the competition, on the basis of the preliminary draft prepared by Municipal Administration.

PROVVEDITORATO REG.LE OO.PP. CAMPANIA | Published April 8, 2015  -  Deadline July 20, 2015
Winner
CO.RE.FRA. S.C.A.R.L
cpvs
45300000

Custody of the executive planning, safety coordination during design and of? Performance of energy efficiency measures school complex? Antonio De Curtis? located in Casalnuovo di Napoli after obtaining the final project in the competition, on the basis of the preliminary draft prepared by Municipal Administration.

Cogeneration plant construction work

Gesac SpA Società Gestione Servizi Aeroporti Campani | Published February 25, 2017  -  Deadline March 15, 2017
cpvs
45251220

1) Contract description: The total contract amount is 7887 € 280.10 of which: a) 109 216.69 euros for final design including 2 427.43 EUR for security expenses; b) 6 900 234.76 euros for works of which 143 244.48 EUR for security expenses and 66 880.76 euros for increase for night work; c) 877 828.65 euros for operation and maintenance for five years of which 22 276.22 euros for security charges.

The amounts mentioned before are exclusive of VAT which will be paid when due.

The processes that make up the contract are: a) engineering works - main category - OG9 4089 184.17 EUR classification V; b) electrical works - category OG10, 1557 € 831.90, class IV; c) civil works - categories OG1 1077 € 543.93 - ranking IIIa.

The categories and classes related to the design are:

E.02 - Constructions civil works 668 435.43 euros; S.03 - Structural works 409 108.50 euros; IA.04 - electrical works 1 557 831.90 euros; IA.02 - mechanical works 4 089 184.17 euros.

engagement in the performance is expected to draw up a unique geological expertise report of a geologist - an activity which can not be sub-contracted (about to see. Disciplinary).

2) Site or location of works: Naples Capodichino Airport.

3) work Objective: energy efficiency of termofrigrorifera production facilities of the Naples-Capodichino, intervention designed to replace the current existing thermo production facilities with a unique technological center of heating and cooling energy production.

4) Lead time or duration: a) executive planning 84 days; b) performing work 364 consecutive calendar days; c) operation and maintenance: 5 years.

Engineering design services for the construction of civil engineering works

Commissario Straordinario per la progettazione, l'affidamento e la realizzazione dei lavori relativi all'adeguamento funzionale dell'impianto di depurazione di Napoli Est | Published December 8, 2016  -  Deadline January 20, 2017
cpvs
71322000

By way of example and without limitation, the documents required for the preparation of the Final Design is the one indicated by the art. 33 to 43 of Regulation (DPR 207/2010), integrated by the contents referred to in Title II Chapter I Section III of the same Regulation, referring to the final design, including that relating to safety coordination during design.

163/2006), prepared by the Campania Region, it comes with soil tests and geotechnical assessments and plumbing. There was also the availability of public network services and check the mode of connection of the natural gas.

The black average flow (QMN) is estimated at 7190 m³ / h in relation to the population equivalent of 862,875 units, the coefficient of influx into the sewer and water budget of 0.80 to 250 l / (ab * d).

The purification plant adaptation concerns the following treatment stages:

a) biological treatment of wastewater;

b) Digestion of sludge;

c) Dehydration mechanics;

d) thermal drying of sludge.

Each treatment section to be examined and revised for specific insights.

Are provided, also, revision surgeries which mainly concern the restoration of lifts, initial and intermediate, which is currently equipped with augers.

The elaboration of the Executive Project shall take into account the environmental feasibility study minimizing the impacts for both the construction and management phases, in order to avoid related environmental issues: the building materials used and the equipment provided, the generated noise, production of waste during the construction of the works, the energy consumption, the possible reuse of the material used in the construction process.

The Executive Project shall be drawn up on the basis of:

1) Guidelines of European environmental policy and legislation on public procurement;

2) the most used technologies in the field of wastewater treatment in the EU Member States;

3) Construction and management systems which are less invasive and impacting both during construction and during operation of the treatment.

In carrying out activities will be referred to the obligations arising from the directives, the Community regulations on the environment as well as to the corresponding national and regional legislation for the sector.

Operating-theatre devices

Azienda Sanitaria Locale Napoli 1 Centro | Published November 11, 2015  -  Deadline December 29, 2015
cpvs
33162100

Apparatus for extracorporeal shock wave lithotripsy, having the following characteristics: Generator shock wave generator of shock waves of the latest generation, with pressure focal optimized to ensure maximum effectiveness with minimal side effects - System for triggering through ECG signal - pulse frequency up to 120 / min - Pulse duration <2 50 135 usec - penetration depth at least mm pressure focal mpa Energy levels selectable - Low noise at maximum power tracking and monitoring system Dual system pointing ultrasound and radiological with simultaneous operation without stopping treatment - Simultaneous display of the two pointings - Possibility of correction for precision aim without stopping treatment pointing system and radiological monitoring with image intensifier (fluoroscopy): Generator RX with: - voltage up to 110 kV - current up to 3.5 mA - Dual focal spot - Field of view at least 9 "- A low volume of radiation - CE (Medical Device Directive). Targeting system and ultrasound monitoring: Transducer frequency 3.5-5 MHz - Display mode at least B and M - CE (Medical Device Directive). Large area radiolucent patient table - motorized movements - movements along the three axes - Tilt - Trendelenburg - Commands console and pedal - Capacity of at least 200 kg - Complete with leg holders, liquid collection tank. Control panel LCD monitor at least 17 "- ECG Monitoring Patient - Memory storage capacity of images - Image size 1Kx1K - Equipped with DICOM 3.0 interface Features Power supply 220 V, 50/60 Hz - Other arrangements may be necessary - in Compliance specific standards - CE (Medical Device Directive).
  • 1