Public tenders for energy in Tarcal Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Eredménytájékoztató- Bodrogkeresztúr Municipality public buildings energy modernization

Bodrogkeresztúr Községi Önkormányzat | Published September 11, 2015
Winner
ARM Invest Trade Kft.
cpvs
45100000

Building energy improvements in existing school classroom building backyard under the wing of the object: building energy renovation: 66 (130 u). Existing kitchen, 68 (u 133) below: 66 (130 u) existing Nyitnikék during daytime kindergartens, 66 (u 130) existing schools under building energy development of architectural documentation due to history, location foregoing, the planned reconstruction does not fall under the within the scope of the building permit process. The conversion and renovation ideas for the leaders involved in the design Bodrogkeresztúr Village Mayor's Office of leegyeztette. Planning program renovation of the building should be designed in such a way that it is more favorable to the building use and the resulting change the maximum to serve higher demand arising in connection with the operation, at the same time meet the tender "," Environment and Energy Operational Programme KEOP + 2015 + 5.7.0 Public Buildings call for priority development of energy-building "in standards. The school's main building and the courtyard is hosszfalas classroom wing design made parallel with the street spine. Getting there - on foot or by car - possible from Kossuth Lajos utca. The building has several entrances, there is a floor height lines of the sidewalk (+ - 0.00) compared to 15 centimeters higher (+0.15) made. The internal corridor from the list of open spaces. Basic data - number of floors: ground floor + first floor, ground floor of the court building in design - Roof Shape: hip and gable roofs saddle - topographical lot number: 130 u. - Ground floor line: +0.15 - + -0.00 level: Description of planned renovations to the existing sidewalk level for all outdated, worn exterior wooden doors (with a few window-kányokkal) must be replaced within the framework of the reconstruction. At the same time the base also get additional thermal insulation, as well as padlásfö-Deme is leszigeteljük. The new wall and födémrétegződéseket, as well as other points of the planned state of the art description specified. Description of the existing state structure Foundation: The foundation planes connecting the existing building, made of concrete strip foundation. The internal partition wall with bricks térlehatárolást resolved. Floors: The existing building was covered with wood-beamed ceilings above the ground floor slab. 15 cm ballast made. Floor: Building interiors of laminate flooring. The roof structure was brick red clay surface cserépfedést. Windows: Type and custom-sized wooden windows and doors can be found in the building. Plasters: A load-bearing walls, partitions and wall surfaces were smoothed, plastered plaster. The existing stone facade coloring pasztelsárga slick dusty plaster, painted light gray cementsimítású legs and dyed brown-looking wood structures. Heat and water insulation: thermal insulation of the existing building is not made. Water and energy supply, heating, sewage treatment: The main power supply on the renovations to the existing central heating is not affected. Demolition and conversion work - Rainwater drainage channels decommissioning - the existing pavement demolition - Pre Steps demolition - removing external doors and windows, demolition - after preparation Pavement plinth insulation - Interior painting sidewall for the window replacement - placement of vapor barriers and vapor barrier existing padlásfödémnél - Skirting wall thermal insulation - Attic ceiling heat insulation the proposed layer order according to - heat-insulated glazed wooden windows and doors (exterior doors and windows) installation - Skirting wall insulation's surface finish - External térlehatároló facade thermal insulation - Façade wall insulation surface training - equipment Rainwater drainage channels Renovation works structural design Primer: New foundation is complete. Sockets: Due to the plinth insulation should be brought down to 50 cm below the pavement level, hence requiring the old 15 cm compacted kavicságyazat. Walling: New load-bearing masonry is complete. Ceiling: New intermediate or roof slab is complete. Cover Chair: The existing roof will be converted. Shell: the roof plane existing clay tile roofing will be renovated. Insulation: (. A total of 30 cm thick) The ceiling above the ground floor upper plane of 2x15 cm Rockwool Hardrock Max mineral wool insulation, the plinth 12 cm Austrotherm XPS TOP P plinth insulation, while the outer walls of 15.0 cm Austrotherm ATN-70 facade falhőszigetelés made. Coverage: The premises padlóburkolatait interior wall coverings and tiles, you can not touch this renovation, not so new inner linings are made. All dif

Bodrogkeresztúr Municipality public buildings energy modernization. 2 sz.szerződésmódosítás

Bodrogkeresztúr Községi Önkormányzat | Published November 13, 2015
Winner
ARM Invest Trade Kft.
cpvs
45200000

68 (u 133) Nyitnikék under existing day-care nursery because of history, location foregoing, the planned reconstruction is not covered by the building permit process. The conversion and renovation ideas for the leaders involved in the design Bodrogkeresztúr Village Mayor's Office of leegyeztette. Planning program renovation of the building should be designed in such a way that it is more favorable to the building use and the resulting change the maximum to serve higher demand arising in connection with the operation, at the same time meet the tender "," Environment and Energy Operational Programme Kepo + 2015 + 5.7.0 Public Buildings call for priority development of energy-building "in standards. Functional design of the kindergarten hosszfalas design of streets parallel and perpendicular to the street made gabled ridge, "U" shaped single-storey building. Getting there - on foot or by car - from the Kossuth Lajos utca. The building has several entrances, there is a floor height lines of the sidewalk (+ - 0.00) compared to 30 cm higher (+0.30) made. The courtyard entrance areas about which we can get into the building through szélfogóin. The interior hallway above the open space. Basic data • Level number: downstairs Form • Roof: hipped gable roofs, "U" shaped roof topographical layout • Number of sites: 133 u. • Ground floor line: +0.30 -0.00 • + levels: Level Description of the existing pavement reconstruction planned for all obsolete and worn exterior wooden doors (with window ledges) must be replaced within the framework of the reconstruction. At the same time the base also get additional thermal insulation, as well as warming the camp ceilings also leszigeteljük. The new wall and födémrétegződéseket, as well as other points of the planned state of the art description specified. Structural description of existing state capitals in the main body of the World Cup. wreath was constructed. The walls are made of 10 cm thick. Floors: The existing building was covered with wood-beamed ceilings above the ground floor slab. 15 cm ballast made. Floor: Building interiors of laminate flooring. The roof structure was brick red clay surface cserépfedést. Windows: Type and custom-sized wooden windows and doors can be found in the building. Plasters: A load-bearing walls, partitions and wall surfaces were smoothed, plastered plaster. The existing stone facade coloring pasztelsárga slick dusty plaster, painted light gray cementsimítású legs and dyed brown-looking wood structures. Heat and water insulation: thermal insulation of the existing building is not made. Water and energy supply, heating, sewage treatment: The main power supply on the renovations to the existing central heating is not affected. Demolition and conversion work Dismantling • Surface-mounted pipeline decommissioning • Rainwater drainage channels • The tornácnál breakdown cold flooring • Concrete substrates demolish the porch • The existing pavement demolition • The Staircase partial demolition • A technically justified locations - plaster táskásodás, wall divorced renders, leázás, etc. other. - The plaster crushing • Preparation of the porch floor with preparing • Pavement concreting • Cold floors (frost-proof floor plate) porch • Water vapor or after removing the decommissioning • Plaster repair these locations • External műanyagredőnyök • Exterior doors and windows, demolition • Kava repair window replacement because of it • Plaster Repair window and door replacement place a vapor barrier existing padlásfödémnél • Plinth wall thermal insulation, surfacing • Attic Ceiling insulation of the proposed layer order according to installation • Heat-insulating-glazed wooden windows and doors (exterior doors and windows) • Installation of external műanyagredőnyök • Surface-pipe installation • External térlehatároló facade thermal insulation, coloring • External térlehatároló Installing facade thermal insulation, coloring • Rainwater drainage channels, construction of Restoration work Primer: New foundation is complete. 15 cm compacted kavicságyazat necessary. Walling: New load-bearing masonry is complete. Ceiling: New intermediate or roof slab is complete. Cover Chair: The existing roof will be converted. Shell: the roof plane existing clay tile roofing will be renovated. Insulation: The ceiling above the ground floor brackish

Bodrogkeresztúr Municipality public buildings energy modernization. 1 no. contract modification

Bodrogkeresztúr Községi Önkormányzat | Published November 5, 2015
Winner
ARM Invest Trade Kft.
cpvs
45200000

68 (u 133) Nyitnikék under existing day-care nursery because of history, location foregoing, the planned reconstruction is not covered by the building permit process. The conversion and renovation ideas for the leaders involved in the design Bodrogkeresztúr Village Mayor's Office of leegyeztette. Planning program renovation of the building should be designed in such a way that it is more favorable to the building use and the resulting change the maximum to serve higher demand arising in connection with the operation, at the same time meet the tender "," Environment and Energy Operational Programme Kepo + 2015 + 5.7.0 Public Buildings call for priority development of energy-building "in standards. Functional design of the kindergarten hosszfalas design of streets parallel and perpendicular to the street made gabled ridge, "U" shaped single-storey building. Getting there - on foot or by car - from the Kossuth Lajos utca. The building has several entrances, there is a floor height lines of the sidewalk (+ - 0.00) compared to 30 cm higher (+0.30) made. The courtyard entrance areas about which we can get into the building through szélfogóin. The interior hallway above the open space. Basic data • Level number: downstairs Form • Roof: hipped gable roofs, "U" shaped roof topographical layout • Number of sites: 133 u. • Ground floor line: +0.30 -0.00 • + levels: Level Description of the existing pavement reconstruction planned for all obsolete and worn exterior wooden doors (with window ledges) must be replaced within the framework of the reconstruction. At the same time the base also get additional thermal insulation, as well as warming the camp ceilings also leszigeteljük. The new wall and födémrétegződéseket, as well as other points of the planned state of the art description specified. Structural description of existing state capitals in the main body of the World Cup. wreath was constructed. The walls are made of 10 cm thick. Floors: The existing building was covered with wood-beamed ceilings above the ground floor slab. 15 cm ballast made. Floor: Building interiors of laminate flooring. The roof structure was brick red clay surface cserépfedést. Windows: Type and custom-sized wooden windows and doors can be found in the building. Plasters: A load-bearing walls, partitions and wall surfaces were smoothed, plastered plaster. The existing stone facade coloring pasztelsárga slick dusty plaster, painted light gray cementsimítású legs and dyed brown-looking wood structures. Heat and water insulation: thermal insulation of the existing building is not made. Water and energy supply, heating, sewage treatment: The main power supply on the renovations to the existing central heating is not affected. Demolition and conversion work Dismantling • Surface-mounted pipeline decommissioning • Rainwater drainage channels • The tornácnál breakdown cold flooring • Concrete substrates demolish the porch • The existing pavement demolition • The Staircase partial demolition • A technically justified locations - plaster táskásodás, wall divorced renders, leázás, etc. other. - The plaster crushing • Preparation of the porch floor with preparing • Pavement concreting • Cold floors (frost-proof floor plate) porch • Water vapor or after removing the decommissioning • Plaster repair these locations • External műanyagredőnyök • Exterior doors and windows, demolition • Kava repair window replacement because of it • Plaster Repair window and door replacement place a vapor barrier existing padlásfödémnél • Plinth wall thermal insulation, surfacing • Attic Ceiling insulation of the proposed layer order according to installation • Heat-insulating-glazed wooden windows and doors (exterior doors and windows) • Installation of external műanyagredőnyök • Surface-pipe installation • External térlehatároló facade thermal insulation, coloring • External térlehatároló Installing facade thermal insulation, coloring • Rainwater drainage channels, construction of Restoration work Primer: New foundation is complete. 15 cm compacted kavicságyazat necessary. Walling: New load-bearing masonry is complete. Ceiling: New intermediate or roof slab is complete. Cover Chair: The existing roof will be converted. Shell: the roof plane existing clay tile roofing will be renovated. Insulation: The ceiling above the ground floor brackish

No. 3. Contract amendments Bodrogkeresztúr Municipality public buildings energy modernization

Bodrogkeresztúr Községi Önkormányzat | Published February 22, 2016
Winner
ARM Invest Trade Kft.
cpvs
45200000

Planned outer wall layer order
- 0.5 cm thin plaster Weber Terranova facade finishes
- 15 cm Austrotherm ATN-70 wall insulation facade
- 2 cm renders existing stone dust
- 30 cm in existing brickwork B30
- 2 cm existing interior plaster
The existing wood windows instead gerébtokos wood with wooden structure, heat-insulating glass (Low-E + argon 4-16-4 Ug = 1.0 W / m2K) windows and exterior doors are installed.

Results of the "buildings installed solar systems owned by the local government" adopted procurement process

Bodrogkeresztúr Községi Önkormányzat | Published February 11, 2015
Winner
ZEMPLÉN ÉPKER Kft.
cpvs
45210000, 45315000, 45315100

The object of the procurement "Installing Solar system for buildings owned by the local government," the amount of purchases: Contracting trying to achieve the following in relation to buildings energy modernization: Mayor's Office building - 5 kW solar system. Village House - 22 kW solar system. Gym - 2 kW solar system. The total amount includes solar systems site supply, installation, installed the necessary equipment to carry out the installation work as well. The solar modules bidder must provide a minimum 20-year manufacturer's warranty, at least 80% power to demonstrate compliance with the above standards, certified by the accredited certification agency must have product. During the execution of the institution must ensure the smooth and safe operation. The compliance or equivalence must be verified authentic quality certificate or a declaration from an independent, professionally recognized organization in particular from the manufacturer.

No. 1 Amendment No. EEOP a contract to 1.1.1. / 2F / 09-11-2013-0001 of "completing Abaúj-Zemplén Solid Waste Management System" in the subject

Abaúj-Zempléni Szilárdhulladék Gazdálkodási Önkormányzati Társulás | Published December 28, 2015
Winner
Tokaj Konzorcium
cpvs
45222100, 45213250, 45111291, 45233127, 71245000, 71326000

Within the framework of a contract for the "Development of municipal solid waste management systems" to perform construction tasks EEOP No. 1.1.1. / 2F / 09-11-2013-0001 of "completing Abaúj-Zemplén Solid Waste Management System" program related projects in the FIDIC Red According to the book (second edition 2005 Hungarian) the conditions detailed description of the technical conditions of the tender specifications and the requirements of the Principal III of the work to be performed. and Volume V contains. The main volumes of the works are as follows: The planned facilities include: - 110 pieces of separate collection of 85 islands settlement locations are as follows: Bodrogkeresztúr, Sátoraljaújhely, Tokaj. - 1 mechanical pretreatment (30,000 tons / year capacity) and selective sorting hall (3500 tons / year capacity) Bodrogkeresztúr - 1 car wash building Bodrogkeresztúr - 1 social-office building Bodrogkeresztúr - 1 compost 3,300 tonnes / year capacity, Bodrogkeresztúr Composting Operation: The pavement slope of 1: 1.5 inclined. The composting plant concrete cover 6330 m2. Waste sorting and mechanical handling major quantities hall • Structural design: Net area: Ground floor: - 2206.81 m2 production hall steel hair concrete floor (44.41 m2 social areas inside containers installed) - bálatároló 887.35 m2 steel concrete covering all the hair net 3,094.16 m2 Floor: Description of technology related to the waste treatment technology, the following additional facilities and activities planned: - social facilities - transport and routes - Storage and warehousing - leachate handling - cleaning gyűjtőedényzet - Development of disinfection • Selective sorting plant - feed conveyor - gun belt - sorting belt - Magnetic Separator - transferring tape Mechanical treatment plant (the processing line at least 15 t / h of input material must processing capacity to have) the mechanical preparation of the following phases are: Receiving incoming waste Place the waste shredder machine: Chop (shredding) Magnetic Separation ( sorting separation) Rostálásos Deposition (sieve) Specific Gravity (Air Screening, légszeparátor) Optical sorting (choosing PVC will be built in optical sorting) fine grinding 0-30 mm fraction Fuel tömörítőse walking floor version collection, conveyance of different materials from the storage containers. The preparation of machine bases, supply, delivery, installation, commissioning, control building, personnel training, work and fire protection contractor responsible for the education of the machines. • Road construction, retaining walls, paving the road manager of the hall surrounded by asphalt paving an area of ​​2,850 m2 • Utilities (Water Supply, Waste Water Treatment); Lightning protection; Electric energy supply; Machinery, equipment and energy supply of road lighting; Existing, converted 0.4 kV network; Existing old network with a hub makeover; Hall south-west side lighting makeover; 0.4 kV and public lighting network; Power networks; Lighting network; Electric shock protection; Road and pavement; Ditches and pools; Curbs, gutters; Leaky; Channels; Car Wash building mines supplying the gépjűrműpark grooming and maintenance tasks in accordance with Environmental regulations. The wash water is led out of the room in the middle of a grid extending gutter of the building. The connecting building between the two buildings for the workers we designed a sink for thermo-toilets. Social-office building categorized as "E, especially dirty plants' waste-processing, according to the standard. The kitchen has a rinser dishwasher, microwave connectors, respectively. Other household electrical appliances connections are built. (Coffee maker, kettle, etc.). 3 + 1 design waste yard Bodrogkeresztúr 0172/31, 1372/4 Sárospatak Tokaj 3654 (will only asset purchases), and Sátoraljaújhely 11021/28 hrsz-on. 110 pcs island developing waste collection contractor shall also contribute to the documentation as specified during trial run will be conducted by the operator. The conditional amount of documentation and usability of the draft contract will be issued as part of which will be issued during the procurement procedure details.

Information EER - Photovoltaic systems

Tarcal Község Önkormányzata | Published November 9, 2015
Winner
"JKH" Kereskedelmi és Szolgáltató Kft.
cpvs
45310000

The subject of the public procurement: Conditional develop a contract to be implemented within the EEOP 2014-4.10.0 / N application of photovoltaic systems Tarcal Village Institutions. The contract will expire when the National Environment and Energy Centre Nonprofit Ltd. of the tender refuses in writing) the procurement quantity.. Solar panels, connecting the solar panels to cable networks, transformer inverter and fed out by the inverter electricity collecting distributing the integration of Call for proposals, the in accordance with the contract documents, technical specifications and unpriced budget requirements. Within the project, the preparation and execution of the full export plans, taking into account the following areas of consumption data of solar systems will take place. Tarcal LHH Property Address kWh annual consumption multiplier SolarEdge Estimated size kWp PMH 2 u / MVM Partner Main road hrsz .: 61 848 5428 1430 3.80 PMH 2 u / MVM Partner Main road 63 u. 847 8079 1430 5 65 Sum: 13 507 1430 9.45 Medical MVM Partner Main road 64 u. 343/1 3,163 1,430 2.21 4 u. 343/2 5,463 1,430 3.82 Kitchen and dining room MVM Partner Home út 97. u. 8. 3743 31,220 1430 21.83 u. 872 4780 1430 3.34 Content For full technical specifications of the tender (tender plan) have been identified, of which the offer should be made for full completion. The estimated total net investment of 25 million, - Ft. The names alone are presented in order to identify clearly the nature of the subject. Unpriced change the budget (expansion, leaving items etc) result in the nullity of the bid

Information treaty-amendment KEOPTarcal - JKH

Tarcal Község Önkormányzata | Published December 14, 2015
Winner
"JKH" Kereskedelmi és Szolgáltató Kft.
cpvs
45310000

The subject of the public procurement: Conditional develop a contract to be implemented within the EEOP 2014-4.10.0 / N application of photovoltaic systems Tarcal Village Institutions. The contract will expire when the National Environment and Energy Centre Nonprofit Ltd. of the tender refuses in writing) the procurement quantity.. Solar panels, connecting the solar panels to cable networks, transformer inverter and fed out by the inverter electricity collecting distributing the integration of Call for proposals, the in accordance with the contract documents, technical specifications and unpriced budget requirements. Within the project, the preparation and execution of the full export plans, taking into account the following areas of consumption data of solar systems will take place. Tarcal LHH Property Address kWh annual consumption multiplier SolarEdge Estimated size kWp PMH 2 u / MVM Partner Main road hrsz .: 61 848 5428 1430 3.80 PMH 2 u / MVM Partner Main road 63 u. 847 8079 1430 5 65 Sum: 13 507 1430 9.45 Medical MVM Partner Main road 64 u. 343/1 3,163 1,430 2.21 4 u. 343/2 5,463 1,430 3.82 Kitchen and dining room MVM Partner Home út 97. u. 8. 3743 31,220 1,430 21.83 u. 872 4780 1430 3.34 Content For full technical specifications of the tender (tender plan) have been identified, of which the offer should be made for full completion. The estimated total net investment of 25 million, - Ft. The names alone are presented in order to identify clearly the nature of the subject. Unpriced change the budget (expansion, leaving items etc) result in the nullity of the bid
  • 1