Call +44 800 9755 164

Public tenders for energy in Szerencs Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Szerencs Municipality public building energy modernization - the execution of construction projects analyzed

Szerencs Város Önkormányzata | Published December 7, 2015
Winner
Jánosik és Társai Kft.
cpvs
45321000, 45421100

Szerencs Municipality public building energy modernization - the execution of construction projects analyzed

(PTS-126) Szerencsi Tanuszoda development of solar energy supply system by building

Szerencs Város Önkormányzata | Published August 17, 2015
Winner
Tiszta Energiák a Földért és az Emberért Kft.
cpvs
45000000, 45310000

Szerencsi Tanuszoda energy supply in developing solar system by building the technical content and major amounts of public procurement: the power plant to be installed Details: Solar panel type: 250W polycrystalline solar nominal DC output: 50 kWp Inverters Type 2 Fronius Symo 20.0-3 M, 1 Fronius Symo 10.0- 3M Nominal AC power: 50 kVA to be built in solar cells must comply with the requirements of Standard EN 61730 in case of crystalline modules are IEC 61215 requirements in the case of thin-film modules, the required IEC 61646 standard. Compliance with these standards may be verified certificate issued by an accredited certification body of the product is submitted. The operational execution facility should be carried out. The construction work includes a detailed description of the technical specifications that are part of the documentation.

(PTS-126) Szerencsi Tanuszoda development of solar energy supply system by building - a statement amending the contract

Szerencs Város Önkormányzata | Published November 20, 2015
Winner
Tiszta Energiák a Földért és az Emberért Kft.
cpvs
45000000, 45310000

Szerencsi Tanuszoda energy supply in developing solar system by building the technical content and major amounts of public procurement: the power plant to be installed Details: Solar panel type: 250W polycrystalline solar nominal DC output: 50 kWp Inverters Type 2 Fronius Symo 20.3 M, 1 Fronius Symo 10.3 million nominal AC Power: 50 kVA to be built in solar cells must comply with the requirements of Standard EN 61730 in case of crystalline modules are IEC 61215 requirements in the case of thin-film modules required by IEC 61646 standard. Compliance with these standards may be verified certificate issued by an accredited certification body of the product is submitted. The operational execution facility should be carried out. The construction work includes a detailed description of the technical specifications that are part of the documentation.

Was working drawings and related EEOP 4.10.0 / E / 12-2014-0105 project with code "Bolyai Janos Szerencsi Catholic Primary School in energy modernization," the preparation and implementation of works "No. I. amendment

Bolyai János Katolikus Általános Iskola | Published January 12, 2015
Winner
WENGER Építő és Kereskedő Korlátolt Felelősségű Társaság
cpvs
45000000

Subject: The John Bolyai Szerencsi Catholic Primary School in energy modernization "in construction plans and related EEOP 4.10.0 / E / 12-2014-0105 CODES project preparation and implementation of the works," "a contract" Quantity: Contracting disposal of material coverage is in this procurement process in relation to net 85,250,000, - EUR + VAT 27%, of which 3.4 million net, - € + 27% VAT to prepare an implementation plan translated source. In order to improve building energy renovations take place the following indicators: a complete system for adjusting the weekly time programs controller and compact calorimeter apparatus receives. The solar package includes: solar mounting bracket, connecting kit VPM solar station, ready-mixed heat transfer medium, VPS solar buffer tank, fresh water station VPM solar, solar HT pipe insulation with the required length. The windows, doors increased air tightness, insulation glazed structures are unique. Based on the requirements of the Disaster vertical lightning arrester than ± 25 cm wide inhomogeneous rock wool insulation is formed. The facade insulation for sheet metal work is to be carried out. You have to demolish the façade electrical equipment (bell, lights, etc), then these should be re-installed. Currently, the operation of the building uneconomical, TNM Regulation only partly complied with the built-in structures. Contracting draws attention to the Bidders in order to plan, budget unpriced substances in products replaced by an equivalent quality materials and products.

REA training landscape. (Szerencsi Bonbon)

Szerencsi Bonbon Kft. | Published February 18, 2015
Winner
TIT Jurányi Lajos Egyesülete
cpvs
80500000, 80511000, 80530000

Under an agency agreement "in combination with the training of luck Chocolates Ltd. employees with wage subsidies in order to maintain market competitiveness." According designated as providing the framework, TÁMOP 2.1.3.B-12 / 1-2012-0681 identification number project contracting employee training services for: - the development of digital literacy (enabled by NMH), 120 hours; For one group; Group number: 5 - Environmental sustainability knowledge (authorized by NMH) 30 hours; Group of four; Number of teams: 12; 17; 20; 5 people - First Aid & Safety Basics (enabled by NMH) 30 hours; Group of three; Number of teams: 12; 17; 20 people - English CEF A1-C1 (enabled by NMH), 240 hours; For one group; Group number: 5 - Confectionery manufacturing and packaging (enabled by NMH), 500 hours; Group of three; Number of teams: 12; 17; 20 people - Communication Training (enabled by NMH) 30 hours; Group of four; Number of teams: 12; 17; 20; 5 main contractor responsible for the TÁMOP 2.1.3.B-12 / 1-2012-0681 training and the identification number of projects to test those with overall execution, which includes in particular the following: a) the organization of the theoretical and practical course of hours, retention; b) Preparation for the exam; c) the organization of the examination conducted; d) the transfer of the course, participants confirming completion of training certificates; In e) training documentation required by the laws of the regular adult education leadership (leadership training contracts and other documentation related to training participants, course diary, course attendance sheet) and also for the support contract and related instructions provided; Environmental considerations apply tools, products, materials, procurement of services) available, they should seek to provide services in the preservation of natural resources, including material efficiency, energy efficiency, to avoid damage. The courses take place during the period of work of employees. The determination of the detailed technical requirements included in the system documentation.
  • 1