Call +44 800 9755 164

Public tenders for energy in Szentendre Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyHungaryszentendre

Elizabeth Resort Zanka supply of energy measurement tasks

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published August 24, 2015
Winner
MAGYAR ENERGIA CENTRUM Kft.
cpvs
71251000

Subject of procurement: A Framework for supplying Elizabeth Resort Zanka surveying tasks energetic "Government of accounts on Elizabeth implementation of the program, as well as social campuses establishing in the submission a named individual facilities for energy efficiency investments in the preparation" of EEOP 7.9.0 / 12-2014-0035 code number Applications between. Duties to be performed: Buildings Energy Survey will form the initial basis for building energy audit prepared in the energy surveys. The steps of the survey are as follows: 1. 1.1 Available data exploration. Obtaining official Resolutions 1.2. Plans 1.3. Consumer information 1.4. 2. Maintenance 3. Identification of data gaps Obligation to provide documents 4. Replacement of missing data 5th Buildings Survey 5.1. The building survey Steps 5.2. Measurements of the site survey to be carried out 5.3. Survey Protocol 5.4. 6. Preparation of photo documentation of tasks to be carried out surveys for a description of the technical specifications annexed to the tender documentation in detail. The amount of purchases: performing energy surveys designed for energy efficiency refurbishment of existing levels of gross approx. 12.300 m2 area.

Energy-efficiency consultancy services

ÉMI – Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published October 17, 2015
Winner
Antenna Hungária Magyar Műsorszóró és Rádió hírközlési Zártkörűen Működő Részvénytársaság
cpvs
71314300, 71315300, 71314000, 79311000, 79311210, 71354000, 71354100, 72212326, 72211000, 80000000, 48612000, 48614000, 72311100, 72314000, 79952000

Under the Green Energy Project Surveys (ZFP) EEOP 7.9.0 / 12-2013-0015 identification number "E Management (E-MEN)," part of a project, the KEOP 7.9.0 / 12-2013-0016 identification number of "Product Line-based models (TPM ) "part of a project, the KEOP 7.9.0 / 12-2013-0017 identification number" Energy map (E-map) is "part of a project, the KEOP 7.9.0 / 12-2013-0034 identification number of" Green Economy and Climate Protection Development (ZMP) "part of a project, and the implementation of the KEOP 7.9.0 / 12-2013-0035 identification number of "Sustainable urban energy models (FTM)" part of a project within the framework of a contract to offer 5 parts as follows: Part 1 reviews the framework of Green Energy Projects Surveys (ZFP) EEOP 7.9.0 / 12 -2013-0015 identification number in implementing the "E-Management (E-MEN)," part of a project management contract; Part 2 Offer: Under the Green Energy Projects Surveys (ZFP) within the framework of the implementation of the KEOP 7.9.0 / 12-2013-0016 identification number of "Product Line-based models (TPM)" project is part of a contract; Part 3 deals: As part of the Green Energy Projects Surveys (ZFP) in the "Energy map (E-map)" KEOP 7.9.0 / 12-2013-0017 identification number in implementing the project part of a contract; Part 4 deals: Under the Green Energy Projects Surveys (ZFP) within the framework of the implementation of the KEOP 7.9.0 / 12-2013-0034 identification number of "Green Economy and Climate Protection Development (ZMP)" project is part of a contract; Part 5 reviews the framework of Green Energy Projects Surveys (ZFP) within the framework of the implementation of the KEOP 7.9.0 / 12-2013-0035 identification number of "Sustainable urban energy models (FTM)" project is part of a contract. By the successful tenderer (s) detailed tasks to be performed include part of the tender documentation for each offer.

Energy and related services

ÉMI – Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published January 8, 2016
Winner
TSPC – Technical Supervision and Planning Consulting Hungary Kft.
cpvs
71314000, 71242000, 79314000, 71320000, 71630000, 71220000

Elizabeth Hotel, Siofok (8600, Talkative Joseph Promenade 82), energy audits, preparation of development proposals. Unpriced preparing budget proposals, cost estimates, preparation of variant analysis. Feasibility study. Preparation of design plans. Preparation of procurement documentation, technical specifications, preparation of provisional public procurement documents.

Energy and related services

ÉMI – Építésügyi Minőség-ellenőrző Innovációs Nonprofit Kft. | Published January 9, 2016
Winner
TSPC – Technical Supervision and Planning Consulting Hungary Kft.
cpvs
71314000, 71242000, 79314000, 71320000, 71630000, 71220000

Elizabeth Hotel, Balatonőszöd (8637 Balatonőszöd, Linden u. 11), energy audits, preparation of development proposals. Unpriced preparing budget proposals, cost estimates, preparation of variant analysis. Feasibility study. Preparation of design plans. Preparation of procurement documentation, technical specifications, preparation of provisional public procurement documents.

Energy and related services

ÉMI – Építésügyi Minőség-ellenőrző Innovációs Nonprofit Kft. | Published January 9, 2016
Winner
TSPC – Technical Supervision and Planning Consulting Hungary Kft.
cpvs
71314000, 71242000, 79314000, 71320000, 71630000, 71220000

Elizabeth resort Zanka (8251 Zanka, u. 30/13.), Energy audits, preparation of development proposals. Unpriced preparing budget proposals, cost estimates, preparation of variant analysis. Feasibility study. Preparation of design plans. Preparation of procurement documentation, technical specifications, preparation of provisional public procurement documents.

Energy and related services

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published September 3, 2015  -  Deadline October 14, 2015
cpvs
71314000, 71242000, 79314000, 71320000, 71630000, 71220000

Elizabeth Resort Zanka (8251 Zanka, Id .: 030/13.), Energy audits, preparation of development proposals. Unpriced preparing budget proposals, cost estimates, preparation of variant analysis. Feasibility study. Preparation of design plans. Preparation of procurement documentation, technical specifications, preparation of provisional public procurement documents.

Energy and related services

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published September 3, 2015  -  Deadline October 14, 2015
cpvs
71314000, 71242000, 79314000, 71320000, 71630000, 71220000

Elizabeth Hotel Balatonőszöd (8637 Balatonőszöd, 11 Lime Street), energy audits, preparation of development proposals. Unpriced preparing budget proposals, cost estimates, preparation of variant analysis. Feasibility study. Preparation of design plans. Preparation of procurement documentation, technical specifications, preparation of provisional public procurement documents.

Energy and related services

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published September 3, 2015  -  Deadline October 14, 2015
cpvs
71314000, 71242000, 79314000, 71320000, 71630000, 71220000

Elizabeth Hotel Siofok (8600, Talkative Joseph Promenade 82), energy audits, preparation of development proposals. Unpriced preparing budget proposals, cost estimates, preparation of variant analysis. Feasibility study. Preparation of design plans. Preparation of procurement documentation, technical specifications, preparation of provisional public procurement documents.

Energy supply expert activities - information on the contract award notice

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published December 14, 2015
Winner
Schöko Bau Kft.
cpvs
71314000, 71314300

The object and amount of purchases: • continuous learning generated by professional partly related to the implementation of the Project energetics and content of finished products tracking. Expert contributions to the regional energy trade decisions related to the preparation of the Project • Contracting. • Creation of Expert resolutions arising from participation in energy-related project, final production, quality documents, in connection with the functional, technical compliance of. • During the examination of the project along part produced energy-related and effectively to meet professional criteria of professional products. • Creation of Expert Resolution partly related to energy generated by the project and related to the ratio value end products. • Creation of Expert Resolution of the technical implementation of the project contractors in charge of assessing the contractual performance of current income generated energy-related products for. Within the framework of professional care, decision preparation activities • Power industry agreement (continuous). Bidder carrying out the above tasks can create ad hoc and regular project progress reports. Documentation: During the delivery of documents to be produced within two (2) pieces of original and printed on one (1) electronic copy of the transfer.

Energy supply surveying tasks Elizabeth Hotel Siofok - information on the outcome of Procedure

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published August 24, 2015
Winner
SCHÖKO BAU Kft.
cpvs
71251000

The subject of the public procurement: framework supply surveying tasks energetic Elizabeth Hotel Siofok "Government of accounts on Elizabeth implementation of the program, as well as social campuses establishing in the submission a named individual facilities for energy efficiency investments in the preparation" of EEOP 7.9.0 / 12-2014-0035 code number Applications between. Duties to be performed: Buildings Energy Survey will form the initial basis for building energy audit prepared in the energy surveys. The steps of the survey are as follows: 1. 1.1 Available data exploration. Obtaining official Resolutions 1.2. Plans 1.3. Consumer information 1.4. 2. Maintenance 3. Identification of data gaps Obligation to provide documents 4. Replacement of missing data 5th Buildings Survey 5.1. The building survey Steps 5.2. Measurements of the site survey to be carried out 5.3. Survey Protocol 5.4. 6. Preparation of photo documentation of tasks to be carried out surveys for a description of the technical specifications annexed to the tender documentation in detail. The amount of purchases: performing energy surveys designed for energy efficiency refurbishment of existing levels of gross approx. 12.300 m2 area.

Elizabeth Hotel Balatonőszöd supply of energy measurement tasks - information on the contract award notice

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published August 31, 2015
Winner
Dinamo Építészcsoport Kft.
cpvs
71251000

Subject of procurement: A Framework "Government of accounts on Elizabeth implementation of the program, as well as social campuses establishing in the submission a named individual facilities for energy efficiency investments in the preparation" of EEOP 7.9.0 / 12-2014-0035 with code tender care Elizabeth Hotel Balatonőszöd assessment tasks for energy between. Duties to be performed: Buildings Energy Survey will form the initial basis for building energy audit prepared in the energy surveys. The steps of the survey are as follows: 1. 1.1 Available data exploration. Obtaining official Resolutions 1.2. Plans 1.3. Consumer information 1.4. 2. Maintenance 3. Identification of data gaps Obligation to provide documents 4. Replacement of missing data 5th Buildings Survey 5.1. The building survey Steps 5.2. Measurements of the site survey to be carried out 5.3. Survey Protocol 5.4. 6. Preparation of photo documentation of tasks to be carried out surveys for a description of the technical specifications annexed to the tender documentation in detail. The amount of purchases: performing energy surveys designed for energy efficiency refurbishment of existing levels of gross approx. 10.000 m2 area.

Contract modification - modernization of energy Franciscan High School

Ferences Gimnázium | Published December 16, 2015
Winner
RÓZSAÉP Kereskedelmi és Szolgáltató Kft.
cpvs
45350000, 45261400, 45315000, 45421100, 71356400, 09331000

Subject: a contract to Szentendre Franciscan High School energetic modernization of the subject of Volume: 27 m2 flat roof heat insulation and waterproofing 48 pieces skylight replacement of 140 window replacement, plastic, insulated glazed window Uw = 1.3 W / m2K 7 pieces of window replacement, wooden, 68mm profile thickness modified euro profile. Glazing: 4 mm Low-E argon filling + 16 mm + 4 mm float glass layer order (Ug = 1.1 W / m2K, Rw = 32 dB) 11 db insulating glass door replacement 306.97 m sills, window sills replacement boiler body 4 1 available fittings and removal of flue gas hot water in the budget required for boiler replacement system development and installation of 1 furnace body regulatory authority building, installation of circulation pumps for solar modules fitted 20 kVA beépítetett apparent power of at least 60 cells, installation of solar panels required for the preparation of the boiler replacement approved by the gas supplier Gas Plan. The renovation work during the continuous operation of the building must be carried out under normal use. Detailed technical content and amounts in the accompanying documentation unpriced budget.

Members buds Street Nursery (2000 Szentendre, Bimbo u. 8-10.) Modernization of the energy complex construction craftsmanship

Szentendre Város Önkormányzata | Published May 27, 2015
Winner
ARCHIBONA Kft
cpvs
45000000

8-10.) Complex energy modernization of building construction contract for subjects 8-10.) The construction of complex energy modernization of building renovation aimed primarily at improved thermal insulation of the outer structure, as well as modern and innovative architectural solutions for producing renewable energy, reducing CO2 emissions by architectural, engineering and it includes electrical solutions. The upgrade affects the outer parts of the building, the interior parts - except for the electrical work - remain intact. (Plaster coverings, heating system, etc.). These succinctly: The outer walls are given additional thermal insulation, windows and doors of the existing outdated same place Subsequent heat and electricity-generating solar panels are constructed. The tin structures are renewed. Since the bridge structure remains intact, so no building permit obligation von behind. The southern facade in front of the ground floor and second-floor windows of employing 3-aisle structural shell as a so-called two-stage high. "Klímafal" is that collects solar energy in winter, all the windows in the south facade exterior aluminum blinds get blind. The western wall of the building next to the exit to the yard so-called 2x3 meters. green paneled facade is made by employers heat exchanger ventilation fans will be built in order to better ventilation. It is an aesthetic space stone instead of concrete sidewalks around the building. The north terrace on the ground floor will also get a new layer order, where water and heat insulation will be adequate. The part of the boiler room and cellar. Ensuite hőszegetelt the warehouse can get the existing windows, pierced fémajtókra the current existing, recently replaced the combustion turbo intake of fresh air from the outside due to boiler is no longer needed. Will be demolished on the west side of the building has been disused high steel chimney. The interior spaces will be replaced with luminaires using LEDs are világószerkezetei. All these construction changes do not entail authorization. Partial reconstruction - structures Solutions: Foundations of the foundation is not affected by the renovation. Vertical load-bearing structure of the existing static vertical load-bearing structures are not affected by the renovation. Here, the planned parapetfalak 25cm YTONG P4 this are the new windows it. Northern longitudinal side of the balcony below the YTONG wall with 2 steel beams I220 challenge made kiváltásról detailed description of the structural plans. The walls of the Dryvit 3cm layer remains. The basement ceiling slabs above the ground floor and are not affected by the renovation. The lintels lintels are not affected by the renovation. Wreaths wreaths does not affect the existing renovation. Partitions Partitions are not affected by the renovation. Roof of the building north-south central axis of the west, insulated floor space of the existing bituminous waterproofing central axis east of the thermal insulation of new waterproofing slope of 1% in the same direction as introduces the eaves on the east side foil sheets of rain water into the PVC waterproofing layer to glue at least 10cm inch range. The parapets will be glued to the edge of line tin foil structure. The layer thickness should not be too large, so the bottom is almost twice as polystyrene pur foam insulation thermal insulation capacity, 5cm for polystyrene and PVC slope identical to the existing slope of the roof edges dropper solution. The exception under the form of doors on the north terrace kisbelmagasságú, only accessible from the courtyard steel metal warehouse door. (See plans) The surface is powder coated in any other insulated plastic doors and windows insulated glazed-a 2 layers. (Requirements:. Uw = 1.3 W / m2K, glazing Ug = 1.0 W / m2K The outer side of the consignation anthracite colors, golden oak wood decor foil inside of the windows above the first floor staircase 70cm high with the exception of plastic windows, armrest aranytörgy dekorfóliás made. The doors and windows after behelyzésük be wrapped around the water and air tightness in order to falcsatlakozásoknál EPDM foil. coverings The new kava plaster and in the same way in wet places kerámiaburkolata, if possible, the same type of ceramic, such as the original, or your best like. The upstairs built terrace associated laminate employing parquet floor of the built-in balcony floor height of the two casing at the junction enclosure relay the floor with colored accommodate the lam. Parquet. Before needed an external base of the outer bottom wall plaster spalling repair the insulation. Exterior cladding, heat insulation Where there is an existing Dryvit 3cm, there is an exception at 10cm EPS

Szentendre KEOP-2015-5.7.0 contract modification

Szentendre Város Önkormányzata | Published December 21, 2015
Winner
SZKÍTA ÉPÍTŐ Építőipari, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
cpvs
45000000

Szentendre Municipality of certain public buildings energy modernization under the facility "building energy development priority KEOP-2015-5.7.0 Public Buildings" in Szentendre, Part 1: White House: 18. Estimated value of £ 49,977,985 net Danubecorso Part 2: Central kitchen and dining room: Bajcsy Zsilinszky u. 6. Estimated net value of EUR 21,158,922 Part 3: Püspökmajor Nursery: Hamvas Béla utca 1. Estimated net value of EUR 38,867,940 Part 4: Adults GP surgeries: 27. Estimated value of £ 16,576,120 net Bükkös Coast Details of the documentation.

KEOP-2015-5.7.0 results

Szentendre Város Önkormányzata | Published September 16, 2015
Winner
SZKÍTA ÉPÍTŐ Építőipari, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság;SZKÍTA ÉPÍTŐ Építőipari, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság;SZKÍTA ÉPÍTŐ Építőipari, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság;SZKÍTA ÉPÍTŐ Építőipari, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
cpvs
45000000

Szentendre Municipality of certain public buildings energy modernization under the facility "building energy development priority KEOP-2015-5.7.0 Public Buildings" in Szentendre, Part 1: White House: 18. Estimated value of £ 49,977,985 net Danubecorso Part 2: Central kitchen and dining room: Bajcsy Zsilinszky u. 6. Estimated net value of EUR 21,158,922 Part 3: Püspökmajor Nursery: Hamvas Béla utca 1. Estimated net value of EUR 38,867,940 Part 4: Adults GP surgeries: 27. Estimated value of £ 16,576,120 net Bükkös Coast Details of the documentation.

Project management consultancy EEOP 7.9.0 / 12-2014-0035 project with code - information on the contract award notice

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published September 18, 2015
Winner
4Sales Systems Üzleti Rendszerfejlesztő és Tanácsadó Kft.
cpvs
79421200, 79411000

The subject of the public procurement: EEOP 7.9.0 / 12-2014-0035 identification number, called the "Government of accounts on Elizabeth implementation of the program, as well as social campuses establishing in the submission a named individual facilities for energy efficiency investments in the preparation of" Project Project Management consulting, as described below.

Information on the "Enterprise Contract energetic modernization of the M Building Condominium" adopted by award notice

M Épület Társasház | Published June 17, 2015
Winner
RENESCO Energiahatékonysági, Szolgáltató, és Kereskedelmi Kft.;RENESCO Energiahatékonysági, Szolgáltató, és Kereskedelmi Kft.
cpvs
45262690, 09331100, 09331000

Part A: Building Energy A.1. EPS external thermal insulation of buildings and recycled mineral wool insulation - insulation of exterior walls, leading to below ground level - a flat roof canopies - basement ceiling warehouses A.2. Replacing doors and windows, and plastic. doors and windows with aluminum structure - Apartments for windows, patio doors - curtain wall staircase - cellar windows, entrance doors A.3. Shielding - plastic windows blinds in front of apartments building A.4. Strangszabályozás optimization A.5. Ventilation system transformation - instead of continuous central suction unique, adjustable ventilation system for each apartment Part B: B1 expansion of renewable energy use. Hybrid collectors (solar and solar one) B.2 Installing roof. Installation of solar panels on the south façade

Technical coordination of care - information on the contract award notice

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published November 11, 2015
Winner
Energy Environment Economy Solution Korlátolt Felelősségű Társaság
cpvs
71356300, 72220000, 79421100

The object and amount of purchases: EMI Construction Quality Control and Innovation in Nonprofit Ltd. for - E-MANAGEMENT. Analysis of the Energy Management Tools project (E-MEN) - EEOP 7.9.0 / 12-2013-0015, - Product Line-based models (TPM) - EEOP 7.9.0 / 12-2013-0016, - Energy Map: National Renewable Energy map (E-map) - EEOP 7.9.0 / 12-2013-0017, - Green Monitoring Program (ZMP) - EEOP 7.9.0 / 12-2013-0034 - to provide technical coordination tasks related EEOP 7.9.0 / 12-2013-0035, projects - Sustainable urban energy management model (FTM). Main tasks in connection with the performance of the technical coordination: - Place of the technical coordination of the project organization o the principal project director receives direct instructions, and toward regular accountable to entrepreneurs engaged in the implementation o the list of projects correspondents of direct communication with - technical communication, coordination and contact tasks o liaise with the principal project leaders and the principal project director at p liaison and technical coordination in carrying out the implementation contractors contact points - project scheduling, exploration, coordination of ongoing monitoring o project plan based on the preparation o uniform format and technically coordinated implementers of the project plan, project plans submitted by the responsible implementation contractors related to technical coordination o activities Compare actual data plan, coordinate ongoing delays in imports of entrepreneurs continuous control of the availability of resources engaged in its implementation report at - based on the needs of business integration points between the technical coordination of technical and technological integration tasks oa collection of projects engaged in implementation

Information on eredményről- Works in 2 parts

Társasház Szentendre, Kálvária u. 57-61. | Published June 12, 2015
Winner
;
cpvs
45210000, 45350000, 45310000, 45321000, 44221100, 71333000, 71300000

Procurement subject: Part 1 deals: framework contract for the Design, Szentendre, 57-61 Calvary road. existing 24 apartments and basement storage devices including residential building at the innovative energy renewal and modernization engineering. Part 2 deals: framework contract for the Design, Szentendre, 57-61 Calvary road. under the existing number of 24 flats and basement storage design and preparation of construction plans needed for implementation, including installation of the collectors residential building hybrid collector. The amount of Procurement: Part 1 deals: Under the existing 1,572.3 m2 of net heated floor area condominium renovation of energy: thermal insulation of facades - it must be 1953 m2 (insulation are recycled, (at least 50% újrahasznosítottság) roof heat insulation and water - 504. ceiling windows in Cellar szigetelése- 745 m2 m2 315.9 m2 cseréje- facades - home ablakok- 30 2000x1450 2000x1450 + 42 + 10 + 14 1150x1450 1150x1450 + 24db + 24 pieces of 550x1450 850x2350 - + staircase entrance portals that ablakok- 107.9 m2 3 x 3 pieces 2280x2100 + 3 2280x2350 + 3 2560x2950 + 6 2560x2950 + 3 pieces 2560x1240 - basement windows Improving 48 pieces shutters attachment can 72 pieces of heating modernization 1 staircase riser control, radiators per regulations, development of equipment cost allocators central ventilation system - 4 apartment centrally controlled ventilation, and a 10-apartment building heat-recovery ventilation central quantities and detailed and itemized detailed technical parameters and functions to be performed by the contractor in the tender documents and forms part of the technical documentation. Part 2 offers 20 units, 60 units per building preparing hybrid collector design plans, installation, suitable for simultaneous generation of electricity and heat water. The number of hybrid modules per building: 20, a total of 60 hybrid modules Type: Thermal Power Produced Volther heating energy per building: 35.7 GJ / a, a total of 107.1 GJ / produced electricity per building: 13208 kWh / a, a total of 39,624 kWh / Hybrid electric power collector per building: 3.4 kW, 10.2 kW contractor responsible for preparing all the necessary export plans.

Supervisor quality care insurance plan tasks EEOP 7.9.0 / 12-2014-0035 project with code - information on the contract award notice

ÉMI Építésügyi Minőségellenőrző Innovációs Nonprofit Kft. | Published September 23, 2015
Winner
„METRÓ” Közlekedésfejlesztési, Beruházási és Mérnöki Szolgáltató Kft.
cpvs
71210000, 71631000

The subject of the public procurement: EEOP 7.9.0 / 12-2014-0035 identification number, project entitled "Government of accounts on Elizabeth implementation of the program, as well as social campuses establishing in the submission a named individual facilities for energy efficiency investments in preparing" care plan Supervisor quality insurance functions, as follows According to. • continuous professional knowledge generated during the project implementation, participation and content of finished products tracking. • Expert assistance related to the contracting authority's decision in the preparation of the Project. • Creation of Expert resolutions arising from participation in the Project, final production, quality documents, in connection with the functional, technical compliance of. • partly produced during the project and effectively ensure product quality. • Creation of Expert resolutions arising from participation in the project or in relation to the proportion of final value. • Creation of Expert Resolution charge of the implementation of Project Professional Contractors contractual performance of the subject of perception. • Contribution to the criticism of experts conducted during the Project Procurement and professional examination of compliance with the public tender. • Planning Supervisor quality insurance and decision-making activities under a contract provision for (continuous). • During the execution of the original print 2 copies and one electronic transfer of documents to be produced. The terms of reference include detailed technical specifications which form part of the tender documentation. The amount of purchases: Planning Supervisor quality care insurance contracting, project physical completion of tasks, foreseen until 30 September 2015. ...