Public tenders for energy in Paks Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

"Creating a framework KEOP6.2.0 / B / ID No. 1120130006 Energy House Visitor Centre II project."

Aktív Energia Egyesület | Published October 9, 2015
Winner
2KOP Építési Szolgáltató és Gazdasági Tanácsadó Kft.
cpvs
45000000, 45211100, 45212312

Subject: Amount "Creating a framework KEOP6.2.0 / B / 1120130006 identification number of projects ENERGY HOUSE Exhibition Centre II.": Creating Passive house is the building of three organizational units: • First, a monolithic reinforced concrete building parts: adobe infill masonry, located in the office, conference and the social part of the exhibition floor space. • On the other hand, the exhibition and conference is located in front of greenhouse space, steel supporting structure. • Third, the building is distinguished by its movable wall building. Foundation: The foundation 1,50 m deep beneath the pillars point Funds takes place. A double bottom beam, a part of the fixed support structure of parts of buildings, on the other hand moving beneath the building located between the two insulation. The reinforced concrete girders provides a movable wall building rail system of the host structure. The concrete quality: C25 / 30 XC216F3 IEC 47981: 2004 Monolithic reinforced concrete building: The building is 10x12 m to 25x25 cm cross section pillars are made of reinforced concrete structure. The pillars are broadened so attached to the bottom beam under the floor. In addition to the steps of the staircase curved arms are also made of reinforced concrete structure. The lintels are also reinforced concrete beam. The filling adobe walls. The concrete quality: C25 / 30 XC116F3 IEC 47981: 2004, the rebar: B500 Building Greenhouse: Greenhouse in front of the building of reinforced concrete, the steel frame structure Hea Overall frame size 10,6x13,8 mként 3.00 m-long main Hea 200 as profiles It made the connections are made with screws M24 09.10. The frames are connected Hea 140 and placed horizontally between the profiles of 3.0 frames vertically mként located 75 cmként steel hollow sections made to receive the glass wall. The two grid reinforcement steel bar stretched 20 GMDSS happens. The steel structure is connected to the glass structure. Steel grade S 235 building BS EN 100 271 Mobile: The steel supporting structure is also movable wall frame construction of the main girders 3.00 m 10,60x12,75 mként placed Hea 240 profiles made. The horizontal beams at the bottom, shoulders and spine can be found. Also Hea profiles are made. The lines stretched relations quality 10.9 screws. Because of maneuverability under horizontal support structure is a framework for frameworks exact design of the design of this phase has not yet been building some movement mode fully open, stationary design of the wheels must be such that upward pointing power is able to absorb. Severity: Maximum vertical force in the framework Pz = 90. Maximum upward force PZ1 = 10 CN PZ2 = 25 KN (in the middle of the corner points) Maximum lateral force Px = CN metal materials 40 Floor Concrete C25 / 30XC216F3 Floors Walls C25 / 30XC116F3 Products concrete C8 / 10XN (H) MSZ1: 2004 B500B Rebar Steel S235 JR support structure of the building complies with the requirements of the following standards. The support structure of the building does not contain asbestos. Applied standards: EN 1990: 2005 The basics of structural design EN 19911: 2005 The impacts structures Design of steel structures EN 199 311 Acquisition of Passive House certification is not part of the contract. The Energy House itself will be an exhibition hall, as for materials and solutions used in the building works in the entire engineering technology In addition, the building must not only permanent exhibitions, but also periodic conferences, events and meetings as well as suitable, during which visitors specifically in renewable energy technologies up close, You get to know it in action. The House Energy demonstration center building, the new building will be built, not the completion of the building project must meet the requirement for the value of the building (s) specific heat losses provided for by Regulation 7/2006 factors of TNM.

Further information on the outcome of the process - Active Energy Association - Creating EEOP-6.2.0 / B / ID No. 11-2013-0006 project ENERGY HOUSE Screening Center

Aktív Energia Egyesület | Published November 21, 2014
cpvs
45000000, 45211100, 45212312

Subject: EEOP-6.2.0 / B / ID No. 11-2013-0006 project is to create ENERGY HOUSE Screening Center Amount: Passive House design consists of three structural building units: • First, a monolithic reinforced concrete building parts: adobe masonry infill, located in the office here , business and the social part of the exhibition floor space. • On the other hand, the exhibition and conference is located in front of the greenhouse space, steel supporting structure. • Third, the building is distinguished by its movable wall building. Foundation: The foundation funds nadir of 1.50 m occurs during the pillars. The insulation is located between the two. The reinforced concrete tie beam building provides a movable wall rail system of the host structure. The concrete grade C25 / 30 XC2-16-F3 BS 4798-1: 2004 Monolithic reinforced concrete building: The building is 10x12 m 25x25 cm cross-section of the pillars are made of reinforced concrete structures. The pillars are broadened so attached to the bottom beam under the floor. The stairs are also made of reinforced concrete arch structure. The monolithic reinforced concrete lintels also. The adobe walls filling. The concrete grade C25 / 30 XC1-16-F3 BS 4798-1: 2004 rebar: B500 Greenhouse building: Dimensions 10,6x13,8 200 m for the main Hea -as profiles made the connections are made M24 10.9 bolts. One is located in the 3.0-m frames per 75 cm vertical steel hollow sections are made to receive the glass wall. The bracing two increments of 20 mm steel rod stretched happen. Scüco connected to the steel structure of the glass structure. Steel grade S 235 BS EN 10027-1 Building Mobile: The mobile wall steel supporting structure also 10,60x12,75 m frame structure is located on the main points as 3.00 m Hea 240 profiles. Hea profile also prepared. The strained relations framework 10.9 grade screws. Handling certain condition of the building is fully open, upright design of the wheels should be such that the power indicator up to be able to pick up. Mobilisation: Maximum vertical load limits Pz = 90. The largest upward force Pz1- = -10 CN Pz2- = -25 CN (in the middle of the corner points) Maximum lateral force Px = 40 CN between the steel structures vertically placed wooden purlins are made of 75 cm - a. Determination of the size of wooden structures and relations of the establishment is not part of the design task. Material Qualities Floor Concrete C25 / 30 XC2-16-F3 Floors Walls C25 / 30 XC1-16-F3 Mounting concrete C8 / 10-XN (H) -MSZ-1: 2004 Reinforcing steel B500B Steel S235 JR Building support structure contained in the following standards compliance. The support structure of the building does not contain asbestos. Applied standards: BS EN 1990: 2005 Basics of structural design EN 1991-1: 2005 BS impacts of structures EN 1993-1-1 Design of steel structures to obtain the passive house certification is not part of the contract. In addition, the building must be not only the permanent exhibitions, but periodic conferences, events and meetings as well as suitable, in which visitors specifically to learn about renewable energy technologies up close, even during operation.

Active Energy Association - Creating the framework EEOP-6.2.0 / B / 11-2013-0006 SEQ ID NO POWER HOUSE Exhibition Centre II project. - Results of the procedure

Aktív Energia Egyesület | Published April 29, 2015
Winner
2KOP Építési Szolgáltató és Gazdasági Tanácsadó Kft.
cpvs
45000000, 45211100, 45212312

Subject: Amount "Creating a framework EEOP-6.2.0 / B / 11-2013-0006 SEQ ID NO POWER HOUSE Exhibition Centre II project." The building design Passive house consists of three structural components: • First, a monolithic reinforced concrete building parts: adobe masonry infill here located in the office, conference and exhibition of the social part of the floor space. • On the other hand, the exhibition and conference is located in front of greenhouse space, steel supporting structure. • Third, the building is distinguished by its movable wall building. Foundation: The foundation 1,50 m deep beneath the pillars point Funds takes place. One of the two insulation away. The reinforced concrete girders provide the movable wall building rail system of the host structure. The concrete quality: C25 / 30 XC2-16-F3 BS 4798-1: 2004 reinforced concrete building: The building is 10x12 m 25x25 cm cross section pillars are made of reinforced concrete structure. The pillars are so attached to the bottom beam will widen over the floor. The stairs are also made of reinforced concrete arch structure. The lintels are also reinforced concrete beam. The adobe masonry infill. The concrete quality: C25 / 30 XC1-16-F3 BS 4798-1: 2004 rebar: B500 Greenhouse building: Dimensions 10,6x13,8 Hea 200 m-long main -as profiles made of 10.9 M24 connections are made with screws. Located between the frames as 3.0 meters per 75 cm vertical steel hollow sections made to receive the glass wall. The bracing two increments of 20 mm prestressed steel bar is done. The steel structure is connected to the glass structure. Steel grade S 235 BS EN 10027-1 Mobile building: the steel supporting structure is also movable wall frame construction 10,60x12,75 m is positioned as the main beams 3.00 m Hea 240 profiles. Also Hea profiles are made. The quality 10.9 frames stretched relations screws. Some handling condition of the building is fully open, stationary design of the wheels must be such that it is able to power up looking to hire. Severity: Maximum vertical force in the framework of Pz = 90. Maximum upward force Pz1- = -10 CN Pz2- = -25 CN (in the middle of the corner points) Maximum lateral force Px = 40 CN metal materials Flooring Concrete C25 / 30 XC2-16-F3 Floors Walls C25 / 30-F3 XC1-16 Products concrete C8 / 10-XN (H) -MSZ-1: 2004 B500B Rebar Steel S235 JR support structure of the building complies with the requirements of the following standards. The support structure of the building does not contain asbestos. Applied standards: EN 1990: 2005 Basics of structural design EN 1991-1: 2005 The impacts on structures EN 1993-1-1 Design of steel structures Acquisition of Passive House certification is not part of the contract. In addition, the building must not only permanent exhibitions, but periodic conferences, events and meetings as well as suitable, during which visitors specifically to learn about renewable energy technologies up close, even during operation. The completion of the building project must meet the requirement for the value of the building (s) specific heat losses provided for by Regulation 7/2006 factors of TNM.

Electricity

Mezőföldi Regionális Víziközmű Korlátolt Felelősségű Társaság | Published September 29, 2017
cpvs
09310000

24:00 CET during a full supply-based electricity trading agreement.

24:00 CET, 10 426 669 kWh, of which 40% is defined as an optional part.

The contracting authority checks the existence of the license in the register of the Hungarian Energy and Utilities Regulatory Authority.

The contract price includes the costs of invoicing the mediated service.

147 of the Financial Regulation,

taxes on energy, VAT, any other taxes, duties, fees, contributions

and costs, as well as the renewable energy source and the specified current applicable legislation

from the Transmission System Operator to facilitate the production of electricity generated from waste energy from the Transmission System Operator

The cost and regulation of electricity (KÁT) required by traders.

Article 76 (2) a) evaluates and chooses the bids according to point (a)

The requirements of the Contracting Authority as the object of the procurement

specifically corresponding to specified quality and technical requirements, and economically

selection of the most advantageous offer is only for the lowest price evaluation, given that the goods are legal

defined and configurable standard product and can not be differentiated according to quality criteria.

Information on the outcome of the process - Active Energy Association - Communication campaign activity EEOP-6.2.0 / B / ID No. 11-2013-0006 supply project

Aktív Energia Egyesület | Published November 21, 2014
Winner
Equinox Communications Kft.
cpvs
79342200

Subject: "Communication campaign activity EEOP-6.2.0 / B / ID No. 11-2013-0006 supply project" Quantity: • Create a Brand book (graphic elements) preparation • Preparation of text and image content items • Material • Software development in information tables online: • Website development • Social media activity • Development of Facebook quiz application and placement • Online banner campaign printed materials and media: • Media Interface Order • Publishing graphic preparation and printing of o Brochure o Directory o Desktop Audio / Video production: • 3 PR film production production and publishing and publishing • 3 Radio Spot • Impact of the project at the close of

Framework are EEOP 4.10.0 / E / 12-2014-0110 project Balogh Anthony Catholic Elementary and High School Modernization and energy to carry out associated works - the outcome of such information

Balogh Antal Katolikus Általános Iskola és Gimnázium | Published December 12, 2014
Winner
LAKI Épületszobrász Zrt.
cpvs
45321000, 45261400, 45261410, 45320000, 45331000, 45421100, 09331000, 09331100, 45261215, 45315100

Tárgya: KEOP-4.10.0/E/12-2014-0110 számú projekt keretében Balogh Antal Katolikus Általános Iskola és Gimnázium energetikai korszerűsítése és egyéb járulékos munkák elvégzése kivitelezési szerződés keretében Mennyisége: Homlokzati hőszigetelés üvegszövet hálós erősítéssel (EPS) 740 nm Homlokzati hőszigetelés üvegszövet hálós erősítéssel (XPS) 74 nm Külső fal belső oldali hőszigetelése ásványi hőszigetelő lappal 395 nm Fa nyílászáró szerkezetek bontása 140 nm, Fém nyílászáró szerkezetek bontása 33 nm Fa és műanyag nyílászáró szerkezetek elhelyezése 70 db Fa falburkolat bontása fűtött és nem fűtött térelhatároló szerkezeteknél: 198 nm Fa falburkolat bontása belső térelhatároló szerkezeteknél: 408 nm Magastető szaruzat közti szigetelése 480 nm Cserépfedés bontása 906 nm Új cserépfedés készítése 906 nm Napkollektorok elhelyezése, bruttó kollektorfelület: 3 m²/db: 8 db Szolár rendszer telepítése HMV ellátáshoz 1 db Hőleadók le és visszaszerelése: 100 db Thermosztatikus szabályozók felszerelése 66 db Fűtési csővezeték, Fekete acélcső szerelése eltérő keresztmetszetben 180m Gázvezeték, Fekete acélcső szerelése 20 m Napelemes rendszer inverterrel 3 fázisú, 5,88 kW: 1 db Főelosztó fülke átalakítása, oda-vissza mérővel történő bővítése: 1 db Belső teherhordó, és főfalak 25 cm vastagság felett valamint válaszfalak nedvesség elleni szigetelése 64 fm Előtető építése és bontása főbejárat felett 1 db Gipszkarton álmennyezet készítése 238 nm Belső falfelületek diszperziós felületképzése 320 nm Belső falfelületek mosható felületképzése 304 nm Fa és fémfelületek felületképzése 625 nm Vagyonvédelmi rendszer 1 rendszer Passzív mozgás érzékelők vagyonvédelmi rendszerhez 20 db 8 ledes kezelőfelület vagyonvédelmi rendszerhez 4 db CAT5e kábelezés 1430 m Kábeltálca elhelyezése 103 fm Lámpatestek cseréje, vagy fel-és visszaszerelése 265 db Gégecső beépítése különböző átmérővel 930 fm Vastagfalú védőcső elhelyezése 375 fm Erősáramú vezetékelés alu és réz változó teljesítményben összesen 3655 fm Meglévő védőcsőben futó kábelezés kibontása védőcső eltávolításával együtt 750 fm A napelemes modulokra kötelező gyártói garancia minimum 20 évre, legalább 80%-os teljesítményre. A részletes műszaki tartalmat a felhívás 3. sz. melléklete tartalmazza.

Electricity

Mezőföldi Regionális Víziközmű Korlátolt Felelősségű Társaság | Published October 4, 2017  -  Deadline November 6, 2017
cpvs
09310000

The sale of electricity for general use as of January 1, 2018. 00:00 CET - 31.12.2018. 24:00 CET during a full supply-based electricity trading agreement.

The sale of electricity for general use as of January 1, 2018. 00:00 CET - 31.12.2018. 24:00 CET, 10 426 669 kWh, of which 40% is defined as an optional part.

The offer price includes the electricity and balancing energy costs, the crossing fee, the balance sheet membership fee. The contract price includes the costs of invoicing the mediated service.

The offer price does not include system usage fees, the 2007 LXXXVI. TV. , Taxes, fees, fees and charges as well as any electricity generated from renewable energy sources and waste as defined in the relevant applicable law, as defined in Section 147 of the Civil Code, the energy tax, the VAT, in order to promote the production of energy from the Transmission System Operator, the cost and regulation of the electricity (KÁT) obliged by traders.

Assessment Criteria: The contracting authority is purchasing on behalf of other contracting authorities: Article 76 (2) (a), and select the most economically advantageous tender, referring to the tender dossier. 76 (5). In addition, the tenderer's needs meet the quality and technical requirements specified in the contract, and the most economically advantageous tender is only used to evaluate the lowest price, given that the goods can not be differentiated according to the standard product defined by the law and can be defined by quality standards.

Engineering services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published December 15, 2016
Winner
Trampus és Társa Korlátolt Felelősségű Társaság
cpvs
71300000

Final Safety Analysis Report updating, and performing expert work relating to the preparation of the Periodic Safety Update Report (2017-2021).

The acquisition aims of the Paks Nuclear Power Plant (with VVER-440 type nuclear power plant) Final Safety Analysis Report (FSR) annual update of the 2017-2021 years, as well as technical engineering services and scientific support due to the 2017 year Periodic Safety Update Report (IBJ) is produced.

The Final Safety Analysis Report of the operating license of the most important founding documents, certificates and safe operation of the facility in terms plays a major role. The FSR annual update of the Paks Nuclear Power Plant Zrt as the licensee of a nuclear facility 118/2011 on nuclear safety requirements for nuclear facilities and related official activities. regulatory obligations set out in § 31 of Regulation (VII.11.) (118/2011. (VII.11.) Korm.) on..

The 118/2011. Periodic Safety Review, as defined in § 34 of Government Decree. (VII.11.) (IBF) aims to examine the operation of nuclear facilities in line with the base of the authorization. After ten years of the Periodic Safety Review for the first time from the date of the operating license becomes final, then due in ten years from the closing of the previous revisions of its issue.

The FSR and updating tasks completion IBF and closing it in 1996 in support of IBJ preparation CXVI on nuclear energy. Law 118/2011 of. acting in independent technical szakértőről (VII.11.) No, the use of nuclear energy Govt. 247/2011. (XI.25.) Of the Atomic Energy Authority and the National Govt. Official guidelines include.

Result Information on the "digitization perform tasks related to the creation of a Digital Archive Paks" t. procurement procedure

TelePaks Nonprofit Kft. | Published November 11, 2015
Winner
IT Labor Kft
cpvs
72000000

Service orders; The volume of public procurement contracting communicate in a way that gives the contract amount from which the amount of the contract has been concluded. 24.500.000- net commissions framework contract, subject to a ceiling of HUF + VAT. Staff employed by the Contractor or digitizer roles are required to carry out their work under the guidance of the Project, which generally involves: - fixing and maintaining code and master files (person, organization, venue, event, taxonomy). - Sample processing required to be carried out; - Is held (take over, label, return, etc.). Digitized materials; - To carry out the processing (digitization, refining); - Fix the available meta-information, if applicable, respectively. Based improve professional driver instruction, complement and maintain them. Their tasks determined by the project leader - in general - quarterly breakdown. In connection with specific data processing is still operational, technical (eg. The collection management) of command laws of the relevant organization or the head of the institution. Number of Institution / Organisation Estimated Quantity Available workstation Messenger Paks 2,000 pages, 500 photos TelePaks 4,000 hours of video recording 1.0 2.0 1.0 Nuclear Energy Museum City Library item 1000 Volume 200 (*) 2,000 items 1.0 1.0 Paks Gallery Fortuna City Museum of Radio 2500 100,000 items 2.0 to 1.0 hours recording

Supply of technical and scientific background to support the activities of the spent fuel pool cooling circuit Reconstruction Project - Contract award notice

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published November 20, 2015
Winner
VEIKI Energia+ Kft.
cpvs
71300000

The Paks Nuclear Power Plant Zrt it owns 500 MW of rated electric power functions provide improved VVER-440/213 type nuclear power plant units spent fuel pool cooling circuit pipelines of long operated its technical and scientific back-office support activities and engineering services functions of supply, including key support functions required by the Hungarian Atomic Energy Authority (HAEA), the operation beadványozási tasks required for official acceptance for case management, professional supervision of the tasks is launched. An ad hoc orders at the expense of the framework contract is required to perform the following tasks - bearing in mind that the planned tasks under the main job categories subtasks, these are the technical content and the amount of refrigerant piping system and any other system involved the actual condition of the necessary interventions depend on, and the HAEA subject to change based on future comments, decisions. Nuclear Regulatory Commission, Washington, DC 20555-0001, July 2001) (22 pieces planned program) Deadline: 12/31/2017. The preparation should take into account the results of the already implemented short-term microbiological monitoring program. (1 program planned) Deadline: 03/31/2016. The requirements of Regulation No 11) on.. (3 engineered program) Deadline: 05/31/2017. The spent fuel pool cooling circuit pipelines reconstruction technology in developing participation. (1 program planned) Deadline: 06/30/2017. Further definition of tasks: It runs both the contractor and the contracting authority for the opportunity to put forward to promote the successful implementation of the project of new jobs, which are approved by the contracting authority. (5 job expected)

Technical testing, analysis and consultancy services

MVM Paks II. Atomerőmű Fejlesztő Zártkörűen Működő Részvénytársaság (MVM Paks II. Zrt.) | Published May 17, 2017
Winner
Magyar Tudományos Akadémia Energiatudományi Központ
cpvs
71600000

Hungary's Government in January 2014 Convention concluded with the Government of the Russian Federation on cooperation in the peaceful uses of nuclear energy, which it promulgating 2014.évi II. Act came into force on 02.12.2014 (hereinafter referred to as the Convention). According to Article 8 of the Convention to be concluded so-called for the implementation of the Convention. are tasks under the Convention within the framework of the implementation agreements stated in detail. The Implementation Agreements, including the so-called. EPC contract with MVM Paks II. Ltd. NIAEP the Organization of the Russian company selected as general contractor to 12/09/2014. He signed on the day. The new nuclear power plant units is an important part of establishing control provided by the General Contractor fuel behavioral analysis. This requires independent ways to develop and carry out analyzes related to fuel behavior model that analyzes establish the safe operation of the reactor core to guarantee or to meet acceptance criteria for the integrity of fuel available for the pre-defined operating state for initial events. The winning bidder contractor responsible for the Feladatspecifikációban as specified, carry out the required construction license application for the foundation of related nuclear fuel analyzes and documented.

2. Change the number of individual contracts affect the performance of the contract deadline, as well as a 4.6 point 4. points shall be added under which the Contractor declares to undertake and initiate the acquisition of nuclear supplier qualification. (Based 118/20111. (VII.11.) On order. § 30). the deadline for the No. 1 change as a result of performance of the contract consisting of: 28/02/2017. It was days ago. The revised deadline: 12/03/2018.

Information on the amending treaty-Paks Renewable House II.

Aktív Energia Egyesület | Published July 10, 2015
Winner
2KOP Építési Szolgáltató és Gazdasági Tanácsadó Kft.
cpvs
45000000, 45211100, 45212312

Subject: Amount "Creating a framework EEOP-6.2.0 / B / 11-2013-0006 SEQ ID NO POWER HOUSE Exhibition Centre II project." The building design Passive house consists of three structural components: • First, a monolithic reinforced concrete building parts: adobe masonry infill here located in the office, conference and exhibition of the social part of the floor space. • On the other hand, the exhibition and conference is located in front of greenhouse space, steel supporting structure. • Third, the building is distinguished by its movable wall building. Foundation: The foundation 1,50 m deep beneath the pillars point Funds takes place. One of the two insulation away. The reinforced concrete girders provide the movable wall building rail system of the host structure. The concrete quality: C25 / 30 XC2-16-F3 BS 4798-1: 2004 reinforced concrete building: The building is 10x12 m 25x25 cm cross section pillars are made of reinforced concrete structure. The pillars are so attached to the bottom beam will widen over the floor. The stairs are also made of reinforced concrete arch structure. The lintels are also reinforced concrete beam. The adobe masonry infill. The concrete quality: C25 / 30 XC1-16-F3 BS 4798-1: 2004 rebar: B500 Greenhouse building: Dimensions 10,6x13,8 Hea 200 m-long main -as profiles made of 10.9 M24 connections are made with screws. Located between the frames as 3.0 meters per 75 cm vertical steel hollow sections made to receive the glass wall. The bracing two increments of 20 mm prestressed steel bar is done. The steel structure is connected to the glass structure. Steel grade S 235 BS EN 10027-1 Mobile building: the steel supporting structure is also movable wall frame construction 10,60x12,75 m is positioned as the main beams 3.00 m Hea 240 profiles. Also Hea profiles are made. The quality 10.9 frames stretched relations screws. Some handling condition of the building is fully open, stationary design of the wheels must be such that it is able to power up looking to hire. Severity: Maximum vertical force in the framework of Pz = 90. Maximum upward force Pz1- = -10 CN Pz2- = -25 CN (in the middle of the corner points) Maximum lateral force Px = 40 CN metal materials Flooring Concrete C25 / 30 XC2-16-F3 Floors Walls C25 / 30-F3 XC1-16 Products concrete C8 / 10-XN (H) -MSZ-1: 2004 B500B Rebar Steel S235 JR support structure of the building complies with the requirements of the following standards. The support structure of the building does not contain asbestos. Applied standards: EN 1990: 2005 Basics of structural design EN 1991-1: 2005 The impacts on structures EN 1993-1-1 Design of steel structures Acquisition of Passive House certification is not part of the contract. In addition, the building must not only permanent exhibitions, but periodic conferences, events and meetings as well as suitable, during which visitors specifically to learn about renewable energy technologies up close, even during operation. The completion of the building project must meet the requirement for the value of the building (s) specific heat losses provided for by Regulation 7/2006 factors of TNM.

Engineering support services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published May 19, 2017  -  Deadline June 22, 2017
cpvs
71336000, 72267100

improving the business framework contract / Operational log entries and preparation of technical support and ad hoc reports from 2017 to 2021. years.

The KHM (Maintenance Effectiveness Monitoring) periodic reports to the RRE (SSCs) reliability and unavailability monitoring support, KM (risk monitor) operation of the electronic logging system to log entries proofreading and reporting of and initial processing of peer-reviewed data in an offline external e -naplóban (fixing operational entries used by MVM PAZrt program).

And providing technical framework support required to meet the quality of the reports by the detailed procurement technical specification.

1.1 Task description

The task can be performed only in Hungarian.

1.1.2 E-journal entries revision

0: fixed 00 to e-journal entries proofread (data correction) will be subject to the KHM and WANO (World Association of Nuclear Operators) reporting of production records, KM (Risk Monitor) operation and PSA (Probabilistic safety assessment) failure compilation of statistics véve.A aspects of repair and data loading, proceed as ordered occasionally cycles into the application form.

After the year 350 000 log entry screening, based on the assumption of a 5% rate of annual planned revision quantity: 17 500 pcs.

The scheduled running of algorithms, loading data into the database.

According to this diary 1.1.3 to support the KHM, WANO and HAEA (Hungarian Atomic Energy Authority) report preparation of reports specific in application form.

The preparation of the data must be done to make it suitable for further processing in tabular form.

1.1.4 Technical Support Framework (human consulting, software backup insurance) e-journal system fixed application form by occasionally to perform the following tasks

provide a piece daytime phone number 1.1.4.1 is available for assistance, which may indicate a problem within 06-18 hours.

In addition to the working hours to sign a deal with mistakes and next business day.

1.1.4.2 If the problem is due to software e- logging fails, paper documents for the lost time obliged to fix the system after the patch.

Setting 1.1.4.3 Privileges and investigation issues.

assistance with using 1.1.4.4 Application.

1.1.4.5 Reporting and interpretation assistance related queries.

1.1.4.6 support for the interpretation of some functions.

1.1.4.7 Incorrect assistance in the restoration of data recording.

1.1.4.8 help users to frequently asked questions.

issues 1.1.4.9 Data scrutiny.

1.1.4.10 Application support for parameterization.

1.1.4.11 Database monitoring, monitoring of table spaces for the Megrend problems. direction.

Application Server 1.1.4.12 examining the problems, issues indication to the operator.

Making 1.1.4.13 An occasional individual queries formulated in accordance with the customer's needs.

1.1.4.14 The scheduled running of algorithms, loading data into the database.

1.1.4.15 algorithms in the system (e-executable log data acquisition algorithms) change tracking megrend. Based on demand.

Detailed in the tender documentation for procurement specification.

  • 1