Public tenders for energy in Miskolc Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Building Energy Development

Tiszáninneni Református Egyházkerület | Published February 13, 2015
Winner
Multi Konyha Korlátolt Felelősségű Társaság
cpvs
45261400, 45315100, 45443000, 45453100, 09331000, 09332000

Completion of the technical content of Miskolc-Szirmay Reformed Primary School, Primary School and Nursery Art building building energy modernization works specified in the technical documentation. The construction work on the facades of flat roof insulation, windows and facade (46 pc) and solar-exchange system (80 pcs solar modules) consists of installation. available.

Building Energy development

Tiszáninneni Református Egyházkerület | Published February 13, 2015
Winner
Multi Konyha Korlátolt Felelősségű Társaság
cpvs
45261400, 45315100, 45443000, 45453100, 09331000, 09332000

Completion of the technical content of Miskolc-Szirmay Reformed Primary School, Primary School and Nursery Art building building energy modernization works specified in the technical documentation. The construction work on the facades of flat roof insulation, windows and facade (46 pc) and solar-exchange system (80 pcs solar modules) consists of installation. available.

Results of the process: preparation related to the Borsod-Abaúj-Zemplén County Government Office, resulting in energy savings in the preparation of investment projects for energy efficiency improvement study

Borsod-Abaúj-Zemplén Megyei Kormányhivatal | Published November 13, 2015
Winner
LENERG Energiaügynökség Mérnöki és Tanácsadó Nonprofit Kft.
cpvs
71620000

7/2006 on the preparation used by the Borsod-Abaúj-Zemplén County Government Office on 23 existing state building energy certification for determining the energy characteristics of buildings. (V. 24.) TNM Regulation 176/2008 as well as for the certification of the energy performance of buildings. According to the requirements laid down in Regulation (VI. 30.).. Advanced development concept, the proposed modernization of the energy available about the energy savings and an estimate of the cost associated developments. Building energy certification and preparing for the potential energy calculations based on the state selected for detailed development concept five buildings.

Information on the contract amendment (related to preparation resulting in Borsod-Abaúj-Zemplén County Government Office Building energy-saving investment projects for the preparation of Energy Efficiency Development Study)

Borsod-Abaúj-Zemplén Megyei Kormányhivatal | Published November 13, 2015
cpvs
71620000

Production of associated management contract, resulting in Borsod-Abaúj-Zemplén County Government Office Building energy-saving investment projects for the preparation of Energy Efficiency Development Study Preparation energy certification for existing state used by the Borsod-Abaúj-Zemplén County Government Office 23 buildings the energy characteristics of buildings the fixing of laying 7/2006. (V. 24.) TNM Regulation 176/2008 as well as for the certification of the energy performance of buildings. According to the requirements laid down in Regulation (VI. 30.).. Advanced development concept, the proposed modernization of the energy available about the energy savings and an estimate of the cost associated developments. Building energy certification and preparing for the potential energy calculations based on the state selected for detailed development concept five buildings.

"Energy efficiency improvements of a contract for the preparation of the EEOP 7.13.0 / No. 15-2015-0031. Applications under the Open Door Baptist Church for "

Nyitott Ajtó Baptista Gyülekezet | Published December 4, 2015
Winner
DOMOBER Mérnöki Iroda Tervező és Szolgáltató Korlátolt Felelősségű Társaság
cpvs
71250000, 71300000

Subject: "Energy efficiency improvements of a contract for the preparation of the EEOP 7.13.0 / No. 15-2015-0031. Applications under the Open Door Baptist Church for "Volume: The aim is to II. building energy upgrades to buildings selected for full herds surveyed the building stage development of design documentation for implementation, renewable energy planning: - In principle, plans licensee, licensee of construction plans, working drawings tender preparation plans, the accompanying program design and / or. Starting in accordance with the procedures required to obtain licenses Regulatory / resolutions 30.) Government Regulation -.. - The 7/2006. Preparation of appropriate values ​​in accordance with the requirements (V.24.) TNM energy calculations, calculation of energy and energy cost savings. - Buildings determining the total cost of Cadastral Table III. Filling in for phase portions (worksheet 3. fázis_ET III) according to 30) on Regulation and the 7/2006.. Preparation of appropriate values ​​in accordance with the requirements (V.24.) TNM energy calculations, calculation of energy and energy cost savings. Name of building Property Address Building net floor area (m2) Determination 1619 1358641597 Buildings total cost of Cadastral Table III. Filling phase for parts

Information amending the contract renewal energy aa Fényi Gyula Jesuit High School Law procurement procedure

Fényi Gyula Jezsuita Gimnázium és Kollégium | Published April 17, 2015
Winner
Alexander 2001 Kft.
cpvs
09330000, 09331100, 09331000, 45331100

Works, construction of Fényi Gyula Jesuit High School 3529, Miskolc, Light Square Gyula 2-12. number (HRSZ: 13063) during the heating of buildings upgrading napkollektros installing solar systems. Common procurement vocabulary (CPV): Main object: 09330000-1 Solar Energy More articles: - Solar heat production 09331100-9 - Solar panels 09331000-8 - 45331100-7 heating installation Total quantity or scope: Heating system: Name Type Power / Tértogat (No. ) Gas Boilers Buderus GB 95.00 2 162-100 162-100 Gas boiler Buderus GB 95.00 2 Hot water tank Buderus SU 1000 1000 W 2 liter hot water tank of 1000 liters Buderus SU 1000 W 2 1 fiúkollégium the radiators in each room. Flat-plate collectors: Name Model Number (No.) Absorber surface area (m2) Flat-plate collectors Buderus SKN 4.0 22 2.1 20 4.0 m2 Flat plate collector Buderus SKN 2.1 m2 of solar collectors: Name Model Number (No.) Amerisolar AS-6P-30 250W polycrystalline solar cells polycrystalline 192 In the present project, the Miskolc Fényi Gyula Jesuit High School building some buildings in the complex energy development achieved by the use of renewable energy sources. Buildings affected by the development, respectively, are as follows: Gymnasium; Kitchen, dining room building; Fiúkollégium. The gymnasium is physically placed on top of a building with a nominal capacity of 48 kWp photovoltaic system with a total energy yield of 47,000 kWh / year, but this value is specified as a percentage of consumptions were distributed among the buildings under development. Since the material properties has one connection point, so all the buildings involved in the development indirectly reduce energy consumption. The development will take place within the framework Gymnasium; Kitchen, dining room building; Fiúkollégium boiler modernization, as well as the kitchen, restaurant and Fiúkollégium buildings solar system will be used. Detailed quantitative information (descriptions, plans) included in the dossier.

"The development of building energy Miskolc Gárdonyi Geza Catholic Primary School in combination with renewable energy sources" to prepare the contract to carry out project work related subjects and the subjects I no construction plans. Change

Gárdonyi Géza Katolikus Általános Iskola és Óvoda | Published February 20, 2015
Winner
Bau-Alex Kft.
cpvs
45000000

Subject: "a contract" building energy development of Miskolc Gárdonyi Geza Catholic Primary School in combination with renewable energy sources "preparing to carry out related subjects project works and construction plans Volume: The complete heating pipe network can be exchanged: Non-alloy outside galvanized carbon steel pipe, which préskötéses connections, enclosed building heating network has been developed (2508 m). The solar package includes: solar mounting bracket, connecting kit VPM solar station, ready-mixed heat transfer medium, VPS solar buffer tank, fresh water station VPM solar, solar HT pipe insulation with the required length. The windows, doors increased air tightness, insulation glazed custom plastic structures are both old- and gymnasium wing. Based on the requirements of the Disaster vertical lightning arrester than ± 25 cm wide inhomogeneous rock wool insulation is formed. - Flat roof insulation: the gym existing flat roof structure does not correspond to the TNM Regulation, in complete thermal insulation and the corresponding vízszigetelelést also need to be achieved and the sheet metal work is to be performed (75 m). - Attic Ceiling insulation of the existing roof slabs are 20 cm Therwoolin insulation sheet, which is under párazáró-, over vapor-permeable film-spreading are planned (1,369 m2).

"EEOP 5.5.0 / A / 12-2013-0101 - Delhi municipal buildings for energy development - Technology Review" - the award for information

Miskolc Megyei Jogú Város Önkormányzata | Published October 8, 2014
Winner
MIK Miskolci Ingatlangazdálkodó Zrt.
cpvs
71631000, 71631300, 71631400

"EEOP 5.5.0 / A / 12-2013-0101 - Miskolc municipal buildings for energy development - Technology Review 'Quantity: In this project, the following project elements with respect .: 30519/42 Id Id Id .: .: 13077 20395 Id .: 40026/10 3073/4 Id Id .: .: 4994/2 7745/1 Id .:

Information regarding the preparation of implementation plans relating resulting in Borsod-Abaúj-Zemplén County Government Office Building energy-saving investment projects carried out subject award notice

Borsod-Abaúj-Zemplén Megyei Kormányhivatal | Published December 21, 2015
Winner
Klimasol Kft
cpvs
71321000

Preparation of energy plans for 5 buildings

The construction works of Clement Didák Fiúkollégiumának renewal of energy - informational award notice

Konventuális Ferences Minorita Rend | Published December 30, 2015
cpvs
09331000, 09331100, 44221100, 45331100, 45321000, 45310000, 45315100

Works and construction. "The Clement Didák Fiúkollégiumának energy renewal of the construction works of" Project Element Name related Technical parameters Solar System Grid Solar system with 6 kWp solar system Síkkollektoros system 46.2 m2 absorber surface exterior window replacement / modernization Window Replacement / modernization and incidental expenses of U = 1.6 W / m ^ 2K, 81.7 m2 surface heating / Use hot water system (s) upgrading Heat generator replacement / modernization and incidental expenses of 2 x 80 kW Subsequent outer side of insulation Ceiling insulation and incidental expenses of 2 x 6 cm thick mineral wool in the procurement process resulted in conclusion of construction contract a type of flat-rate sum, not itemized settlement.

". Geothermal system for heating and cooling energy 5.5.0-09-11 TOP Owl building construction work" - No. 2 contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published December 11, 2015
Winner
TITÁN Service Kft.
cpvs
45262200, 45110000, 45231100, 45233251, 45262600

Within the framework of a contract to a "Miskolc, Upper Majláth-terminus of an elevated level of service development in place to stop the building of the rehabilitation of the Owl" called, TOP 5.5.0-09-11. projects under number construct the Owl building construction work on the geothermal system for heating and cooling energy contractor is responsible in developing geothermal system for heating and cooling energy of the Owl's building - the area in preparation for removal of the existing space stone picked up on pallets on-site interim storage, - geothermal heating system complete design 8 100 m wells drilling, connecting wires required by building, combining the collection pit building up, the heat center / heat exchanger connecting - substation / heat exchanger construction, start-up - the restoration area, paving Cover contractor is responsible, Furthermore: - full implementation of the investment in ensuring the smooth operation of electric traffic, electric transport maintenance contracting bidders draws attention to the technical delivery and take-over should take place until 30 November 2015. A detailed and itemized specifications, quantities and technical specifications in the Annexes to the tender documentation can be found. Contracting draw attention to, things to equivalent megajánlása equivalence for the tenderers must demonstrate its offer.

Treaty change: "Energy investment in the Jókai Mór Reformed Hungarian-English Bilingual Primary School, Primary School and Nursery School of Art"

Jókai Mór Református Magyar-Angol Két Tanítási Nyelvű Általános Iskola, Alapfokú Művészeti Iskola és Óvoda | Published September 11, 2015
Winner
Jánosik és Társai Kft.
cpvs
45261400, 45321000, 45440000, 45442100, 45110000, 45111000, 45111100, 45442110

The Customer is "Energy investment in the Jókai Mór Reformed Hungarian-English Bilingual Primary School, Primary School and Nursery School of Art" written works subject of PPA. 122 / A. Chosen in a public procurement procedure as per § the Contractor as a contractor to perform work contemplated by this Agreement.

"EEOP 5.5.0 / A / 12-2013-0101 - Delhi municipal buildings for energy development - Central Assembly Members Kindergarten" - informational award

Miskolc Megyei Jogú Város Önkormányzata | Published October 8, 2014
Winner
GERIXON Tervező és Kivitelező Kft.
cpvs
45200000, 45210000, 45320000, 45321000, 45331100

"EEOP 5.5.0 / A / 12-2013-0101 - energy development Miskolc municipal buildings - Central Kindergarten Assembly Members' Quantity: Building the right age at the time windows, and heating system installed. Rehabilitation of buildings comprises: using EPS insulation board, glued dübelezve, fiberglass mesh, plaster pieces, boot heel and use profiles, plastic-based roughcast Linings - existing, remaining flat roof subsequent thermal insulation of 15 cm thick EPS 100 thermal plates, the plates are mechanically attached to APP modified bitumen sheet, to be insulated surface due, respectively, roof drains and páraszellőzők incorporating EPS insulation plate, mechanically fixed, equal to the roofing material of the bituminous membrane insulated from the top of the Parapet wall and kétvízorros fallefedéssel, galvanized steel, six meter dilatálva - replacement front doors (doors and windows) , white, 5-chamber plastic profile, 4-16Ar 4-mm insulating glass (at least Ug = 1.1 W / m 2 K, Rw = 32 dB), demolition, removal of the broken down doors, sill white, white arm-rests, the demolition injured internal soffit repair (plastering, painting) renewal elements HVAC - heating pipes and replacing emitters, valves, ball valves, légtelenítőkkel, thermostatic valves within the system - lightning protection system breakdown, restore, measurement and test report

"EEOP 5.5.0 / A / 12-2013-0101 - Delhi municipal buildings for energy development - Joseph Street Kindergarten" - informational award

Miskolc Megyei Jogú Város Önkormányzata | Published October 8, 2014
Winner
FEDRID Kft.
cpvs
45200000, 45210000, 45320000, 45321000, 45331100

"EEOP 5.5.0 / A / 12-2013-0101 - Miskolc municipal buildings for energy development - Joseph Street Preschool" Quantity: Building the right age at the time windows, and heating system installed. Rehabilitation of buildings comprises: using EPS insulation board, glued dübelezve, fiberglass mesh, plaster pieces, boot heel and use profiles, plastic-based roughcast Linings - existing, remaining flat roof subsequent thermal insulation of 15 cm thick EPS 100 thermal plates, the plates are mechanically attached to APP modified bitumen sheet, to be insulated surface due, respectively, roof drains and páraszellőzők incorporating EPS insulation plate, mechanically fixed, equal to the roofing material of the bituminous membrane insulated from the top of the Parapet wall and kétvízorros fallefedéssel, galvanized steel, six meter dilatálva HVAC renovation includes: - Replacement of existing boiler with a 100 kW condensing boiler, the corresponding hydraulic block, circulation pump, safety and control devices, building heating network, a controller, and weather dependent. thermostatically controlled - existing chimney demolition, new chimney construction conform to the new boiler technical parameters - replacement of existing heating circulating pumps, heating systems connected - heating pipes and emitters replacement valves, ball valves, légtelenítőkkel, thermostatic valves within the system - Breakdown of lightning protection system, restore , measurement and test report

At this point of the Tisza River Reformed Church in preparation for energy-efficiency improvements in the context of supply c .- (TOP-7.13.0 / 15-2015-0005) project planning tasks - information notice on the outcome of Procedure

Tiszáninneni Református Egyházkerület | Published December 4, 2015
Winner
Klimasol Higiénia-, Komfortklíma, Szoláriumtechnika Kereskedelmi És Szolgáltató Kft.
cpvs
71240000, 71321000, 71356400

"At this point in the Tisza River Reformed Church in preparation for energy-efficiency improvements in the context of supply c .- (TOP-7.13.0 / 15-2015-0005) project planning tasks" for 7 pieces of conceptual building plans or licensee. tender designs, as well as the preparation of the unpriced budget. The necessary buildings under monumental protection, in respect of consultation with the Monument Protection Authority, and the initiation of the permitting process, submitting to the authority.

EEOP 5.5.0 / A / 12-2013-0101 - energy development of Miskolc municipal buildings - Joseph Street Nursery - 1 no. contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published February 25, 2015
Winner
FEDRID Kft.
cpvs
45200000, 45210000, 45320000, 45321000, 45330000

"EEOP 5.5.0 / A / 12-2013-0101 - energy development of Miskolc municipal buildings - Joseph Street Kindergarten" Volume: Short description of the building: The building was built in the early 1970s, reinforced concrete pillars of the building is 700 m2 surrounding premises are connected to the function of the building according to the length of the building at the time era windows, and heating system installed. Rehabilitation of buildings includes: use of EPS insulation board, glued dübelezve, fiberglass mesh, plaster pieces, boot and heel using profiles, plastic-rubbed plaster by applying - existing, remaining flat roof subsequent thermal insulation 15 cm thick EPS 100 insulating plates, the plates are mechanically secured to the APP modified bitumen sheet, to be insulated surface due aggregating, roof drains and páraszellőzők incorporation of EPS insulation plates, fastened mechanically identical to the roof insulation material bituminous sheet insulation on top of the Parapet and kétvízorros fallefedéssel, galvanized steel, 6 meter dilatálva Technical building renovation includes: - Replacement of existing boiler with a 100 kW condensing boiler, the corresponding hydraulic block, circulation pump, safety and control devices, building heating network, a controller, and weather dependent. thermostatically controlled - existing chimney demolition, new chimney construction conform to the new boiler technical parameters - replacing existing heating circulation pumps, heating system connected - heating pipelines and heat emitters replacement valves, ball valves, légtelenítőkkel, thermostatic valves within the system - Ending lightning protection system restore and measuring and test report

EEOP 5.5.0 / A / 12-2013-0101 - Delhi municipal buildings for energy development - Batsányi Kindergarten - 1st c. contract modification

Miskolc Megyei Jogú Város Önkormányzata | Published February 25, 2015
Winner
PAPEX Kft.
cpvs
45200000, 45210000, 45320000, 45321000, 45331100

Works: "EEOP 5.5.0 / A / 12-2013-0101 - energy development of Miskolc municipal buildings - Kindergarten Batsányi" Volume: Short description of the building: The building was built in the 1970s, reinforced concrete frame structure, the building of 700 m2, are included in the function rooms can be connected in parallel to the longitudinal axis of the building per page organized, both in building the appropriate age at the time windows, and heating system installed. Rehabilitation of buildings includes: use of EPS insulation board, glued dübelezve, fiberglass mesh, plaster pieces, boot and heel using profiles, plastic-rubbed plaster by applying - existing, remaining flat roof subsequent thermal insulation 15 cm thick EPS 100 insulating plates, the plates are mechanically secured to the APP modified bitumen sheet, to be insulated surface due aggregating, roof drains and páraszellőzők incorporation of EPS insulation plates, fastened mechanically identical to the roof insulation material bituminous sheet insulation on top of the Parapet and kétvízorros fallefedéssel, galvanized steel, 6 meter dilatálva - replacement front doors (doors and windows) , white, five-chamber plastic profile, 4-16Ar 4-mm insulating glass (at least Ug = 1.1 W / m2K, Rw = 32 dB), demolition, removal of the windows exploded, white rim, white arm-rests, the demolition injured interior soffit repair (plastering, painting) Building Engineering renewal of: - Replacement of heating pipelines and heat emitters, valves, ball valves, légtelenítőkkel, thermostatic valves within the system - lightning protection system breakdown, restore, measurement and test report

"EEOP 5.5.0 / A / 12-2013-0101 - Delhi municipal buildings for energy development - Kindergarten Avas Roof" - indicative of the results of the process

Miskolc Megyei Jogú Város Önkormányzata | Published October 8, 2014
Winner
DAMÉP Kft.
cpvs
45200000, 45210000, 45320000, 45321000, 45331100

Work contract - "EEOP 5.5.0 / A / 12-2013-0101 - energy development Miskolc municipal buildings - Roof Avas Kindergarten" Quantity: Building the right age at the time windows, and heating system installed. Rehabilitation of buildings comprises: using EPS insulation board, glued dübelezve, fiberglass mesh, plaster pieces, flying and using corner profiles, plastic-based roughcast is applied - to improve footing in patches, and painting two coats facade paint - existing, remaining flat roof subsequent thermal insulation of 15 cm thick EPS 100 thermal plates, the plates are mechanically attached to APP modified bituminous membrane, to be insulated surface due, respectively, roof drains and páraszellőzők incorporating EPS insulation plate, mechanically fixed, equal to the roofing material of the bituminous membrane insulated from the top of the Parapet wall and kétvízorros fallefedéssel, galvanized steel, 6 dilatálva meter - replacement front doors (doors, windows), white, 5-chamber profile, plastic, 4-mm 4-16Ar insulating glazing (Ug = 1.1 at least W / m 2 K, Rw = 32 dB), demolition, demolished the doors removal of white ledge, white arm-rests, the demolition damaged internal soffit repair (plastering, painting) HVAC renovation consists of: - heating pipes and emitters replacement of valves, ball valves, légtelenítőkkel, thermostatic valves within the system - demolition, restoration, measurement and lightning protection systems test report

Information subject auditor selection procedure, the results of

Miskolci Egyházmegye | Published September 28, 2015
Winner
Konstrukta Max Kft.
cpvs
71314000

"The Miskolc Diocese of buildings for energy efficiency improvements in the preparation of" Selecting connection with the project was related to the preparation of the second phase of building energy assessment, energy auditor certificates of Volume II. phase relation: approx. Survey plan for 48 buildings, energy certification, estimation, facilitating the selection III. In connection phase: making buildings energy performance certificate for the current status Planned 176/2008. (VI. 30.) In accordance with Govt. Regulation. The 7/2006. Preparation of appropriate values ​​in accordance with the requirements (V.24.) TNM energy calculations, calculation of energy and energy cost savings.

The properties selected this side the river Tisza Reformed Church District register of Conceptual design - No. 1. modification of the contract, Part I

Tiszáninneni Református Egyházkerület | Published September 25, 2015
Winner
Pro Environ Kft.
cpvs
71335000, 71315300

"At this point the Tisza selected properties of the Reformed Church District Cadastre from conceptual planning" Part I perform energy audits for buildings 25 pcs. Contractor shall: 1. Preparation of survey plans of selected buildings. 2. The status of energy certification for existing buildings. 3. Based on surveys of the proposed building energy retrofits for energy, available energy savings and cost associated with the development of the conceptual design estimates carried out after the fourth selection of the buildings to be designed (according to the criteria specified in the invitation to tender).