Public tenders for energy in Lenti Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Information - building energy development "priority" KEOP-2015-5.7.0 "Public buildings CPK Arany János Primary School and Elementary Art School building energy modernization

Lenti Város Önkormányzata | Published September 28, 2015
Winner
LE-KO Kft.
cpvs
45210000, 45321000, 45315000

Subject: "KEOP-2015-5.7.0" building energy development priority of public buildings "as part of the tender on Arany János Primary School and Elementary Art School building energy modernization within the framework of the project management contract quantity: The Municipality of KEOP-2015-5.7.0" key public buildings Under the tendering building energy development "on the importance 1183/15. u-U, 8960 Lenti, Lily of the Valley Street property under the second intends to implement the Arany János Primary School and Elementary Art School building energy modernization. The south wing is connected to the rectangular floor plan design part of the building gym. The facade windows are avétos state. The building facade walls 12 cm thick EPS boards expanded follow-up facade heat insulation must be made of the base stands 12 cm thick extruded insulation boards bonded point of incorporating should be established. Horizontal slab between the roof and the attic and roof inclined planes 15 cm thick fibrous insulation must be installed between the rafters of the attic knee walls bounding must be provided with a 15 cm thick EPS insulation. Uw = 1.1 to be W / m2K heat transfer coefficient to possess.

Under the tendering building energy development "," KEOP-2015-5.7.0 "Public buildings high priority on Gönczi Ferenc Secondary Grammar School building energy modernization - Contract modification

Lenti Város Önkormányzata | Published October 19, 2015
Winner
LE-KO Kft.
cpvs
45210000, 45321000, 45315000

Subject: "KEOP-2015-5.7.0" "framework proposal on Gönczi Ferenc Secondary Grammar School building energy modernization, within the framework of the project management contract" building energy development priority of public buildings Volume: The Municipality of KEOP-2015-5.7.0 "priority public buildings Under the tendering building energy development "in 8960 Lenti, Nicholas Zrinski road No. 5. It intends to implement during the planned u-u 453 property Gönczi Ferenc Secondary Grammar School building energy modernization. 453 u.) The building rectangular floor plan design with two and three-storey main building has a neck member is connected to the kitchen-dining room and the gym locker room, boiler room-wing. The renovated school building components and front walls are plastered incomplete, worn-out condition of the façade windows. The main building, neck tag, and related kitchen-dining room and the locker room, gym, boiler house building wings 17 cm thick expanded EPS boards follow-up facade heat insulation must be made of the base stands 11 cm thick extruded insulation boards per point bonded by incorporating should be established. Range down from the bottom floor between the basement and ground floor insulation of 15 cm thick EPS insulation must be prepared. Uw = 1.1 W / m2K will have a heat transfer coefficient. 453 u.) Two of the three buildings renovated, and the third building will be demolished. Work will be performed in the premises of buildings painting of purity.

Building energy development within the framework of "Public buildings was a priority applications" KEOP-2015-5.7.0 "Gönczi Francis High School and Vocational School building energy modernization - Information

Lenti Város Önkormányzata | Published September 23, 2015
Winner
LE-KO Kft.
cpvs
45210000, 45321000, 45315000

Subject: "KEOP-2015-5.7.0" "framework proposal on Gönczi Ferenc Secondary Grammar School building energy modernization, within the framework of the project management contract" building energy development priority of public buildings Volume: The Municipality of KEOP-2015-5.7.0 "priority public buildings Under the tendering building energy development "in 8960 Lenti, Nicholas Zrinski road No. 5. It intends to implement during the planned u-u 453 property Gönczi Ferenc Secondary Grammar School building energy modernization. 453 u.) The building rectangular floor plan design with two and three-storey main building has a neck member is connected to the kitchen-dining room and the gym locker room, boiler room-wing. The renovated school building components and front walls are plastered incomplete, worn-out condition of the façade windows. The main building, neck tag, and related kitchen-dining room and the locker room, gym, boiler house building wings 17 cm thick expanded EPS boards follow-up facade heat insulation must be made of the base stands 11 cm thick extruded insulation boards per point bonded by incorporating should be established. Range down from the bottom floor between the basement and ground floor insulation of 15 cm thick EPS insulation must be prepared. Uw = 1.1 W / m2K will have a heat transfer coefficient. 453 u.) Two of the three buildings renovated, and the third building will be demolished. Work will be performed in the premises of buildings painting of purity.

Building energy development "KEOP-2015-5.7.0" Public buildings priority "development of building energy Lenti Daycare Nursery and Kindergarten, Lenti Culture Szombathely Home - Contract modification

Lenti Város Önkormányzata | Published October 19, 2015
Winner
LE-KO Kft.
cpvs
45210000, 45321000, 45315000

Subject: "KEOP-2015-5.7.0" as part of building energy applications development "priority on public buildings Lenti Daycare Kindergarten and Nursery, and the development of building energy Lenti Szombathely Home Cultural context of construction contracts amounts: 41.sz. designed u-u 445 plot Lenti Daycare Nursery and Kindergarten below the building, and the 8960 Lenti, Szombathely road No. 68. It intends to implement the planned u-u below 3581 Szombathely Cultural property under the Home Energy refurbishment. A sub-tasks (eligible costs) Lenti Daycare Kindergarten building energy renovation of the east, and the west side is located in a wing group containing 3-3 bedrooms, wedged between the kitchen and the laundry-boiler room block. West side of the building block of the northern and central building, as well as the two intermediate nursery block on the west side and south side of the building blocks of the East as a kindergarten operate. The pre-school and nursery parts of buildings to be renovated facade walls 30 cm thick, internal drainage, attikás covered with a flat roof, doors and windows of the facade are worn condition. The building parts will be supplied with additional thermal insulation. The nursery section garnish wall surfaces 17 cm thick insulation made of expanded EPS subsequent tables, kindergarten section garnish lábazatait 17 cm thick extruded insulation boards glued points as possible by incorporating established. The nursery section garnish wall surfaces 12 cm thick insulation made of expanded EPS subsequent tables, the nursery section garnish lábazatait 11 cm thick extruded insulation boards glued points as possible by incorporating established. Who is the renovation of the existing flat roof waterproofing polyurethane glue in kindergarten arrays of 12 cm; nursery arrays 10 cm thick EPS insulation was designed to which 2 layers. new bitumen sheet waterproofing membrane made from the parapet of overlays, tinning, as well as collecting lightning protection system and back down the building. Uw = 1.1 to be W / m2K heat transfer coefficient, to be able to. The existing mechanical system, remaining outside the central, outdoor, weather-dependent control has to be able to adapt to changing characteristics in energy. B. items (eligible costs) Lenti Szombathely Cultural Home renovation of parts of buildings facade walls 40 cm thick, old wooden doors and facade structures deteriorated condition. The front had built 14 cm solid brick wall small 16 cm EPS boards will receive additional thermal insulation. Uw = 1.1 to be W / m2K heat transfer coefficient to read. The main hall of outstanding rooftop weight of the side wall 12 cm expanded polystyrene, glued and mechanically fastened is fitted. C. items (non-eligible cost): Preparing roof Lenti Daycare Kindergarten

Building energy development priority "KEOP-2015-5.7.0" Public Buildings "building energy development Lenti Daycare Kindergarten and Early Childhood Home and Cultural Lenti Szombathely - information

Lenti Város Önkormányzata | Published October 2, 2015
Winner
LE-KO Kft.
cpvs
45210000, 45321000, 45315000

Subject: "KEOP-2015-5.7.0" as part of building energy applications development "priority on public buildings Lenti Daycare Kindergarten and Nursery, and the development of building energy Lenti Szombathely Home Cultural context of construction contracts amounts: 41.sz. designed u-u 445 plot Lenti Daycare Nursery and Kindergarten below the building, and the 8960 Lenti, Szombathely road No. 68. It intends to implement the planned u-u below 3581 Szombathely Cultural property under the Home Energy refurbishment. A sub-tasks (eligible costs) Lenti Daycare Kindergarten building energy renovation of the east, and the west side is located in a wing group containing 3-3 bedrooms, wedged between the kitchen and the laundry-boiler room block. West side of the building block of the northern and central building, as well as the two intermediate nursery block on the west side and south side of the building blocks of the East as a kindergarten operate. The pre-school and nursery parts of buildings to be renovated facade walls 30 cm thick, internal drainage, attikás covered with a flat roof, doors and windows of the facade are worn condition. The building parts will be supplied with additional thermal insulation. The nursery section garnish wall surfaces 17 cm thick insulation made of expanded EPS subsequent tables, kindergarten section garnish lábazatait 17 cm thick extruded insulation boards glued points as possible by incorporating established. The nursery section garnish wall surfaces 12 cm thick insulation made of expanded EPS subsequent tables, the nursery section garnish lábazatait 11 cm thick extruded insulation boards glued points as possible by incorporating established. Who is the renovation of the existing flat roof waterproofing polyurethane glue in kindergarten arrays of 12 cm; nursery arrays 10 cm thick EPS insulation was designed to which 2 layers. new bitumen sheet waterproofing membrane made from the parapet of overlays, tinning, as well as collecting lightning protection system and back down the building. Uw = 1.1 to be W / m2K heat transfer coefficient, to be able to. The existing mechanical system, remaining outside the central, outdoor, weather-dependent control has to be able to adapt to changing characteristics in energy. B. items (eligible costs) Lenti Szombathely Cultural Home renovation of parts of buildings facade walls 40 cm thick, old wooden doors and facade structures deteriorated condition. The front had built 14 cm solid brick wall small 16 cm EPS boards will receive additional thermal insulation. Uw = 1.1 to be W / m2K heat transfer coefficient to read. The main hall of outstanding rooftop weight of the side wall 12 cm expanded polystyrene, glued and mechanically fastened is fitted. C. items (non-eligible cost): Preparing roof Lenti Daycare Kindergarten

"Under the tendering KEOP-2015-5.7.0 ..... on Lenti Daycare Nursery and Kindergarten and below Szombathely Cultural Home building energy development, within the framework of the project management contract - information

Lenti Város Önkormányzata | Published August 12, 2015
cpvs
45210000, 45321000, 45315000

Subject: "KEOP-2015-5.7.0" "Under the tendering procedure on Lenti Daycare Nursery and Kindergarten, as well as the development of building energy below Szombathely Home of Culture, within the framework of the project management contract" building energy development priority of public buildings Volume: No 41. designed u-u 445 property under Lenti Daycare Nursery and Kindergarten Vörösmarty utca seat and the 8960 Lenti, Szombathely road No. 68. u-U 3581 in real estate during the building of a community center intends to implement energy renewal. 445 u. The existing building Description: The building is typical of the style of architecture, the latest possible execution, structural solutions and equipment was completed. East or west side of the building away from the wing groups containing 3-3 bedrooms, wedged between the kitchen and the laundry-boiler room block. The building west side north and central building block, as well as the two intermediate nursery block on the west side and south on the east side of the building blocks as a kindergarten operate. Also installed were new steel panel radiators. Each of the structures to be modernized primarily to save energy! 1550 m2 Development Intent: To replace the facade windows due to lower plastering and painting works are made. 3581 u. The existing building Description: The building facades are wood windows and doors. Development Intent: The cultural center's building will be placed in new insulated plastic doors and windows and facade of the building External boundaries, as well as warming the camp ceilings gets heat insulation.

Páka Municipality public-service mission buildings (Town Hall, Elementary School) modernization of energy-KEOP-2015-5.7.0

Páka Község Önkormányzata | Published September 4, 2015
Winner
LE-KO Kft.
cpvs
45000000, 45261400, 45421100

It named by a decision of 23) Páka Municipality public-service mission buildings (Town Hall, Elementary School) energy modernization - EEOP 5.7.0 Technical Content: The Local Government and School building was built in the 1970s. The staircase in the middle of the building. The sanitary NE side of the building can be found. The renovated facade walls 25cm thick, 51cm thick pillars, inner-drained, attikás covered with a flat roof, doors and windows of the facade are worn condition. The walls and pillars are both 16 cm thick EPS boards expanded, additional thermal insulation are made from a base of 12 cm thick XPS insulation boards glued points as possible by incorporating established. The building unit serving the kitchen and boiler room single-storey flat roof, while the rest of the building's ground floor, floor design, flat roof. On the ground floor classrooms, workshops, a restaurant and gym changing rooms, sanitary facilities are located on the first floor of the faculty and directors of offices, classrooms and lecture halls chemistry and biology. The renovated facade walls and pillars 30cm thick, internal drainage, attikás flat roof covered with a part of the façade windows have deteriorated condition, part of a previous recent renovation has been replaced with improved airtight plastic aperture closing time, but the contemporary requirements of even these do not meet . The building parts will be supplied with additional thermal insulation. The walls and pillars are both 13 cm thick expanded post EPS insulation boards are made from a base of 13 cm thick XPS insulation boards glued points as possible by incorporating established. The present building refurbishment for both the existing flat roof waterproofing polyurethane adhesive thickness of 21 cm EPS thermal insulation designed to which 2 layers. new bitumen sheet waterproofing membrane made from the parapet of overlays, tinning, as well as collecting lightning protection system and back down the building.

Information amending agreement, Csömödér Municipality

Csömödér Község Önkormányzata | Published November 28, 2014
Winner
K67 Mérnök Építőipari Kft.
cpvs
45000000

Subject: Energy development Csömödér Part 1: Installing Solar system for nursing homes Part 2: Installing Solar system in the mayor's office, for kindergarten Volume: Part 1: Energy development within the framework of the project Csömödér retirement home for 31.255 kW polycrystalline structure solar cells for solar panels, solar panel performance oriented to the transportation element of the network connection, integration, installation, commissioning and territorial jurisdiction of the current service provider's network connection to the preparation of the 8957 Csömödér, u. House has 33 (u .: 399) number - the documentation indicated below. Part 2: Energy development framework Csömödér project 10.340 kW polycrystalline structure solar cells for the mayor's office, nursery for solar panels, solar panel performance that matches the network connection to the transport element of, integration, installation, commissioning and your regional electricity network connection to the preparation of the 8957 Csömödér, u. 49 (u .: 394/1), 8957 Csömödér, u. Property is located on 16 (u .: 261/1) number - the documentation indicated below.
  • 1