Public tenders for energy in Keszthely Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyHungarykeszthely

Building Energy Development

Ranolder János Római Katolikus Általános Iskola | Published October 5, 2015
Winner
Get-Energy Magyarország Kft.
cpvs
45310000, 09332000

Building Energy Development John's Roman Catholic Primary School Ranolder Total quantity or scope: The location and installation of the system set out in the technical documentation amounts of solar panel.

Building Energy Development

Ranolder János Római Katolikus Általános Iskola | Published April 29, 2015
Winner
Get-Energy Magyarország Kft.
cpvs
45310000, 09332000

Building Energy Development John Roman Catholic Primary School Ranolder Total quantity or scope: The location and installation of the system set out in the technical documentation amounts of solar panel.

Obtaining natural gas energy

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published June 24, 2015  -  Deadline July 13, 2015
cpvs
09123000

Obtaining natural gas power full supply of natural gas energy, 09. 01. 2015 at 06:00 (CET) as part of purchase (commercial) contract - for the period 09 30 2016 06:00 (CET), which includes the accounting system usage fees.

KEOP development of energy-2015-5.7.0 Public Buildings priority Environment and Energy Operational Programme of the Keszthely Keszthely Mayor's Office and the Tree of Life Nursery School building energy korszerűsítése- Contract award procedure

Keszthely Város Önkormányzata | Published September 9, 2015
Winner
Keszthelyi Tudor Fa-és Építőipari Szakképző Kft.;Keszthelyi Tudor Fa-és Építőipari Szakképző Kft.
cpvs
45453100, 45443000

KEOP development of energy-2015-5.7.0 Public Buildings priority Environment and Energy Operational Programme of the Keszthely Keszthely Mayor's Office and the Tree of Life Nursery School building energy modernization, and as detailed in the tender documents as follows: Part I exercise: Keszthely historic Town Hall building energy modernization - rev plaster facade. 1115 m2 - roofing, tiling 115 m2 - mounted concrete pavement rev. 70 m2 - custom wood doors and windows FORMAT BUILT. 96 pieces - aluminum window FORMAT BUILT. 11 units - 1,115 m2 indoor dispersion paint - loft insulation 455 m2 - 238 m2 facade insulation II. subtasks: Keszthely Tree of Life Nursery School building energy modernization - Production of facade plaster, insulation 746 m2 - egyvízorros fallefedés 50 cm kit. a width of 109 m - 128 m2 breakdown doors - plastic doors and windows 36 installation - installation of steel doors and windows 1 - interior painting 371 m2 - 400 m2 flat roof insulation - insulation against rainwater 515 m2

Obtaining natural gas energy within the framework of full supply of natural gas energy sales (commercial) contract.

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published October 7, 2015
Winner
E.ON Energiakereskedelmi Korlátolt Felelősségű Társaság
cpvs
09123000

Purchase of Natural Gas Natural gas power full supply of energy, 09. 01. 2015, 06:00 (CET) as part of purchase (commercial) contract - for the period from 09. 30. 2016 06:00 (CET), which includes the accounting system usage fees. Quantity: 206,745 m3. The contracting authority is entitled to a specified quantity of + 50% to deviate. Contracting is currently - a total of 11 rooms with beds in consumption - according to the detailed Documentation. The number of consumption places specified in this paragraph, the natural gas required can vary during the term of the contract within the energy quantity, places of consumption may be deaths and new consumption points of entry within this.

Energy development priority KEOP-2015-5.7.0 Public Buildings and the Mayor's Office Keszthely Keszthely Tree of Life Nursery School building energy modernization - II. For sub-tasks - Tájék Contract Type I

Keszthely Város Önkormányzata | Published December 4, 2015
Winner
Keszthelyi Tudor Fa-és Építőipari Szakképző Kft.
cpvs
45453100, 45443000

Environment and Energy Operational Programme of energy development priority KEOP-2015-5.7.0 Public Buildings and the Mayor's Office Keszthely Keszthely Tree of Life Nursery School building energy modernization, and as detailed in the tender documents as follows: II. subtasks: Keszthely Tree of Life Nursery School building energy modernization - Production of facade plaster, insulation 746 m2 - egyvízorros fallefedés 50 cm kit. a width of 109 m - 128 m2 breakdown doors - plastic doors and windows 36 installation - installation of steel doors and windows 1 - interior painting 371 m2 - 400 m2 flat roof insulation - insulation against rainwater 515 m2

Building Energy Development John's Roman Catholic Primary School Ranolder

Ranolder János Római Katolikus Általános Iskola | Published November 5, 2015
Winner
Get-Energy Magyarország Kft.
cpvs
45310000, 09332000

Building Energy Development John's Roman Catholic Primary School Ranolder Total quantity or scope: The location and installation of the system set out in the technical documentation amounts of solar panel.

Energy development priority KEOP-2015-5.7.0 Public Buildings and the Mayor's Office Keszthely Keszthely Tree of Life Nursery School building energy modernization - in the case of sub-tasks I - Type II Tájék contract.

Keszthely Város Önkormányzata | Published December 4, 2015
Winner
Keszthelyi Tudor Fa-és Építőipari Szakképző Kft.
cpvs
45453100, 45443000

KEOP development of energy-2015-5.7.0 Public Buildings priority Environment and Energy Operational Programme of the Keszthely Keszthely Mayor's Office and the Tree of Life Nursery School building energy modernization, and as detailed in the tender documents as follows: Part I exercise: Keszthely historic Town Hall building energy modernization - rev plaster facade. 1115 m2 - roofing, tiling 115 m2 - mounted concrete pavement rev. 70 m2 - custom wood doors and windows FORMAT BUILT. 96 pieces - aluminum window FORMAT BUILT. 11 units - 1,115 m2 indoor dispersion paint - loft insulation 455 m2 - 238 m2 facade insulation

"Energy development of buildings of the Institute of Primary Health Care and Preschool buildings of Sopron Street" in KEOP-5.5.0 / A / 12-2013-0058 project was necessary for the development of building energy Sopron Street Nursery design and construction tasks

Keszthely Város Önkormányzata | Published November 6, 2015
cpvs
45453100, 45443000

Within "Energy development of buildings of the Institute of Primary Health Care and Preschool buildings of Sopron Street" in KEOP-5.5.0 / A / 12-2013-0058 identification number required for building energy supply project for the development of the Sopron Street Nursery design and construction tasks, as detailed in the tender documents and the following says: The kindergarten two separate building facade thermal insulation (528.84 m2 + 475.11 m2), insulation against a flat roof rainwater (436 m2), replacement of storm sewers, attic floor thermal insulation, replacement of doors and windows (61 pcs + 21 pcs) and 1 x 45KW power-mounted condensing gas boiler installation free 60 fm transmission line between the relevant central heating installation with heating wire partial replacement base and the replacement of two buildings. The building has 45 pieces in heat rejection radiators valves of the task is replacing, a trial run. The new boilers and heating systems assembly vote should be conducted in a manner suitable for its intended use, functional. Preparation of plans relating to boiler replacement contractor will cooperate obtaining the necessary construction permits. The facades, roofs in lightning protection, and incidentals gyengerámú wires, or outdoor units, labels, signs, structures locksmith professional Repositioning, hide it in the required thermal insulation and rainwater roof insulation work.

"Energy development of buildings of the Institute of Primary Health Care and Preschool buildings of Sopron Street" in KEOP-5.5.0 / A / 12-2013-0058 project was necessary for the development of Primary Health Care Institute of the design and construction tasks - ELJ Tájék RESULT

Keszthely Város Önkormányzata | Published November 6, 2015
cpvs
45453100, 45443000

Within "Energy development of buildings of Primary Health Care Institute and Sopron Street Kindergarten buildings of" in KEOP-5.5.0 / A / 12-2013-0058 identification number of projects supplying the necessary building energy for the development of Primary Care Institute for the design and construction tasks, the tender documents as detailed and as follows: : The building facade thermal insulation (1097,8m2), insulation against a flat roof rainwater (450 m2), replacement of storm sewers, attic floor thermal insulation, replacement of doors and windows (118 units), as well as the installation of 1 x 60KW power condensing gas boiler associated heat center assembly with heating Partial replacement of basic cable. The building at 103 pieces of heat rejection radiators valves of the task is replacing, a trial run. The new boilers and heating systems assembly vote should be conducted in a manner suitable for its intended use, functional. Preparation of plans relating to boiler replacement contractor will cooperate obtaining the necessary construction permits. The facades, roofs in lightning protection, and incidentals gyengerámú wires, or outdoor units, labels, signs, structures locksmith professional Repositioning, hide it in the required thermal insulation and rainwater roof insulation work.

X-ray devices

Keszthelyi Kórház | Published August 13, 2015
Winner
HOGE Orvosi Műszer Kft.
cpvs
33111000

Delivery of X-ray equipment listed below, installation and repair during the warranty period, user training, KEOP called "purchase of energy-saving tools for health promotion" - framework 5.6.0 / E number of projects: 1. Surgical C-arm image intensifier (for trauma and orthopedic surgical C-arm image intensifier), 1. Mobile X-ray equipment.

amending the treaty conference

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published August 17, 2015
Winner
KlIMABEST Kft.
cpvs
09331000, 09332000

Subject: Contract Delivery Environment and Energy Operational Programme Local heat and electricity to meet the demand for renewable energy sources, "solar KEOP framework of subject-4.10.0 / A number of small power plant project to install renewable electricity production in 8360, Strip Ferenc promenade u. 3823 (Town Beach) locations. Quantity: Current annual electricity consumption: 1150000 kWh for roof surface available surface: 300 m2 desired performance of buildings attached solar system: 21,560 kWh / year of the contractor's task also includes the following tasks: Connection to use the report to the service provider preparation of construction plans of the solar systems, Obtaining regulatory approvals itemized cost estimates for static analysis of the roofing expert opinion for solar panels and supporting structures delivery, professional installation (material + fees) Wiring, inverter, control, meter, measuring point Building (material + fees) Internal and external network connection establishment (material + fees) System Management (communication and measurability) Internet connection installation is made to fulfill other obligations imposed by the provider (technical delivery rectification involvement in production of the solar systems launching) Statements, certificates, guarantees necessary for the contractor for the framework EEOP 4.10.0 / A number of projects declarations Detailed technical specifications in the tender documentation.

Indicative award

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published March 6, 2015
Winner
KLIMABEST Kft.
cpvs
09331000, 09332000

Subject: Supply contract framework Energy Operational Programme Environment and Local heat and electricity to meet demand from renewable energy sources, "solar context of subject EEOP 4.10.0 / A small number of projects to install renewable power plant for electricity production in 8360, Fair Square 10 (Joseph Egry Primary and Elementary Art School) site. Quantity: Current annual electricity consumption: 38,000 kWh Roof area available surface area of ​​1400 m2 building attached solar system desired output: 49,000 kWh / year The contractor shall also provides the following tasks: Connection to use the report to the service provider preparing construction plans of the solar system, to obtain regulatory approvals itemized costing static analysis of the roofs expert opinion for solar panels and supporting structures delivery, professional installation (material + fees) wiring, inverter, control, meter, measuring point construction (material + fees) Internal and external network connection establishment (material + fees) System Management (communication and measurability) Internet connection installation is made to fulfill other obligations imposed by the provider (technical delivery rectification contribution production of the solar system to begin) Notices, certificates, guarantees necessary for the contractor's part EEOP-4.10.0 / A number of projects declarations of detailed technical specifications in the tender documentation.

contract amendment Keszthely solar Egry School

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published January 19, 2015
Winner
KLIMABEST Kft.
cpvs
09331000, 09332000

Subject: Supply contract framework Energy Operational Programme Environment and Local heat and electricity to meet demand from renewable energy sources, "solar context of subject EEOP 4.10.0 / A small number of projects to install renewable power plant for electricity production in 8360, Fair Square 10 (Joseph Egry Primary and Elementary Art School) site. Quantity: Current annual electricity consumption: 38,000 kWh Roof area available surface area of ​​1400 m2 building attached solar system desired output: 49,000 kWh / year The contractor shall also provides the following tasks: Connection to use the report to the service provider preparing construction plans of the solar system, to obtain regulatory approvals itemized costing static analysis of the roofs expert opinion for solar panels and supporting structures delivery, professional installation (material + fees) wiring, inverter, control, meter, measuring point construction (material + fees) Internal and external network connection establishment (material + fees) System Management (communication and measurability) Internet connection installation is made to fulfill other obligations imposed by the provider (technical delivery rectification contribution production of the solar system to begin) Notices, certificates, guarantees necessary for the contractor's part EEOP-4.10.0 / A number of projects declarations of detailed technical specifications in the tender documentation.

amending the contract prospectus Keszthely solar Csanyik Szendrey Primary School Institution Headquarters

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published January 19, 2015
Winner
KLIMABEST Kft.
cpvs
09331000, 09332000

Subject: Supply contract Environment and Energy Operational Programme Local heat and electricity to meet demand from renewable energy sources, "Installing solar power plant in the context of small subjects EEOP 4.10.0 / A number of projects of renewable electricity generation 8360 Fodor u. 43 (Csanyik Szendrey Primary School Institution Headquarters) site. Quantity: Current annual electricity consumption: 40,877 kWh Roof area available surface: 972 m2 desired performance of the building attached solar system: 44,100 kWh / year The contractor shall also provides the following tasks: Connection to use the report to the service provider preparing construction plans of the solar system, to obtain regulatory approvals itemized costing static analysis of the roofs expert opinion for solar panels and supporting structures delivery, professional installation (material + fees) wiring, inverter, control, meter, measuring point construction (material + fees) Internal and external network connection establishment (material + fees) System Management (communication and measurability) Internet connection installation is made to fulfill other obligations imposed by the provider (technical delivery rectification contribution production of the solar system to begin) Notices, certificates, guarantees necessary for the contractor's part EEOP-4.10.0 / A number of projects declarations of detailed technical specifications in the tender documentation.

contract amendment Keszthely napalm (Strand)

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published January 19, 2015
Winner
KLIMABEST Kft.
cpvs
09331000, 09332000

Subject: Supply contract Environment and Energy Operational Programme Local heat and electricity to meet the needs of renewable energy sources, "solar context of subject EEOP 4.10.0 / A small number of projects to install renewable power plant for electricity production in 8360, Strip Mall Franz u. 3823 (City Beach) site. Quantity: Current annual electricity consumption: 1150000 kWh Roof area available surface: 300 m2 desired performance of the building attached solar system: 21,560 kWh / year The contractor shall also provides the following tasks: Connection to use the report to the service provider preparing construction plans of the solar system, to obtain regulatory approvals itemized costing static analysis of the roofs expert opinion for solar panels and supporting structures delivery, professional installation (material + fees) wiring, inverter, control, meter, measuring point construction (material + fees) Internal and external network connection establishment (material + fees) System Management (communication and measurability) Internet connection installation is made to fulfill other obligations imposed by the provider (technical delivery rectification contribution production of the solar system to begin) Notices, certificates, guarantees necessary for the contractor's part EEOP-4.10.0 / A number of projects declarations of detailed technical specifications in the tender documentation.

Results of the solar cell process Keszthely 4

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published January 9, 2015
Winner
KLIMABEST Kft.
cpvs
09331000, 09332000

GWP "framework agreement Transport Environment and Energy Operational Programme for Local heat and electricity to meet demand from renewable energy sources," solar context of subject EEOP 4.10.0 / A small number of projects to install renewable power plant for electricity production in 8360, the third space Zeppelin (Fejér George Town Library) and the 8360 Ady Endre u. . 49 (Municipal Gym) locations "quantity: 1 Location: George Town Library Fejér current annual electricity consumption: the available surface area of ​​16,923 kWh Roof area: 105 m2 desired performance of the building attached solar system: 13,230 kWh / year 2 Location: City Gym Current annual electricity consumption: 11,088 kWh Roof area available surface area of ​​500 m2 desired performance of the building attached solar system: 23,520 kWh / year The contractor shall also provides the following tasks: Connection to use the report to the service provider preparing construction plans of the solar system, official obtain licenses itemized costing static analysis of the roofs expert opinion for solar panels and supporting structures delivery, professional installation (material + fees) wiring, inverter, control, meter, measuring point construction (material + fees) Internal and external network connection establishment (material + fees) System Management ( communication and measurability) Internet connection installation is made to fulfill other obligations imposed by the provider (technical delivery rectification contribution production of the solar system to begin) Notices, certificates, guarantees necessary for the contractor's part EEOP-4.10.0 / A number of projects Statements The detailed technical specifications in the tender documentation.

Results of the three solar cell process Keszthely

VÜZ Keszthelyi Városüzemeltető Egyszemélyes Nonprofit Kft. | Published December 8, 2014
Winner
KLIMABEST Kft.
cpvs
09331000, 09332000

Subject: "framework agreement Transport Environment and Energy Operational Programme for Local heat and electricity to meet demand from renewable energy sources," solar context of subject EEOP 4.10.0 / A small number of projects to install renewable power plant for electricity production in 8360, the third space Zeppelin (Fejér George Town Library) and the 8360 Ady Endre u. . 49 (Municipal Gym) locations "quantity: 1 Location: George Town Library Fejér current annual electricity consumption: the available surface area of ​​16,923 kWh Roof area: 105 m2 desired performance of the building attached solar system: 13,230 kWh / year 2 Location: City Gym Current annual electricity consumption: 11,088 kWh Roof area available surface area of ​​500 m2 desired performance of the building attached solar system: 23,520 kWh / year The contractor shall also provides the following tasks: Connection to use the report to the service provider preparing construction plans of the solar system, official obtain licenses itemized costing static analysis of the roofs expert opinion for solar panels and supporting structures delivery, professional installation (material + fees) wiring, inverter, control, meter, measuring point construction (material + fees) Internal and external network connection establishment (material + fees) System Management ( communication and measurability) Internet connection installation is made to fulfill other obligations imposed by the provider (technical delivery rectification contribution production of the solar system to begin) Notices, certificates, guarantees necessary for the contractor's part EEOP-4.10.0 / A number of projects Statements The detailed technical specifications in the tender documentation.

Change No. 1 contract modification

Keszthelyi Kórház | Published October 26, 2015
Winner
KG INVEST 2008 Kft.
cpvs
45310000

In 8360, Ady Endre street is located under the second KESZTHELYI HOSPITAL FOR REDUCING THE AMOUNT OF ELECTRICITY USE 160 kW photovoltaic system be installed, annual output of 182,000 kWh of solar panels in Hospital A, B, D to the block will be constructed. The Canadian Solar panels 250Wp types, which are characterized by high efficiency and long-term reliability both in quality and performance. Hospital building on top of the "B" a total of 168 solar panels will be placed resistant finish, with a total power of 42kW. DC electricity produced by these panels with 2 and 5 10000UE Growatt Growatt 5000TL type of inverter converts alternating current suitable for the supply voltage, which is suitable for consumers in the household energy use. The inverters Growatt inverter family is now one of the most advanced on the market, which are designed to the highest German standards and controls in accordance solar. The top of the building "D" a total of 306 solar panel is fitted with a total power of 76,5kW. DC electricity produced by these panels Growatt 20000UE 3 pieces, set of 3 types of Growatt 5000TL inverter converts the appropriate supply voltage alternating current. Top of the "A" building a total of 166 solar panel is fitted with a total power of 41,5kW. DC electricity produced by these panels Growatt 20000UE 1x, 2x Growatt inverter converts 10000UE type the correct line voltage alternating current.

Change No. 2 contract modification

Keszthelyi Kórház | Published November 11, 2015
Winner
KG INVEST 2008 Kft.
cpvs
45317000

In 8360, Ady Endre street is located under the second KESZTHELYI HOSPITAL FOR REDUCING THE AMOUNT OF ELECTRICITY USE 160 kW photovoltaic system be installed, annual output of 182,000 kWh of solar panels in Hospital A, B, D to the block will be constructed. The Canadian Solar panels 250Wp types, which are characterized by high efficiency and long-term reliability both in quality and performance. Hospital building on top of the "B" a total of 168 solar panels will be placed resistant finish, with a total power of 42kW. DC electricity produced by these panels with 2 and 5 10000UE Growatt Growatt 5000TL type of inverter converts alternating current suitable for the supply voltage, which is suitable for consumers in the household energy use. The inverters Growatt inverter family is now one of the most advanced on the market, which are designed to the highest German standards and controls in accordance solar. The top of the building "D" a total of 306 solar panel is fitted with a total power of 76,5kW. DC electricity produced by these panels Growatt 20000UE 3 pieces, set of 3 types of Growatt 5000TL inverter converts the appropriate supply voltage alternating current. Top of the "A" building a total of 166 solar panel is fitted with a total power of 41,5kW. DC electricity produced by these panels Growatt 20000UE 1x, 2x Growatt inverter converts 10000UE type the correct line voltage alternating current.