Public tenders for energy in Encs Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

The construction works of a contract Encsi Zrinski Helena Primary School and Elementary Arts School in connection with the subject of energy modernization EEOP 4.10.0 / project identification signal N

Encs Város Önkormányzata | Published May 6, 2015
Winner
Podráczki és Társa Kft.
cpvs
45210000, 45350000, 45261215, 45443000

The construction works of a contract Encsi Zrinski Helena Primary School and Elementary Arts School in connection with the subject of energy modernization EEOP 4.10.0 / F 'project identification

The construction works of a contract Encsi Zrinski Helena Primary School and Elementary Arts School in connection with the subject of energy modernization EEOP 4.10.0 / project identification signal N

Encs Város Önkormányzata | Published May 15, 2015
Winner
Podráczki és Társa Kft.
cpvs
45210000, 45350000, 45261215, 45443000

The construction works of a contract Encsi Zrinski Helena Primary School and Elementary Arts School in connection with the subject of energy modernization EEOP 4.10.0 / F 'project identification

"The KEOP-2015-5.7.0 identification number and" building energy development priority of public buildings "as part of the construction was ENCs City Sports Center and the buildings of the Upper Castle Extract energetic modernization" project

Encs Város Önkormányzata | Published December 18, 2015
Winner
Polgári Építőipari Kereskedelmi és Szolgáltató Kft.
cpvs
45000000

Execution "EEOP-2015-5.7.0 identification number and" Public buildings building energy development priority "as part of the construction was ENCs City Sports Center and the buildings of the Upper Castle Extract energetic modernization" project with the attached technical documentation. Town hall: Existing Condition Description: Also in the hall replaced the tile and floor insulation. This project is the following - improving thermal capabilities - work includes: - A full post-wall facade thermal insulation - has not changed Replacing the doors and windows insulated plastic doors, gates, windows - Subsequent thermal insulation of the flat roof slab. Upper Castle Extract: Existing Condition Description: Heat technical point of view the building's poor construction. This project is the following - improving thermal capabilities - work includes: - A full frontal wall insulation of post - replacing the plastic insulated windows and front doors, gates, windows. - Subsequent thermal insulation of floors (above ground floor and basement).

Within EEOP 1.1.1 / 2F / subject 09-11-2013-0002 project "Hernád Valley Solid Waste Management System Development" road crossings and supply of infrastructure construction tasks (according to FIDIC Red Book)

Hernád Völgye és Térsége Szilárdhulladék-kezelési Önkormányzati Társulás | Published November 9, 2015
Winner
Podráczki - MISA Konzorcium
cpvs
45200000

Within the framework of a contract EEOP 1.1.1 / 2F / subject 09-11-2013-0002 project "Hernád Valley Solid Waste Management System Development" road crossing infrastructure and supply construction jobs (according to FIDIC Red Book) Part I Infrastructure building: - Monitoring wells - Water - Sewage - Precipitation - Gas - Power - leachate - Low power - Street lighting II.rész: - road, construction works on pavement: - Railway Gateway redevelopment: Within them: Out of the Colony of jobs Road construction of road asphalt , 2x1 lane, from 0.5 to 0.5 m wide, curb sides. Right side 0.5 m deep, 50 cm wide base of 1: 1.5-inch ground rézsűhajlású ditch will be constructed. The road crossing the 0 + 179.51 km section of Miskolc-Hidasnémeti crosses the railway line, with precast concrete elements gateway. The crossing is currently the site is located on a 6 m wide passage, necessary for this expansion. It needs to move equipment enabling the existing light well. During the execution of the MAV professional supervision is required. A special building project, the available amount of £ 18 million plus VAT. Water supply to construct the wall of the building to be implemented up to a distance of 1 meter. Sanitation 1pc FLYGT or equivalent type of installation incorporating lifting pump + 1 hot standby. Gas supply The gas supply to the site next to the existing siding KPE medium pressure pipeline DN90 ~ 220 m long cable is done by building negotiated with the DSO TIGÁZ Ltd. has a way of making construction plan. Electric energy waste treatment plant ~ 100 kW power needs by installing the transformer with the system, as agreed with the service provider, preparation of construction drawings. Road construction works due within the colony, paving the expected high load bearing capacity of the pavement structure unanimous: 15 cm protective layer of sandy gravel, road fund cementstabilizációs CKT 20 cm, 25 cm basalt concrete. The control building (office) with 5 pieces perpendicular passenger car design. Parking will be built. The waste transfer - go around ramming authorities also provide asphalt pavement width 2.00 m. Water supply in the plot of land border with ~ 1 m water meter combination with water meter pit is established (with drain) of small consumptions measuring the guarantee. Sanitation of the sump area generated Q = 2 m3 / day wastewater quantities accepted, then pump takes over and push up the planned D110 HDPE pressure pipe 288 m length of the u-u 542 road becsatlakozásában existing tisztítóaknába rainwater and leachate drainage final recipient of Devecser stream , storm water pumping station in between. 1pc FLYGT type of incorporation or equivalent lifting pump installation + 1 hot standby. Gas supply of individual buildings (office, color machine, reception) gas supply to earth ditch push invested in plastic tubes takes place, according to the construction plan. Electric power supply cables to the earth From the individual consumer sites, according to the construction plan. Low Voltage Engineering to determine the content of the promoter is required to match. Street lighting is lighting in front of the property, which is needed for carrying out tasks designs manufactured to the winning contractor. Monitoring wells: 4 pieces of groundwater monitoring wells (8 m deep) The construction works do not include non-eligible expenses within the framework of the project KEOP. Detailed technical information on the works included in the documentation. Based on Government Decree. Section 7 (4).
  • 1