Public tenders for energy in Debrecen Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Medical consumables

Debreceni Egyetem | Published February 17, 2017
Winner
bella-Hungária Kft.
cpvs
33140000, 33771100, 33751000

DEK-345 / 2016_Adásvételi framework contract incontinence pants, sanitary napkins, diapers and pants betegalátét subject of:

Part 1: Incontinence pants;

Part 2: Sanitary napkins;

Part 3: Diaper pants;

Part 4: Betegalátét.

DEK-345 / 2016_Adásvételi framework contract incontinence pants, sanitary napkins, diapers and pants betegalátét energy - Incontinence pants.

Frame Amount: 57,548,580 HUF net.

Contracting assume the obligation to exercise 70% allocation.

Information based on volume orders in recent years:

Size: XS - 3200/31 months;

Size: S - 4890 pcs / month 31;

Size: M - 28 700 pcs / month 31;

Size: L - 416 180 pieces / month 31;

Size: XL - 15 190 pcs / 31 months.

Bidder should megajánlania factory new condition, the products were not previously in use, the contractor must guarantee that the products sold by the new factory condition, had not been used.

For details, refer to the technical specification.

DEK-345 / 2016_Adásvételi framework contract incontinence pants, sanitary napkins, diapers and pants betegalátét energy - Sanitary towels.

Frame Total net 4,907,830 HUF.

Contracting assume the obligation to exercise 70% allocation.

Information based on volume orders in recent years:

Size: 34x9 cm - 18 290 pcs / month 31;

Size: 26x7 cm - 183 160 pcs / 31 months.

The size of +/- 5% with regard to size and width and length tolerance with respect.

Bidder should megajánlania factory new condition, the products were not previously in use, the contractor must guarantee that the products sold by the new factory condition, had not been used.

For details, refer to the technical specification.

DEK-345 / 2016_Adásvételi framework contract incontinence pants, sanitary napkins, diapers and pants betegalátét energy - Diaper pants.

Frame Total net 22,378,195 ...

Electricity

Debrecen Megyei Jogú Város Önkormányzata | Published January 12, 2017
Winner
E.ON Energiakereskedelmi Korlátolt Felelősségű Társaság
cpvs
09310000

"Full supply of electricity purchase contract."

The contracting 01.01.2017. (0:00) -31.12.2017. Purchase of providing electrical energy needs for the period (24:00) electricity a total of 14,828,708 kWh + amounts to 50%, which includes the quantities received used and contracting Debrecen Municipality of contracting the administrative area of ​​public lighting use electricity as well (public lighting amount of energy use in kWh 6,379,927 + 50%).

conditions relating to the purchase of electricity, as well as detailed requirements for public procurement subject matter included in the draft contract as part of the bidding documentation.

The use of relevant procurement sites (POD IDs) and the amount of rain the calendar year, electricity consumption (kWh) are presented in the tender documents.

the technical specifications for the procurement of technical subject matter includes a description of the tender documentation.

Architectural, engineering and planning services

Debrecen Megyei Jogú Város Önkormányzata | Published March 23, 2017  -  Deadline May 22, 2017
cpvs
71240000

International School of Debrecen creation plan application.

The contest aims Debrecen-Pallag part of settlement of Sorrows Street - bordered by Manninger Gustav 66056/2 street. topographical number of real estate in a multi-unit operated educational system of international IB school buildings and construction of related structures.

The functions of the Applicant shall include also:

- A legally adequate parking lots, bicycle racks with handicapped parking spaces provided,

- Roadways and their accession to the public road within the plot,

- Off-site access roads,

- Gardening and landscaping work part

- Renewable energy sources investigation, design solutions built economically.

technical design of the proposed facility must be considered to be no more gross 2.6 billion HUF than the planned investment works within the property and construction cost of the acquisition cost of the asset together.

Syringes

Debreceni Egyetem | Published December 3, 2016  -  Deadline January 12, 2017
cpvs
33141310, 33141320

Purchase DEK-362 / 2016_Adásvételi framework agreement disposable syringes and needles in the subject.

Part 1: Two-part syringes.

Part 2: Three-part syringes.

Part 3: Perfusion syringes.

Part 4: Öblítőfecskendők, central position katéterkónusszal.

Part 5: Disposable needles.

Purchase DEK-362 / 2016_Adásvételi framework agreement disposable syringes and needles energy - Two-part syringes.

Frame Amount: 77,988,316 HUF net.

Contracting assume the obligation to exercise 70% allocation.

Information based on volume orders in recent years:

2-piece disposable syringe (2 ml): 2.8737 million pieces / 36 months.

2-piece disposable syringe (5 ml): 1.6341 million pieces / 36 months.

2-piece disposable syringe (10 ml): 1.53828 million pieces / 36 months.

2-piece disposable syringe (20 ml): 987 000 pcs / 36 months.

Contracting states that within the framework of this contract packaging are also available to order as indicated above.

For details, refer to the technical specification.

Purchase DEK-362 / 2016_Adásvételi framework agreement disposable syringes and needles energy - Three-part syringes

Frame Total net 23,771,611 HUF

Contracting assume the obligation to exercise 70% allocation.

Information based on volume orders in recent years:

needle-free disposable insulin syringe (1 ml): 142 500 pieces / 36 months.

Disposable needles mounted, without blind spots insulin syringe (1 ml): 11 400 pcs / 36 months.

Disposable syringe tuberculin (1 ml): 86 400 pcs / 36 months.

Disposable syringes with Luer Lock (2 ml): 2100 pcs / 36 months.

Disposable syringes with Luer Lock Connector (5 ml): 2100 pcs / 36 months.

Disposable syringes with Luer Lock Connector (10 ml): 7200/36 months.

Disposable syringes with Luer Lock Connector (20 ml): 9540 pcs / 36 months.

Single use ...

Spectrometers

MTA Atommagkutató Intézete | Published November 23, 2016
Winner
MB Scientific AB
cpvs
38433000

VUV photon source, a monochromator and supply of vacuum system.

Delivery of high intensity 1, preferably continuously tunable monochromatic VUV (Vacuum Ultraviolet) source.

Parts of the products to be supplied:

- The discharge tube of different energy (wavelength) of ultraviolet photons preparation

- Monochromator,

- Vacuum system and stand.

Electricity

Debrecen Megyei Jogú Város Önkormányzata | Published October 12, 2016  -  Deadline November 14, 2016
cpvs
09310000

The contracting 01.01.2017. (0:00) - 12.31.2017. Purchase of providing electrical energy needs for the period (24:00) electricity a total of 14,828,708 kWh + amounts to 50%, which includes the quantities received used and contracting Debrecen Municipality of contracting the administrative area of ​​public lighting use electricity as well (public lighting amount of energy use in kWh 6,379,927 + 50%).

Medical consumables

Debreceni Egyetem | Published October 4, 2016  -  Deadline November 2, 2016
cpvs
33140000, 33771100, 33751000

DEK-345/2016 - Framework Contract Purchase incontinence pants, sanitary napkins, diapers and pants betegalátét energy - betegalátét

Electricity

Debreceni Vagyonkezelő Zrt. | Published September 22, 2016  -  Deadline October 26, 2016
cpvs
09310000

The contracting entity (s) 01.01.2017. (0:00) - 12.31.2017. providing electrical energy needs for the period (24:00) electricity purchase of a total number of 27.4 GWh + 40% Contracting (k) Use existing locations: 1049 pcs.

The Bihar County Government Office Vámospércs Peace u. No. 3. building energy under development - No. 2. contract modification

Hajdú-Bihar Megyei Kormányhivatal | Published May 25, 2016
Winner
TÖMB 2002 Szolgáltató Kft.
cpvs
45453100, 45111100, 45421100, 45320000, 45321000, 45261310, 45443000, 45442300, 45262300, 09331000

Az ajánlatkérőnek „A Hajdú-Bihar Megyei Kormányhivatal Debrecen, Piac u. 42-48. sz. alatti épületének energetikai fejlesztése” tárgyú projektjéhez [KEOP-5.6.0/12-2013-0046] kapcsolódó
építési beruházás megvalósítása.
Az elvégzendő feladatok különösen az alábbiak:
Bontási munkák
A lábazat, a homlokzat és a záró fafödém szerkezet hőszigetelése során jelentős bontási munkát nem szükséges végezni. A padlásfödém takarítása szükséges a hőszigetelés elvégzéséhez. Az épület körüli járdát 30-50 cm sávban fel kell bontani, hogy a lábazati hő-szigetelést le lehessen süllyeszteni a járda szintjétől min. 60 cm-re. A nyílászárók és a külső, belső párkányok bontása az
épületen belülről fog történni.
Helyszíni betonozás
Az elbontott járda helyére új beton járda készül.
Nyílászárók
Új, homlokzati 3 réteg hőszigetelő üvegezésű kívül-belül fehér színű műanyag nyílászá-rók kerülnek elhelyezésre. Belül műanyag párkány RAL9001 színben, kívül festett mű-anyag bevonatos acéllemez párkány kerül beépítésre. A cserélendő nyílászárók műanyag tok és szárnyrendszerrel, résszellőzős vasalattal készülnek (Uf=1.30 W/m2K) Az üvege-zés belátás gátló a külső oldalról és napvédő bevonatú üvegezés.
Hőszigetelés
15 cm vastagságú AT H-80 homlokzati EPS polisztirol hab hőszigetelő rendszer készül az épület teljes külső homlokzat felületére, műanyag dübelezéssel. A nyílászárók sávjá-ban, terv szerinti helyeken 15 cm vastagságú, 30 cm szeles kőzetgyapot hőszigetelő sá-vot kell készíteni tűzvédelmi előírások szerint, acél beütő szeges dübelezéssel. 25 cm vastagságú ásványgyapot hőszigetelés készül az épület záró fafödém szerkezetére, a szükséges párazáró és párafékező fóliákkal. Minden hőszigetelés rendszerszerkezettel készítendő, a rendszerszerkezetet tilos megváltoztatni.
Bádogozás
Műanyag bevonatos alu lemez ablakpárkány készül a cserélni kívánt homlokzati nyílás-zárókhoz.
Külső felületképzés
A homlokzaton nemesvakolat rendszerrel készül, LB Knauf 4000 H 89 fehér színben. Külső felületképzés a lábazaton lábazati vakolat rendszerrel készül, LB Knauf Colorol 51 szürke színben. A vakolat szükség szerint javítandó a hőszigetelő rendszer készítése előtt. A homlokzaton tálalható minden kiegészítő elemet (lámpa, létra, villámhárító, stb.) a szigetelési munkálatok után vissza kell helyezni, a tartószerkezetek meghosszab-bításával, üzemképes állapotban. Gépészeti csövek, szerelvények, klímatartók tekinteté-ben a gépészeti és elektromos tervek rendelkeznek. Az előtető levétele nem szükséges, azt körbe kell zárni a hőszigeteléssel. A nyílászárók kibontása kívülről nem érinti a homlokzati vakolatot, színezést, struktúrát, viszont a belső oldalon a kávák visszajavítá-sát, festését el kell végezni. A kávák javítása akár gipszkarton lemezzel is elvégezhető, majd él védést, glettelést követően üvegszövet haló erősítésű diszperziós festést kell vé-gezni az adott helyiségen belüli színvilággal.
Napelem
A magas tetőre tervezett kiserőmű nagysága: legnagyobb névleges kimeneti teljesítmé-nye: 6,00 kVA AC.
A kivitelezést az épületben található Nyíradonyi Járási Hivatal általános működésével párhuzamosan szükséges elvégezni.

EEOP 5.6.0 / 12 - Technical Inspector / 4th - No. 1. contract modification

Hajdú-Bihar Megyei Kormányhivatal | Published May 25, 2016
Winner
P-Tervezőiroda Kft.
cpvs
71356100

Part I deals
The contracting authorities "in the Hajdu-Bihar County Government Office Debrecen, Kossuth u. 12-14. s. During the development of energy-related building under the subject "project [EEOP 5.6.0 / 12-2013-0045] works construction construction activity on 191/2009. Regulation ( 'the...: Government Decree No. 191/2009 (IX 15)) (IX. 15) Govt. § 16 (3) of the performance of the technical inspection tasks.
II. part offer
"The Bihar County Government Office Debrecen, Piac u. 42-48. s. During the development of related energy "building project under Law [EEOP 5.6.0 / 12-2013-0046] works on the 191/2009. Regulation (IX. 15.) Government. § 16 (3) of the performance of the technical inspection tasks.
III. part offer
The contracting authorities "in the Hajdu-Bihar County Government Office Debrecen, Ruzomberok u. No. 4. During the development of related energy "building project under Law [EEOP 5.6.0 / 12-2013-0047] works on the 191/2009. Regulation (IX. 15.) Government. § 16 (3) of the performance of the technical inspection tasks.
ARC. part offer
"The Bihar County Government Office Debrecen, Diószegi road No. 30. During the development of energy-related building under the subject "Project [EEOP 5.6.0 / 12-2013-0048] works on the 191/2009. Regulation (IX. 15.) Government. § 16 (3) of the performance of the work-technical audit functions.

Results of the procedure EEOP 5.6.0 - u. PIU

Hajdú-Bihar Megyei Kormányhivatal | Published May 30, 2016
Winner
Contur ’93 Kft-EUPRO Kft. Konzorcium: Contur ’93 Kereskedelmi és Szolgáltató Kft. és EUPRO Projektmenedzsment Kft.
cpvs
79411000

within the framework of the Environment and Energy Operative Program (TOP) 2012-5.6.0 Central government agencies for energy efficiency investments in the project entitled "Hajdu-Bihar County Government Office Debrecen, Kossuth u. 12-14. s. project manager for energy development project called "building-related tasks during the performance.

and the quantity of procurement:
their general project management activities, constant availability, as follows, according to the job description set out:
- General management tasks
- Technical expertise tasks
- Financial expert tasks
- Legal advisory tasks.
Details of the tasks in the invitation to tender II. Part.

"Reconstruction Rehabilitation of electricity distribution network" - information

Kenézy Gyula Kórház és Rendelőintézet | Published January 15, 2016
Winner
Bauviv Kft.
cpvs
45315300

Reconstruction Rehabilitation of electricity distribution network "Bartók portal" We need to solve the main distribution standard and enhanced full-fledged network, altered to meet consumer demands separation. The proposed separation is conducted as follows: Normal power feeders: • Part I of the main distributor • Building IV. The main part of the building distributor • Department of Neurosurgery • Obstetrics (RESERVE) • Other buildings (RESERVE) Advanced network branches: • I part of the building main distributor (loop) • IV. The main part of the building distributor (loop) • Department of Neurosurgery • Obstetrics • Backlight • Breakfast • • Former child class children had contagious • Porta • Spare taps • I • Circle Line Circle Line II. Instead of DIL sínbontó be designed and installed in motor circuit breaker. New modern automatic transfer switch must be designed and installed. Power factor correction equipment demolished the existing equipment, PCB capacitors tatalmú be treated properly documented as hazardous waste, and the new equipment is installed and working. It part of the building main distribution building new 4x150mm2 circuit power cord is recommended (Bartók main distribution - I. part of the building main distributor. - IV part of the building main distribution - Bartók main distributor) for enhanced supply for the increased taps to be the distributor to provide automatic switching between normal and increased supply. ARC. part of the building main distribution building new 4x150mm2 circuit power cord is recommended (Bartók main distribution - I. part of the building main distributor. - IV part of the building main distribution - Bartók main distributor) for enhanced supply for the increased taps to be the distributor to provide automatic switching between normal and increased supply. ARC. B. Bartok part of the building facing the street entrance area in front step existing cable laying depth is not correct. Lowering the existing cables, revenue would be needed. Sinti distributors: distributors of plans are available, they should be integrated into tangible design documentation. In tangible energy development to be designed, installed and commissioned the new floor plan hubs. The existing distribution equipment MA synth-type 5x16mm2 5x25mm2 and aluminum cables uniformly 5x25 NYY copper cables to be replaced. It is necessary architectural and engineering interventions

The Bihar County Government Office in Debrecen, Market u. 42-48. c. Energy II to develop the building below.

Hajdú-Bihar Megyei Kormányhivatal | Published December 28, 2015
Winner
HUNÉP Universal Építőipari Zrt.
cpvs
45453100, 45421100, 45320000, 45321000, 45331220, 09331000

The Bihar County Government Office in Debrecen, Market u. 42-48. c. energy buildings under development "project implemented under Law [EEOP 5.6.0 / 12-2013-0046] works, complementing the previous design: Architecture - Building 1: Air yard Warmth (2.63 mx 1.62 m size 22, 26 m high) + guard preparation, in addition to thermal insulation of buildings tetőkijáró (Overall Size 5.32 x 4.44), rotating lift machine room heat insulation (Overall Size 5.38 x 7.03 m); - The second building: In addition to thermal insulation of buildings tetőkijáró (4.30 x 2.10m Overall Size) - Building 3: Preparation of 8-cm-thick insulation wall 8 doorway garage demolition, new location, 7 door demolition, new housing, 22 pieces Breakdown new window placement, placement RWA 43 pieces, 15 pieces placement constraints, 19 pcs basement window guard rail placement of roof top rainwater roof structures ell. Isolation. Building Services: Building 1, on top of the existing chiller remaining connecting cables for demolition, due to the increase in floor heat insulation above the snow line, and construction of new connection lines. Supply of 30 pieces of outdoor air conditioning units vibration damper. Solar Power: Positioning the 2 and 3 buildings with flat roof 40 kWp photovoltaic system.

DZSH energy modernization of buildings - Amendment 2 of the Treaty

Debreceni Zsidó Hitközség | Published January 11, 2016
Winner
Mester-Építő Kft.
cpvs
45453100, 45421100, 45321000, 09332000, 71220000

Debrecen Jewish Community building energy modernization construction of 458.17 m2 + 1 + 2 solar system, gas boiler fittings

implementation plans - No. 1. contract modification

Hajdú-Bihar Megyei Kormányhivatal | Published February 12, 2016
Winner
P-Tervezőiroda Kft.
cpvs
71220000, 71245000

The contracting of the "Preparing Bihar County Government Office buildings energy efficiency improvement" preparation of construction plans related to the subject project [EEOP 7.14.0 / 15-2015-0004].
Contracting have prepared under this project for 30 pieces of detailed building energy development concept, of which up to 10 buildings will be selected after the contract is concluded, with the implementation plan to be prepared.
The implementation plans must be drawn up buildings selected by the contracting authorities. The detailed design documentation for building three copies (CD or DVD) and six copies on paper can be handed over to the contractor for the offer-request electronically. The export schedule should always include budget priced and unpriced, including the so-called. Related plans, budgets as well.

Making energy certificates - No. 1. contract modification

Hajdú-Bihar Megyei Kormányhivatal | Published February 12, 2016
Winner
"METRÓ” Közlekedésfejlesztési, Beruházási és Mérnöki Szolgáltató Kft.
cpvs
71314000

Making relating to the contracting authority resulting in energy savings investment projects for preparation of energy efficiency in the context of the development study "Preparing Bihar County Government Office buildings energy efficiency improvement" projects subject [EEOP 7.14.0 / 15-2015-0004].
The tasks to be undertaken:
7/2006 on the state of preparation of energy certification for existing buildings occupied by the contracting authority for determining the energy characteristics of buildings. (V. 24.) TNM Regulation 176/2008 as well as for the certification of the energy performance of buildings. According to the requirements laid down in Regulation (VI. 30.)..
Detailed development plans of the proposed modernization of energy about the available energy savings and improvements estimate of the cost associated.
Number of buildings involved in the project: 30.
building energy certificate and energy calculations preparation for the planned state selected on the basis of a detailed development plan up to 10 buildings.

The Bihar County Government Office in Debrecen, Diószegi road No. 30. Energy II to develop the building below.

Hajdú-Bihar Megyei Kormányhivatal | Published November 27, 2015
Winner
HUNÉP Universal Építőipari Zrt.
cpvs
45310000, 09331000

The contracting "The Bihar County Government Office in Debrecen, Diószegi road No. 30. energy buildings under development "project implementation related subjects [EEOP 5.6.0 / 12-2013-0048] works. The work to be performed as follows: 80 flat roof of the building, each with a 250 Wp solar panel placement.

Implementation plans

Hajdú-Bihar Megyei Kormányhivatal | Published November 27, 2015
Winner
P-Tervezőiroda Kft.
cpvs
71220000, 71245000

The contracting the "Preparing Bihar County Government Office buildings energy efficiency improvement" Preparation of project execution plans related subjects [EEOP 7.14.0 / 15-2015-0004]. Contracting under this project have prepared for 30 pieces of detailed building energy development concept, of which a maximum of 10 buildings will be selected after the contract is concluded, with the export plan has to be prepared. The implementation plans must be drawn up buildings selected by the contracting authorities. The detailed design documentation for building three copies (CD or DVD) and six copies on paper can be handed over to the contractor to the contracting authority electronically. The export design documentation should always include priced and unpriced budget, including the so-called. special budget-related plans as well.

Creating energy certificates

Hajdú-Bihar Megyei Kormányhivatal | Published November 27, 2015
Winner
METRÓ” Közlekedésfejlesztési, Beruházási és Mérnöki Szolgáltató Kft.
cpvs
71314000

Making related to contracting, resulting in energy savings of preparation of investment projects for energy efficiency development within the framework of the study "Preparing Bihar County Government Office buildings energy efficiency improvement" projects subject [EEOP 7.14.0 / 15-2015-0004]. The tasks: preparing 7/2006 on the state of energy certification for existing buildings occupied by the contracting authority in determining the energy characteristics of buildings. (V. 24.) TNM Regulation 176/2008 as well as for the certification of the energy performance of buildings. According to the requirements laid down in Regulation (VI. 30.).. Advanced development concept, the proposed modernization of the energy available about the energy savings and an estimate of the cost associated developments. Number of buildings involved in the project: 30. Building energy certification and preparing for the potential energy calculations based on the state selected for detailed development concept up to 10 buildings.

K. É. 20068/2015. Change registration number notice

Hajdú-Bihar Megyei Kormányhivatal | Published October 30, 2015  -  Deadline October 29, 2015
cpvs
45453100, 45421100, 45320000, 45321000, 45331220, 09331000

42-48. c. energy buildings under development "project implemented under Law [EEOP 5.6.0 / 12-2013-0046] works, complementing the previous design: Architecture - Building 1: Air yard Warmth (3.10 mx 1.80 m size 22, 45 m high), in addition to thermal insulation of buildings tetőkijáró (Overall Size 5.32 x 4.20), rotating lift machine room heat insulation (Overall Size 5.38 x 7.03 m); - The second building: In addition to thermal insulation of buildings tetőkijáró (Overall Size 3,20 x 2,20m), located in the northern facade wall ducts boxing, insulation over a length of 18 m; - Building 3: 3 size 90/95 ground floor there are 2 x 90/210 ports window doors, 1.50 mx 2.25 m 1 x double doors, 8 sanitary window size 50/85, 5 mx 4.30 2.40 m sized garage demolition of the existing one of the same new placement of doors and windows, 45 m2 doorway wall 10 cm thick thermal insulation, size 34.0 x 1,20m reinforced concrete. 10 cm thick roof thermal insulation. Building Services: Building 1, on top of the existing chiller remaining connecting cables for demolition, due to the increase in floor heat insulation above the snow line, and construction of new connection lines. Supply of 30 pieces of outdoor air conditioning units vibration damper. Solar Power: Placing a second building with flat roof 40 kWp photovoltaic system. The main contractor for the construction contract and the contractor for this procurement procedure execution will be carried out in the same workspace on that basis, on the basis of this cooperation is the obligation of the contractor e