Call +44 800 9755 164

Public tenders for energy in Bicske Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Bicske Municipality - Natural Energy

Bicske Város Önkormányzata | Published March 6, 2015  -  Deadline March 26, 2015
cpvs
09123000

Delivery of natural gas energy to the contracting of 07/01/2015. 06:00 CET - 07.01.2016. 06:00 CET framework for the period, the total supply of natural gas-based energy trading contracts.

Bicske Municipality - the purchase of natural gas energy

Bicske Város Önkormányzata | Published June 29, 2015
Winner
FŐGÁZ Zrt.
cpvs
09123000

Delivery of natural gas energy to the contracting authority of the 01.07.2015. 06:00 CET - 07.01.2016. 06:00 CET framework for the period, the total supply of natural gas-based energy trading contracts. Delivery of natural gas energy to the contracting authority 07/01/2015. 06:00 CET - 07.01.2016. In order to obtain a total of 183,006 m3 of natural gas for energy framework 06:00 CET period, the total supply of natural gas-based energy trading contracts. The contracting the specified amount may vary from 50% in the positive direction. The amounts set out in the technical gas must be interpreted in calculating normal state (gnm3).

Bicske - modernization of energy under the SEQ ID NO EEOP 2015-5.7.0, "Public buildings building energy development priority" project "- Achievement Guide

Bicske Város Önkormányzata | Published July 31, 2015
Winner
;
cpvs
45000000

"The St. Margaret Elementary School and St. Ladislaus Members Michael Csokonai Vitez Primary School modernization of the energy KEOP-2015-5.7.0 identification number, '' as part of the project" Public buildings building energy development priority Part 1: St. Margaret Elementary School in St. Ladislaus School Tag energy modernization tasks in connection with the school energy modernization: • Formwork and scaffolding • Earthworks and civil engineering • Plastering and rabicolás • Roofing • Socket making, cold and preparing hot housing • Flashing • Joiner constructions • Metal constructions • Finishing • Insulation • Building wiring • Cleaning work of the tasks of the building must be carried out on the ground and a total floor area of ​​1,193.65 m2, of which the ground floor area of ​​595.47 m2 and 598.15 m2 of floor area, according to technical specification. A detailed description of the tasks and contains the exact amounts of the technical specification annexed to the specifications. Part 2: Mihaly Csokonai Vitez elementary school energy modernization tasks during the school energy modernization: • Procession facilities • Formwork and scaffolding • Earthworks and civil engineering • Plastering and rabicolás • Roofing • Socket making, cold and creating a warm jacket • Flashing • Joiner constructions • Metal constructions • Finishing • Insulation • Building wiring • Cleaning the work tasks have a total area of ​​3,043.51 m2 on the ground floor and two floors and the basement of the building. A detailed description of the exact quantities and contains a technical specification annexed to the specifications.

Mihaly Csokonai Vitez Primary School Modernisation of energy - Contract Amendment 2nd

Bicske Város Önkormányzata | Published December 23, 2015
Winner
Mészáros és Mészáros Kft.
cpvs
45000000

Part 2: Mihaly Csokonai Vitez elementary school energy modernization tasks during the school energy modernization: • Procession facilities • Formwork and scaffolding • Earthworks and civil engineering • Plastering and rabicolás • Roofing • Substrate preparation, preparation hidegés warm jacket • Flashing • Joiner constructions • Metal constructions • Finishing • • Electrical Insulation • Building cleaning works must be carried out complex tasks with a total of 3,043.51 m2 on the ground floor and two floors and the basement of the building. A detailed description of the exact quantities and contains a technical specification annexed to the specifications.

"Modernization Bicskei training pool, thermal and technology to meet the electricity needs using renewable energy sources" - Results of the procedure

Bicske Város Önkormányzata | Published November 6, 2015
Winner
FEJÉR-B.Á.L. Zrt.
cpvs
45000000

"Modernization Bicskei training pool, thermal and technology to meet the electricity needs using renewable energy sources" Contractor's duties in accordance with the technical specifications to ensure provision of the training pool Bicske process heat and electricity. The project aims to pool covered by the development application of heat pumps and solar systems below 50 kVA connected load by establishing reduce the rate of greenhouse gas emissions and increase the share of renewable energy sources. The heat supply of alternative energy supply systems, ground source water to water heat pump. The required heat a piece of ground source water to water heat pump. The soil probe to install the necessary size of the area available. The applications that may be relevant in heat pumps and combined with COP of the heat supply system is designed to express the introduced surplus of electric energy and heat energy recoverable value of between 4.0-5.0. Based on the above, the heat pump classified appropriate technical-environmental point of view. For Bicskei Tanuszoda 100-150 kW of heat demand solution can be suitably heat pump trigger. The purpose of the training pool heat pumps and technological needs of electricity supply must be installed 30 KW photovoltaic system in the attached technical specifications indicated below.

The St. Margaret Elementary School and St. Ladislaus Members Michael Csokonai Vitez Primary School Modernisation of energy - Achievement Guide

Bicske Város Önkormányzata | Published August 17, 2015
Winner
Mészáros és Mészáros Kft.;Mészáros és Mészáros Kft.
cpvs
45000000

In connection with the tasks of the school energy modernization: • Formwork and scaffolding • Earthworks and civil engineering • Plastering and rabicolás • Roofing • Socket making, cold and creating a warm jacket • Flashing • Joiner constructions • Metal constructions • Finishing • Insulation • Building wiring • Cleaning work of the tasks on the ground floor and the building floor must be carried out in a total area of ​​1,193.65 m2, of which the ground floor area of ​​595.47 m2 and 598.15 m2 of floor area, according to technical specification. A detailed description of the tasks and contains the exact amounts of the technical specification annexed to the specifications. Part 2: Mihaly Csokonai Vitez elementary school energy modernization tasks during the school energy modernization: • Procession facilities • Formwork and scaffolding • Earthworks and civil engineering • Plastering and rabicolás • Roofing • Socket making, cold and creating a warm jacket • Flashing • Joiner constructions • Metal constructions • Finishing • Insulation • Building wiring • Cleaning the work tasks have a total area of ​​3,043.51 m2 on the ground floor and two floors and the basement of the building. A detailed description of the exact quantities and contains a technical specification annexed to the specifications.

St. Margaret Elementary School and St. Ladislaus Members Michael Csokonai Vitez Primary School Modernisation of energy - Part 2 Contract Amendment

Bicske Város Önkormányzata | Published November 9, 2015
Winner
Mészáros és Mészáros Kft.
cpvs
45000000

Part 2: Mihaly Csokonai Vitez elementary school energy modernization tasks during the school energy modernization: • Procession facilities • Formwork and scaffolding • Earthworks and civil engineering 2 • Plastering and rabicolás • Roofing • Socket making, cold and creating a warm jacket • Flashing • Joinery Structures • Metal Structures Finishing • • • Electrical Insulation • Building cleaning works must be carried out complex tasks with a total of 3,043.51 m2 on the ground floor and two floors and the basement of the building. A detailed description of the exact quantities and contains a technical specification annexed to the specifications.

The St. Margaret Elementary School and St. Ladislaus Members Michael Csokonai Vitez Primary School Modernisation of energy - Part 1 Contract Amendment

Bicske Város Önkormányzata | Published November 5, 2015
Winner
Mészáros és Mészáros Kft.
cpvs
45000000

Part 1: St. Margaret Elementary School in St. Ladislaus Members School energetic modernization tasks in connection with the school energy modernization: • Formwork and scaffolding • Earthworks and civil engineering • Plastering and rabicolás • Roofing • Socket making, cold and creating a warm jacket • Flashing • Joiner constructions • Metal constructions • Finish • Insulation • Building wiring • Cleaning the work tasks have a total area of ​​1,193.65 m2 on the ground floor and the floor of the building, of which the ground floor area of ​​595.47 m2 and 598.15 m2 of floor area, according to technical specification. A detailed description of the tasks and contains the exact amounts of the technical specification annexed to the specifications.

St. Margaret Elementary School in St. Ladislaus School Tag - Power - Contract Amendment 2

Bicske Város Önkormányzata | Published December 23, 2015
Winner
Mészáros és Mészáros Kft.
cpvs
45000000

section: St. Margaret Elementary School in St. Ladislaus Members School energetic modernization tasks in connection with the school energy modernization: • Formwork and scaffolding • Earthworks and civil engineering • Plastering and rabicolás • Roofing • Substrate preparation, preparation hidegés warm jacket • Flashing • Joiner constructions • Metal constructions • Finishing • Insulation • Building wiring • Cleaning the work tasks have a total area of ​​1,193.65 m2 on the ground floor and the floor of the building, of which the ground floor area of ​​595.47 m2 and 598.15 m2 of floor area, according to technical specification. A detailed description of the tasks and contains the exact amounts of the technical specification annexed to the specifications.

"Bicske city area surveillance camera system expansion" - Results of the procedure

Bicske Város Önkormányzata | Published November 6, 2015
Winner
ATROX-MÉRNÖK Kft.
cpvs
35125300

"Bicske city area surveillance camera system expansion" should be expanded 17 + 3 The camera is currently operating at 20 by a camera surveillance system. Regardless of background monitoring system, which is part of the documentation, technical specifications in the city operation as detailed in the technical parameters to perform the following works well contractor shall: 1. Surveillance cameras (17 pieces dome camera with accessories and one column, 3 plate recognition camera) supply, installation and Startup 2. After consultation conducted with Magyar Telekom G-PON (public internet access) transmission medium and establish VPN connections overall design of the police center needed 3 cameras energy supply of the high-voltage network (network design, licensing, procurement, installation and network components Setting Up) 4. In addition to the existing monitoring center to build a new central station a new, suitable for 20 camera image on the receiving workstation (client PC), locking center was created with 2 84cm-inch monitor commissioning arrangement 5. preparing the necessary project documentation sixth necessary reconciliations 7 Obtaining the necessary permits to carry out all activities related to the development of coherent systems 8. 9. Extension of the surveillance system, newly installed administration of assets within the warranty period of the ETA is designated for the purpose by the Member States of the European Union, issued by the certification body. 23.) Govt. § 26 paragraph (6)).
  • 1