Call +44 800 9755 164

Public tenders for energy in Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyHungary

. High Water Works Co. argument - based on the realization among HELL Energy Hungary Kft Szikszó route to transmission facilities and other water utility serving the water supply.

ÉRV Északmagyarországi Regionális Vízművek Zrt. | Published October 28, 2016  -  Deadline December 12, 2016
. High Water Works Co. argument - based on the realization among HELL Energy Hungary Kft Szikszó route to transmission facilities and other water utility serving the water supply.

Obtaining natural gas energy to the Municipal and County Government Offices for - Corrigendum

Zala Megyei Kormányhivatal | Published November 14, 2016
Obtaining natural gas energy to the Municipal and County Government Offices for - Corrigendum

partial reconstruction of ELTE Lágymányosi Campus Environment Energy Efficiency Program "in the framework of a contract - Amendment

Eötvös Loránd Tudományegyetem | Published November 23, 2016
partial reconstruction of ELTE Lágymányosi Campus Environment Energy Efficiency Program "in the framework of a contract - Amendment

LTE has been partially updated in Lágymányosi Campus Environment Energy Efficiency Program "in the framework of a contract - Amendment

Eötvös Loránd Tudományegyetem | Published November 18, 2016
LTE has been partially updated in Lágymányosi Campus Environment Energy Efficiency Program "in the framework of a contract - Amendment

partial reconstruction of ELTE Lágymányosi Campus Environment Energy Efficiency Program ", a contract modification keretében-

Eötvös Loránd Tudományegyetem | Published November 9, 2016
partial reconstruction of ELTE Lágymányosi Campus Environment Energy Efficiency Program ", a contract modification keretében-

"Győr, Árpád út 32. building energy development within the framework of the project KEHOP 5.2.2-16-2016-00013"

Győr-Moson-Sopron Megyei Kormányhivatal | Published December 7, 2016  -  Deadline January 3, 2017
"Győr, Árpád út 32. building energy development within the framework of the project KEHOP 5.2.2-16-2016-00013"

partial reconstruction of ELTE Lágymányosi Campus Environment Energy Efficiency Program "in the framework of a contract. Window replacement, partial cooling and ventilation system modernization

Eötvös Loránd Tudományegyetem | Published November 30, 2016
partial reconstruction of ELTE Lágymányosi Campus Environment Energy Efficiency Program "in the framework of a contract. Window replacement, partial cooling and ventilation system modernization.

Changing public procurement "NAV purchase of electric energy for objects in the free market anticipates 12 months' procurement procedure documents

Nemzeti Adó- és Vámhivatal Központi Irányítás | Published November 14, 2016
Changing public procurement "NAV purchase of electric energy for objects in the free market anticipates 12 months' procurement procedure documents

Change calls for tender and procurement documents are subject to the "free market anticipates NAV purchase of electric energy objects for 12 months' procurement procedure

Nemzeti Adó- és Vámhivatal Központi Irányítás | Published November 2, 2016
Invitation to tender documents and procurement Changing the subject "free market anticipates NAV purchase of electric energy objects for 12 months' procurement procedure.

The KEHOP-5.2.4-15-2016-00004. Identification number of projects within the framework of construction works contract for the modernization of energy performing clinical block Kútvölgyi

Semmelweis Egyetem | Published December 7, 2016  -  Deadline January 12, 2017
The KEHOP-5.2.4-15-2016-00004. Identification number of projects within the framework of construction works contract for the modernization of energy performing clinical block Kútvölgyi

Design contract with the "M4 East Abony node (M8-M4 junction separation) is amended to permit the preparation of an export plan and plan of" energy - call for tenders

NIF Zrt. | Published October 26, 2016  -  Deadline December 1, 2016
Design contract with the "M4 East Abony node (M8-M4 junction separation) is amended to permit the preparation of an export plan and plan of" energy - call for tenders

Natural gas

KFKI Üzemeltető Kft. | Published November 16, 2016  -  Deadline December 20, 2016

Natural gas sales contract with the Institute for Management Ltd. site of natural gas supply for 12 months, with consumer connection points takeover of the Hungarian natural gas network is constantly available, according to the Hungarian standard in force (BS 1648: 2000). 2 / H-quality natural gas energy procurement, free-market conditions, according to , full supply of natural gas under the trade agreement, which includes the accounting system operating costs as well.

Delivery of natural gas energy to the contracting authority 01/01/2017. 6:00 am up to 01.01.2018. 55.5408 million MJ / year (annual gas consumption is nominal) amount of natural gas in order to obtain energy within the framework of full supply of natural gas for energy trading contract period from 6:00 pm.

The contracting of the nominal amount of gas consumption + 50% surcharge-free rate may vary. See the purchase option clause in section II.2.11).

The quantities set at 15 ° C and QL = 34.2 MJ / gnm³ +/- 5% of the reference shall be construed circumstances of the BS 1648 standard regulations.

The gas supply system includes charges related to natural gas and purchase state-imposed, against the rain contracting costs, fees, taxes and other contributions. These charges, taxes, levies a full accounting of the contractor responsible.

Electricity

KFKI Üzemeltető Kft. | Published November 16, 2016  -  Deadline December 20, 2016

Sale of electricity to supply the Institute for Management Kft. Site of 12 months, 01/01/2017. 00:00 CET - 12.31.2017. during the period between 24:00 CET, within the framework of full board without scheduling obligation based power trading agreement.

General purpose of the sale of electricity 01.01.2017. 00:00 CET - 12.31.2017. during the period between 24:00 CET, 9700 MWh framework of the full board without scheduling obligation based power trading agreement.

The contracting a specified amount in a positive direction + 50% different.

The offer price to be submitted HUF / kWh measuring unit, rounded to three decimals.

The bid price includes the cost of electricity charges and balancing energy, cross-border capacity charges, the balance circle membership fee. The contract price includes the cost of any service broadcast invoicing as well.

The offer price does not include the system of user charges in 2007 LXXXVI. TV. energy, renewable energy sources and waste funds referred 147 §-in, energy tax, VAT, other taxes, levies, fees, charges and expenses, as well as the relevant prevailing legislation may arise under the relevant legislation set out has been generated electricity in order to facilitate the production of the transmission system operator compulsorily purchased by the electricity Trading (FIT) the amount and cost of regulation.

Natural gas

Budapest Főváros II. Kerületi Önkormányzat | Published November 30, 2016  -  Deadline January 5, 2017

Contracting authority in this procurement procedure as a result of the sale and purchase agreement to be connected to the Budapest City II. District Municipality and institutions named in place of consumption for the Hungarian transmission network is constantly available to purchase natural gas energy market competition 03.01.2017. 6:00 am - 1/3/2018. 6:00 pm period, within the framework of full supply contract without the obligation schedule.

The subject of the contract (supplies) in Budapest Capital II. Purchase of all local District Council natural gas energy.

Annual consumption is: a total of 1,326,076 m³ + 30% volume difference

expressed in m³ The value of the quantity of gas technology normal state, i.e. at 15 C and 101 325 Pa pressure understood.

Electricity

Zala Megyei Kormányhivatal | Published December 6, 2016  -  Deadline January 9, 2017

Purchases of electricity within the framework of the Municipal and County Government Offices for the full supply of electricity trading contracts.

Purchases of electricity to the Municipal and County Government Offices for.

The contracting authority invites the bidders' attention to the fact that LXXXVI 2007 on electricity. Based on Law § 74 (1) e) of the electricity trade subject to licensing. The license verifies the existence of the contracting records of the Hungarian Energy and Utilities Regulatory Agency.

Total contracted amount: 27,907,747 kWh + 50% option by contracting the amount of options in addition to user-defined locations may use in respect of another property as well.

The 50% difference fixed penalty-free, with no obligation to use contracting.

in the context of full supply contracts and selling above amount of electricity 03.01.2017. 00:00 and 02/28/2018. the period between 24:00.

Architectural design services

Városliget Ingatlanfejlesztő Zártkörűen Működő Részvénytársaság | Published November 19, 2016  -  Deadline December 27, 2016

The system is aimed at exploiting the Széchenyi Spa thermal water run-off and groundwater attendant cooling system design tasks.

The system is aimed at exploiting the Széchenyi Spa thermal water effluent, groundwater and making the attendant cooling system design tasks.

Main elements of the system to be designed, respectively. the main tasks:

Szechenyi Baths run-off water recovery:

- Lifting unit to the Széchenyi Baths run-off water from the central reservoir delivering,

- Structural designs,

- Engineering plans,

- Electrical power supply and control engineering design,

- Printing business plan of the central buffer reservoir,

- Central buffer reservoir engineering objects and spaces,

- Structural designs,

- Engineering plans,

- Electrical power supply and control engineering design,

- Designing buildings supply lines;

2. kútvízhasznosítás:

- Sinkholes and water source wells and pipelines,

- Establishment of producing and drain well pair,

- Well tests, pumping tests and swallow,

- Hydrogeological modeling,

- Impact studies,

- Design of wells,

- Primary side wiring plan

- Electrical power supply and control engineering design,

- Designing buildings supply lines.

The implementation plans, the system must be prepared for each element of the necessary permits and contributions must be completed.

Job Description, History

The local building regulations prescribe the requirements laid down in the applicable building energy regulation "nearly zero-energy building" satisfactory building design and construction.

The point where calculations are required for the planned system (CO₂ savings, etc), calculated in both concept (a system for the use of ground source water run-off system and the Szechenyi Spa).

Technical data for each share of renewable buildings (heating power requirements and thermal and hydraulic parameters etc), the designer of each building engineering designer of conciliation.

Reconciliation of each building network providing primary side (water attendant) cooling power supply design parameters of the design task.

During the planning of the necessary consultations to include all of the administrative department concerned.

The approved design is complete, surrender all coated administration, by an expert approved construction plan package.

Facilities to be performed

Within the Park project this document, the following buildings, facilities engaged in:

- Hungarian Museum of Transport and Technology (KOM)

- New National Gallery (UNG)

- US House of Music (ZEN)

- Museum of Ethnography (NEP)

- City Park Theatre (SZI)

- Park Service Center (BAZ)

- Olof Palme House (OLO).

Syringes

Debreceni Egyetem | Published December 3, 2016  -  Deadline January 12, 2017

Purchase DEK-362 / 2016_Adásvételi framework agreement disposable syringes and needles in the subject.

Part 1: Two-part syringes.

Part 2: Three-part syringes.

Part 3: Perfusion syringes.

Part 4: Öblítőfecskendők, central position katéterkónusszal.

Part 5: Disposable needles.

Purchase DEK-362 / 2016_Adásvételi framework agreement disposable syringes and needles energy - Two-part syringes.

Frame Amount: 77,988,316 HUF net.

Contracting assume the obligation to exercise 70% allocation.

Information based on volume orders in recent years:

2-piece disposable syringe (2 ml): 2.8737 million pieces / 36 months.

2-piece disposable syringe (5 ml): 1.6341 million pieces / 36 months.

2-piece disposable syringe (10 ml): 1.53828 million pieces / 36 months.

2-piece disposable syringe (20 ml): 987 000 pcs / 36 months.

Contracting states that within the framework of this contract packaging are also available to order as indicated above.

For details, refer to the technical specification.

Purchase DEK-362 / 2016_Adásvételi framework agreement disposable syringes and needles energy - Three-part syringes

Frame Total net 23,771,611 HUF

Contracting assume the obligation to exercise 70% allocation.

Information based on volume orders in recent years:

needle-free disposable insulin syringe (1 ml): 142 500 pieces / 36 months.

Disposable needles mounted, without blind spots insulin syringe (1 ml): 11 400 pcs / 36 months.

Disposable syringe tuberculin (1 ml): 86 400 pcs / 36 months.

Disposable syringes with Luer Lock (2 ml): 2100 pcs / 36 months.

Disposable syringes with Luer Lock Connector (5 ml): 2100 pcs / 36 months.

Disposable syringes with Luer Lock Connector (10 ml): 7200/36 months.

Disposable syringes with Luer Lock Connector (20 ml): 9540 pcs / 36 months.

Single use ...

Construction work

Semmelweis Egyetem | Published December 6, 2016  -  Deadline January 12, 2017

Construction contracts under the KEHOP-5.2.4-15-2016-00004 identification number of projects in the works to carry out the modernization of energy Kútvölgyi Clinical Array, which is the Hospital Clinic Building and the four-story wing of the facade thermal insulation, stone cladding, doors and windows and replacing the shade structures the modernization of the cooling system and the modernization of energy at a time, into strength necessary technical work to be performed includes option also includes a pie clinic building and the modernization of the economic wing of energy.

The detailed definition of the work to be done working drawings, specifications and budget proposals as part of the tender documents contain.

The Kútvölgyi Clinical Array (, 1125 Bp Kútvölgyi Road 4, 10733/6 hrsz, National Heritage registration number:... 15726) constitute a monument.

Basic package:

Contractor (AT) is responsible for the entire seven-storey Kórházép. and Rendelőint. For four-story wing on the following aspects:

Package 1:

- Facade insulation (flat roof hőszig.-gel): 12 600 m²,

- Mounted stone (including kőfedésű flat roof): 10 800 m²,

- Replacement of wooden windows and doors: 3000 m²,

- Aluminum doors and windows and curtain wall replacement: 1600 m²,

- Motorized blinds exchange: 1800 m²,

- Present a unique cooling system to replace a number of new VRV system,

- Lightning protection rsz. building.

Package 2:

- Façade World Cup. (Part bauxite) systems to improve surface 650 m²,

- Complex renovation of balconies,

- Smoke and heat extraction RWA rsz. building complete,

- Other professional, ancillary works.

Winning AT has a job in the meantime. It must be carried out on the basis of a detailed organizational plan and a weekly schedule he developed on the basis of organizational specification issued as part of the technical specifications.

30 days.

Phase Objective: within the alapcsomagon all the front surface of the heat island. carrying out the necessary preparatory work to place the kórházép. 100% of, and permanent housing to 50% in construction and facade replacement doors and windows, deadline: 180 days after the transfer of m.terület.

The evaluation criteria:

The aspects of this notice include the following points II.2.5 kieg.-gel:

The price includes additional criteria for award criteria:

, Tart.kerettel increased total net against serve for Basic package onto. (HUF), weighting: 40,

, Increased total net against tart.kerettel for Option 1 are from. (HUF), weighting: 5

, Increased total net against tart.kerettel for Option 2 are from. (HUF), weighting: 5th

If the price criteria AK reverse scaling, linear scaling method for applying qualitative criteria, scores of 1-10.

II. It includes chapters.

Main terms of payment and the applicable statutory provisions:

20 and 30-32. §-in shall prevail.

AK 5 billings and submission of the final bill allows one certified by recognized by the AT and AK-winning technical inspector, actually made the appropriate rate may amount to as follows:

Part 1 account: the implementation of 25% at the stage of completion, but no later than 45 days after the transfer of the m.terület,

After 135 days,

billings 4 to 180 days if the technical content specified in szakaszteljesítéshez realized,

In case of 70% to reach the stage,

final bill: Following the successful completion of the technical handover procedure.

§ 135 (7) of Art. in advance according to the first settlement részszámlából deduction is made.

The szerz.szerű and accounts drawn up in accordance with the law 100% KEHOP-5.2.4-15-2016-00004 no. framework, utófinanszírozással project, will be settled by bank transfer within 30 days of receipt.

5% of the appropriate degree of margin ends up.

The payment currency: HUF.

AK payments in the 2003 XCII. TV. (Art.) 36 / A. § 2011 and CXCV. TV. meet (APF.) according to the provisions.

§ 142. Subsection (1). b), it is obliged to pay VAT AK.

FIZ. conditions in the szerz.tervezet.

§ 136 (1) in bek., respectively. to § 143 (3) bek. was contained.

Natural gas

Orosháza Város Önkormányzata | Published December 2, 2016  -  Deadline January 9, 2017

Purchase of Natural Gas - scheduled without obligation - within the framework of the purchase contract, a total of 61 consumer space with respect Orosháza Local Government and institutions of the following breakdown:

Part 1 bid round: 45 x 20 meter institution established in consumption during m³ / h in relation to (Universal) 7,171,936 MJ; 234 315 m³ quantities.

Part 2 bid circular as an institutional space measuring 16 to 20 m³ / h above in respect of (free market) 17,502,868 MJ; 643 976 m³ quantities.

6: 00), a total of 24,674,804 MJ; 878 291 m³ amount that amount + 30% in contracting - both bid circular in respect of part - may be different without the payment of liquidated damages and fees during the contract period.

The electricity distribution network Égáz-ral Gas Distribution Plc. (6724 Szeged, Pulcz utca 44).

6:00 am - 20/02/2018. 6: 00), a total of 7,171,936 MJ or 234 315 m³ quantities.

Natural gas Aker. For the distribution pipeline will be handed over to the consumer in some places land borders facing the exit points.

The price of natural gas delivered to the molecule and price of the basic fee is made up of:

Molecular price:

Pn = (Po-100) * EF [HUF / MJ].

Pn - price molecule.

Po - discount rate determined by sale (in percentage, expressed as a positive number) compared to the current universal service price.

The Po does not change during the contract period.

Po = ...%.

EF - Customer sites use the valid price for universal service used by the universal service territorially competent.

The molecule is not included in natural gas sales and all related services mandatory tax imposed by the prevailing legislation (k) and other charges levies, fees, particularly in strategic gas storage fee for the Hungarian Hydrocarbon Stockpiling Association, the import adjustment factor, the energy tax the general sales tax.

A.tevőknek of their offer, they provide relative to the current universal service price discount rate is necessary to specify, in%, expressed as a positive number.

6. Lasts up to 00), a total of 17,502,868 MJ and 643.976 m³ quantities.

Natural gas Aker. For the distribution pipeline will be handed over to the consumer in some places land borders facing the exit points.

The contracting consumer sites supply connection points corresponding to the locations of consumption occurs.

The contract price of three-component gas fee, that is the price of delivered gas molecules + + RHD RHD capacity fee congestion charge.

The price of the gas molecules must be transported HUF / MJ.

The molecule is a fixed price, which does not change during the term of the contract, it can not be changed.

Molecular price does not include:

The system charges include odorisation Award,

- The natural gas sold and all related services mandatory tax imposed by the prevailing legislation (k) and other charges levies, fees, particularly in strategic gas storage fee for the Hungarian Hydrocarbon Stockpiling Association, the import adjustment factor, energy tax, general sales tax.

Street-lighting equipment

Pécs Megyei Jogú Város Önkormányzata | Published November 23, 2016  -  Deadline December 23, 2016
tasks to be completed in full by the contractor include the financing (in a closed-end financial leasing) the supply and installation of the plant ready for operation and setting of all the items of equipment to be carried out in accordance with the procurement documents in detail. 

tasks to be completed in full by the contractor include the financing (in a closed-end financial leasing) the supply and installation of the plant ready for operation and setting of all the items of equipment to be carried out in accordance with the procurement documents in detail.

The city's energy-saving street lighting development efforts in pursuing further 12 190 light place, 912.40 kW installed capacity lamp replacement, downtown decorative lighting system of 145 lights remote monitoring and location of lighting fixtures with plans to expand to 147 pieces.

Requirements for leasing:

- Financing: closed-end financial leasing,

- Duration: 120 months from the date of contract signature date,

- Payment frequency: monthly,

- Funding currency: HUF,

- Interest rates: varies from 1 month BUBOR base rate,

- Margin interest rate: megajánlottak by the offeror in accordance with,

- Interest-up, in accordance with regulations of the bidder winning the general conditions set out in the lease and to an extent,

- The contracting authority solely in the contract notice and the procurement documents included in those fees / costs are determined in accordance obliged to pay other fees, handling fees or other costs from the contractor can not be imposed during the term.

A detailed technical description included in the tender documents.