Public tenders for high-voltage-equipment in Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Püspökladány (excl.) - required Debrecen (excl.) section of line for carrying aid application dossier, in order to ensure maximum eligibility in accordance with the EU have been completed licensing, building plans and tender documents for the modernization and revision of the grant application documentation requirements.

Nemzeti Infrastruktúra Fejlesztő Zrt. | Published July 25, 2013
Winner
RODEN Mérnöki Iroda Kft.Villám u. 13.Budapest 1089
cpvs
71320000, 71356400, 71322000, 71322500, 71335000, 71240000, 71620000, 79421200

Under contract design Püspökladány (excl.) - required Debrecen (excl.) section of line for carrying aid application dossier preparation of documentation required for the Cohesion Fund eligible for a refund of the European Commission those listed in the 1083/2006 EC Regulation's Form Grant application 1828/2006 Regulation (EC 2006.7 . .11) in accordance with: the Püspökladány (excl.) - Debrecen (excl.) section of line construction required in accordance with a completed permit, working drawings and tender documents for the modernization and review of the grant application documentation requirements to ensure the maximum EU contribution - the line segment previously completed the authorization, execution and tender designs of all the railways and all other related discipline-specific (eg, road construction, public works, etc.). approval, tendering and execution plans when conformity review (due to a technical necessity ETCS 2 for Szajol (excl.) - Delhi (incl.) section) - redesign as necessary plans, additional planning, where necessary, the lack of plans, preparation, purchase and documents - licensing of in need of plans, updating of existing licenses, - a detailed environmental impact assessment, preparation of review and consultation in accordance with the approver / standards - related to the design and permitting work in full-scale field surveys and studies, respectively. Laboratory tests are carried out and data acquisition. The Püspökladány (excl.) - Debrecen (excl.) section of line construction required in accordance with a completed permit, working drawings and tender documents for the modernization and review of the grant application documentation requirements to ensure the maximum EU support, in which: - renewed the superstructure, the substructure will be strengthened to 160 km / h high-speed and introduction of a 225 kN axle load transport. - If the traffic engineering parameters reconstructed structures are confirmed in the track is located, including any cross streams associated with water management. - The stations (eg, building entrance, before space station, equipment for building) will be rebuilt. - Track all network traffic will be suitable according to the needs of high-speed traffic. - New sk +55 cm high platforms are created, they will be reached without crossing the tracks szintbeni. This promotion will be based on pedestrian underpasses, which will ensure the accessibility of lifts ésrámpák. - To protect against the weather and perontetők lépcsőlefedések are created. - The high-voltage equipment is modernized, the safety of the traction power supply substations növeléséreaz Ebes more powerful transformers will be installed in the switchgear and other equipment are changed. - To make winter safer railway station operation, all electrical heaters are installed Exchange. - The new electronic inspection equipment to ensure there are renewed and telecommunications equipment and cable routes as well. - Appropriate allocation of audible and visual passenger information, public address equipment installed. - The crossing will be placed in new cabinets, required for high-speed transportation design. - Instead of some heavily-trafficked road crossings based on under-and overpasses. - The need for noise walls in locations considered. - The length of line segment covered 41 km. Particularly crucial aspect of optimizing the technical and economic considerations to ensure the EU's eligibility. AA will only accept technical content / solutions teljesítésérevonatkozóan the contract, for which the EU biztonsággalkielégíti conditions of eligibility under the Support Request Documentation economic calculations. Bidder's bid formulating note that the complex task of planning discussions Sorana achieve an end sometimes multiple iterations / redesign, the parties concerned döntéstmegalapozó / comparative studies, preparation of proposals can be achieved. Above, the contractor (Design) are made at their own expense, to ensure the offer is fully the responsibility of the contractor (Design). Presented to the planning target complex implementation contractor (designed) to the task. Prepared by the successful Bidder (designed) must contain all the engineering plans / specifications required for the design of complex objective reality. For a list of available entity and the contractor (designed) to be transferred to the planning of the draft contract design documents 2 Case. Annex 8 Articles of Association.