Public tenders for high-voltage-equipment in Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Planning, delivery and installation of a rotating phase shifter including 3 420-kV switching fields and field work as part of the new construction of substation Bergrheinfeld.

TenneT TSO GmbH | Published February 12, 2014  -  Deadline February 28, 2014
cpvs
31214300, 31120000

Planning, delivery and installation of a rotating phase shifter (air-cooled machine, about +250 Mvar/-150 Mvar) including 3 420-kV switching fields and field work as part of the new construction of substation Bergrheinfeld. All high voltage equipment of the 3 420-kV switchgear panels (2 * cable box, 1 * panel red. Phase shifter), except the power switch of the 420-kV switching field for the rotating phase shifters are beige is by TenneT of existing framework contracts.

Supply and installation of a rotating phase shifter including three 420-kV switching fields and field work as part of the new building of the substation Bergrheinfeld.

TenneT TSO GmbH | Published February 4, 2014  -  Deadline February 28, 2014
cpvs
31120000

Supply and installation of a rotating phase shifter (air-cooled machine, about +250 Mvar/-150 Mvar) including three 420-kV switching fields and field work as part of the new building of the substation Bergrheinfeld. All high voltage equipment of three 420-kV switchgear panels (2 * cable box, 1 * panel red. Phase shifter), except the power switch of the 420-kV switching field for the rotating phase shifters are beige is by TenneT of existing framework contracts.

Contracts, disconnectors and earthing switches for high voltage equipment.

50Hertz Transmission GmbH | Published March 1, 2014  -  Deadline March 21, 2014
cpvs
31214110, 31214120

The design, manufacture, testing, delivery (including transport) of disconnectors and earthing switches. The necessary assembly for isolating and earthing switch 245kV to 420kV of is requested optional. However, it is intended to be carried out the installation of third-party companies. Is included in the scope of this reason, the training and certification of contractors for installation. The subsequent adjustment is included in the scope.

Offshore Installation Manager (OIM) Platform BorWin1.

TenneT Offshore 1. Beteiligungsgesellschaft mbH | Published September 27, 2013  -  Deadline October 31, 2013
cpvs
45231400, 45232200, 45255410, 45315300, 51111300, 65320000, 71336000, 71356000

In the erection phase the OIM supervises the completion of the work on the platform (electrical work, inspection, maintenance and assembly works) including the safe use of all operating and media for the safe handling of the high-voltage equipment. On site the OIM makes the decisions regarding security and health protection for the entire locally offshore personnel present. Within constructional phases he reports directly to the site manager and the industrial safety coordinator. In the operating phase the OIM is responsible for the completion of the work on the platform (electrical work, inspection, maintenance and assembly works) includ-ing the safe use of all operating and media for the safe handling of the high-voltage equipment. On site the OIM makes the decisions regarding security and health pro-tection for the entire locally offshore personnel present. In the operating phase the OIM reports directly to the service group leader and the industrial safety coordinator.

Ohlensehlen substation - construction of a 380 - / 110 kV substation

Tennet TSO GmbH | Published September 14, 2013  -  Deadline October 23, 2013
cpvs
31214000

Renewal and expansion of the 380 kV switchgear at the substation Ohlensehlen (TenneT share): Lot 1 - Construction - TenneT TSO GmbH - Share: Provision of the necessary construction work as follows: operating buildings, subsistence building, control cells, EB cells, small foundations, gantry foundations, operations building, fence, etc., Lot 2 - Steel - TenneT TSO GmbH - Share: Supply and installation of Small Steel & portals. Lot 3 - Electrical installation - TenneT TSO GmbH - Share: Construction of two line segments, construction of two transformer boxes, installation of a coupling structure of 2 busbars about 6 fields, No supply of high voltage equipment. Construction of 110 kV switchgear at the substation Ohlensehlen (E.ON Netz-share): Lot 4 - Earthworks and concrete work - E.ON Netz GmbH - Share: Provision of the necessary construction work as follows: operating buildings, subsistence building, control cells, EB cells Small foundations, gantry foundations, operating building, fence, etc. Lot 5 - steel construction and corrosion protection - E.ON Netz GmbH - Share: Supply and installation of Small Steel & portals, various corrosion protection work etc. Lot 6 - Electrical work - E.ON Netz GmbH - Share: Structure of 2-piece tube busbars about 9 Panels with 40 kA design, line 6 cubicles, 1 clutch. No supply of high voltage equipment.

Planning services of architects and engineers for the partial reconstruction and modernization of the indoor pool Vogelsang in Solingen.

Solinger Bädergesellschaft mbH | Published January 14, 2014  -  Deadline February 11, 2014
cpvs
71240000

The Bädergesellschaft Solingen mbH intend the partial reconstruction and modernization of the indoor pool Vogelsang in Solingen. The following planning work are among others expected: - refurbishment, conversion, optimization and upgrading of the shower and toilet areas, the locker area and the staff area - redevelopment of the foyer and entrance area - redevelopment of the floor tiles in the pool surround and the spillways, - laying, optimization and upgrading of the paddling pool and the related location area, - Refurbishment of windows and sun protection - pipe network rehabilitation of the CW / HW-network - renovations of high-voltage equipment and lighting as well as Sibel, - Changes in ventilation ducting, - adaptations of the channel hydraulics and the pool water piping, - Conversion of the water treatment cycle for the children's wading pool. More information can be found in the tender documents, which are referred to in the A.II) address in writing (letter, fax or e-mail) to ask the candidate. Object of the procurement process are the general planning services for the renovation of the indoor pool. In particular, the general planning services include the planning stage according to § § 33 et seq HOAI, the structural design according to § § 49 et seq HOAI and the benefits of building services under § § 53 et seq HOAI including bath water and electrical engineering as well as all any other necessary professional planners and / or Additional services that are necessary for the proper and complete execution of the plan. The general planner owes it to the individual services associated with partial success.
  • 1