Public tenders for high-voltage-equipment in Switzerland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

N02, 080 107, Gotthard Road Tunnel URI high-voltage equipment, Los 3b NSHV replacement, delivery, temporary, installation and hook-up low-voltage distribution. Replacement and supplement grounding / potential equalization. Spare cable installations

Bundesamt für Strassen ASTRA Filiale Zofingen | Published November 14, 2016  -  Deadline July 19, 2016
cpvs

N02, 080 107, Gotthard Road Tunnel URI high-voltage equipment, Los 3b NSHV replacement, delivery, temporary, installation and hook-up low-voltage distribution. Replacement and supplement grounding / potential equalization. Spare cable installations.

Earthmoving work

Swissgrid AG | Published November 4, 2015  -  Deadline December 11, 2015
cpvs
45112500, 44114210, 45251100

Preparatory work for the construction of an industrial building and an annex which contain high-voltage equipment and control systems.

080107 - N02 Gotthard road tunnel URI high voltage equipment, lot 3 NS-HV. Replacement, redelivery, temporaries, installation and hook-up low-voltage distribution. Replacement and supplementary grounding / potential equalization.

Bundesamt für Strassen ASTRA Filiale Zofingen | Published October 24, 2014  -  Deadline December 3, 2014
cpvs
31720000

As part of the project following delivery, installation, collection, BootUp and dismantling work will be procured: 1 replacement NS-distributions (delivery, temporary, material and labor). A distribution includes 1-36 fields. • Main distribution 400 / 230V 19 pcs. • Main distribution 1000V 6 pcs. • subdistributions 400 / 230V 22 pcs. 2nd replacement and supplementary grounding / potential equalization (delivery, material and labor) • earth wires diverse cross-sections approximately 25`000m • Potential equalization bar and Accessories 500 pcs. 3rd replacement cable installations FE05 and FE180 (delivery, material and labor) • 2.5mm ²-25mm ² approx 50`000m • 50mm² -185mm² about 3`800m 4 spare Lighting • LED Divers 40 pcs. • lights Divers 3`300 pcs. 5 replacement double bottom. Raised floor incl. Substructure approx 750sqm 6 ancillary facilities / Divers Diverse adaptations and deconstructions

Structural steel erection work for buildings

Swissgrid AG | Published January 23, 2016  -  Deadline March 4, 2016
cpvs
45262410

Envelope Works for the construction of an industrial building and an annex which contain high-voltage equipment and con-trol-command ..

Detailed project description in the documents "C1.0 Special Conditions" and "C2.0 Romanel - level reports, standards."

Electrical installation work of electrical distribution apparatus

Swissgrid AG | Published January 23, 2016  -  Deadline March 4, 2016
cpvs
45317300, 45331000

Works of technical installations for the construction of an industrial building and an annex which contain high-voltage equipment and con-trol-command.

Detailed project description in the documents "C1.0 Special Conditions" and "C2.0 Romanel - level reports, standards."

Works for complete or part construction and civil engineering work

Swissgrid AG | Published January 22, 2016  -  Deadline March 4, 2016
cpvs
45200000

Structural shell work and finishing work for the construction of an industrial built-ment and an annex that will contain high-voltage equipment and control systems.

Detailed project description in the documents "C1.0 Special Conditions" and "C2.0 Romanel

- Plan, reports, standards. "

132 kV / 15 kV cable system SS Vezia

SBB AG Einkauf Infrastruktur Energie | Published July 22, 2015  -  Deadline September 10, 2015
cpvs
31321300

As part of the construction of the Vezia substation, high voltage cables are provided to connect the various processors and high-voltage equipment. Switching facilities 132 kV to 15 kV and those are housed in two separate buildings. As the transition from 66 kV to 132 kV is anticipated, the connections to 66 kV must be made using the same cables and the same potheads that links to 132 kV. Three benefits must be an offer: • Delivery of cables and media pre-mounted consoles, galvanized, with mounting tabs for cables; • delivery of cables 15 kV and back as well as cables 132 kV with end boxes; • Installation of cable trays and brackets, installation, grounding, and control all the cable installation.

Construction work

armasuisse Immobilien | Published October 2, 2015  -  Deadline November 9, 2015
cpvs
45000000

A part of the building is two storeys as a reinforced concrete hall with envelope Ausgeschriebene work Branches: - BKP 211 - Baumeisterarbeiten includes: NPK: 111 directing work; NPK: 113 site equipment; NPK: 211 excavation and earthworks; NPK: 241-situ concrete; NPK: 314 Masonry; NPK: 315 prefabricated elements of concrete and artificial stones. - BKP 221.6 / 364 - gates, metal / Other conveyors includes: NPK: 384 Goals; NPK: 747 lift tables, loading stations and special elevators. - BKP 23 - Electrical equipment includes: 231 high-voltage equipment; 232 heavy current installations; 233 lighting supplies; 235 Low power equipment; 236 low-voltage systems; 238 Provisional installations; 239 Rest. - BKP 242/243 - heating systems includes: 242.1 district heating; 243.1 convection heaters; 243.2 radiator; 243.3 Lufterhitzeranschluss; 243.4 BWW warming; 246.1 split units. - BKP 244 - ventilation systems includes: 244.1 ventilation system Office / Wet; 244.2 ventilation system narrow aisle warehouse. - BKP 25 - sanitation includes: 251 General sanitary fixtures; 253 Supply and disposal equipment; 254 plumbing lines; 255 insulations; 259 Rest. - BKP 261 - Lift includes: NPK 744 freight elevators with persons accompanied. - BKP 364 - Other conveyors (Vertical Lift System) - BKP 410 - business lines include: NPK 111 directing work; NPK 113 site equipment; NPK 117 crashes and dismantlement; NPK 151 Construction work for pipelines; NPK 211 excavation and earthworks; NPK 221 foundation layers of traffic facilities; NPK 222 Paving and financial statements; NPK 223 covering work;

Wpl Thun, Schwäbis, new narrow-aisle warehouse and workshop

armasuisse Immobilien | Published September 29, 2015  -  Deadline November 9, 2015
cpvs
45000000

Ausgeschriebene work Branches: - BKP 211 - Baumeisterarbeiten includes: NPK: 111 directorial work NPK: 113 site equipment NPK: 211 excavation and earthworks NPK: 241 situ concrete NPK: 314 Masonry NPK: 315 prefabricated elements of concrete and artificial stones - BKP 221.6 / 364 - Goals from Metal / Other conveyors includes: NPK: 384 Goals NPK: 747 lift tables, loading stations and special elevators - BKP 23 - Electrical equipment includes: 231 high-voltage equipment 232 heavy current installations 233 lights deliveries 235 Low power equipment 236 Low power installations 238 Provisional installations 239 Other - BKP 242/243 - heating systems includes: 242.1 district heating 243.1 convection heaters 243.2 radiator 243.3 Lufterhitzeranschluss 243.4 BWW warming 246.1 split units - BKP 244 - ventilation systems includes: 244.1 ventilation system Office / Wet 244.2 ventilation system narrow aisle warehouse - BKP 25 - sanitation includes: 251 General sanitary fixtures 253 Supply and disposal apparatus 254 plumbing lines 255 insulations 259 Rest - BKP 261 - Lift includes: NPK 744 freight elevators with people accompaniment - BKP 364 - Other conveyors (Vertical Lift System) - BKP 410 - business lines include: NPK 111 directorial work NPK 113 site equipment NPK 117 crashes and dismantlement NPK 151 construction work for the plant managers NPK 211 excavation and earthworks NPK 221 foundation layers for traffic installations NPK 222 Paving and statements NPK NPK 237 223 covering work sewer and drainage systems

ETH Zurich, Hönggerberg area, main and sub-distribution for the voltage conversion from 11 kV to 22 kV

ETH Zürich, IB Bauten | Published August 25, 2014  -  Deadline October 16, 2014
cpvs
45000000

The EWZ equips the substation Hönggerberg 2018 from 11 kV to 22 kV on voltage. The ETH Zurich is medium voltage recipients; she owns and operates its own medium-voltage systems. This has the consequence that the existing medium voltage systems must be adapted to the end of 2017. This work has already been awarded and are in execution. Concurrent with the above mentioned modifications are to re-create some of the buildings in the main and sub-distribution. In this call a contractor for the manufacture and supply of this equipment is sought. All plants are able to create slide-in design than min. 3b. The transformer ratings of the distributions are in the range of 1,000 - 3,000 kVA. The main switch for power sizes from 2,000 - 2,500 A interpreted. The following distributions are provided: BUILDING: Distribution Type - HPF: 1 main distribution (2 transformer supplies 1'000 kVA) - HPF: sub-distributions (2E, 3E, 31E, 33E) - HIL: 1 main distribution (2 transformer supplies 1'000 kVA) - HIF: 1 Main Distribution (3 transformer supplies à 1,250 kVA) - HPM: 1 main distribution (2 transformer supplies 1'000 kVA) - HPK: 1 main distribution (2 transformer supplies 1'000 kVA) The extensive main distributions of several transformers à 1 developed '000 kVA and made from a variety of fields (feed, coupling, ESV, Grobabgangs-, fine feeder panels). The cabinets are also mutually coupled to switch transformers in parallel. The main distribution (main and co-switch) are controlled by a comprehensive network control system and operated at a power failure by means of priority control with a standby power. The network control system is not part of this announcement. With the coordination and integration of the system needs to be worked. BKP 231 high-voltage equipment (switchgear assemblies)
  • 1