Public tenders for high-voltage-equipment in Belgium

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Call for applications - 15kV High Voltage Equipment

I.S. water-link O.V. | Published February 2, 2015  -  Deadline February 18, 2015
cpvs
45231400

15kV High Voltage Equipment

Electrical supply Tunnels: The renewal of high-voltage equipment and transformers

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling Elektromechanica en Telematica Gent | Published January 13, 2016
cpvs
45315100, 45315500

Electrical supply Tunnels: The renewal of high-voltage equipment and transformers

Electrical supply Tunnels: The renewal of high-voltage equipment and transformers

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling Elektromechanica en Telematica Gent | Published September 4, 2015  -  Deadline September 15, 2015
cpvs
45315100, 45315500

Electrical supply Tunnels: The renewal of high-voltage equipment and transformers

Project V1672002 - Replacement of high voltage equipment - Aarschot

Aquafin NV - Directie Asset Management | Published September 10, 2015  -  Deadline September 25, 2015
cpvs
45232423

Project V1672002 - Replace high-voltage systems - Aarschot Replacement HS infrastructure Aarschot, PS Nieuwlandlaan

Electrical engineering installation works

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling Elektromechanica en Telematica Gent | Published January 15, 2016
Winner
THV Cofely Fabricom NV — Jacops NV
cpvs
45315100, 45315500

Electricity supply tunnels: the renovation of high voltage equipment and transformers.

Electrical engineering installation works

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling Elektromechanica en Telematica Gent | Published July 29, 2015  -  Deadline September 15, 2015
cpvs
45315100, 45315500

Electricity supply tunnels: the renewal of high-voltage equipment and transformers.

BAH-2015-RB

Centre d'étude de l'energie nucléaire | Published October 9, 2015  -  Deadline November 17, 2015
cpvs
45200000

This market includes the replacement and conversion of high voltage equipment OS2 and all electrical equipment and construction. The existing plant must remain Operational during construction. To do so, there will be a road map of the different works that should be followed

Development of the port area of ​​medium voltage equipment Pecq-work and installation of high voltage cabins

INTERCOMMUNALE IDETA-DEE | Published July 1, 2014  -  Deadline August 19, 2014
cpvs
31682300

OBJECT OF THE MARKET: FOR DEVELOPMENT WORK OF THE PORT AREA PECQ - MEDIUM VOLTAGE EQUIPMENT AND INSTALLATION OF BOOTHS HIGH VOLTAGE Works to be performed on the territory of the Municipality of Pecq, between the Rue de la Croix Rouge, river road and the future road serving the SPW from the National 50 DESCRIPTIO N OF WORK: - Preparatory work (inventory, clearing, removing fence, possible displacement of conduct demolition ground level, ...); - Earthworks (cut grantee, safe sidewalk ...); - Rehabilitation of shoulders (sub-foundations, foundations ...); - Development around the cabins (curbs, paving, ...); - Supply, installation and high voltage equipment cabins (LV, transformer, ...); - Supply and installation of medium voltage cables; - Connections (booths and road network, land, ...); - All other work intended to map and special specifications. - All other work included the surveying

V0097001 - WWTP Lanaken, replace power

Aquafin NV - Directie Asset Management | Published October 11, 2016  -  Deadline November 18, 2016
cpvs
45232423

V0097001 - WWTP Lanaken, replace power

The subject of the contract and carry out work includes the renovation and expansion of the existing power plant.

This mainly includes the following works:

- Preliminary study work. This includes a risk analysis for lightning protection (according to EN 62305-2). The contractor has the necessary expertise or rent it in.

- Coordination network administrator.

- Architectural and preparatory works are an integral part of this tender.

- Delivery, installation and connection of power plant

with associated high voltage equipment, power cables, security, and control units.

- Modifications to the ALSB (low voltage electrical works signs Aquafin)

- Delivery, installation and connection of temporary backup power to hire emergency group

- Deliver, assemble, indienststellen and assistance to the provisional acceptance of the new power plant.

- Demolition and removal of the entire contents (excluding transformer).

- Providing the necessary assistance to start-up, all the inspections and the various tests that will be performed by the network administrator.

- Recovering at his own expense all defects that occur until the end of the guarantee period.

V0079002 - WWTP Yellow, replacing HS

Aquafin NV - Directie Asset Management | Published April 27, 2016  -  Deadline June 10, 2016
cpvs
45252130

V0079002 - WWTP Yellow, replacing HS

The subject of the contract and carry out work includes the renovation and expansion of the existing power plant.

This mainly includes the following works:

- Preliminary study work. This includes a risk analysis for lightning protection (according to EN 62305-2). The contractor has the necessary expertise or rent it in.

- Coordination network administrator.

- Architectural and preparatory works are an integral part of this tender.

- Delivery, installation and connection of power plant

with associated high voltage equipment, power cables, security, and control units.

- Modifications to the ALSB (low voltage electrical works signs Aquafin)

- Delivery, installation and connection of temporary backup power to hire emergency group

- Deliver, assemble, indienststellen and assistance to the provisional acceptance of the new power plant.

- Demolition and removal of the entire contents (excluding transformer).

- Providing the necessary assistance to start-up, all the inspections and the various tests that will be performed by the network administrator.

- Recovering at his own expense all defects that occur until the end of the guarantee period.

V0063006 - Refresh HS installation STP Turnhout

Aquafin NV - Directie Asset Management | Published July 3, 2015  -  Deadline August 14, 2015
cpvs
45232423

V0063006 - Refresh HS cabin STP Turnhout The subject of the contract and work to be carried out includes the renovation and expansion of the existing power plant. This mainly includes the following works: - Preliminary study work. - Coordination network administrator. - Architectural preparations and work are an integral part of this tender. - Delivery, installation and connection of power prefab cabin with associated high voltage equipment, power cables, security, and control units. - Delivery, installation and connection of temporary emergency unit - Deliver, assemble, indienststellen and assistance to the provisional completion of the new power plant. - Demolition and removal of the old HS cabin including the entire contents (excluding transformer). The herinzaaien of the place where the old HS stood cabin. Walls and basement are sufficiently excavated to 80 cm below ground level. - Providing the necessary assistance at the start, all the various inspections and tests that will be performed by the network administrator. - Putting in order of ontkoppelbeveiliging biogas engine cogeneration in accordance with the requirements of the DNB. Dismantling the ontkoppelbeveiliging of the CHP and deliver to Power Quality for the correct settings. The unit replacing within 24 (with the correct settings)! - Recovering at his own expense of all defects that occur until the end of the guarantee period.

V002004 - Renovation power plant WWTP Ghent

Aquafin NV - Directie Infrastructuur | Published March 10, 2015  -  Deadline March 13, 2015
cpvs
45315400

V002004 - Renovation power plant WWTP Ghent The object of the contract and carry out work includes the renovation and expansion of the existing power plant. This mainly includes the following works: - Preliminary study work. - Coordination network administrator. - Architectural preparations and work are an integral part of this tender. - Supply, installation and connection of power prefab cabin with accompanying high-voltage equipment, power cables, security, and control units. - Takeout, installation and connection of the electrical components supplied by the network administrator and Aquafin. - Supply, installation and connection HS connection and transition joints for the reconnection and the interconnection of the existing multi 3x95 Cu power lines. - Supply, installation and connection of new signal cables. - Supply and installation of a fiber optic cable. - Supply, installation and connection of two temporary emergency power - supply, assembly, indienststellen and assistance to the provisional acceptance of the new power plant. - Demolition and removal of the old HV switchgear. - To provide the necessary assistance at the start, all inspections and the various tests that will be carried by the network administrator. - Recovering at his own expense all defects that occur until the end of the guarantee period.

V1303003-V1304003-V1305001-V1306003 - Renovation power plant pumping station Winketkaai-Battel-Maasstraat- Vrouwevliet Mechelen

Aquafin NV - Directie Asset Management | Published August 3, 2016  -  Deadline September 16, 2016
cpvs
45232423

V1303003-V1304003-V01305001-V1306003 - Renovation power plant PS Winketkaai, Battel, Maasstraat, Vrouwevliet - Mechelen

Task 1:

The subject of the contract and carry out work includes the renovation of the existing power plant.

This mainly includes the following works:

- Preliminary study work.

- Coordination network administrator.

- Limited Architectural and preparatory works are an integral part of this contract (Hs connecting cables, drilling holes, ... ..)

- Delivery, installation and connection of a high-voltage transformer oil 400 kVA.

- Supply and installation of high voltage equipment, power cables, security, and control units.

- Adaptation to the Low Voltage board: Head Protection adjust plus the general circuit breaker and transformer connection new power switch for connecting an emergency generator.

- Wiring power transformer board to ALSB and equipment, instruments and general services for both the temporary and the permanent connections.

- Delivery, installation and connection of a temporary emergency power supply

- Deliver, assemble, indienststellen and assistance to the provisional acceptance of the new power plant.

- Demolition and removal of the old HV switchgear and asbestos-containing material (plates).

- Providing the necessary assistance to start-up, all the inspections and the various tests that will be performed by the network administrator.

- Recovering at his own expense all defects that occur until the end of the guarantee period.

- Netting as built file and all related documents

Exercise 2:

The subject of the contract and carry out work includes the renovation of the existing power plant.

This mainly includes the following works:

- Preliminary study work.

- Coordination Network Administrator ...

  • 1