Gas pressure equipment

Energinet.dk | Published February 7, 2017  -  Deadline February 20, 2017
cpvs
39341000, 38432100, 42112300

The Contracting authority wants to purchase Gas Flow Meters for both Energinet.dk and Dansk Gas Distribution. The Contracting authority wishes to purchase gas flow meters on 2 lots with 1 supplier for each lot. The Framework agreement is divided into 2 lots.

For lot 2 the object of this framework agreement is to purchase the following type of meters: Diaphragm meters for Dansk Gas Distribution.

The object of LOT 1 is to purchase the following types of meters:

1) Turbine Meters for Energinet.dk,

2) Turbine Meters for Dansk Gas Distribution,

3) Rotary Meters for Dansk Gas Distribution.

The object of lot 2 is to purchase the following types of meters:

1) Diaphragm Meters for Dansk Gas Distribution.

Gas pressure equipment

Energinet.dk | Published February 25, 2017  -  Deadline March 15, 2017
cpvs
39341000, 38432100, 42112300

The Contracting authority wants to purchase Gas Flow Meters for both Energinet.dk and Dansk Gas Distribution. The Contracting authority wishes to purchase gas flow meters on 2 lots with 1 supplier for each lot. The Framework agreement is divided into 2 lots.

For lot 2 the object of this framework agreement is to purchase the following type of meters: Diaphragm meters for Dansk Gas Distribution.

Gas-analysis apparatus

Københavns Universitet | Published March 8, 2016
cpvs

Gas-analysis apparatus

Gas-analysis apparatus

Københavns Universitet | Published January 28, 2016
cpvs

Gas-analysis apparatus

Lot M6: Flue gas treatment system Lot M7: Flue gas condensing system

HOFOR Energiproduktion A/S | Published August 13, 2016
cpvs

Lot M6: Flue gas treatment system Lot M7: Flue gas condensing system.

Gas-production plant construction work

NGF Nature Energy Korskro A/S | Published September 20, 2016
cpvs
45255800, 45253700

Gas-production plant construction work

Replacement of the Gas SCADA system.

Energinet.dk | Published July 1, 2015
cpvs
48000000

Energinet.dk owns the Danish electricity and gas transmission system. Our main task is to maintain the overall short and long-term security of supply for electricity and gas. Energinet.dk intends to replace the Gas SCADA system, perhaps including the gas simulation and gas management tools, for our gas transmission system. To ensure updated knowledge about the opportunities in the market for a SCADA system for this purpose, Energinet.dk intends to carry out a market screening of potential suppliers for a gas SCADA system. Therefore, Energinet.dk wishes to encourage all interested suppliers to enter into a dialogue with us about the requirements. Such suppliers are invited to contact us for obtaining the relevant documentation regarding system requirements, selection criteria, timeline etc. Please note that we reserve the right to select a number of representative suppliers limited to 5-8 for further dialogue. The deadline for submitting declaration of interest is 24 July 2015at 12.00, and the deadline for submission of completed questionnaires is 7 August 2015 at 12.00. The suppliers selected will be contacted by 14.8.2015 at 12:00. The requested meetings with potential suppliers will be held during calendar week 36 — 31.8.-4.9.2015. The meetings will be held at our premises in Egtved, which is located at a 30 minutes car drive from Billund Airport. The Danish gas transmission system is operated and monitored around the clock from our control centre also located in Egtved, with the option to relocate the monitoring to an emergency control centre in our head office in Fredericia. Hardware, software and all necessary equipment must be installed at two control centres located at an approximate distance of 40 km from each other. Today, some data from the Gas SCADA system are used for settlement (fiscal accounting), and the SCADA system is linked to a gas simulator running both real-time and historical simulations. Data ex-change with other systems is an important parameter, including data exchange with other SCADA systems. There is a strong emphasis on a user friendly interface, including a powerful historical graph tool, and the system must be easy to maintain and develop and it must use an advanced calculation engine.

Gas distribution and related services

Energinet.dk | Published August 27, 2016
Winner
Bohlen & Doyen GmbH
cpvs

The Municipality of Copenhagen and CPH City and Port has decided to establish homes and offices in the former industrial area between HC Ørsted Power Plant and the harbour at Enghave Brygge. In this context, the natural gas transmission line from Amager to HC Ørstedsværket shall be redirected. This contract notice concerns the project to plan, design and build a new MR station that can feed Energinet.dk's re-engineered gas pipeline. The new MR Station shall be delivered as a turnkey delivery.

Gas pipelines

Energinet | Published September 30, 2017
cpvs
44161100

The Baltic Pipe project is connecting the Norwegian gas transmission system with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish transmission systems via a subsea pipeline in the Baltic Sea in order to facilitate the gas supply to Poland. One of the main components for the Baltic Pipe Project is the large diameter onshore pipeline that must be installed across Denmark. Energinet intends to hold initial market consultations with relevant suppliers of large diameter onshore line pipes starting in week 41, in order to properly prepare for the coming tender and to get relevant market insights.

The Baltic Pipe project is connecting the Norwegian gas transmission system with the Danish transmission system via a subsea pipeline in the North Sea and connecting the Danish transmission system with the Polish transmission systems via a subsea pipeline in the Baltic Sea in order to facilitate the gas supply to Poland. One of the main components for the Baltic Pipe Project is the large diameter onshore pipeline that must be installed across Denmark. Energinet intends to hold initial market consultations with relevant suppliers of large diameter onshore line pipes starting in week 41, in order to properly prepare for the coming tender and to get relevant market insights. The pipeline across Denmark is approximately 200 km in length, including hot bends (10xD) and the outer diameter (“OD”) varies from DN800 (32”) to DN1100 (42”) and the design pressure of 80 barg. The wall thickness varies from 12,5 mm to 36,0 mm. The design temperature for the pipelines is in general -20 °C to +50 °C. The line pipes shall preferably be manufactured as LSAW or as HSAW, and a steel grade X70. Pipe grades according to DS/EN ISO 3183 PSL 2. Materials shall fulfill the requirements of Annex M.

The market consultations will be conducted as individual meetings for duration of approximately 4 hours, at the supplier’s locations. Prior to the meeting Energinet will forward an agenda with discussion topics and relevant technical data to enable the selected suppliers to make preparations and to set a relevant team for an open dialogues and discussions of primarily technical issues.

Spare Titan 130 Solonox Gas turbine.

Maersk Olie og Gas A/S | Published September 23, 2014
Winner
Solar Turbines EuropeAvenue Des Etats Unis 1 GosseliesGosselies 6041 minaud_jean-baptiste@solarturbines.com +32 71253077 +32 71253055
cpvs
42112300

Titan 130 -20502S Gas Turbine Engine including GP, PT and AGB.

Affald Center Aarhus, flue gas condensation line 4 and rearrangement of flue gas ducts line 1 and 2.

AffaldCenter Aarhus, Teknik og Miljø, Aarhus Kommune | Published December 22, 2015  -  Deadline January 22, 2016
cpvs
42510000, 42993000, 42000000, 45231112, 44162000, 42320000

The Purchase includes turnkey installation of a flue gas condensing plant at existing line 4 of a 16 ton/h WtE plant and retrofit of flue gas channels for WtE plants line 1 and 2 (2 x 8 t waste/h). This includes:

— Flue gas condenser,

— Pipings,

— Flue gas channels,

— Heat exchangers,

— Connections to district heating water circuit,

— Electrical installations,

— Water treatment plant,

— Approx. 100 m new flue gas duct Ø 1 600 mm with insulation and flanges for emission measurement equipment,

— Supports to the ground and hangers from lattice girders in the roof,

— Stairs, walkways and platform for support of container for emission measurement equipment,

— All auxiliary equipment.

The Contract includes complete detailed engineering, manufacturing, delivery, installation, testing, commissioning and education.

Delivery of Bio-gas Upgrading Plant to Kalundborg

Dong Energy Salg & Service A/S | Published November 16, 2016
cpvs
42514000

Delivery of Bio-gas Upgrading Plant to Kalundborg.

High-pressure TEM sample holder and gas mixing system

Danmarks Tekniske Universitet - DTU | Published August 19, 2016  -  Deadline July 25, 2016
cpvs

This contract describes the requirements of a high-pressure TEM sample holder and gas mixing system, which will be purchased by DTU Cen. The specified TEM holder should in general allow characterization of nanomaterials in a transmission electron microscope in a continuous gas flow at ambient pressure (and above) and elevated temperatures. The TEM holder should be compatible with a FEI Titan (Super twin) transmission electron microscope without any modifications to the micro-scope. The allowance of the high pressure in situ characterization should not compromise the micro-scope performance or safety. A gas mixing system allowing control of gas pressure and composition should be part of the package, integrating the gas flow control and the heating of the specimen in the holder.

High-pressure TEM sample holder and gas mixing system

Danmarks Tekniske Universitet - DTU | Published August 23, 2016  -  Deadline September 19, 2016
cpvs

This contract describes the requirements of a high-pressure TEM sample holder and gas mixing system, which will be purchased by DTU Cen. The specified TEM holder should in general allow characterization of nanomaterials in a transmission electron microscope in a continuous gas flow at ambient pressure (and above) and elevated temperatures. The TEM holder should be compatible with a FEI Titan (Super twin) transmission electron microscope without any modifications to the micro-scope. The allowance of the high pressure in situ characterization should not compromise the micro-scope performance or safety. A gas mixing system allowing control of gas pressure and composition should be part of the package, integrating the gas flow control and the heating of the specimen in the holder.

GSEFSU3: ESD and Fire and Gas systems for Gorm E.

Maersk Oil | Published January 6, 2016
cpvs
31200000, 31230000

GSEFSU3: ESD and Fire and Gas systems for Gorm E.

Gas compressors

Energinet.dk | Published May 30, 2014
cpvs
42123100

Gas compressors

Gas compressors

Naturgas Fyn Distribution A/S | Published March 28, 2014  -  Deadline April 7, 2014
cpvs
42123100

Gas compressors

Heating elements for gas-gas heaters at Avedøre Power Plant.

DONG Energy Thermal Power A/S | Published January 11, 2014
cpvs
42164000

Heating elements for gas-gas heaters at Avedøre Power Plant.

Frame Agreement for the supply of Metering and Analysing units for Bio- and Natural gas.

Energinet.dk | Published February 14, 2015  -  Deadline March 1, 2015
cpvs
39340000, 38432210, 38432100

Pre-qualification for the supply of Metering and Analysing units for Bio- and Natural gas. Metering and analysis units for injection of Bio- and Natural Gas into the transmission grid. The units shall be supplied as turnkey projects completely installed in container or customer building. Including fiscal equipment for metering of gas flow, gas composition (Gas Chromato-graphs) and gas analysis to qualify gas for entering the transmission gird according to the Danish rules. The maximum flow rates for the units is expected to be 500 — 10 000 Nm3/h, nominal gas pressure is 80 barg. It is expected to purchase up to 5 units until the year 2018. A concept description for the units can be requested (Energinet.dk doc no 14/23294-4).

Collection and disposal of flue gas waste and gypsum

Vestforbrænding | Published September 19, 2016  -  Deadline October 21, 2016
cpvs
90510000

The supplier shall arrange for the collection, transport and disposal (final disposal) of VF's current production of exhaust waste that annually is expected to represent 16.000 tonnes humidified flue gas waste, between 1.000 tonnes of humidified residual waste, between 1000 tonnes of dry flue gas waste, as well as 2.500 tons of gypsum Type of Contract: Services