Call +44 800 9755 164

Public tenders for energy in Sainte-foy-les-lyon France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancesainte-foy-les-lyon

Energy renovation of the multipurpose room

Commune de gauchin le gal | Published February 10, 2017  -  Deadline March 17, 2017
cpvs

Energy renovation of the Salle Polyvalente

Conducting energy studies as part of Operation Programmed Housing Improvement (OPAH)

Cc saint pourcain sioule limagne | Published February 20, 2017  -  Deadline March 13, 2017
cpvs
71335000

Conducting energy studies as part of Operation Programmed Housing Improvement (OPAH)

Practical construction works in pyrotechnics implementing materials and energy or not objects, through the training provided by the Defence Training Centre (C ..

Mindef/sga/spac/s-direction des achats | Published January 30, 2017  -  Deadline March 3, 2017
cpvs
80620000

Practical construction works in pyrotechnics implementing materials and energy or not objects, through the training provided by the Defence Training Centre (CFD located in Bourges)

Council Mission Energy Orientation Heritage (COEP) for joint Ingré, La Chapelle St Mesmin, Saran, St Jean le Blanc and St Pryvé St Mesmin

Mairie de saint-pryve-saint-mesmin | Published February 15, 2017  -  Deadline March 17, 2017
cpvs
71314300

Council Mission Energy Orientation Heritage (COEP) for joint Ingré, La Chapelle St Mesmin, Saran, St Jean le Blanc and St Pryvé St Mesmin

CSPS Mission categories 2 and 3 for the operations of the SPL Energy Meeting

Spl energies reunion | Published February 6, 2017  -  Deadline March 7, 2017
cpvs

This contract is for the realization of mission coordination on security and worker health protection (CSPS) for work operations SPL Energies Reunion. The mission assigned to categories coordinator is level 2 and 3 within the meaning of Article R.4531-2 Labour Code.

Mission technical controller for studies and operations work for the SPL Energy Meeting

Spl energies reunion | Published February 9, 2017  -  Deadline March 10, 2017
cpvs

This contract is for the implementation of technical controller assignment in the studies and operations work for the SPL Energies Reunion.

Construction work

Mairie du Bouscat | Published February 18, 2017  -  Deadline March 10, 2017
cpvs
45000000, 45212200

The program about the renovation of this sports complex is part of the existing volume of the basketball area, corresponding to the first tranche of work. It aims to optimize the facilities and existing structures within the constraints related to sports practices regulated by the federations, and the specifications established in collaboration with associations. The object of the contract is to ensure the improvement of the energy performance of the building included in the scope of the market. The contractor undertakes to achieve a goal of improving energy performance. The goal is verifiable and measured implementation of a plan of measures and checks. To achieve these objectives, the contractor is entrusted with the design and implementation of interventions on the equipment and work on existing buildings and the operation and maintenance of equipment and buildings.

Construction work

Mairie du Bouscat | Published February 8, 2017  -  Deadline March 9, 2017
cpvs
45000000, 45212200

The program about the renovation of this sports complex is part of the existing volume of the basketball area, corresponding to the first tranche of work. It aims to optimize the facilities and existing structures within the constraints related to sports practices regulated by the federations, and the specifications established in collaboration with associations. The object of the contract is to ensure the improvement of the energy performance of the building included in the scope of the market. The contractor undertakes to achieve a goal of improving energy performance. The goal is verifiable and measured implementation of a plan of measures and checks. To achieve these objectives, the contractor is entrusted with the design and implementation of interventions on the equipment and work on existing buildings and the operation and maintenance of equipment and buildings.

Renovation of a building of 1 440 m 2 SHON. The program about the renovation of this sports complex is part of the existing volume of the basketball area corresponding to the first tranche of work. It aims to optimize the facilities and existing structures within the constraints related to sports practices regulated by the federations. The contract includes the design of structures and carrying out the work.

2017P000S00150 | Andalusia

Région Nouvelle-Aquitaine | Published January 19, 2017  -  Deadline March 7, 2017
cpvs
71000000

patrimonial estate site Poitiers - Andalusia building - Mission Work of Master for energy efficiency improvements and interior - File 15J501002 (warning: a site visit is organized on 01/31/17 at 14:30)

Construction work

Expansiel Promotion — DOA | Published February 4, 2017  -  Deadline March 3, 2017
cpvs
45000000

Design realization about 59 collective housing, and a Home for All for the city of Chevilly-Larue DRC residence.

Design realization about 59 collective housing in Psla, and a Home for All for the city of Chevilly-Larue DRC residence, Chevilly-Larue, ZAC Sorbiers Saussaies, Lot 7, on a plot of about 2757 m 2 .

The operation is part of an energy efficiency approach RT 2012-10% and certification NF HQE housing and an optimization approach of costs and construction time.

Financing: equity + bank loan.

District heating

SEM Vitry énergies | Published February 7, 2017  -  Deadline March 31, 2017
cpvs
09323000, 09320000, 42515000, 45232140, 45251220

SEM awarded to the concessionaire the task of ensuring, at his peril, design, part of the financing, construction renovation modernization and network expansion, maintenance, maintenance, technical operation, commercial management and operation with customers of the heating network at its disposal.

The project SEM Vitry Energy includes:

design, part of the financing and execution of work on the heating system in Vitry-le-François:

The replacement of the biomass boiler with a biomass cogeneration or biomass boiler room and possibly other energy solutions

deleting an extra-relief of boiler and related work

installing a regulation of the primary network and necessary modifications

replacement of mixing bottles from interchanges between primary and secondary networks in about 29 ss-stations

the extension work and network development

operation, maintenance of existing structures and realize dealer including major maintenance / renovation

marketing, supply, heat distribution

revenue collection and management of subscriber relationships

where appropriate, assistance for electricity from cogeneration billing.

  • 1