Call +44 800 9755 164

Public tenders for energy in Sainte-foy-les-lyon France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancesainte-foy-les-lyon

The consultation seeks the conclusion of an energy performance contract

Centre hospitalier de saint-denis | Published December 20, 2016  -  Deadline January 23, 2017
energy performance contract for the operation of HVAC systems and the achievement of energy efficiency work

Supply of LED bulbs as part of energy saving certificates

Oph seine ouest habitat | Published January 3, 2017  -  Deadline January 24, 2017
Supply of LED bulbs as part of energy saving certificates

Project management support for updating the territorial energy climate plan and its evolution in air climate plan territorial energy (PCAET)

Ca var esterel mediterranee | Published January 12, 2017  -  Deadline February 6, 2017
Consultation Number: 2017A001 Project management assistance for updating the territorial energy climate plan and its evolution in air climate plan territorial energy (PCAET)

Framework Agreement on energy audits recent courthouse and their cross-sectional analysis.

Apij | Published January 19, 2017  -  Deadline February 17, 2017
Framework Agreement on energy audits recent courthouse and their cross-sectional analysis

Replacing current antiquated joinery with new woodwork, moldings and respecting the existing colors and meet the current requirements in terms of energy performance ..

Ville de paris | Published December 21, 2016  -  Deadline January 23, 2017
Replacing current antiquated joinery with new woodwork, moldings and respecting the existing colors and meet the current requirements in terms of energy performance, acoustics and security.

This contract is for the implementation, on behalf of the Energy Regulatory Commission (CRE), an analysis of business costs of company EDF and allocation

Commission de regulation de l'energie | Published December 19, 2016  -  Deadline January 23, 2017
This contract is for the implementation, on behalf of the Energy Regulatory Commission (CRE), an analysis of business costs of company EDF and allocation between different customer segments on the one hand and activities (electricity, gas, EEC, other services) and the nature of offers (market prices or regulated tariff) on the other.

2017-29148 | Mission support for the creation of a regional fund for development and investment in renewable energy in the Loire Valley and a support structure for engineering

Conseil Régional des Pays de la Loire | Published January 13, 2017  -  Deadline February 10, 2017
support mission for the creation of a regional fund for development and investment in renewable energy in the Loire Valley and a support structure for engineering The purpose of this contract is to assist and advise the Pays de la Loire in the design, structuring and implementation of ENR tool. By << >> ENR tool means: firstly, the actual investment company (Phase A1 below) and, secondly, the support structure for project engineering (Phase A2). This mission is organized in two phases: A / phase of the feasibility study investment tool and the support structure for project engineering divided into 2 phases A1 and A2 specified above; B / structuring phase, negotiation and finalization of legal documents and implementation of ENR tool. For each of these two phases, the Pays de la Loire and the provider work closely, in conjunction with partners in the region on this tool, including the Caisse des Dépôts et Consignations.

Electrical supplies and accessories

SPL Énergies Réunion | Published December 16, 2016  -  Deadline January 30, 2017

This contract is for the supply of various consumables, PPE, technical work clothes on behalf of the SPL Energy Meeting. This is a public supply Spent tender opened under Article 12 and 67 of Decree No 2016-360 of 25.3.2016.

Lot 1 is for the supply of PPE.

Annual Minimum Amount: 1 000 EUR HT.

Annual maximum amount: 8 500 EUR HT.

Lot 2 relates to the provision of electrical equipment.

Annual Minimum Amount: 1 000 EUR HT.

Annual maximum amount: 11 000 EUR HT.

Lot 3 is to the provision of various tools.

Annual minimum HT: 1 000 EUR HT.

annual maximum HT: 13 000 EUR HT.

Lot 4 relates to the provision of measuring and counting.

Annual Minimum Amount: 1 000 EUR HT.

Annual maximum amount: 28 000 EUR HT.

Lot 5 relates to the provision of various facilities.

Minimum: 1 000 EUR HT.

Maximum amount: 8 000 EUR HT.

STEPPORTO | Realization of the sewage treatment plant extensions Porto from 14000 to 30,000 inhabitants equivalent with setting up a biogas plant and energy recovery of biogas produced by injection

Siaepa du Cubzadais-Fronsadais | Published December 20, 2016  -  Deadline January 27, 2017

Petroleum products, fuel, electricity and other sources of energy

RAE Saint-Quay Port d'Armor | Published January 4, 2017  -  Deadline February 7, 2017

diesel fuel supply premium gasoline and SP 95 for the fueling station from the marina.

Diesel fuel: 230 000 to 600 000 liters.

Unleaded 95: 000-450 150 000 liters.

diesel fuel supply premium gasoline and SP 95 for the port refueling station.

2017P000S00150 | Andalusia

Région Nouvelle-Aquitaine | Published January 19, 2017  -  Deadline March 7, 2017
patrimonial estate site Poitiers - Andalusia building - Mission Work of Master for energy efficiency improvements and interior - File 15J501002 (warning: a site visit is organized on 01/31/17 at 14:30)

Restructuring work

Saint-Louis Habitat (OPH Saint-Louis) | Published December 20, 2016  -  Deadline January 27, 2017

See brief description of the market in the tender documents.

The successful tenderer will be entrusted with the design and construction work including a contractual commitment to a level of improvement in energy efficiency over 3 years, signing on a price, a quantity of work, an intervention schedule determined during the competitive dialogue.

The entire mission of architectural and engineering design, construction work and monitoring of consumption that follow will be the sole responsibility of the bidder.

The maximum predictive framework for the design and implementation of 6,248,400 euros HT.

Technical control services

Ugecam Bretagne — Pays de la Loire | Published January 17, 2017  -  Deadline February 20, 2017

Missions of technical control under the Decree of 28/05/1999 no99-443: Basic Missions: Mission L and S. complementary missions: PS: safety of people in buildings during earthquakes, including design and certification réalisation.mission of P1: the strength of non inextricably liés.mission equipment elements LE: existing strength. HAND Mission: accessibility of buildings for people handicapées.attestation HAND certifying, after control, the consideration and implementation of rules on accessibility for people handicapées.mission HYS: hygiene and health in buildings . Mission Pha: sound insulation in buildings other than use habitation.mission Th: thermal insulation of buildings and energy savings including certificate finale.mission VIEL: the initial verification of electrical installations.

Missions of technical control - construction Pole UGECAM ssr Porzou on the site in Concarneau (29).

Missions of technical control - construction CSSR Chillon on the site of the Capuchins in Angers (49).

Missions of technical control - consolidation of operations SSR addiction center L'Escale and aftercare The Thébaudais center in Rennes (35).

The frr wishes to have external expertise can measure, analyze and monitor the environmental footprint of its portfolio of financial assets.

Fonds de reserve pour les retraites | Published January 6, 2017  -  Deadline January 30, 2017
The FRR intends to implement external expertise can measure, analyze and monitor the environmental footprint of its portfolio of assets Environmental financiers.L'empreinte the FRR wishes to calculate is defined by identifying the associated risks by climate change which it is exposed through holding assets financiers.Cette footprint should in particular enable it to identify the high carbon footprint assets (Emissions and GHG reserves, coal), those generators physical risks and transition energy and environment, all in compliance with the international goal of limiting global warming.
  • 1