Call +44 800 9755 164

Public tenders for energy in Saint-valery-sur-somme France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancesaint-valery-sur-somme

2017-29148 | Mission support for the creation of a regional fund for development and investment in renewable energy in the Loire Valley and a support structure for engineering

Conseil Régional des Pays de la Loire | Published January 13, 2017  -  Deadline February 10, 2017
support mission for the creation of a regional fund for development and investment in renewable energy in the Loire Valley and a support structure for engineering The purpose of this contract is to assist and advise the Pays de la Loire in the design, structuring and implementation of ENR tool. By << >> ENR tool means: firstly, the actual investment company (Phase A1 below) and, secondly, the support structure for project engineering (Phase A2). This mission is organized in two phases: A / phase of the feasibility study investment tool and the support structure for project engineering divided into 2 phases A1 and A2 specified above; B / structuring phase, negotiation and finalization of legal documents and implementation of ENR tool. For each of these two phases, the Pays de la Loire and the provider work closely, in conjunction with partners in the region on this tool, including the Caisse des Dépôts et Consignations.

The consultation seeks the conclusion of an energy performance contract

Centre hospitalier de saint-denis | Published December 20, 2016  -  Deadline January 23, 2017
energy performance contract for the operation of HVAC systems and the achievement of energy efficiency work

Project management support for updating the territorial energy climate plan and its evolution in air climate plan territorial energy (PCAET)

Ca var esterel mediterranee | Published January 12, 2017  -  Deadline February 6, 2017
Consultation Number: 2017A001 Project management assistance for updating the territorial energy climate plan and its evolution in air climate plan territorial energy (PCAET)

Engineering studies

Ville d'Asnières-sur-Seine | Published January 14, 2017  -  Deadline February 9, 2017

This consultation relates to making diagnoses asbestos / lead / termites and energy performance (DPE).

STEPPORTO | Realization of the sewage treatment plant extensions Porto from 14000 to 30,000 inhabitants equivalent with setting up a biogas plant and energy recovery of biogas produced by injection

Siaepa du Cubzadais-Fronsadais | Published December 20, 2016  -  Deadline January 27, 2017

Petroleum products, fuel, electricity and other sources of energy

RAE Saint-Quay Port d'Armor | Published January 4, 2017  -  Deadline February 7, 2017

diesel fuel supply premium gasoline and SP 95 for the fueling station from the marina.

Diesel fuel: 230 000 to 600 000 liters.

Unleaded 95: 000-450 150 000 liters.

diesel fuel supply premium gasoline and SP 95 for the port refueling station.

Restructuring work

Saint-Louis Habitat (OPH Saint-Louis) | Published December 20, 2016  -  Deadline January 27, 2017

See brief description of the market in the tender documents.

The successful tenderer will be entrusted with the design and construction work including a contractual commitment to a level of improvement in energy efficiency over 3 years, signing on a price, a quantity of work, an intervention schedule determined during the competitive dialogue.

The entire mission of architectural and engineering design, construction work and monitoring of consumption that follow will be the sole responsibility of the bidder.

The maximum predictive framework for the design and implementation of 6,248,400 euros HT.

  • 1