Call +44 800 9755 164

Public tenders for energy in Paris France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity, heating, solar and nuclear energy

Ministère de l'écologie, du développement durable et de l'énergie | Published September 23, 2016  -  Deadline February 2, 2017
Electricity, heating, solar and nuclear energy

Electricity, heating, solar and nuclear energy

Ministère de l'écologie, du développement durable et de l'énergie | Published January 5, 2017  -  Deadline February 3, 2017
Electricity, heating, solar and nuclear energy

Electricity, heating, solar and nuclear energy

Ministère de l'environnement, de l'énergie et de la mer | Published January 6, 2017  -  Deadline June 16, 2017
Electricity, heating, solar and nuclear energy

Electricity, heating, solar and nuclear energy

Ministère de l'environnement, de l'énergie et de la mer | Published January 11, 2017  -  Deadline February 28, 2017
Electricity, heating, solar and nuclear energy

Electricity, heating, solar and nuclear energy

Ministère de l'environnement, de l'énergie et de la mer | Published September 9, 2016  -  Deadline March 10, 2017

The tender covers the construction and operation of photovoltaic systems on buildings, greenhouses, farm sheds and carports parking, located in mainland France metropolitan.

The facilities are divided into families defined as:

- 1 family (purchase agreement): peak power plants from 100 kWp excluded and excluded 500 kWp

- Family 2 (extra pay): peak power plants from 500 kWp and included 8 MWp included. Parking shadehouses are excluded from this family.

Under 2 ° of Article L. 311-12, successful candidates appointed by the Minister for Energy benefit:

- For the family 1, a contract to purchase electricity generated, entered into under 1 ° of Article L. 311-12 (purchase agreement), according to the provisions of Articles L. 311- 13 L. 311-13-1 of the code of energy and as detailed in 7 specifications,

- For the family 2 of additional electricity produced remuneration agreement, concluded under 2 ° of Article L. 311-12 (extra pay), according to the provisions of Articles L. 311- 13-2 to L. 311-13-3 of the code of energy and as detailed in 7 specifications.

Electricity, heating, solar and nuclear energy

Ministère de l'écologie, du développement durable et de l'énergie | Published August 3, 2016  -  Deadline February 2, 2017

The tender covers the construction and operation of power generation facilities from solar, located in mainland France metropolitan.

The facilities are divided into families defined as:

Family 1: Photovoltaic installations ground strictly power greater than 5 MWp and up to 17 MWp.

Family 2: Photovoltaic installations ground strictly greater power to 500 kWp and less than or equal to 5 MWp.

Family 3: Photovoltaic installations on power parking shade structures strictly than 500 kWp and less than or equal to 10 MWp.

Family 4: innovative installations strictly greater power to 500 kWp and less than or equal to 8 MWp.

Under 2 ° of Article L311-12, the candidates nominated by the Minister for Energy receive additional compensation contract for electricity, established according to the provisions of Articles L311-13- 2 L311-13-4 the energy code and as detailed in 7 specifications.

2016G21017640 | Framework agreements for repair and improvement and energy efficiency of HVAC systems equipment in the Paris community alloti in 7 lots

Ville de Paris / Mairie de Paris | Published December 23, 2016  -  Deadline February 22, 2017
Framework agreements for repair and improvement and energy efficiency of HVAC systems equipment in the Paris community alloti into 7 lots: - lot 1:> - LOT 2:> - LOT 3:> - LOT 4:> - LOT 5:> - LOT 6:> - LOT 7:>

Training software package

Solution logicielle de gestion de la formation de type SaaS | Published January 10, 2017  -  Deadline February 3, 2017

GRDF wishes to acquire a software solution for SaaS learning management, standard and configurable according to the specifics of GRDF and internal training organization (Energy Training), this solution must integrate the management of training and its implementation by internal training organization, and to provide the features that will be described in the specification.

The training management solution, must be SaaS, with an annual subscription includes access to the solution, hosting, support and operational maintenance.

This contract includes the implementation of services (setup and configuration) as well as training for users and administrators.

Provision of a software solution training management SaaS, including access / user licenses, hosting and operation, support, maintenance in operational conditions, including in particular corrective, adaptive and scalable and training for users and administrators.

Refuse disposal and treatment

Radio France | Published December 20, 2016  -  Deadline January 31, 2017

Holiday various containers and the removal, treatment and recovery of various waste or by material recycling or incineration with energy recovery for industrial waste (CIW), the mixed paper and cardboard, medical waste , batteries, neon lights, furniture and household waste.

Rental - collection - treatment and recovery of waste.

Restructuring work

Paris Habitat — OPH | Published December 30, 2016  -  Deadline February 13, 2017

The work program shall include:

1. The improvement of energy performance.

2. The housing rehabilitation.

3. The improvement of quality of service.

4. residentialisation group.

The conditions for applications selection are defined in the tender documents.

Building construction work

ICF La Sablière SA HLM | Published December 24, 2016  -  Deadline February 1, 2017

The project is envisioned as a global market performance (design, construction, operation and maintenance), with research of an innovative construction method respecting the lot sheets and allowing:

1. An improved energy consumption through a thoughtful design of the built favoring the installation of easy technical operating systems;

2. Reduced time and site nuisance compared to traditional methods;

3. An architectural style making room for revegetation / vegetation and coming integrate the neighborhood.

performance levels and expected environmental certifications are:

Compliance with RT 2012.

Label Effinergie +

The NF HQE habitat certification to the latest vintage in force.

The plan air Territorial Climate Energy (PCAET) of East Ensemble.

The share of ENR consideration heating and hot water will exceed 30%.

Construction work

OSICA | Published January 6, 2017  -  Deadline March 6, 2017

energy rehabilitation of 93 collective housing buildings of 6 (V817).

Macro Lot A: closed and covered (demolition, carcass work, exterior joinery, ITE cleaning, sealing, metalwork).

Macro lot B: finishing work (Common, housing).

Macro Lot C: technical trades (electrical, plumbing, heating, ventilation).

Macro Lot D: outdoor areas (parks and VRD).

Framework Agreement on energy audits recent courthouse and their cross-sectional analysis.

Apij | Published January 19, 2017  -  Deadline February 17, 2017
Framework Agreement on energy audits recent courthouse and their cross-sectional analysis

The frr wishes to have external expertise can measure, analyze and monitor the environmental footprint of its portfolio of financial assets.

Fonds de reserve pour les retraites | Published January 6, 2017  -  Deadline January 30, 2017
The FRR intends to implement external expertise can measure, analyze and monitor the environmental footprint of its portfolio of assets Environmental financiers.L'empreinte the FRR wishes to calculate is defined by identifying the associated risks by climate change which it is exposed through holding assets financiers.Cette footprint should in particular enable it to identify the high carbon footprint assets (Emissions and GHG reserves, coal), those generators physical risks and transition energy and environment, all in compliance with the international goal of limiting global warming.
  • 1