Call +44 800 9755 164

Public tenders for energy in Mulhouse France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancemulhouse

Electricity, heating, solar and nuclear energy

Université de Haute-Alsace | Published May 19, 2016  -  Deadline June 17, 2016
cpvs

Electricity, heating, solar and nuclear energy

Compliance and improving the energy efficiency of the building C in Lavoisier school in Mulhouse

Alsace champagne-ardenne lorraine | Published September 2, 2016  -  Deadline October 3, 2016
cpvs

Compliance and improving the energy efficiency of the building C in Lavoisier school in Mulhouse

Supply and delivery of electrical energy needed for Habitat Mulhouse in Mulhouse

mulhouse habitat | Published August 11, 2015  -  Deadline September 21, 2015
cpvs
09310000, 65300000

supply and delivery of electricity.

Electricity

Mulhouse Habitat | Published November 4, 2015
Winner
GDF SUEZ — ENGIE
cpvs
09310000, 65300000

Supply and delivery of electrical energy.

Electricity

Mulhouse Habitat | Published August 14, 2015  -  Deadline September 21, 2015
cpvs
09310000, 65300000

Supply and delivery of electrical energy.

Calorimeters

Mulhouse Habitat | Published February 25, 2017  -  Deadline March 20, 2017
cpvs
38418000, 39715200

Because of the law on the energy transition, Mulhouse Habitat wants to acquire energy meter on the district heating in buildings.

To harmonize equipment and implementation of Decree No. 2012-545 of 2.4. 2012 and the Decree of 27.8.2012, Mulhouse Habitat m2a decided to install heating cost allocators (RFC) on all of its housing stock with a collective heating (except floor heating).

Calorimeters

Mulhouse Habitat | Published February 22, 2017  -  Deadline March 14, 2017
cpvs
38418000, 39715200

Because of the law on the energy transition, Mulhouse Habitat wants to acquire energy meter on the district heating in buildings.

To harmonize equipment and by Decree No 2012-545 of 23.4.2012 and the Order of 27.8.2012, Mulhouse Habitat decided to install heating costs splitters (RFC) on the all of its housing stock with a collective heating (except floor heating).

The estimated number of calorimeters install is 18 000 and 12 000 for thermostatic heads.

These services consist of:

- Installation, rental, maintenance and remote reading Heat cost Splitters (RFC)

- The availability of an Internet portal for the lessor providing easy access global consumption data, analyze the variations in consumption of buildings and housing in relation to the computer services of the holder, if necessary,

- Sending automated alerts in case of abnormal consumption or defective system,

- The installation of thermostatic valves for sites that do are not equipped or defective.

Natural gas

SA HLM SOMCO | Published January 13, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>ES Énergies Strasbourg SA</OFFICIALNAME></ORGANISATION><ADDRESS>37 rue du Marais Vert</ADDRESS><TOWN>Strasbourg</TOWN><POSTAL_CODE>67000</POSTAL_CODE><COUNTRY VALUE="FR"/><PHONE>+33 388752040</PHONE></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
09123000

This framework agreement is in the context of the introduction of competition in the gas market under the European Directive 2003/55 / ​​EC of 26 June 2003. This framework agreement concluded with no minimum or maximum with several holders (maximum 5 per lot subject to a sufficient number of bids) is to establish the terms governing contracts to be (subsequent contracts) for: - the supply and delivery of natural gas up delivery points of all the sites list is annexed to the specifications - and the services associated with providing billing, customer relationship and GRD annual summary sheet management, to provide for energy needs of facilities owned by the SA HLM Somco.

Architectural, construction, engineering and inspection services

SIVOM de la région mulhousienne | Published November 11, 2015  -  Deadline December 7, 2015
cpvs
71000000

SIVOM chose to make a biogas plant sludge and grease the step of Sausheim and external sludge and grease. The prospective site is located near the thickeners / flotation and dewatering unit, on the WWTP site. The successful deposit is 6700 tonnes of dry matter per year, consisting mainly of the byproducts of the treatment plant of Sausheim (96% of the deposit as solids), more sludge and other fats and greases step of industrial cleaning of grease traps. it is intended to heat the digester with the energy recovered from the flue gases of the electrostatic outputs of neighboring incineration plant and to inject the gas into the GrDF network after purification. this project management concerns: & amp; # 8226; the establishment of a biogas plant (tarpaulins, digesters, receiving local inputs, ...), - the creation of a gas purification unit and its connection to the injection station (station leased to GrDF) - optimization of the die processing and transfer of digestate, - the implementation of interfaces with existing works, - the connection to the heat circuit that will be created on the smoke exits the electrostatic plant incineration, - all local control cabinets, programming, - setting the communication and configuration of equipment in the supervision (page spreadsheet Synoptic +), - the possible establishment of a weighbridge - the Editorial regulatory issues (including building permits) the provisional budget for this work is 12 million euros (HT).
  • 1