Call +44 800 9755 164

Public tenders for energy in Marseille-02 France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancemarseille-02

Repair and maintenance services of central heating

OPH 13 Habitat | Published April 20, 2017  -  Deadline May 29, 2017
cpvs
50720000

This consultation relates to the operation of district heating installations type PF PFI, MTI or MCI for the production of heating, hot water and air conditioning including: management of fuel supply (P1), Driving installations and works of small talk (P2), major maintenance and replacement of equipment (P3), with technical renewal energy saving improvements or operating (P3R). Main features: operating market of heating, cooling, hot water, and booster EF, including in particular the management of the energy supply, maintenance, operation and maintenance of approximately 102 cited, or about 116 boiler and 78 substations. The contract also includes the renovation and improvement of thermal installations of 13 Habitat Heritage.

Repair and maintenance services of central heating

OPH 13 Habitat | Published April 13, 2017  -  Deadline May 29, 2017
cpvs
50720000

This consultation relates to the operation of district heating installations type PF PFI, MTI or MCI for the production of heating, hot water and air conditioning including: -Management of fuel supply (P1) -Driving facilities and work of small talk (P2) -Gros maintenance and replacement of equipment (P3), with technical -Renewal energy saving improvements or operating (P3R). Main features: operating market of heating, cooling, hot water, and booster EF, including in particular the management of the energy supply, maintenance, operation and maintenance of approximately 102 cited, or about 116 boiler and 78 substations. The contract also includes the renovation and improvement of thermal installations of 13 Habitat Heritage.

A firm phase + an optional slice on a supplement to P3R.

Structural shell work

Conseil régional Provence-Alpes-Côte d'Azur | Published April 25, 2017  -  Deadline June 1, 2017
cpvs
45223220, 45112000, 45260000, 45261000, 45321000, 45421130, 45421143, 45421000, 45324000, 45430000, 45330000, 45311000, 45313100

Renovation of energy, compliance with accessibility handicapped and safety of the lycée - reinforcement of the insulation by the outside - realization of the ventilation - creation of a mixed wood / gas boiler - replacement of the SSI, implementation of a Photovoltaic installation.

Asbestos removal (380 square meters approx) Reorganization of the entrance (300 square meters approx), extension of the lodge, creation of an elevator shaft, demolition and creation of a new silo for the boiler room M3 env), reinforcement of the porticos and the roof of the gymnasium (750 square meters approx), modification and reinforcement of the upper floor of the Cdi (280 square meters env).

Fences (approx 470 ml).

150 ml).

120 m2).

200 m2), metal cladding on facade or wooden structure (approx.250 m2).

75 ml).

350 ml).

180 m2), outdoor and indoor furniture.

50 m2).

100ml).

Connection on the existing GTC.

170 m2).

Creation of a 630kg elevator, 2 service faces, 5 levels served, upgrading existing elevator.

Architectural services for outdoor areas

La maison familiale de Provence | Published April 15, 2017  -  Deadline May 12, 2017
cpvs
71222000

In firm phase: Full Mission project management (design and implementation) and additional mission support BDM. In slice conditional OPC mission. Program located in arcs sur Argens - Laurons path on a land take of 9000 m 2 about.

- completion of 50 units in social home Psla and 50 surface parking spaces and 30 boxes adjoining the parking lot of the neighboring operation

- Predictive floor area: 3450 m 2 about - forward living area of ​​accommodation: 3200 m 2 .

The expectations of the client are: control of the operation budget - integration into the site and architectural quality - quality of use of accommodation - quality outdoor spaces - control the energy consumption of buildings in operation - mastery BDM approach.

Mission complete project management governed by Law o 85704 of 12.7.1985 as amended by Act No o 88-1090 of 1.12.1988 and the implementing legislation (Decree o 93-1268 of 29.11.1993, the Decree of 21.12.1993).

The project management mission will have the following mission elements:

1) sketches Studies (QSE).

2) preliminary project studies (APS APD)

3) Project studies (PRO).

4) Assistance provided to the Client for the award of contracts or work (ACT).

5) Visa implementing studies by companies (VISA).

6) the performance of the Directorate or works contracts (DET).

7) Assistance provided to the client during acceptance operations and during the completion guarantee period (AOR).

complementary missions:

- support BDM: firm phase,

- scheduling, coordination, control (OPC): conditional phase.

Architectural and related services

Sud Habitat | Published April 15, 2017  -  Deadline May 15, 2017
cpvs
71200000

Embodiment 74 of 4 new housing real estate programs 74 and parking surface Pertuis (83460):

existing building demolition and / or rehabilitation of some housing

Site 1: Path of Espignon: Construction of 21 individual housing

Site 2: avenue de Verdun: Realization of 12 individual housing

Site 3: Ilot Trouillet-Verdun: Realization of 12 collective housing in R 3

Site 4: St. Paul Arena: Construction of 29 individual housing

Total land take on the 4 sites: 9884 square meters - Estimated total floor area: 5,200 m2 - Estimated total living area: 4 700 m2. The 4 programs will be carried out concurrently.

The expectations of the client: controlling the cost of the operation - integration into the site and architectural quality - quality of use of the external housing and spaces - control of energy consumption and process BDM

More details in the CSLA.

Mission complete project management governed by Law No. 85704 of 12.7.1985 as amended by Act No. 88-1090 of 1.12.1988 and the implementing legislation (Decree No. 93-1268 of 29.11.1993, the order of 21.12.1993). Project management mission will include: 1) sketches Studies (QSE) - 2) pre-project studies (APS ODA) - 3) Project studies (Pro) - 4) Assistance provided to the master of book for the award of contracts or work (ACT) - 5) Visa implementing studies by companies (Visa) - 6) the performance of the Directorate or works contracts (DET) - 7) Support made to the client during acceptance operations and during the completion guarantee period (AOR).

complementary mission firm phase: Support BDM - complementary mission conditional phase: Scheduling, Coordination, Control (OPC).

  • 1