Public tenders for energy in Grenoble France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancegrenoble

Energy management and water

Semitag | Published February 21, 2017  -  Deadline March 8, 2017
cpvs
71314200

Energy management and water

Miscellaneous repair and maintenance services

CEA/Grenoble | Published December 16, 2016  -  Deadline January 20, 2017
cpvs
50800000

Maintenance and operation of facilities and technical equipment and tertiary CEA Grenoble.

Benefits include:

- The conduct of facilities,

- Preventive and corrective maintenance,

- Assistance to the control bodies for equipment subject to regulation,

- The management of the call center (service calls)

- Management of legacy data (data heritage, plans, etc ...)

- Coordination of annual building stops,

- Management of spare parts and consumables necessary for the realization of benefits,

- The maintenance management of facilities and equipment of the site via the computer tool of the "CMMS" (Management Computerized Maintenance)

- The monitoring of energy consumption (electricity, city water, heating, ...) with a goal of annual savings to achieve,

- Penalty payments to cover outside the collective working hours (7:55 a.m. to 4:35 p.m.), including weekends and holidays, in some technical fields (generators, inverters, electrical, fluid and ventilation, ...)

- Technical hotlines (in the fields of electricity, fluids and ventilation) during the ceremonial campaigns Clinatec building ...

...

A more comprehensive document describing the expected performance and quantitative data is mandatory to withdraw from one of the points of contact listed in Schedule A. The withdrawal will be against signing a confidentiality agreement.

A number of options concerning, inter alia, on the design of the perimeter and ancillary benefits may be made and specified as required in the tender documents.

Architectural and related services

OPAC 38 | Published December 13, 2016  -  Deadline January 10, 2017
cpvs
71200000, 71300000

Preprogrammed forward work: cleaning and waterproofing of walls and replacement of external joinery.

Estimated budget works: € 3,247,000 excluding VAT.

predictable start of study: April 2017.

anticipated start of work: September 2018.

Composition / team skills required: Architect (team leader) - construction economics - Thermal fluids - OPC.

It is not sought exclusive design offices.

Mission: Technical and energy audit, MOP law base and performance and OPC studies: it is stated that each mission will be a subsequent contract.

The first subsequent market include diagnostic studies. It will eventually be followed by a second subsequent contract with the core mission "MOP law" and performance studies, and also include the fund.

Commercial ovens

CEA/Grenoble | Published December 21, 2016
cpvs
42341000

CEA / Grenoble wishes to acquire one (1) a rapid annealing furnace type RTA (Rapid Thermal Annealing) which aims heat treatment of thin film battery electrode material to improve its crystallization. The energy provided will allow to reach a temperature of 1000 ° C with ramps dismantled very fast. It will also be compatible with a clean room atmosphere.

The equipment will be installed in a clean room-type production environment on the site of STMicroelectronics in Tours, and will therefore comply with the standards in these environments.

Supply of one (1) rapid annealing furnace type "TSR" (Rapid Thermal Annealing).

Global procurement energy performance for energy renovation of the elementary school Marlioz and repair of the boiler room of the kindergarten Marlioz Aix-les-Bains (73)

Spl d'efficacite energetique | Published March 30, 2017  -  Deadline May 2, 2017
cpvs
45321000

Global procurement energy performance for energy renovation of the elementary school Marlioz and repair of the boiler room of the kindergarten Marlioz Aix-les-Bains (73)

Construction work

CCI de Grenoble | Published January 26, 2017  -  Deadline February 27, 2017
cpvs
45000000, 45311200, 09332000, 45331110, 45330000, 45261420, 45262311, 45450000

Markets for work benefits as part of the project "Learning Grid by Grenoble" on the website of the Institute of business and technology, participating in the creation of a technical educational tool to simulate the operation of a city smart (smart City) in energy performance and includes the following services:

1. Renovation of electrical, thermal and lighting identified in the diagnostic phase and for which the renovation was defined in the study phase and establish an energy metering plan;

2. Installation of the equipment with the objective of installing means of renewable energy production and storage to optimize the energy consumption of the campus.

Renovation of electrical installations strong currents and creating a VDI network.

completion of a solar photovoltaic system on the roofs of buildings B 2, B 4, B 5 and B 6.

Renovation of thermal installations and creation of a cogeneration.

Resumption of sealing complex and poses photovoltaic materials.

Construction of local cogeneration and various earthworks, roads and underground networks.

Various false ceiling, plastering, painting, floor covering.

Research and testing facilities construction work

CEA/Grenoble | Published October 7, 2016
cpvs
45214620

The approach taken is based on the establishment of an operational basis, pilot site for energy independence in everyday life, which will consist of a chain of mature organs of generation, storage and management of energy and will be representative actual uses around a commercial building (named Totem) and vehicle fleet used every day of the year. The operational base will serve as a base for R & D projects: developing technologies will be introduced in parallel of these bodies, which will evaluate their performance by providing a test environment (inputs and outputs) of the profiles representative uses a feedback on the long term and provide the opportunity to conduct comparative assessments to equivalent function compared to mature bodies of the operational base.

Research and testing facilities construction work

CEA/Grenoble | Published October 7, 2016  -  Deadline November 4, 2016
cpvs
45214620

The approach taken is based on the establishment of an operational basis, pilot site for energy independence in everyday life, which will consist of a chain of mature organs of generation, storage and management of energy and will be representative actual uses around a commercial building (named TOTEM) and vehicle fleet used every day of the year. The operational base will serve as a base for R & D projects: developing technologies will be introduced in parallel of these bodies, which will evaluate their performance by providing a test environment (inputs and outputs) of the profiles representative uses a feedback on the long term and provide the opportunity to conduct comparative evaluations equivalent function compared to mature bodies of the operational base. The market will focus on the design and implementation of construction works of Totem Building, built-in energy (technical modules required for the autonomy of the building), production sources, energy storage capacities and infrastructure expectations necessary for the realization of R & D projects. The market will also focus on the implementation of the permit application to build and integration of back of the building and its annexes in the court of technologies (carried out as part of another construction operation on the same site). Totem building will represent a total surface area of ​​about 520 m 2 SDP spread over 2 floors as well as a functional roof dedicated to photovoltaics. This surface will integrate all its technical features.

Engineering services

CCI de Grenoble | Published September 1, 2016
Winner
TPF ingénierie
cpvs

Project management for the design and implementation of production equipment and storage of renewable energy at the site of the Institute of business and technology.

Thermal insulation work

SPL d'Efficacité Énergétique | Published September 24, 2016  -  Deadline October 24, 2016
cpvs
45321000, 45331000, 50720000, 71320000, 71340000

The city of Grenoble has entrusted energy renovations of 3 schools in the SPL-DARE.

Research and testing facilities construction work

CEA/Grenoble | Published October 29, 2016  -  Deadline November 4, 2016
cpvs
45214620

CEA Tech plans to create at the entrance to his Labège an iconic infrastructure to develop but also to validate the scale 1 innovative technologies in response to the challenges of digital and energy transitions.

energy control work assistance for the implementation of thermal renovation projects 'copies' of the wall device / wall 2

Metropole grenoble alpes metropole met | Published July 27, 2016  -  Deadline September 12, 2016
cpvs

energy control work assistance for the implementation of thermal renovation projects 'copies' of the MUR / MUR 2 device

Architectural, construction, engineering and inspection services

Communauté d'agglomération Grenoble Alpes Métropole | Published April 6, 2016  -  Deadline May 12, 2016
cpvs
71000000, 71323200

management contract of work for the realization of the new heat production unit (NUP) using biomass to:

- Meet the evolving energy needs resulting from the development of this sector,

- Compensate for the scheduled shutdown of the heavy fuel oil boiler, antiquated, to help meet the recommendations of the air protection plan

- Consolidate the renewable energy rate used by the heating network of the town,

- Enroll in an exemplary sustainable development approach, in line with the energy climate plan air of Grenoble Alpes Métropole,

- Ensure greater stability of prices of energy delivered by a lesser dependence on fossil conventional energy.

associated work and services of mastery mission - planning, restructuring and renovation of technical installations in buildings CHU Grenoble Alpes.

CHU de Grenoble | Published March 5, 2016  -  Deadline April 12, 2016
cpvs
71221000

In accordance with the law number 85-704 07.12.1985 on the public project contracting and its relationship with the mastery of private work, and texts for its application, the provisions of this Framework Agreement concern :

Oeuvre- development of mastering the tasks and associated services, restructuring and renovation of technical installations in buildings Grenoble University Hospital.

This multi-awarded framework agreement is to define the terms governing contracts concluded on the basis of said markets subsequent to the conclusion and thus to select a service provider or a group capable of conducting control of missions work for works development, restructuring and renovation of technical facilities (power supplies and VDI networks, energy performances, heating, cooling, ventilation, water networks and medical fluids, access control facilities and video surveillance) buildings of the University Hospital of Grenoble. It covers the total wealth of the Grenoble University Hospital and the said related transactions COPERMO.

Architectural and related services

Actis | Published January 26, 2016  -  Deadline March 2, 2016
cpvs
71200000

- Project management for the Rehabilitation of a home dwelling people aged 64 rooms located 56 rue Saint Laurent in Grenoble, actis of property managed by the CCAS From Grenoble.

This is a R + 8 building. The useful area is 3642 square meters.

Note that some levels (ground floor and 5th floor) of the building are classified ERP 5th category (offices - multipurpose rooms and restaurant)

provisional program is available as follows:

- Improving the energy performance of the building

- Fire safety

- Accessibility of public areas

- Various technical improvements on the frame and plumbing systems

requested tasks:

BASE and EXE -

Complementary missions:

OPC -

Fluid Diagnostics: heating, waste stack, SSI, notamment-

achievement of Energy Objectives: Monitoring and corrective actions for 2 years -

Asbestos mission.

mastery of work assignments for thermal operations and improving energy conversion occupied site, the group "The Moras" and "Starlings", located in the municipality of Villefontaine. Framework agreements without minimum and maximum and a trader.

OPAC 38 | Published March 11, 2016  -  Deadline April 8, 2016
cpvs
71200000

project management assignments for thermal operations and improving energy conversion:

Lot 01: Villefontaine "The Moras' thermal energy conversion improvement and occupied site, 98 dwellings.

Pre-program work forward: Energy conversion, electrical safety development work of housing, recovery balconies, insulation of facades subject diagnosis, checking the VMC, partial recoveries coated. predictable start of study: June 2016.

Composition / skills required of the team: architect (team leader) - construction economics - Fluid CVS - electricity - OPC.

It is not sought exclusive design offices. Mission: diagnosis, EXE + base + OPC: It is stated that each mission will be a subsequent contract.

Lot 02: Villefontaine "The Starlings' thermal study with improvement in energy conversion occupied site, 134 dwellings.

Pre-planned works program: study of energy conversion, facades, roofing, joinery, VMC, collective parables, setting electrical safety, fire safety. predictable start of study: June 2016.

Composition / skills required of the team: architect (team leader) - construction economics - Fluid CVS - electricity - OPC.

It is not sought exclusive design offices. Mission: diagnosis, EXE + base + OPC: It is stated that each mission will be a subsequent contract.

A configurable stationary electrochemical storage.

CEA/Grenoble | Published February 6, 2016  -  Deadline February 29, 2016
cpvs
31430000

Platform CEA Tech Aquitaine wishes to purchase a stationary storage device with a capacity of 30 kW with the following capabilities:

- Connectable to the network (380V AC)

- With a bidirectional energy exchange function,

- Allows the implementation of Li-ion batteries (eg LFP - 26650 format),

- Can manage a mixed batteries of different chemistry,

- Dynamic balancing the floors of cells within the battery pack,

- Isolate dynamic stages of defective cells, exhausted or overheated, and during operation to ensure continuity of service,

- To generate some form of analog output voltage (Bandwidth ≥ 50 kHz), discrete increments of 5V maximum.

This equipment will be installed on the energy platform of the CEA Tech Aquitaine antenna.

Framework Agreement - mono bidder: work of mastery and servicing mission - renovation of technical installations in buildings of the University Hospital of Grenoble.

CHU de Grenoble | Published February 19, 2016  -  Deadline March 31, 2016
cpvs
71221000

Under the provisions of Law No 85-704 of 12 July 1985 on the public project contracting and its relationship with the mastery of private work, and texts for its application, the provisions of this Framework Agreement concern :

Renovation Oeuvre- mastery of missions of technical installations in buildings of the University Hospital of Grenoble.

This mono-awarded framework agreement is to define the terms governing contracts concluded on the basis of said markets subsequent to the conclusion and thus to select a service provider or a group capable of conducting control of missions work for works renovation of technical facilities (power supplies and VDI networks, energy performances, heating, cooling, ventilation, water networks and medical fluids, access control systems and video surveillance) buildings Grenoble University Hospital.

It covers the total wealth of the Grenoble University Hospital.

Realization of periodic regulatory controls, initial and benefits related to the facilities, equipment and premises of CEA / Grenoble and neighboring sites, including the National Institute of Solar Energy (INES) in Le Bourget-du-Lac ( 73) the platform of Saint-Etienne (42) and PRTT (CEA tech) on sites Metz, Toulouse, Bordeaux and Nantes.

CEA/Grenoble | Published February 17, 2016
Winner
Apave Sudeurope
cpvs
71630000

Benefits include the achievement of periodicals, initial regulatory controls and associated services on the facilities, the equipment and the premises of CEA / Grenoble and neighboring sites.

The materials involved are mainly:

- Lifting, handling, gear, lifts, hoists, doors and gates, lifelines,

- Gas and steam pressure vessels,

- Fume cupboards,

- Electrical installations and equipment,

- Work equipment and machinery

- Bascule bridge,

- Protective equipment against lightning.

Basic benefits are mainly:

- Checks on public buildings,

- Periodic checks and inspections of the equipment listed above,

- Annual audits of facilities classified for environmental protection,

- Updating the ATEX classification of nomination dossiers,

- Control and calibration of a weighing bascule bridge and expenses for periodic testing of lifting equipment,

- Supply and installation of controls management software to plan, monitor their development, establish budgets, indicators, statistics and extract data reports,

- Preparation accompanying notes, dissemination and archiving of audit reports,

- Details of any changes in the regulations in force with precision the impact on facilities and installations at CEA / Grenoble,

- Technical assistance and advice.

Benefits based on a schedule of unit prices are mainly:

- Initial checks of electrical installations,

- Checks before commissioning of equipment service

- Machine compliance audit.

The controls are carried out in accordance with the laws and regulations in force.

They involve i ...

Scanning electron microscopes

Institut polytechnique de Grenoble | Published October 16, 2015
Winner
Eden Instruments
cpvs
38511100

Purchase and maintenance of a system diffraction analysis of backscattered electrons (EBSD) coupled to a system of X-ray microanalysis with energy spectrometry (EDS).