Electrical installation work

CEA/Grenoble | Published May 17, 2017  -  Deadline June 23, 2017
cpvs
45310000

Construction, equipment and connection of a new high-voltage electrical supply substation at the CEA / Grenoble site.

Construction, equipment and connection of a new high-voltage electrical supply substation at the CEA / Grenoble site.

The main projects envisaged are:

- the construction of a new building to accommodate new equipment,

- the implementation of new HTA trains and associated auxiliary equipment,

- the connection of the various HTA loops of the site with the resumption of existing connections or the realization of new HTA links.

Initial installations:

The CEA of Grenoble is supplied with electrical energy via an HTB type outdoor delivery station RTE comprising:

- a 225/15 kV transformer - TR611 - 2 * 40 MVA, the protections of which are located in the adjoining RTE source station (confluent station),

- a transformer 225/20 kV - TR613 - 70 MVA belonging to GEG whose protections are located in the RTE source station,

A transformer 225/15 kV - TR612 - 2 * 40 MVA, the protections of which are located in the adjoining RTE source station.

Two ultimate backup links are also available for an ultimate "5MW" rescue via RTE's HTA train.

Future installations:

The new building for the electric delivery station will consist of:

- a basement for the route of the HTA connections:

It will be partitioned into 5 parts in order to obtain a fire separation 2h between the different rooms under the oars,

The routing of the new loop links is studied so that there is no common path of links of the same loop.

- the path is studied so that there is no common path of connections of the different sources.

- a DRC above the flood level with:

- a HTA room A1 row,

- a HTA room rowing B1,

- a HTA room A2 row,

- a HTA room B2 train,

- one room "auxiliary trains A1 and B1"

- a room "auxiliary trains A2 and B2"

- a room "counting RTE and auxiliary buildings"

- a fire separation 2h is provided between the various premises.

- a roof gravelly terrace to provide a certain thermal comfort to the building and to meet the architectural constraints of integration.

The new HTA delivery station will consist of 4 new HTA trains:

- A1 train with 8 HTA cells,

- A2 train with 9 HTA cells,

- B1 train with 8 HTA cells,

- B2 train with 8 HTA cells.

Only the source switch between the TR611 and the TR612 is realized automatically via the automation of the RTE Confluent substation.

They will have a working voltage of 24kV.

In order to remain in compliance with the operating agreement between the CEA and RTE, the TR611 and TR612 arrival cells and the 5MW final arrivals which are RTE / ENEDIS operational will have to comply with the HN64S40 standard of October 1995 And be authorized by ENEDIS.

The owner will have to carry out all the necessary services (stripping, earthworks, hard work, second-hand work, VRD, HV, BT, TBT, control-command, participation in supervision, ventilation, air conditioning, heating, fire detection, extinction Fire, lightning protection, water supply, evacuation of EU / EV and EP, tests, etc.) for the start-up of the new substation and its insertion into the existing electricity distribution network.

Miscellaneous repair and maintenance services

CEA/Grenoble | Published December 16, 2016  -  Deadline January 20, 2017
cpvs
50800000

Maintenance and operation of facilities and technical equipment and tertiary CEA Grenoble.

Benefits include:

- The conduct of facilities,

- Preventive and corrective maintenance,

- Assistance to the control bodies for equipment subject to regulation,

- The management of the call center (service calls)

- Management of legacy data (data heritage, plans, etc ...)

- Coordination of annual building stops,

- Management of spare parts and consumables necessary for the realization of benefits,

- The maintenance management of facilities and equipment of the site via the computer tool of the "CMMS" (Management Computerized Maintenance)

- The monitoring of energy consumption (electricity, city water, heating, ...) with a goal of annual savings to achieve,

- Penalty payments to cover outside the collective working hours (7:55 a.m. to 4:35 p.m.), including weekends and holidays, in some technical fields (generators, inverters, electrical, fluid and ventilation, ...)

- Technical hotlines (in the fields of electricity, fluids and ventilation) during the ceremonial campaigns Clinatec building ...

...

A more comprehensive document describing the expected performance and quantitative data is mandatory to withdraw from one of the points of contact listed in Schedule A. The withdrawal will be against signing a confidentiality agreement.

A number of options concerning, inter alia, on the design of the perimeter and ancillary benefits may be made and specified as required in the tender documents.

Performance review services

Grenoble Alpes Métropole | Published May 17, 2017  -  Deadline June 12, 2017
cpvs
79313000, 38551000, 71314300

As part of an experimental project on Mur | Mur 2, the Métropole wishes to develop a tool allowing: - to develop monitoring "solutions" including both the equipment in the renovated buildings, the communication system between the counting instruments And the owners of the device or their delegate, as well as the computer interface allowing the management and the analysis of the databases. - to associate with these solutions a user interface allowing the latter to know precisely and up to date 1 maximum the levels of energy consumption. Based on this information, actions will be developed to "optimize" the behavior of users in their rehabilitated dwellings framework agreements concluded without minimum, with maximum and one economic operator for each lot: - lot no1 Monitoring evolved: without minimum, with Maximum fixed at 150 000 euro (s) HT-lot no2 Basic monitoring: without a minimum, with a maximum of 116 000 euro (s.

Lot 1 must fulfill the monitoring obligation imposed by the CDC within the framework of the AIP in the strict sense. The (Temporary) Instrumentation will therefore cover only collective condominiums (collectively, with the sample of dwellings). Given the level of monitoring required, it will be necessary for the service provider to propose a specific data monitoring platform (see point 4).

Lot 2 concerns "voluntary" condominiums (Mur | Mur 1 and 2) based on an interface under development. This contract will therefore cover only the installation of the instrumentation according to the same modalities as in lot No1.

Construction work

CHU de Grenoble | Published December 17, 2016
Winner
Axima Concept
cpvs
45000000, 45110000, 45210000, 45261000, 45320000, 45421000, 45324000, 45421146, 45442100, 45262321, 45431000, 45432111, 45432113, 45313000, 45331000, 45330000, 45332400, 45315500, 45315600

In a dynamic grouping of higher education institutions of medical and paramedical specialties, the university hospital - Grenoble Alpes and Grenoble Alpes university constituted a control group and provide project management for the construction of a building including license levels of Faculties of Medicine and Pharmacy and the full 7 paramedical schools of Grenoble. Driving operation will be provided by Chuga, coordinator of the control group. Benefits under the category 1 under the Labour Code (Act No. 93-1418 on 31.12.1993).

Lot 1: covered Clos.

Lot 2: Interior woodwork - furniture.

Lot 3 Plastering - suspended ceilings - painting.

Lot 4: Tiling - faience.

Lot 5: flexible floor coverings.

Lot 6: Parquet.

Lot 7: elevators.

Lot 8: Heating - Ventilation - Plumbing - geothermal energy.

Lot 9: Electricity strong currents, low currents.

Architectural, construction, engineering and inspection services

SPLA Sages | Published November 21, 2015  -  Deadline January 12, 2016
cpvs
71000000

As part of the urban reflection on the redevelopment of the ZAC Flaubert in Grenoble of 90 hectares, the framework agreement is primarily intended to: - define the main principles of organization and sustainable urban composition that will guide and oversee future developments in terms of landscape and urban structure, viaire mesh and circulations, configuration of public spaces, urban shapes and buildability and to identify and localize major functional vocations of the site - set the terms and implement a co-construction process of the urban project throughout the implementation of the operation: ability to identify and mobilize project holders and all stakeholders on a local urban territory, communicate and consult locally, to lead this work with appropriate methodological tools and finding concrete proposals of urban project - to integrate and translate the principles of the energy and ecological transition - to ensure operational monitoring of the implementation of real estate developments of the operation: landscape, urban and general and specific architectural requirements, help with selection of architectural projects and operators, development of real estate projects (PC visa mission ...). It is stated that the mission of the group stops to produce a detailed outline of public and private spaces, and for general landscaping requirements and detailed, other mission elements (Mop law) being provided by another provider already appointed.

X-ray inspection equipment

CEA/Grenoble | Published October 9, 2015
Winner
Bruker Axs
cpvs
38582000

CEA / LETI wants to equip a standard X-ray diffraction equipment to two circles to meet the needs of materials characterization pole of Optics and Photonics Department. This equipment, which will be operated self-service for different users, aims to provide a simple characterization but with excellent resolution. It is therefore expected a more automated equipment possible requiring the least possible human intervention. It must have the ability to cover the following measurement techniques: - mapping in double diffraction X mode - high resolution diffraction (HRXRD) - X-ray reflectivity There must be equipped mainly as follows: - a photon source having energy around 8keV, - an efficient detection system allowing rapid acquisitions and thin films - a goniometer 2 circles and adapted to provide optical characterizations required, - a sample holder allowing translations in X, Y and Z This equipment will be used in the Search programs Nanosciences, Nanotechnologies in Micro- and. This equipment will be installed at CEA / Grenoble. Required delivery date: imperatively before 12/18/2015

X-ray inspection equipment

CEA/Grenoble | Published June 26, 2015  -  Deadline July 28, 2015
cpvs
38582000

CEA / LETI wants to equip a standard X-ray diffraction equipment 2 circles to meet the needs of the optical characterization of materials Department pole and photonics. This equipment, which will be operated self-service for different users, aims to offer a simple characterization but with excellent resolution. It is therefore expected a more automated equipment possible requiring the least possible human intervention. It must have the ability to cover the following measurement techniques: - mapping in double diffraction X mode - high resolution diffraction (HRXRD) - X-ray reflectivity It must be equipped mainly as follows: - a photon source having energy around 8 keV - an efficient detection system for rapid acquisitions and thin films - a goniometer 2 circles and adapted to provide optical characterizations required, - a sample holder allowing shift in X, Y and Z. This equipment will be used in the context of nanoscience research programs in micro and nanotechnology. This equipment will be installed at CEA / Grenoble. Required delivery date: imperatively before 12/18/2015

District heating

Grenoble Alpes Métropole | Published April 19, 2017  -  Deadline May 29, 2017
cpvs
09323000, 45232140, 45251250, 71321200

This is a global public market performance combining design, implementation, and maintenance operation went through a contracting entity in the relevant procedure on a competitive basis, and including some benefits to the overall price and some benefits to purchase orders.

This contract includes a part of the overall price for services (referred to as Part A mission in parts of the market):

Part A: design, construction and operation and maintenance, in a process of continuous improvement of performance, a boiler and a wood energy heating system with extra gas, serving - for their heating needs and, for some, DHW - heating consumer buildings Gières town center: municipal buildings, condominiums, businesses;

This contract further includes a portion of benefits in the form of a framework agreement to purchase orders with maximum and an economic operator (called Part B missions in parts of the market):

Part B: as part of a schedule of unit price, design, implementation and operation and maintenance during the contract period, extensions of the heating system (including substations in the future buildings subscribers) .

Architectural services for buildings

Conseil général de l'Isère | Published April 22, 2017
cpvs
71221000, 71000000

Contest restricted on sketch. Realization in new construction of 1 building of ENV 1 120 m 2 Integrating the college reception center, school life, the teaching cluster, the arts cluster, the CDI, 3 general education rooms, 1 courtyard, 1 computer room.

Asbestos removal and partial demolition of the 1991 building of ENV 950 m 2 , Partial asbestos removal of the 1975 building on approx. 890 m 2 . Implementation of energy and cleanliness work on preserved buildings (building of 1955: excluding exterior carpentry, building of 1975: light refurbishment on env 890 m 2 ; 1991 building, non-demolished part of ENV 420 m 2 ). Building accessibility. Capacity of the college after the operation of 500 to 580 pupils.

Aménagts ext. Necessary for visibility, and for accessibility ext. Of the building. 4 400 000 MEUR HT. Duration of mission: 5 years / contract award. 4 È Trim. 2018 / delivery, commissioning 4 E Trim. 2020. Basic mission + exe 1 and 2, DIAG, SSI, signage, commissioning.

Architectural, construction, engineering and inspection services

CEA/Grenoble | Published October 1, 2015  -  Deadline October 22, 2015
cpvs
71000000

10.05 The building gradually converts to accompany the development of nanoscience on the Minatec campus and tends to become a "project nursery" Minatec Labs to explore the upstream of information technology, health and energy . The headquarters building of this project, no longer reflects the new design turned to new technologies: the thermal quality of the building is poor, it corresponds to the achievements of 60/70. This is to rethink the exterior building envelope to combine respect for the architectural expression, thermal improvement and development of accessibility; so that it integrates with the rest of the site, especially at Minatec, and so meets his new vocation in today's regulatory environment and in accordance with specific features of the CEA. 10.05 The building has more than 3 storeys (this varies according to the wing and the area concerned). Work therefore be to achieve: - renovation and thermal treatment of the facades to improve the energy performance of the building and the comfort of users, - creating a vertical serving all floors of the building including spaces usability. A study is also required to improve the accessibility of inputs 2 south end of the building. Continuity of service activities and research should be ensured during construction (works in occupied site). The mission entrusted to the supervisor is a basic mission within the meaning of Law No 85-704 of 07/12/1985 and Decree n ° 93-1268 of 29.11.1993 on project management tasks entrusted by masters of public work to private law providers, and the decree of 21.12.1993 specifying the technical procedures for implementing the mission elements of project management, including basic mission elements and complementary missions: DIAG , APS, APD, PRO, ACT, EXE / SYN, DET, OPC, AOR until the end of the year of perfect completion. The market will include a firm phase and an optional slice specifically described below: - the firm phase corresponds to the design phase, it includes the following mission elements: DIAG, APS, APD, PRO (including establishment of the license file build PC), ACT (until tender documents business "DCE"). It includes the following mission elements: ACT (from DCE), EXE / SYN, DET, OPC, AOR until the end of the year of perfect completion. Tenders will be selected on sketch (ESQ). It will ask the master contractor to study three scenarios: - scenario 1: no asbestos (unless necessary for the creation of vertical coverage) and better address the thermal and aesthetics, - Scenario 2 : asbestos removal without full façade, with at minimum the replacement of the doors of all the woodwork (without removal of dormant) and the replacement of fixed joinery (including the asbestos removal), - Scenario 3: including a total asbestos removal façades for the complete replacement of the entire joinery (opening + dormant). In the latter scenario, the renovation is to remove all asbestos materials present in the composition of building facades. A number of options may be made and clarified as necessary in the tender documents. The expected duration of the basic mission is estimated to be: - for the firm phase: six months. - Optional tranche for 30 months as part of the scenario # 3 most complex, time related to the guarantee of perfect completion are included.

Architectural services for buildings

CHU de Grenoble | Published February 1, 2017
Winner
Cabinet Patriarche
cpvs
71221000

In accordance with the law number 85-704 of 12 July 1985, this Framework Agreement is: The development of Oeuvre- mastering tasks and related services, restructuring and renovation

building systems of Grenoble University Hospital.

This framework agreement multi-attribute aims to define the terms governing contracts to be concluded subsequent and therefore select a provider or a group

MOE can conduct missions on development works, restructuring and

upgrading of technical equipment (power supplies and VDI networks, energy performance,

heating, cooling, ventilation, water networks and medical fluids,

access control systems and video surveillance) buildings of the University Hospital of Grenoble. It focuses on the heritage

total of Grenoble University Hospital and the said related transactions COPERMO.

This framework agreement multi-attribute aims to define the terms governing contracts to be concluded subsequent and therefore select a provider or a group

which can carry out project management tasks related to development work, restructuring and

upgrading of technical equipment (power supplies and VDI networks, energy performance,

heating, cooling, ventilation, water networks and medical fluids,

access control systems and video surveillance) buildings of the University Hospital of Grenoble. It focuses on the heritage

total of Grenoble University Hospital and the said related transactions Copermo.

District heating

Métropole Grenoble Alpes Metropole Met | Published March 7, 2017  -  Deadline April 20, 2017
cpvs
09323000, 42511110, 45232140, 71321200

The future concession contract will be entrusted to the dealer operation, maintenance, major maintenance renewal (level 5 French nf x 60-10) of the existing main network on part of the territory of Grenoble- Alpes Métropole and heat production plants. network densification development capital expenditures (excluding Ger) are provided for an estimated amount of 86 million EUR. An incineration plant (off-contract) 4 and heat generation plants supply a mesh network in high pressure high temperature with a length of about 170 km, serving approximately 1,000 delivery points. The average amount of energy sold annually is 800,000 MWh / year. The convention will be a period of 15 years. Applicants can download the file completing this opinion (at: http://lametro.marcoweb.fr), which contains a synthetic presentation.

See II.1.4) of this notice.

Architectural and related services

OPAC 38 | Published December 13, 2016  -  Deadline January 10, 2017
cpvs
71200000, 71300000

Preprogrammed forward work: cleaning and waterproofing of walls and replacement of external joinery.

Estimated budget works: € 3,247,000 excluding VAT.

predictable start of study: April 2017.

anticipated start of work: September 2018.

Composition / team skills required: Architect (team leader) - construction economics - Thermal fluids - OPC.

It is not sought exclusive design offices.

Mission: Technical and energy audit, MOP law base and performance and OPC studies: it is stated that each mission will be a subsequent contract.

The first subsequent market include diagnostic studies. It will eventually be followed by a second subsequent contract with the core mission "MOP law" and performance studies, and also include the fund.

associated work and services of mastery mission - planning, restructuring and renovation of technical installations in buildings CHU Grenoble Alpes.

CHU de Grenoble | Published March 5, 2016  -  Deadline April 12, 2016
cpvs
71221000

In accordance with the law number 85-704 07.12.1985 on the public project contracting and its relationship with the mastery of private work, and texts for its application, the provisions of this Framework Agreement concern :

Oeuvre- development of mastering the tasks and associated services, restructuring and renovation of technical installations in buildings Grenoble University Hospital.

This multi-awarded framework agreement is to define the terms governing contracts concluded on the basis of said markets subsequent to the conclusion and thus to select a service provider or a group capable of conducting control of missions work for works development, restructuring and renovation of technical facilities (power supplies and VDI networks, energy performances, heating, cooling, ventilation, water networks and medical fluids, access control facilities and video surveillance) buildings of the University Hospital of Grenoble. It covers the total wealth of the Grenoble University Hospital and the said related transactions COPERMO.

Framework Agreement - mono bidder: work of mastery and servicing mission - renovation of technical installations in buildings of the University Hospital of Grenoble.

CHU de Grenoble | Published February 19, 2016  -  Deadline March 31, 2016
cpvs
71221000

Under the provisions of Law No 85-704 of 12 July 1985 on the public project contracting and its relationship with the mastery of private work, and texts for its application, the provisions of this Framework Agreement concern :

Renovation Oeuvre- mastery of missions of technical installations in buildings of the University Hospital of Grenoble.

This mono-awarded framework agreement is to define the terms governing contracts concluded on the basis of said markets subsequent to the conclusion and thus to select a service provider or a group capable of conducting control of missions work for works renovation of technical facilities (power supplies and VDI networks, energy performances, heating, cooling, ventilation, water networks and medical fluids, access control systems and video surveillance) buildings Grenoble University Hospital.

It covers the total wealth of the Grenoble University Hospital.

Architectural services for buildings

CHU de Grenoble | Published December 8, 2015  -  Deadline January 13, 2016
cpvs
71221000

Under the provisions of Law No 85-704 of 12 July 1985 on the public project contracting and its relationship with the control of private works, and the texts adopted for its application, the provisions of this Framework Agreement concern : The development of oeuvre- mastery of missions and related services, restructuring and upgrading of technical installations in buildings of the University Hospital of Grenoble. This single-attribute framework agreement is to define the terms governing contracts concluded on the basis of said markets and therefore subsequent to the conclusion to select a service provider or a group capable of carrying out control missions work for works development, restructuring and renovation of technical facilities (power supplies and VDI networks, energy performances, heating, cooling, ventilation, water networks and medical fluids, access control facilities and CCTV) building of the University Hospital of Grenoble. It covers the total assets of the CHU of Grenoble.

Construction work for school buildings

CCI de Grenoble | Published October 14, 2017  -  Deadline November 9, 2017
cpvs
45214200, 45262311, 45112500, 45421000, 45261420, 45421141, 45431100, 45431200, 45442100, 45313100, 45262220, 45331000, 45330000, 45332200, 45332300, 45311200, 09332000

Construction of an energy monitoring center "Cockpit Energétique" on the site of the institute of trades and techniques.

Site installation, earthworks, infrastructure and superstructure works.

Miscellaneous works, networks and external facilities.

Curtain facade, glazed frames, enamelled glazings, locksmith, sunshades and blinds.

Sealing complexes and supports for photovoltaic panels.

Partitions and false ceilings.

Inner frames.

Waxed concrete screeds, tiles and faience.

Interior painting and facade painting.

Elevator.

Well drilling.

Heating, cooling, ventilation, sanitary plumbing and regulation.

Strong currents and weak currents

photovoltaic solar installation.

Realization of periodic regulatory controls, initial and benefits related to the facilities, equipment and premises of CEA / Grenoble and neighboring sites, including the National Institute of Solar Energy (INES) in Le Bourget-du-Lac ( 73) the platform of Saint-Etienne (42) and PRTT (CEA tech) on sites Metz, Toulouse, Bordeaux and Nantes.

CEA/Grenoble | Published February 17, 2016
Winner
Apave Sudeurope
cpvs
71630000

Benefits include the achievement of periodicals, initial regulatory controls and associated services on the facilities, the equipment and the premises of CEA / Grenoble and neighboring sites.

The materials involved are mainly:

- Lifting, handling, gear, lifts, hoists, doors and gates, lifelines,

- Gas and steam pressure vessels,

- Fume cupboards,

- Electrical installations and equipment,

- Work equipment and machinery

- Bascule bridge,

- Protective equipment against lightning.

Basic benefits are mainly:

- Checks on public buildings,

- Periodic checks and inspections of the equipment listed above,

- Annual audits of facilities classified for environmental protection,

- Updating the ATEX classification of nomination dossiers,

- Control and calibration of a weighing bascule bridge and expenses for periodic testing of lifting equipment,

- Supply and installation of controls management software to plan, monitor their development, establish budgets, indicators, statistics and extract data reports,

- Preparation accompanying notes, dissemination and archiving of audit reports,

- Details of any changes in the regulations in force with precision the impact on facilities and installations at CEA / Grenoble,

- Technical assistance and advice.

Benefits based on a schedule of unit prices are mainly:

- Initial checks of electrical installations,

- Checks before commissioning of equipment service

- Machine compliance audit.

The controls are carried out in accordance with the laws and regulations in force.

They involve i ...

Commercial ovens

CEA/Grenoble | Published December 21, 2016
cpvs
42341000

CEA / Grenoble wishes to acquire one (1) a rapid annealing furnace type RTA (Rapid Thermal Annealing) which aims heat treatment of thin film battery electrode material to improve its crystallization. The energy provided will allow to reach a temperature of 1000 ° C with ramps dismantled very fast. It will also be compatible with a clean room atmosphere.

The equipment will be installed in a clean room-type production environment on the site of STMicroelectronics in Tours, and will therefore comply with the standards in these environments.

Supply of one (1) rapid annealing furnace type "TSR" (Rapid Thermal Annealing).

Electrical materials

CEA/Grenoble | Published November 21, 2015  -  Deadline December 21, 2015
cpvs
31681410

As part of the need to secure the electricity supply of its equipment process in micro and nano electronics, CEA Grenoble wishes to make a protective chain with energy storage flywheel machines. This solution will: - rescuing a rated power of 1200kVA with minimum 15% reserve, - answer a redundancy configuration N + l with 3 machines for 1200 kVA - be extensible to N redundancy configuration + l but with 4 machines for 1800 kVA - have a backup reserve of 25 seconds minimum per machine and total autonomy of more than 35 seconds - independent cooling being, that is to say have a chilled water cooling system integrated into the machine in order to optimize the footprint, - have a lower level of power loss 6% in all configurations.