Public tenders for energy in Grenoble France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancegrenoble

Positive Energy Schools Challenge - Helps animate the Youtube channel and produce videos in schools

Grenoble-alpes metropole | Published July 10, 2018  -  Deadline July 31, 2018
cpvs

Positive Energy Schools Challenge - Helps animate the Youtube channel and produce videos in schools

Global public energy performance market for the energy renovation of the Jean Poperen space in Meyzieu (69)

Spl d'efficacite energetique | Published June 5, 2018  -  Deadline July 6, 2018
cpvs
45321000

Global public energy performance market for the energy renovation of the Jean Poperen space in Meyzieu (69)

Update and regulatory compliance of the Air Energie Climat Métropolitain Plan

Grenoble-alpes metropole | Published March 6, 2018  -  Deadline April 5, 2018
cpvs
71313000

Update and regulatory compliance of the Air Energie Climat Métropolitain Plan

Global public energy performance contract for the energy renovation of the CEP School Group in Annecy (74)

Spl d'efficacite energetique | Published January 2, 2018  -  Deadline February 2, 2018
cpvs
45321000

Global public energy performance contract for the energy renovation of the CEP School Group in Annecy (74)

Thermal insulation work

SPL d'efficacité énergétique | Published October 19, 2017
Winner
campenon Bernard Dauphine Ardeche
cpvs
45321000, 45331000, 50720000, 71320000, 71340000

The city of Grenoble has entrusted energy renovation work for three school groups at Spl Oser.

The sites will be subject to an administrative emphythotic lease.

The Spl Oser then organizes the renovation and maintenance of the buildings entrusted to it as part of a global public performance contract. The Licensee intervenes in this context and must define, on the basis of the Consultation Document submitted to it, the actions it proposes to undertake in order to achieve the targeted performance.

The performance objectives of the operation are:

- Achievement of the Bbc renovation level for the Ampère school group as a whole;

- Achievement of the Bbc renovation level for the Elisée Chatin elementary school;

- Achievement of the Bbc renovation level for the Painlève elementary school;

- a reduction in primary energy consumption.

The city of Grenoble has entrusted energy renovation work for three school groups at Spl Oser.

The sites will be subject to an administrative emphythotic lease.

The Spl Oser then organizes the renovation and maintenance of the buildings entrusted to it as part of a global public performance contract. The Licensee intervenes in this context and must define, on the basis of the Consultation Document submitted to it, the actions it proposes to undertake in order to achieve the targeted performance.

The performance objectives of the operation are:

- Achievement of the Bbc renovation level for the Ampère school group as a whole;

- Achievement of the Bbc renovation level for the Elisée Chatin elementary school;

- Achievement of the Bbc renovation level for the Painlève elementary school;

- a reduction in primary energy consumption.

Scanning electron microscopes

Universite Grenoble Alpes | Published October 18, 2017  -  Deadline November 13, 2017
cpvs
38511100, 38519000

Scanning electron microscopy, EDS detector, multi-metal metalliser and plasma cleaner.

Conventional scanning electron microscope with tungsten filament (new) + energy dispersion spectrometer (SDD-EDS) for SEM (new).

Metallizer making homogeneous and conductive deposits for samples to be analyzed in MEB or met (nine).

Plasma cleaner (new).

Construction work for school buildings

CCI de Grenoble | Published October 14, 2017  -  Deadline November 9, 2017
cpvs
45214200, 45262311, 45112500, 45421000, 45261420, 45421141, 45431100, 45431200, 45442100, 45313100, 45262220, 45331000, 45330000, 45332200, 45332300, 45311200, 09332000

Construction of an energy monitoring center "Cockpit Energétique" on the site of the institute of trades and techniques.

Site installation, earthworks, infrastructure and superstructure works.

Miscellaneous works, networks and external facilities.

Curtain facade, glazed frames, enamelled glazings, locksmith, sunshades and blinds.

Sealing complexes and supports for photovoltaic panels.

Partitions and false ceilings.

Inner frames.

Waxed concrete screeds, tiles and faience.

Interior painting and facade painting.

Elevator.

Well drilling.

Heating, cooling, ventilation, sanitary plumbing and regulation.

Strong currents and weak currents

photovoltaic solar installation.

Health and social work services

Conseil général de l'Isère | Published October 13, 2017
Winner
Ulisse énergie
cpvs
85000000

Fighting the energy insecurity of owners and tenants of the private park: implementation of a departmental department of personalized support - market reserved for the SIAE.

Fighting against the energy insecurity of the owners and tenants of the private park: implementation of a departmental department of personalized support - reserved market. Framework agreement with purchase orders with annual minimum of 11250 EUR HT and annual maximum of 45000 EUR HT. Duration of contract: 4 years.

Energy audits and non-regulatory techniques - wall / wall condominiums 2 outside period 1945/1975

Grenoble alpes metropole | Published August 7, 2017  -  Deadline September 18, 2017
cpvs

Energy and non-regulatory technical audits - MUR / MUR 2 co-ownership outside period 1945/1975

Elaboration of a strategy to mobilize and support companies in energy saving actions through experimentation in the zone of economic activity of domène

Grenoble alpes metropole | Published July 7, 2017  -  Deadline July 31, 2017
cpvs

Development of a strategy to mobilize and support companies in energy saving actions through experimentation in the Domène economic activity area

Electrical installation work

CEA/Grenoble | Published May 17, 2017  -  Deadline June 23, 2017
cpvs
45310000

Construction, equipment and connection of a new high-voltage electrical supply substation at the CEA / Grenoble site.

Construction, equipment and connection of a new high-voltage electrical supply substation at the CEA / Grenoble site.

The main projects envisaged are:

- the construction of a new building to accommodate new equipment,

- the implementation of new HTA trains and associated auxiliary equipment,

- the connection of the various HTA loops of the site with the resumption of existing connections or the realization of new HTA links.

Initial installations:

The CEA of Grenoble is supplied with electrical energy via an HTB type outdoor delivery station RTE comprising:

- a 225/15 kV transformer - TR611 - 2 * 40 MVA, the protections of which are located in the adjoining RTE source station (confluent station),

- a transformer 225/20 kV - TR613 - 70 MVA belonging to GEG whose protections are located in the RTE source station,

A transformer 225/15 kV - TR612 - 2 * 40 MVA, the protections of which are located in the adjoining RTE source station.

Two ultimate backup links are also available for an ultimate "5MW" rescue via RTE's HTA train.

Future installations:

The new building for the electric delivery station will consist of:

- a basement for the route of the HTA connections:

It will be partitioned into 5 parts in order to obtain a fire separation 2h between the different rooms under the oars,

The routing of the new loop links is studied so that there is no common path of links of the same loop.

- the path is studied so that there is no common path of connections of the different sources.

- a DRC above the flood level with:

- a HTA room A1 row,

- a HTA room rowing B1,

- a HTA room A2 row,

- a HTA room B2 train,

- one room "auxiliary trains A1 and B1"

- a room "auxiliary trains A2 and B2"

- a room "counting RTE and auxiliary buildings"

- a fire separation 2h is provided between the various premises.

- a roof gravelly terrace to provide a certain thermal comfort to the building and to meet the architectural constraints of integration.

The new HTA delivery station will consist of 4 new HTA trains:

- A1 train with 8 HTA cells,

- A2 train with 9 HTA cells,

- B1 train with 8 HTA cells,

- B2 train with 8 HTA cells.

Only the source switch between the TR611 and the TR612 is realized automatically via the automation of the RTE Confluent substation.

They will have a working voltage of 24kV.

In order to remain in compliance with the operating agreement between the CEA and RTE, the TR611 and TR612 arrival cells and the 5MW final arrivals which are RTE / ENEDIS operational will have to comply with the HN64S40 standard of October 1995 And be authorized by ENEDIS.

The owner will have to carry out all the necessary services (stripping, earthworks, hard work, second-hand work, VRD, HV, BT, TBT, control-command, participation in supervision, ventilation, air conditioning, heating, fire detection, extinction Fire, lightning protection, water supply, evacuation of EU / EV and EP, tests, etc.) for the start-up of the new substation and its insertion into the existing electricity distribution network.

Construction work

CCI de Grenoble | Published May 17, 2017
Winner
Lambda Isolation
cpvs
45000000, 45311200, 09332000, 45331110, 45330000, 45261420, 45262311, 45450000

Contracts for works performed under the project "Learning Grid by Grenoble" on the site of the Institute of Trades and Techniques, participating in the creation of a technical-pedagogical tool to simulate the functioning of a city Smart city in terms of energy performance and including the following services: 1 °) Renovation of the electrical, thermal and lighting installations identified during the diagnostic phase and for which renovation was defined during the study phase and Set up an energy metering plan. 2) Installation of equipment whose objective will be to install means of production of renewable energies and storage in order to optimize the energy consumption of the campus.

Renovation of electrical installations of strong currents and creation of a VDI network.

Complete installation of a solar photovoltaic system on the roofs of buildings B 2, B 4, B 5 and B 6.

Renovation of thermal installations and creation of cogeneration.

Recovery of waterproofing complexes and installation of photovoltaic panel supports.

Construction of the Cogeneration space and various earthworks, roads and underground networks.

Various false ceiling works, plastering, painting, flooring.

Patent and copyright consultancy services

Université Grenoble Alpes | Published May 17, 2017  -  Deadline June 20, 2017
cpvs
79120000

Industrial property attorney services for the management of inventory patents (Groupement de commande Grenoble Alpes - Polytechnic Institute of Grenoble).

Medical devices.

Signal processing - digital - computing.

Organic chemistry - therapeutic chemistry electrochemistry.

Energy materials.

Diagnosis of biomarkers.

Biotechnology - molecular biology.

Physics - mechanics - fluid mechanics.

Electronics - micro-electronics - nano-materials.

Photonics - laser optics.

Performance review services

Grenoble Alpes Métropole | Published May 17, 2017  -  Deadline June 12, 2017
cpvs
79313000, 38551000, 71314300

As part of an experimental project on Mur | Mur 2, the Métropole wishes to develop a tool allowing: - to develop monitoring "solutions" including both the equipment in the renovated buildings, the communication system between the counting instruments And the owners of the device or their delegate, as well as the computer interface allowing the management and the analysis of the databases. - to associate with these solutions a user interface allowing the latter to know precisely and up to date 1 maximum the levels of energy consumption. Based on this information, actions will be developed to "optimize" the behavior of users in their rehabilitated dwellings framework agreements concluded without minimum, with maximum and one economic operator for each lot: - lot no1 Monitoring evolved: without minimum, with Maximum fixed at 150 000 euro (s) HT-lot no2 Basic monitoring: without a minimum, with a maximum of 116 000 euro (s.

Lot 1 must fulfill the monitoring obligation imposed by the CDC within the framework of the AIP in the strict sense. The (Temporary) Instrumentation will therefore cover only collective condominiums (collectively, with the sample of dwellings). Given the level of monitoring required, it will be necessary for the service provider to propose a specific data monitoring platform (see point 4).

Lot 2 concerns "voluntary" condominiums (Mur | Mur 1 and 2) based on an interface under development. This contract will therefore cover only the installation of the instrumentation according to the same modalities as in lot No1.

Architectural services for buildings

Conseil général de l'Isère | Published April 22, 2017
cpvs
71221000, 71000000

Contest restricted on sketch. Realization in new construction of 1 building of ENV 1 120 m 2 Integrating the college reception center, school life, the teaching cluster, the arts cluster, the CDI, 3 general education rooms, 1 courtyard, 1 computer room.

Asbestos removal and partial demolition of the 1991 building of ENV 950 m 2 , Partial asbestos removal of the 1975 building on approx. 890 m 2 . Implementation of energy and cleanliness work on preserved buildings (building of 1955: excluding exterior carpentry, building of 1975: light refurbishment on env 890 m 2 ; 1991 building, non-demolished part of ENV 420 m 2 ). Building accessibility. Capacity of the college after the operation of 500 to 580 pupils.

Aménagts ext. Necessary for visibility, and for accessibility ext. Of the building. 4 400 000 MEUR HT. Duration of mission: 5 years / contract award. 4 È Trim. 2018 / delivery, commissioning 4 E Trim. 2020. Basic mission + exe 1 and 2, DIAG, SSI, signage, commissioning.

District heating

Grenoble Alpes Métropole | Published April 19, 2017  -  Deadline May 29, 2017
cpvs
09323000, 45232140, 45251250, 71321200

This is a global public market performance combining design, implementation, and maintenance operation went through a contracting entity in the relevant procedure on a competitive basis, and including some benefits to the overall price and some benefits to purchase orders.

This contract includes a part of the overall price for services (referred to as Part A mission in parts of the market):

Part A: design, construction and operation and maintenance, in a process of continuous improvement of performance, a boiler and a wood energy heating system with extra gas, serving - for their heating needs and, for some, DHW - heating consumer buildings Gières town center: municipal buildings, condominiums, businesses;

This contract further includes a portion of benefits in the form of a framework agreement to purchase orders with maximum and an economic operator (called Part B missions in parts of the market):

Part B: as part of a schedule of unit price, design, implementation and operation and maintenance during the contract period, extensions of the heating system (including substations in the future buildings subscribers) .

Architectural services for buildings

CHU de Grenoble | Published April 6, 2017
Winner
CAP Ingelec
cpvs
71221000

Under the provisions of Law No 85-704 of 12.7.1985 on the public project contracting and its relationship to private project management and texts taken for its application, the provisions of this Framework Agreement include:

The project management of tasks - upgrading of technical installations in buildings of the University Hospital of Grenoble.

This single-attribute framework agreement is to define the terms governing contracts concluded on the basis of market said subsequent conclusion and thus to select a service provider or a group which can carry out project management tasks related to work renovation of technical systems (electrical power and VDI networks, energy efficiency, heating systems, air conditioning, ventilation, water networks and medical fluids, access control systems and video surveillance) buildings Grenoble University Hospital.

Under the provisions of Law No 85-704 of 12.7.1985 on the public project contracting and its relationship to private project management and texts taken for its application, the provisions of this Framework Agreement include: the project management of tasks - upgrading of technical installations in buildings of the University Hospital of Grenoble. This single-attribute framework agreement is to define the terms governing contracts concluded on the basis of market said subsequent conclusion and thus to select a service provider or a group which can carry out project management tasks related to work renovation of technical systems (electrical power and VDI networks, energy efficiency, heating systems, air conditioning, ventilation, water networks and medical fluids, access control systems and video surveillance) buildings Grenoble University Hospital.

Global procurement energy performance for energy renovation of the elementary school Marlioz and repair of the boiler room of the kindergarten Marlioz Aix-les-Bains (73)

Spl d'efficacite energetique | Published March 30, 2017  -  Deadline May 2, 2017
cpvs
45321000

Global procurement energy performance for energy renovation of the elementary school Marlioz and repair of the boiler room of the kindergarten Marlioz Aix-les-Bains (73)

District heating

Métropole Grenoble Alpes Metropole Met | Published March 7, 2017  -  Deadline April 20, 2017
cpvs
09323000, 42511110, 45232140, 71321200

The future concession contract will be entrusted to the dealer operation, maintenance, major maintenance renewal (level 5 French nf x 60-10) of the existing main network on part of the territory of Grenoble- Alpes Métropole and heat production plants. network densification development capital expenditures (excluding Ger) are provided for an estimated amount of 86 million EUR. An incineration plant (off-contract) 4 and heat generation plants supply a mesh network in high pressure high temperature with a length of about 170 km, serving approximately 1,000 delivery points. The average amount of energy sold annually is 800,000 MWh / year. The convention will be a period of 15 years. Applicants can download the file completing this opinion (at: http://lametro.marcoweb.fr), which contains a synthetic presentation.

See II.1.4) of this notice.

Energy management and water

Semitag | Published February 21, 2017  -  Deadline March 8, 2017
cpvs
71314200

Energy management and water