Public tenders for energy in Grenoble France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancegrenoble

Architectural and related services

Actis | Published January 26, 2016
Winner
Rigassi et Associés Architectes
cpvs
71200000

Project management for the rehabilitation of two towers Marie Reynoard representing 106 social rental housing spread of R 3 to R + 15. DRC + R 1 + R 2 were converted into office areas where some work is to be performed. ACTIS has already completed the rehabilitation of housing 1000 certified BBC level Cerqual PH & E including 464 housing the Olympic Village in Grenoble and especially 2 laps identical to Reynoard towers in strict compliance with the Charter of the architectural site. The technical solutions, materials and architecture of the previous embodiment will thus largely renewed.

The work will address the following program objectives: obtain a BBC level energy performance; labeling Cerqual paragraph Heritage Habitat Environment option BBC Effinergie and respect for different repositories allowing for financing rehabilitation operations; component replacement work.

Missions required: Basic + EXE.

Complementary missions: OPC + Diagnostic + achievement of energy targets: monitoring and corrective actions for 2 + years project management asbestos.

Supply and electricity transmission and distribution to delivery points in Grenoble

grenoble alpes metropole | Published July 15, 2015  -  Deadline August 26, 2015
cpvs
09310000, 65300000

supply and delivery of electricity to the delivery points of Grenoble Alpes Métropole and SPL Water Grenoble, supplied with low voltage and high voltage and subscribed powers greater than 36 kva. Multi-attribute Framework Agreement, no minimum or maximum The Framework Agreement is passed through a group of commands whose members are Grenoble-Alpes Métropole and Local Public Water Company of Grenoble. This is sure: -The complete supply of electrical energy to all delivery points in low and high voltage. Part of the electric power can be supplied from renewable sources under the conditions defined by the Framework Agreement; -Access To the public electricity distribution network and its use for all delivery points under a single contract; -The Balance of lead audit in accordance with Article L. 321-15 of the Code of energy. It is specified that the PDL power lower than 36kVA Grenoble-Alpes Métropole only (excluding control group) are the subject of a separate consultation. If necessary, the volume, shape (alternative service or tranches) and encryption methods of the tariff option "renewable electricity certified guarantee of origin" will be set for each subsequent market during the restoration competition holders.

Electricity

Grenoble Alpes Métropole | Published July 18, 2015  -  Deadline August 26, 2015
cpvs
09310000, 65300000

Supply and delivery of electricity for delivery points of Grenoble Alpes Métropole and SPL Water Grenoble supplied at low voltage and high voltage and subscribed to powers greater than 36 kVA. Multi-attribute framework agreement, no minimum or maximum amount. The framework agreement is passed through a group of commands whose members are Grenoble-Alpes Métropole and the local public company Eau de Grenoble. This is to ensure: - providing complete electrical energy of all delivery points during low and high voltage. Part of the electric power can be supplied from renewable sources under the conditions defined by the Framework Agreement, - access to the public electricity distribution network and its use for all delivery points in the under a single contract, - the equilibrium lead audit in accordance with Article L. 321-15 of the Code of energy. It is specified that the PDL power lower than 36 kVA of Grenoble-Alpes Métropole only (excluding control group) are the subject of a separate consultation. If necessary, the volume, shape (alternative service or conditional phases) and encryption methods of the tariff option "renewable electricity certified guarantee of origin" will be set for each subsequent market during the restoration competition holders.

Commercial ovens

CEA/Grenoble | Published December 21, 2016
cpvs
42341000

CEA / Grenoble wishes to acquire one (1) a rapid annealing furnace type RTA (Rapid Thermal Annealing) which aims heat treatment of thin film battery electrode material to improve its crystallization. The energy provided will allow to reach a temperature of 1000 ° C with ramps dismantled very fast. It will also be compatible with a clean room atmosphere.

The equipment will be installed in a clean room-type production environment on the site of STMicroelectronics in Tours, and will therefore comply with the standards in these environments.

Supply of one (1) rapid annealing furnace type "TSR" (Rapid Thermal Annealing).

Electrical materials

CEA/Grenoble | Published November 21, 2015  -  Deadline December 21, 2015
cpvs
31681410

As part of the need to secure the electricity supply of its equipment process in micro and nano electronics, CEA Grenoble wishes to make a protective chain with energy storage flywheel machines. This solution will: - rescuing a rated power of 1200kVA with minimum 15% reserve, - answer a redundancy configuration N + l with 3 machines for 1200 kVA - be extensible to N redundancy configuration + l but with 4 machines for 1800 kVA - have a backup reserve of 25 seconds minimum per machine and total autonomy of more than 35 seconds - independent cooling being, that is to say have a chilled water cooling system integrated into the machine in order to optimize the footprint, - have a lower level of power loss 6% in all configurations.

Modular associative local angle car park street m. Dodero and. musset of Grenoble

ville de grenoble. | Published February 28, 2015  -  Deadline March 23, 2015
cpvs

Modular local associative Parking corner of Mr. Dodero and A. De Musset. Lot No. 01: Modular Construction - 15a053 market. Lot No. 02: vrd - 15a054 market. Lot No 03: Plantations - furniture - 15a055 market. Main Features: the transaction was a development of associative local form of construction of a modular building at the corner of Rue Maurice Dodero and Alfred de Musset, the existing parking. It will include: - the development of a modular building with an area of ​​250 m2, meeting architectural objectives and energy performance with the achievement of its foundations and connections to various networks (electricity, water, currents low) - access development and surrounding the building. . Ordinary separate market

Patent and copyright consultancy services

Université Grenoble Alpes | Published May 17, 2017  -  Deadline June 20, 2017
cpvs
79120000

Industrial property attorney services for the management of inventory patents (Groupement de commande Grenoble Alpes - Polytechnic Institute of Grenoble).

Medical devices.

Signal processing - digital - computing.

Organic chemistry - therapeutic chemistry electrochemistry.

Energy materials.

Diagnosis of biomarkers.

Biotechnology - molecular biology.

Physics - mechanics - fluid mechanics.

Electronics - micro-electronics - nano-materials.

Photonics - laser optics.

Realization of periodic regulatory controls, initial and benefits related to the facilities, equipment and premises of CEA / Grenoble and neighboring sites, including the National Institute of Solar Energy (INES) in Le Bourget-du-Lac ( 73) the platform of Saint-Etienne (42) and PRTT (CEA tech) on sites Metz, Toulouse, Bordeaux and Nantes.

CEA/Grenoble | Published February 17, 2016
Winner
Apave Sudeurope
cpvs
71630000

Benefits include the achievement of periodicals, initial regulatory controls and associated services on the facilities, the equipment and the premises of CEA / Grenoble and neighboring sites.

The materials involved are mainly:

- Lifting, handling, gear, lifts, hoists, doors and gates, lifelines,

- Gas and steam pressure vessels,

- Fume cupboards,

- Electrical installations and equipment,

- Work equipment and machinery

- Bascule bridge,

- Protective equipment against lightning.

Basic benefits are mainly:

- Checks on public buildings,

- Periodic checks and inspections of the equipment listed above,

- Annual audits of facilities classified for environmental protection,

- Updating the ATEX classification of nomination dossiers,

- Control and calibration of a weighing bascule bridge and expenses for periodic testing of lifting equipment,

- Supply and installation of controls management software to plan, monitor their development, establish budgets, indicators, statistics and extract data reports,

- Preparation accompanying notes, dissemination and archiving of audit reports,

- Details of any changes in the regulations in force with precision the impact on facilities and installations at CEA / Grenoble,

- Technical assistance and advice.

Benefits based on a schedule of unit prices are mainly:

- Initial checks of electrical installations,

- Checks before commissioning of equipment service

- Machine compliance audit.

The controls are carried out in accordance with the laws and regulations in force.

They involve i ...

District heating

Métropole Grenoble Alpes Metropole Met | Published March 7, 2017  -  Deadline April 20, 2017
cpvs
09323000, 42511110, 45232140, 71321200

The future concession contract will be entrusted to the dealer operation, maintenance, major maintenance renewal (level 5 French nf x 60-10) of the existing main network on part of the territory of Grenoble- Alpes Métropole and heat production plants. network densification development capital expenditures (excluding Ger) are provided for an estimated amount of 86 million EUR. An incineration plant (off-contract) 4 and heat generation plants supply a mesh network in high pressure high temperature with a length of about 170 km, serving approximately 1,000 delivery points. The average amount of energy sold annually is 800,000 MWh / year. The convention will be a period of 15 years. Applicants can download the file completing this opinion (at: http://lametro.marcoweb.fr), which contains a synthetic presentation.

See II.1.4) of this notice.

Architectural and related services

OPAC 38 | Published December 13, 2016  -  Deadline January 10, 2017
cpvs
71200000, 71300000

Preprogrammed forward work: cleaning and waterproofing of walls and replacement of external joinery.

Estimated budget works: € 3,247,000 excluding VAT.

predictable start of study: April 2017.

anticipated start of work: September 2018.

Composition / team skills required: Architect (team leader) - construction economics - Thermal fluids - OPC.

It is not sought exclusive design offices.

Mission: Technical and energy audit, MOP law base and performance and OPC studies: it is stated that each mission will be a subsequent contract.

The first subsequent market include diagnostic studies. It will eventually be followed by a second subsequent contract with the core mission "MOP law" and performance studies, and also include the fund.

associated work and services of mastery mission - planning, restructuring and renovation of technical installations in buildings CHU Grenoble Alpes.

CHU de Grenoble | Published March 5, 2016  -  Deadline April 12, 2016
cpvs
71221000

In accordance with the law number 85-704 07.12.1985 on the public project contracting and its relationship with the mastery of private work, and texts for its application, the provisions of this Framework Agreement concern :

Oeuvre- development of mastering the tasks and associated services, restructuring and renovation of technical installations in buildings Grenoble University Hospital.

This multi-awarded framework agreement is to define the terms governing contracts concluded on the basis of said markets subsequent to the conclusion and thus to select a service provider or a group capable of conducting control of missions work for works development, restructuring and renovation of technical facilities (power supplies and VDI networks, energy performances, heating, cooling, ventilation, water networks and medical fluids, access control facilities and video surveillance) buildings of the University Hospital of Grenoble. It covers the total wealth of the Grenoble University Hospital and the said related transactions COPERMO.

Framework Agreement - mono bidder: work of mastery and servicing mission - renovation of technical installations in buildings of the University Hospital of Grenoble.

CHU de Grenoble | Published February 19, 2016  -  Deadline March 31, 2016
cpvs
71221000

Under the provisions of Law No 85-704 of 12 July 1985 on the public project contracting and its relationship with the mastery of private work, and texts for its application, the provisions of this Framework Agreement concern :

Renovation Oeuvre- mastery of missions of technical installations in buildings of the University Hospital of Grenoble.

This mono-awarded framework agreement is to define the terms governing contracts concluded on the basis of said markets subsequent to the conclusion and thus to select a service provider or a group capable of conducting control of missions work for works renovation of technical facilities (power supplies and VDI networks, energy performances, heating, cooling, ventilation, water networks and medical fluids, access control systems and video surveillance) buildings Grenoble University Hospital.

It covers the total wealth of the Grenoble University Hospital.

Architectural services for buildings

CHU de Grenoble | Published December 8, 2015  -  Deadline January 13, 2016
cpvs
71221000

Under the provisions of Law No 85-704 of 12 July 1985 on the public project contracting and its relationship with the control of private works, and the texts adopted for its application, the provisions of this Framework Agreement concern : The development of oeuvre- mastery of missions and related services, restructuring and upgrading of technical installations in buildings of the University Hospital of Grenoble. This single-attribute framework agreement is to define the terms governing contracts concluded on the basis of said markets and therefore subsequent to the conclusion to select a service provider or a group capable of carrying out control missions work for works development, restructuring and renovation of technical facilities (power supplies and VDI networks, energy performances, heating, cooling, ventilation, water networks and medical fluids, access control facilities and CCTV) building of the University Hospital of Grenoble. It covers the total assets of the CHU of Grenoble.

Construction work for school buildings

CCI de Grenoble | Published October 14, 2017  -  Deadline November 9, 2017
cpvs
45214200, 45262311, 45112500, 45421000, 45261420, 45421141, 45431100, 45431200, 45442100, 45313100, 45262220, 45331000, 45330000, 45332200, 45332300, 45311200, 09332000

Construction of an energy monitoring center "Cockpit Energétique" on the site of the institute of trades and techniques.

Site installation, earthworks, infrastructure and superstructure works.

Miscellaneous works, networks and external facilities.

Curtain facade, glazed frames, enamelled glazings, locksmith, sunshades and blinds.

Sealing complexes and supports for photovoltaic panels.

Partitions and false ceilings.

Inner frames.

Waxed concrete screeds, tiles and faience.

Interior painting and facade painting.

Elevator.

Well drilling.

Heating, cooling, ventilation, sanitary plumbing and regulation.

Strong currents and weak currents

photovoltaic solar installation.

Architectural services for buildings

CHU de Grenoble | Published February 1, 2017
Winner
Cabinet Patriarche
cpvs
71221000

In accordance with the law number 85-704 of 12 July 1985, this Framework Agreement is: The development of Oeuvre- mastering tasks and related services, restructuring and renovation

building systems of Grenoble University Hospital.

This framework agreement multi-attribute aims to define the terms governing contracts to be concluded subsequent and therefore select a provider or a group

MOE can conduct missions on development works, restructuring and

upgrading of technical equipment (power supplies and VDI networks, energy performance,

heating, cooling, ventilation, water networks and medical fluids,

access control systems and video surveillance) buildings of the University Hospital of Grenoble. It focuses on the heritage

total of Grenoble University Hospital and the said related transactions COPERMO.

This framework agreement multi-attribute aims to define the terms governing contracts to be concluded subsequent and therefore select a provider or a group

which can carry out project management tasks related to development work, restructuring and

upgrading of technical equipment (power supplies and VDI networks, energy performance,

heating, cooling, ventilation, water networks and medical fluids,

access control systems and video surveillance) buildings of the University Hospital of Grenoble. It focuses on the heritage

total of Grenoble University Hospital and the said related transactions Copermo.

Architectural, construction, engineering and inspection services

CEA/Grenoble | Published October 1, 2015  -  Deadline October 22, 2015
cpvs
71000000

10.05 The building gradually converts to accompany the development of nanoscience on the Minatec campus and tends to become a "project nursery" Minatec Labs to explore the upstream of information technology, health and energy . The headquarters building of this project, no longer reflects the new design turned to new technologies: the thermal quality of the building is poor, it corresponds to the achievements of 60/70. This is to rethink the exterior building envelope to combine respect for the architectural expression, thermal improvement and development of accessibility; so that it integrates with the rest of the site, especially at Minatec, and so meets his new vocation in today's regulatory environment and in accordance with specific features of the CEA. 10.05 The building has more than 3 storeys (this varies according to the wing and the area concerned). Work therefore be to achieve: - renovation and thermal treatment of the facades to improve the energy performance of the building and the comfort of users, - creating a vertical serving all floors of the building including spaces usability. A study is also required to improve the accessibility of inputs 2 south end of the building. Continuity of service activities and research should be ensured during construction (works in occupied site). The mission entrusted to the supervisor is a basic mission within the meaning of Law No 85-704 of 07/12/1985 and Decree n ° 93-1268 of 29.11.1993 on project management tasks entrusted by masters of public work to private law providers, and the decree of 21.12.1993 specifying the technical procedures for implementing the mission elements of project management, including basic mission elements and complementary missions: DIAG , APS, APD, PRO, ACT, EXE / SYN, DET, OPC, AOR until the end of the year of perfect completion. The market will include a firm phase and an optional slice specifically described below: - the firm phase corresponds to the design phase, it includes the following mission elements: DIAG, APS, APD, PRO (including establishment of the license file build PC), ACT (until tender documents business "DCE"). It includes the following mission elements: ACT (from DCE), EXE / SYN, DET, OPC, AOR until the end of the year of perfect completion. Tenders will be selected on sketch (ESQ). It will ask the master contractor to study three scenarios: - scenario 1: no asbestos (unless necessary for the creation of vertical coverage) and better address the thermal and aesthetics, - Scenario 2 : asbestos removal without full façade, with at minimum the replacement of the doors of all the woodwork (without removal of dormant) and the replacement of fixed joinery (including the asbestos removal), - Scenario 3: including a total asbestos removal façades for the complete replacement of the entire joinery (opening + dormant). In the latter scenario, the renovation is to remove all asbestos materials present in the composition of building facades. A number of options may be made and clarified as necessary in the tender documents. The expected duration of the basic mission is estimated to be: - for the firm phase: six months. - Optional tranche for 30 months as part of the scenario # 3 most complex, time related to the guarantee of perfect completion are included.

Architectural, construction, engineering and inspection services

SPLA Sages | Published November 21, 2015  -  Deadline January 12, 2016
cpvs
71000000

As part of the urban reflection on the redevelopment of the ZAC Flaubert in Grenoble of 90 hectares, the framework agreement is primarily intended to: - define the main principles of organization and sustainable urban composition that will guide and oversee future developments in terms of landscape and urban structure, viaire mesh and circulations, configuration of public spaces, urban shapes and buildability and to identify and localize major functional vocations of the site - set the terms and implement a co-construction process of the urban project throughout the implementation of the operation: ability to identify and mobilize project holders and all stakeholders on a local urban territory, communicate and consult locally, to lead this work with appropriate methodological tools and finding concrete proposals of urban project - to integrate and translate the principles of the energy and ecological transition - to ensure operational monitoring of the implementation of real estate developments of the operation: landscape, urban and general and specific architectural requirements, help with selection of architectural projects and operators, development of real estate projects (PC visa mission ...). It is stated that the mission of the group stops to produce a detailed outline of public and private spaces, and for general landscaping requirements and detailed, other mission elements (Mop law) being provided by another provider already appointed.

X-ray inspection equipment

CEA/Grenoble | Published October 9, 2015
Winner
Bruker Axs
cpvs
38582000

CEA / LETI wants to equip a standard X-ray diffraction equipment to two circles to meet the needs of materials characterization pole of Optics and Photonics Department. This equipment, which will be operated self-service for different users, aims to provide a simple characterization but with excellent resolution. It is therefore expected a more automated equipment possible requiring the least possible human intervention. It must have the ability to cover the following measurement techniques: - mapping in double diffraction X mode - high resolution diffraction (HRXRD) - X-ray reflectivity There must be equipped mainly as follows: - a photon source having energy around 8keV, - an efficient detection system allowing rapid acquisitions and thin films - a goniometer 2 circles and adapted to provide optical characterizations required, - a sample holder allowing translations in X, Y and Z This equipment will be used in the Search programs Nanosciences, Nanotechnologies in Micro- and. This equipment will be installed at CEA / Grenoble. Required delivery date: imperatively before 12/18/2015

X-ray inspection equipment

CEA/Grenoble | Published June 26, 2015  -  Deadline July 28, 2015
cpvs
38582000

CEA / LETI wants to equip a standard X-ray diffraction equipment 2 circles to meet the needs of the optical characterization of materials Department pole and photonics. This equipment, which will be operated self-service for different users, aims to offer a simple characterization but with excellent resolution. It is therefore expected a more automated equipment possible requiring the least possible human intervention. It must have the ability to cover the following measurement techniques: - mapping in double diffraction X mode - high resolution diffraction (HRXRD) - X-ray reflectivity It must be equipped mainly as follows: - a photon source having energy around 8 keV - an efficient detection system for rapid acquisitions and thin films - a goniometer 2 circles and adapted to provide optical characterizations required, - a sample holder allowing shift in X, Y and Z. This equipment will be used in the context of nanoscience research programs in micro and nanotechnology. This equipment will be installed at CEA / Grenoble. Required delivery date: imperatively before 12/18/2015

District heating

Grenoble Alpes Métropole | Published April 19, 2017  -  Deadline May 29, 2017
cpvs
09323000, 45232140, 45251250, 71321200

This is a global public market performance combining design, implementation, and maintenance operation went through a contracting entity in the relevant procedure on a competitive basis, and including some benefits to the overall price and some benefits to purchase orders.

This contract includes a part of the overall price for services (referred to as Part A mission in parts of the market):

Part A: design, construction and operation and maintenance, in a process of continuous improvement of performance, a boiler and a wood energy heating system with extra gas, serving - for their heating needs and, for some, DHW - heating consumer buildings Gières town center: municipal buildings, condominiums, businesses;

This contract further includes a portion of benefits in the form of a framework agreement to purchase orders with maximum and an economic operator (called Part B missions in parts of the market):

Part B: as part of a schedule of unit price, design, implementation and operation and maintenance during the contract period, extensions of the heating system (including substations in the future buildings subscribers) .