Public tenders for energy in Grenoble France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancegrenoble

Scanning electron microscopes

Institut polytechnique de Grenoble | Published October 16, 2015
Winner
Eden Instruments
cpvs
38511100

Purchase and maintenance of a system diffraction analysis of backscattered electrons (EBSD) coupled to a system of X-ray microanalysis with energy spectrometry (EDS).

Business services: law, marketing, consulting, recruitment, printing and security

ACTIS | Published October 7, 2015
Winner
ALTRA Consulting
cpvs
79000000

Appointment of a service provider - consulting for relief from property tax for energy-saving work.

Scanning electron microscopes

Institut polytechnique de Grenoble | Published July 4, 2015  -  Deadline September 14, 2015
cpvs
38511100

Purchase and maintenance of a diffraction analysis of backscattered electron system (EBSD) coupled to a system of X-ray microanalysis by energy spectrometry (EDS).

support mission to the thermal and energy renovation of private dwellings in the metropolitan area as part of the campaign MUR MUR-2.

Grenoble Alpes Métropole | Published March 2, 2016  -  Deadline April 18, 2016
cpvs
71241000, 71242000, 71314300, 71541000

The object of the contract is the animated-monitoring mission of general interest program "Wall | Wall 2" to condominiums 1945-1975 Greater Montréal prompting the latter to carry out thermal improvement work. The objective is the treatment of housing by 5000 the implementation of a strengthened support of owners and their representative bodies (trustee, union council and union co-owners). This support comprises strategy implemented in each condominium, the mobilization of local aid and any specific administrative and financial assistance for the installation of collective subsidy application files (aid for trade unions) and individual (individual aid) and to applications of suitable premises loans. Animation-monitoring mission also aims to support the vote of the works included in the condominium device in the Wall | Wall 2 after a phase of information and mobilization which will be provided by Alec. Formally, the work of the operator in charge of monitoring and entertainment will begin once the supervisor appointed by the positive vote of the General Assembly.

Update and regulatory compliance of the Air Energie Climat Métropolitain Plan

Grenoble-alpes metropole | Published March 6, 2018  -  Deadline April 5, 2018
cpvs
71313000

Update and regulatory compliance of the Air Energie Climat Métropolitain Plan

Health and social work services

Conseil général de l'Isère | Published October 13, 2017
Winner
Ulisse énergie
cpvs
85000000

Fighting the energy insecurity of owners and tenants of the private park: implementation of a departmental department of personalized support - market reserved for the SIAE.

Fighting against the energy insecurity of the owners and tenants of the private park: implementation of a departmental department of personalized support - reserved market. Framework agreement with purchase orders with annual minimum of 11250 EUR HT and annual maximum of 45000 EUR HT. Duration of contract: 4 years.

Construction work

CCI de Grenoble | Published January 26, 2017  -  Deadline February 27, 2017
cpvs
45000000, 45311200, 09332000, 45331110, 45330000, 45261420, 45262311, 45450000

Markets for work benefits as part of the project "Learning Grid by Grenoble" on the website of the Institute of business and technology, participating in the creation of a technical educational tool to simulate the operation of a city smart (smart City) in energy performance and includes the following services:

1. Renovation of electrical, thermal and lighting identified in the diagnostic phase and for which the renovation was defined in the study phase and establish an energy metering plan;

2. Installation of the equipment with the objective of installing means of renewable energy production and storage to optimize the energy consumption of the campus.

Renovation of electrical installations strong currents and creating a VDI network.

completion of a solar photovoltaic system on the roofs of buildings B 2, B 4, B 5 and B 6.

Renovation of thermal installations and creation of a cogeneration.

Resumption of sealing complex and poses photovoltaic materials.

Construction of local cogeneration and various earthworks, roads and underground networks.

Various false ceiling, plastering, painting, floor covering.

Research and testing facilities construction work

CEA/Grenoble | Published October 7, 2016  -  Deadline November 4, 2016
cpvs
45214620

The approach taken is based on the establishment of an operational basis, pilot site for energy independence in everyday life, which will consist of a chain of mature organs of generation, storage and management of energy and will be representative actual uses around a commercial building (named TOTEM) and vehicle fleet used every day of the year. The operational base will serve as a base for R & D projects: developing technologies will be introduced in parallel of these bodies, which will evaluate their performance by providing a test environment (inputs and outputs) of the profiles representative uses a feedback on the long term and provide the opportunity to conduct comparative evaluations equivalent function compared to mature bodies of the operational base. The market will focus on the design and implementation of construction works of Totem Building, built-in energy (technical modules required for the autonomy of the building), production sources, energy storage capacities and infrastructure expectations necessary for the realization of R & D projects. The market will also focus on the implementation of the permit application to build and integration of back of the building and its annexes in the court of technologies (carried out as part of another construction operation on the same site). Totem building will represent a total surface area of ​​about 520 m 2 SDP spread over 2 floors as well as a functional roof dedicated to photovoltaics. This surface will integrate all its technical features.

Research and testing facilities construction work

CEA/Grenoble | Published October 29, 2016  -  Deadline November 4, 2016
cpvs
45214620

CEA Tech plans to create at the entrance to his Labège an iconic infrastructure to develop but also to validate the scale 1 innovative technologies in response to the challenges of digital and energy transitions.

Research and testing facilities construction work

CEA/Grenoble | Published October 7, 2016
cpvs
45214620

The approach taken is based on the establishment of an operational basis, pilot site for energy independence in everyday life, which will consist of a chain of mature organs of generation, storage and management of energy and will be representative actual uses around a commercial building (named Totem) and vehicle fleet used every day of the year. The operational base will serve as a base for R & D projects: developing technologies will be introduced in parallel of these bodies, which will evaluate their performance by providing a test environment (inputs and outputs) of the profiles representative uses a feedback on the long term and provide the opportunity to conduct comparative assessments to equivalent function compared to mature bodies of the operational base.

Electricity supplies

Université Joseph Fourier | Published January 13, 2016
Winner
Régie Gaz Electricité Bonneville
cpvs
31682000

Supply and delivery of electric energy and related services. Contract awarded framework agreement in order grouping between institutions Joseph Fourier University (also coordinator of the group), University Pierre Mendes France, Stendhal University, Comue "Grenoble Alpes university" and Institute of Political Studies in Grenoble.

Electricity supplies

Université Joseph Fourier | Published September 5, 2015  -  Deadline October 12, 2015
cpvs
31682000

Supply and delivery of electric energy and related services framework agreement Contract award orders grouping between institutions University Joseph Fourier (also coordinator of the group), University Pierre Mendes France, Université Stendhal, COMUE "Université Grenoble Alpes' and Institute 'Political Studies in Grenoble.

Construction work

CCI de Grenoble | Published May 17, 2017
Winner
Lambda Isolation
cpvs
45000000, 45311200, 09332000, 45331110, 45330000, 45261420, 45262311, 45450000

Contracts for works performed under the project "Learning Grid by Grenoble" on the site of the Institute of Trades and Techniques, participating in the creation of a technical-pedagogical tool to simulate the functioning of a city Smart city in terms of energy performance and including the following services: 1 °) Renovation of the electrical, thermal and lighting installations identified during the diagnostic phase and for which renovation was defined during the study phase and Set up an energy metering plan. 2) Installation of equipment whose objective will be to install means of production of renewable energies and storage in order to optimize the energy consumption of the campus.

Renovation of electrical installations of strong currents and creation of a VDI network.

Complete installation of a solar photovoltaic system on the roofs of buildings B 2, B 4, B 5 and B 6.

Renovation of thermal installations and creation of cogeneration.

Recovery of waterproofing complexes and installation of photovoltaic panel supports.

Construction of the Cogeneration space and various earthworks, roads and underground networks.

Various false ceiling works, plastering, painting, flooring.

A configurable stationary electrochemical storage.

CEA/Grenoble | Published February 6, 2016  -  Deadline February 29, 2016
cpvs
31430000

Platform CEA Tech Aquitaine wishes to purchase a stationary storage device with a capacity of 30 kW with the following capabilities:

- Connectable to the network (380V AC)

- With a bidirectional energy exchange function,

- Allows the implementation of Li-ion batteries (eg LFP - 26650 format),

- Can manage a mixed batteries of different chemistry,

- Dynamic balancing the floors of cells within the battery pack,

- Isolate dynamic stages of defective cells, exhausted or overheated, and during operation to ensure continuity of service,

- To generate some form of analog output voltage (Bandwidth ≥ 50 kHz), discrete increments of 5V maximum.

This equipment will be installed on the energy platform of the CEA Tech Aquitaine antenna.

Supply and delivery of electricity to the sites of Grenoble Alpes Métropole power less than 36 kva

grenoble alpes metropole | Published July 20, 2015  -  Deadline August 26, 2015
cpvs
09310000, 65300000

supply and electricity transmission and distribution to delivery points Grenoble-Alpes Métropole supplied with low voltage subscribed power less than 36 kva. Multi-attribute Framework Agreement, no minimum or maximum amount It is sure: -The complete supply electrical energy for all low voltage delivery points. Part of the electric power can be supplied from renewable sources in the appropriate conditions will be defined by the framework agreement and subsequent markets, and will be the subject of a specific tariff option (in the form of an alternative service or a conditional phase); -Access To the public electricity distribution network and its use for all delivery points under a single contract; -The Balance of lead audit in accordance with Article L. 321-15 of the Code of energy. It is stated that the points of equal power delivery to or greater than 36kVA are subject to a separate consultation as part of a command group between Grenoble-Alpes Métropole and Local Public Water Company of Grenoble.

Electricity

Grenoble-Alpes Métropole | Published July 22, 2015  -  Deadline August 26, 2015
cpvs
09310000, 65300000

Supply and delivery of electricity for Grenoble-Alpes Métropole delivery points supplied with low voltage subscribed powers lower than 36 kva. Framework Agreement multi-attribute, no minimum or maximum amount This is to ensure: - complete supply electrical energy for all low voltage delivery points. Part of the electric power can be supplied from renewable sources under the conditions if any will be defined by the framework agreement and subsequent markets, and will be the subject of a specific tariff option (in the form of an alternative service or a conditional phase); - Access to the public electricity distribution network and its use for all delivery points under a single contract; - The equilibrium lead audit in accordance with Article L. 321-15 of the Code of energy. it is specified that the points of equal power delivery 36kva or above are subject to a separate consultation as part of a command group between Grenoble-Alpes Métropole and Local Public Water Company of Grenoble.

Installation of road lighting equipment

Ville de Grenoble | Published June 24, 2015
Winner
Groupement alcyon/EEE Alpes Dauphiné (Citéos)/Vinci énergies/Bouygues énergies et services
cpvs
45316110, 50232100, 31527200, 45316100, 50232110

Design and implementation of modernization of rehabilitation, operation and maintenance of public lighting installations. The perimeter door, to date, on: - 384 cabinets, including 364 positions in cabinets or conduct (330 meters posed); - 18 3 200v transformers buried pipe; - 2 posts 20 source 000v / 200v 3 driving; - 17 800 light street lighting homes. This contract also includes the installation and removal of Christmas lights. This is a contract with performance requirements relating in particular to the control of energy expenditure and quality of service.

Scanning electron microscopes

Universite Grenoble Alpes | Published October 18, 2017  -  Deadline November 13, 2017
cpvs
38511100, 38519000

Scanning electron microscopy, EDS detector, multi-metal metalliser and plasma cleaner.

Conventional scanning electron microscope with tungsten filament (new) + energy dispersion spectrometer (SDD-EDS) for SEM (new).

Metallizer making homogeneous and conductive deposits for samples to be analyzed in MEB or met (nine).

Plasma cleaner (new).

Architectural and related services

Actis | Published January 26, 2016  -  Deadline March 2, 2016
cpvs
71200000

- Project management for the Rehabilitation of a home dwelling people aged 64 rooms located 56 rue Saint Laurent in Grenoble, actis of property managed by the CCAS From Grenoble.

This is a R + 8 building. The useful area is 3642 square meters.

Note that some levels (ground floor and 5th floor) of the building are classified ERP 5th category (offices - multipurpose rooms and restaurant)

provisional program is available as follows:

- Improving the energy performance of the building

- Fire safety

- Accessibility of public areas

- Various technical improvements on the frame and plumbing systems

requested tasks:

BASE and EXE -

Complementary missions:

OPC -

Fluid Diagnostics: heating, waste stack, SSI, notamment-

achievement of Energy Objectives: Monitoring and corrective actions for 2 years -

Asbestos mission.

Architectural and related services

Actis | Published January 26, 2016
Winner
Rigassi et Associés Architectes
cpvs
71200000

Project management for the rehabilitation of two towers Marie Reynoard representing 106 social rental housing spread of R 3 to R + 15. DRC + R 1 + R 2 were converted into office areas where some work is to be performed. ACTIS has already completed the rehabilitation of housing 1000 certified BBC level Cerqual PH & E including 464 housing the Olympic Village in Grenoble and especially 2 laps identical to Reynoard towers in strict compliance with the Charter of the architectural site. The technical solutions, materials and architecture of the previous embodiment will thus largely renewed.

The work will address the following program objectives: obtain a BBC level energy performance; labeling Cerqual paragraph Heritage Habitat Environment option BBC Effinergie and respect for different repositories allowing for financing rehabilitation operations; component replacement work.

Missions required: Basic + EXE.

Complementary missions: OPC + Diagnostic + achievement of energy targets: monitoring and corrective actions for 2 + years project management asbestos.