Call +44 800 9755 164

Public tenders for energy in Grenoble France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancegrenoble

Energy management and water

Semitag | Published February 21, 2017  -  Deadline March 8, 2017
cpvs
71314200

Energy management and water

Study for the construction of the energy transition of the Metropolis Grenoble

grenoble alpes metropole | Published March 27, 2015  -  Deadline May 6, 2015
cpvs
71241000, 71314200

Grenoble-Alpes Métropole put new skills in the field of energy, from the metropolis transition to 1 January 2015, according to the law of 27 January 2014 (49 municipalities, 450,000 inhabitants). The transfer of these skills gives the Metropole status of organizing authority of the power distribution within its territory. It appears as the relevant level to implement energy transition. The consultation therefore aims to empower and support the Metro to build the energy transition of its territory. Benefits will divide as follows: 1- main services divided into three tasks: A - Mission "Blueprint of energy" B- Mission "public service of energy" (in 5 parts including a flap (B5) to conditional phase) C- Mission "Dialogue with citizens" 2 additional benefits, with no minimum maximum € 50,000 (excluding VAT). All services are detailed in the specifications.

Energy conversion of boiler Dean Gosse building

universite pierre-mendes-france | Published June 2, 2015  -  Deadline June 29, 2015
cpvs

Energy conversion of boiler room of the building Doyen Gosse. Lot 1: Asbestos: Works include dismantling and evacuation of three existing gas boilers of the boiler as part of an asbestos removal plan,

Global procurement energy performance for energy renovation of the elementary school Marlioz and repair of the boiler room of the kindergarten Marlioz Aix-les-Bains (73)

Spl d'efficacite energetique | Published March 30, 2017  -  Deadline May 2, 2017
cpvs
45321000

Global procurement energy performance for energy renovation of the elementary school Marlioz and repair of the boiler room of the kindergarten Marlioz Aix-les-Bains (73)

Benefits characterization by high energy ion beams.

CEA/Grenoble | Published November 13, 2014  -  Deadline December 15, 2014
cpvs
71620000

As part of his research on the subject of micro and nanotechnologies, CEA-Grenoble wishes to achieve benefits characterization by high energy ion beams on materials and devices from its own manufacturing units, or those of its industry partners. The expected information on the chemical composition or crystal structure is essential to qualify and improve production processes. The annual number of measures to realize is estimated at 250. The contract for a fixed term of two years may be extended for another 12 months.

Steam generator renewal laundry and energy optimization, Laundry GCS-Alpes Health Echirolles

chu de grenoble | Published September 10, 2015  -  Deadline October 7, 2015
cpvs
42162000

Steam generator renewal laundry and energy optimization - File No. 15E6F052

energy control work assistance for the implementation of thermal renovation projects 'copies' of the wall device / wall 2

Metropole grenoble alpes metropole met | Published July 27, 2016  -  Deadline September 12, 2016
cpvs

energy control work assistance for the implementation of thermal renovation projects 'copies' of the MUR / MUR 2 device

Elaboration of a strategy to mobilize and support companies in energy saving actions through experimentation in the zone of economic activity of domène

Grenoble alpes metropole | Published July 7, 2017  -  Deadline July 31, 2017
cpvs

Development of a strategy to mobilize and support companies in energy saving actions through experimentation in the Domène economic activity area

mastery of work assignments for thermal operations and improving energy conversion occupied site, the group "The Moras" and "Starlings", located in the municipality of Villefontaine. Framework agreements without minimum and maximum and a trader.

OPAC 38 | Published March 11, 2016  -  Deadline April 8, 2016
cpvs
71200000

project management assignments for thermal operations and improving energy conversion:

Lot 01: Villefontaine "The Moras' thermal energy conversion improvement and occupied site, 98 dwellings.

Pre-program work forward: Energy conversion, electrical safety development work of housing, recovery balconies, insulation of facades subject diagnosis, checking the VMC, partial recoveries coated. predictable start of study: June 2016.

Composition / skills required of the team: architect (team leader) - construction economics - Fluid CVS - electricity - OPC.

It is not sought exclusive design offices. Mission: diagnosis, EXE + base + OPC: It is stated that each mission will be a subsequent contract.

Lot 02: Villefontaine "The Starlings' thermal study with improvement in energy conversion occupied site, 134 dwellings.

Pre-planned works program: study of energy conversion, facades, roofing, joinery, VMC, collective parables, setting electrical safety, fire safety. predictable start of study: June 2016.

Composition / skills required of the team: architect (team leader) - construction economics - Fluid CVS - electricity - OPC.

It is not sought exclusive design offices. Mission: diagnosis, EXE + base + OPC: It is stated that each mission will be a subsequent contract.

Architectural, construction, engineering and inspection services

Communauté d'agglomération Grenoble Alpes Métropole | Published April 6, 2016  -  Deadline May 12, 2016
cpvs
71000000, 71323200

management contract of work for the realization of the new heat production unit (NUP) using biomass to:

- Meet the evolving energy needs resulting from the development of this sector,

- Compensate for the scheduled shutdown of the heavy fuel oil boiler, antiquated, to help meet the recommendations of the air protection plan

- Consolidate the renewable energy rate used by the heating network of the town,

- Enroll in an exemplary sustainable development approach, in line with the energy climate plan air of Grenoble Alpes Métropole,

- Ensure greater stability of prices of energy delivered by a lesser dependence on fossil conventional energy.

Feasibility study, advisory service, analysis

Grenoble Alpes Métropole | Published August 20, 2015
Winner
TILIA Gmbh
cpvs
71241000, 71314200

Grenoble-Alpes Métropole exercise new skills in the field of energy, from the metropolis passage 1.1.2015, in accordance with the law of 01/27/2014 (49 communes, 450 000 inhabitants). The transfer of these skills gives the Metropole status of organizing authority in energy distribution on its territory. It appears as the appropriate level for the implementation of the energy transition. The consultation therefore provides equip and support the Metro to build the energy transition of its territory. The benefits are divided as follows: 1- main services divided into three tasks: A - Mission "blueprint of energy"; B - Mission "public service of energy" (in 5 parts including a flap (B5) to conditional phase); C - Mission "dialogue with citizens" 2 additional services without minimum with a maximum 50 000 EUR HT. All services are detailed in the specifications.

Business services: law, marketing, consulting, recruitment, printing and security

Actis | Published January 11, 2017
Winner
Altra Consulting
cpvs
79000000

Appointment of a service provider - consulting for property tax relief for energy-saving work.

Appointment of a service provider - consultants whose mission is to assist in developing Actis relief records for energy saving work.

Thermal insulation work

SPL d'efficacité énergétique | Published October 24, 2015  -  Deadline November 23, 2015
cpvs
45321000, 45331000, 50720000, 71320000, 71340000

The Rhône-Alpes Region decided, in partnership with other communities of the Rhône-Alpes region to form a company dedicated to the realization of efficient energy renovation projects, the local public company for energy efficiency (hereinafter "SPL Dare"). The aim of the SPL Dare is a new dynamic on behalf of its shareholders in energy renovation. In this context, the Rhône-Alpes Region wants to entrust the SPL Oser, through the use of a long term Administrative Lease together with a non-detachable Convention provision, care to restore, repair, showcase from an energy point of view and maintain Picasso Aragon High School. The overall goal is to reach the school the following criteria and maintain over time (values ​​established in relation to the historical situation built from data prior to 2016): - improving the overall energy performance of at least 40%, - reduce GHG emissions by at least 50%, - a contribution of renewable energy to at least 10%. For the execution of the administrative long leases (BEA) between the Region and the SPL Oser, whose execution is in progress, the SPL Dare wishes to conclude a global contract for the design, implementation of energy renovation work as well as operation and maintenance of the building considered after a competitive dialogue procedure. in accordance with Articles 38 and 41-1-III of Decree No. 2005-1742 of 30.12.2005.

Thermal insulation work

SPL d'Efficacité Énergétique | Published September 24, 2016  -  Deadline October 24, 2016
cpvs
45321000, 45331000, 50720000, 71320000, 71340000

The city of Grenoble has entrusted energy renovations of 3 schools in the SPL-DARE.

Business services: law, marketing, consulting, recruitment, printing and security

ACTIS | Published April 25, 2015  -  Deadline June 1, 2015
cpvs
79000000

Appointment of a service - advice for relief from property tax for energy-saving work.

Thermal insulation work

SPL d'Efficacité énergétique | Published December 23, 2016
Winner
Société nouvelle Jean Nallet
cpvs
45321000, 45331000, 50720000, 71320000, 71340000

The Rhône-Alpes Region decided, in partnership with other communities in the Rhône Alpes region, to form a company dedicated to the realization of efficient energy renovation projects, the Local Public Corporation Energy Efficiency (hereinafter " SPL Dare ").

The objective of the SPL Dare is a new dynamic on behalf of its shareholders in energy renovation.

In this context, the Rhône-Alpes Region wants to entrust the SPL Oser, through the use of an administrative long lease together with a non-detachable Convention provision, care to restore, repair, showcase from an energy point of view and maintain the Picasso Aragon High school.

The objective is to reach globally on the school the following criteria and maintain over time (values ​​established with respect to s.

Engineering services

CCI de Grenoble | Published September 1, 2016
Winner
TPF ingénierie
cpvs

Project management for the design and implementation of production equipment and storage of renewable energy at the site of the Institute of business and technology.

Scanning electron microscopes

Institut polytechnique de Grenoble | Published October 16, 2015
Winner
Eden Instruments
cpvs
38511100

Purchase and maintenance of a system diffraction analysis of backscattered electrons (EBSD) coupled to a system of X-ray microanalysis with energy spectrometry (EDS).

Business services: law, marketing, consulting, recruitment, printing and security

ACTIS | Published October 7, 2015
Winner
ALTRA Consulting
cpvs
79000000

Appointment of a service provider - consulting for relief from property tax for energy-saving work.

Scanning electron microscopes

Institut polytechnique de Grenoble | Published July 4, 2015  -  Deadline September 14, 2015
cpvs
38511100

Purchase and maintenance of a diffraction analysis of backscattered electron system (EBSD) coupled to a system of X-ray microanalysis by energy spectrometry (EDS).