Public tenders for energy in Boussy-saint-antoine France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFranceboussy-saint-antoine

Architectural and related services

Ville de Fenouillet | Published July 7, 2015  -  Deadline August 5, 2015
cpvs
71200000

The project consists of building a school combining a kindergarten in 4 classes, elementary school 7 classrooms, a dining room and a leisure home associated with the school on land in the ZAC Piquepeyre. The useful area for the project is estimated at about 1 950 m2. The total amount of work is estimated at 3.5 million euros (HT). - Content of the mission: the holder will be given a basic mission within the meaning of Article 15-1 of the Decree of 29.11.1993, without execution study. This mission will be completed by the following: coordination of fire safety systems (ISS), dynamic thermal simulation (STD), the APS and APD stages. Optionally, the coordination task scheduling control (OPC) is requested. The Contractor shall further proceed with energy feasibility studies required by the legislation in force and all necessary steps for obtaining building permits and other administrative authorizations - Provisional commencement of the contract: fourth quarter 2015 - skills of the candidates: minimum capacity required: the project manager or project management team will necessarily have the skills in the following areas: architecture, engineering structure, HVAC / plumbing, electrical engineering, VRD, OPC and economy construction. The project management will be sensitive to the compactness of the teams as well as common candidates previous experience of team members. Applications which do not warrant all of these skills will be eliminated. Note: An entity may carry several skills. The teams taking part in the contest will be notified in September 2015, they have a period of approximately ten (10) weeks to submit their bids after the date of dispatch of competition file.

Site-development work

Commune de Saint-Pierre | Published November 2, 2017
Winner
Réunion Réalisation
cpvs
45111291, 45332200, 45316110, 45112700, 37410000, 34928400, 45210000, 45332400

The works to be carried out concern earthworks, roads, surface treatment, sewage treatment, rainwater drainage, drinking water network, civil engineering works, telephone civil engineering, public lighting, low voltage electricity, development of public spaces, landscaping.

Creation of car parks; pedestrian trail creation and ATV trail; creating a left turn on the old RN 1; completion of a section for the sanitation of rainwater and construction of rafts at the thalweg; construction of a new sewage treatment network; construction of a new drinking water system and connections; underground telephone network; connection to existing networks.

Supply and open trenching of cables for low voltage and street lighting and all accessories; supply and installation of public lighting with energy saving system; tests and commissioning preceded by certificates of conformity.

Preliminary works, earthworks, delivery of plants, planting works for the plants of the cultivation contract, guarantee of recovery of the plants for one year, maintenance of the landscaping until the reception, maintenance of the landscaping for 1 year.

Additional earthworks if necessary; piping on sapphire water pipe and AEP pipe; supply and installation of a backflow preventer and complies with the regulations; hydraulic network of HDPE and buried LDPE; drip irrigation distribution network, sprinklers and valve valves; implementation of electronic programming and automation by programmer and decoders; setting up a filtration station; tests, tests and certificates of conformity (Consuel).

Cleaning and earthworks necessary for setting up platforms; supply and installation of fitness equipment; supply of tools and fasteners for maintenance

2017_BOM_004 | Market of master craftsmanship for the Construction of a festive and cultural space on the domain of Bômale in Saint Denis de Pile (33)

Mairie de Saint Denis de Pile | Published June 15, 2017  -  Deadline July 27, 2017
cpvs
71000000

The project involves the creation of a festive and cultural space on the estate of Bômale in Saint Denis de Pile. The project consists in the creation of a real cultural POLE regrouping: - The construction of a new building of approximately 1200 m² - The rehabilitation of an existing charterhouse of 690 m² This festive and cultural center will group together in a park of 4 hectares: - A media library - Socio-cultural and a toy library - An antenna of the departmental library of Ready - The Direction Sport Education Culture Dynamic Association of the municipality and various municipal services - A reception room called "marriage hall" and "room of the municipal council" Within the Chartreuse Content of the mission entrusted to the winner at the end of the competition: - Studies desquisse (ESQ), - Previous and final project studies (APS and APD), - Project studies (PRO) (ACT) - Execution studies of the works (EXE) on all the lots, - The management of the execution of the works contract (D This basic mission will be complemented by the following additional missions: - Existing Diagnostic Studies (DIAG) - Coordination of the fire safety system (SSI) with the preparation of the safety instructions and assistance with the award of the Safety and Security Commission - Coordination and implementation of signage (TDS) - Operating and maintenance costs (CEM) The project must also include a sustainable development approach and take into account the following requirements: Thermal regulations in force - Respect for and implementation of good air quality - Consideration of high acoustic comfort - Economic and energy management of the building - Landscape and architectural integration of the building with its environment - Preparation of regulatory dossiers Required under the Environmental Code (Dossier Water Act,)

Construction work

Harmonie Habitat | Published August 4, 2015  -  Deadline September 30, 2015
cpvs
45000000

To meet the needs of families in the Loire Atlantique department, the supply of new housing should be developed. The economic balance of the operations are increasingly difficult to reach, even though it is increasingly necessary to provide affordable housing, corresponding to the possibilities of families, they want to rent their housing or homeownership. Furthermore, a significant decrease in aid to the stone for several years, new technical and regulatory requirements, changes in the cost of construction make for some traditional production methods of inadequate housing. In this context, Habitat Harmony reflects on the way to optimize the technical and energy performance of housing to produce and lowering production costs. This type of design principle also allows to significantly reduce construction time. It takes other, find ways of a production number allowing cost sharing of studies and construction and reducing very significantly the expenditure in the cost of housing. This framework agreement has an initial term of two years, may be renewed twice for an additional period of one year with the objective of establishing a lasting partnership with the group selected. The design and construction reduces the time to market studies subsequent studies servicing conditions of the host field of the project to achieve and the instruction length of the building permit. The basic version can be adapted with variations to meet the planning regulations of the different municipalities of Loire Atlantique. The different orders placed over the duration of two years of the framework agreement by Harmony habitat should allow the construction of hundreds of housing for this: - A reduced cost of construction - Periods of study and achieve optimized - a guarantee of performance proven. This consultation concerns: - A framework agreement and the organization of subsequent contracts arising - The market for a subsequent operation of 8 units in the municipality of Legé (44). This call for competition is part of the legislative obligations of the Habitat Social Enterprises and their developments (Order No. 2005-649 of 6.6.2005 and implementing Decree No. 2005-1742 of 30.12.2005 and their developments; Code of Construction and Housing ...) mode of devolution - decomposition into slices. The framework agreement and subsequent contracts are not allotted. However, subsequent contracts awarded on the basis of the Framework Agreement, will include a firm phase and one or more conditional stages. Given the characteristics of the procedure and the object of the contract, the perpetuity method used is the single market. The contract will be concluded with a single service provider or with a partner group, at least: A "design" team of: The representative of the sub group of the design team will be secured to all its co-contractors. The team "design" must have necessarily quality architect for the establishment of the architectural project, in accordance with Article 3 of the Law of 01/03/1977 77-2 on architecture and desk VRD of studies. An "art" team consists of: - a company acting as general contractor, the agent of the consortium will be in solidarity with all its co-contractors. Can compete with the natural or legal persons markets: General Business Groupings of joint and several liability companies Each candidate will not call for this consultation, only one bid by acting as either individual candidate or member one or more groups, with the exception of BET Acoustics. The group will necessarily be composed of an independent architect, a company or a consortium of the building and a VRD design office. In addition, the group will have all the skills to design and construction of housing: work in all state bodies architectural structure / seismic economy in the SSI building in thermal fluids in sustainable development in acoustic VRD / landscaped electricity development

public service concession for the management and operation of the future municipal aquatic center of the Municipality of Saint-Genis-Pouilly.

Ville de Saint-Genis-Pouilly | Published March 22, 2016  -  Deadline May 3, 2016
cpvs
92610000, 92000000

The services entrusted to the Assignee will include: 1) to support the design and implementation of equipment related to the City and its contractors 2) organization and administrative and financial management of the service: the ticket management (d tickets entry, membership cards etc.), revenue collection on users, promotion and communication measures for the recognition and development of the aquatic center 3) Home, intelligence and surveillance of different types of users (public , school, associations), implementation of activities and sports-recreational sport for health (water bike, water aerobics, baby swimming, etc .. 4) technical facilities management and maintenance in perfect working works: exploitation of all service facilities, provision of equipment to operation, supply of books in fluids and energy (P1), all the technical equipment maintenance (preventive and corrective), renewal of structures (P3) and equipment, compliance with health standards with the holding of an operating journal subscription of all maintenance contracts and maintenance required for this purpose. 5) Operation of ancillary activities: exploitation of the fitness / wellness, operation of bar-Grignoterie, organizing occasional events.

Call for nominations: revival of lots 5 and 6 for new construction of a building to house the new hospital to the hospital of West Guiana Franck Joly in Saint-Laurent-du-Maroni.

Centre hospitalier de l'Ouest Guyanais | Published November 12, 2015
Winner
AMC Biomédical
cpvs
45000000

Call for applications: revival of Lots 5 and 6 for new construction of a building to house the new hospital to the hospital of West Guiana Franck Joly in Saint-Laurent-du-Maroni. - Work surface in 26,000 m2 excluding technical rooms and 270 parking spaces - land area 74 000 m2, - type U 2nd category - 257 beds and places. The hospital will be equipped with a computer system for telemedicine, patient records management and media management. The building is developed on 4 levels and is divided into 5 buildings as follows: - Building A: lobby and Administration - Building B: medicine and surgery center (consultation, accommodation, outpatient surgery and HDJ) - Building C: child-woman pole (consultations, accommodation and neonatology) - Building D: technical center (sterilization, pharmacy, mortuary, emergency, imaging, laboratories, hemodialysis, UDM, 6 obstetric block rooms, 5 operating theaters ISO 5 Wake and resuscitation, endoscopy) - building E: Logistics Unit (production and self cooking, shopping, laundry, local energy), - Building F: Security building.

Engineering services

Silène | Published September 26, 2015
Winner
Énergie et service SAS
cpvs
71300000

The current electricity supply is provided exclusively by EDF. The end of regulated tariffs to be Silenus obliges electricity suppliers compete for 01.01.2016 on some of its contracts. In addition, the management of 700 delivery points is not optimized, which creates an additional financial cost. To seek financial savings in the long term, the planned contract with the holder of this mission will cover the period from June 2015 to June 2020. The assistance of the Council and Bureau of Engineering, in the market launch phase will particularly on the following: - the complete diagnosis of the contracts in yellow and green tariffs, - the study on the need or not to add the blue tariffs to purchase consultation - consultation with stakeholders Silenus; know its technical and administrative needs - writing the companies consultation file and raises along the assistance market - analysis of the offers of companies, - assistance with Silenus for the implementation of new contract, monitoring the provider meets the market conditions. In parallel, the assistance of the Council and Bureau of Engineering, the counters optimization phase, will focus on the following: - inventory of installations, with the establishment of the complete database (thanks to EDF intranet service or paper bills), - diagnostic facilities, checking up on all the characteristic elements counter (location, power consumption measurement called powers connected devices ...) - the awarding of a report which will be presented solutions to financial and energy savings, - the implementation and monitoring of the proposals work validated by Silenus - the relationship with all stakeholders having a connection with the optimization of the counters (the electricity supplier , ERDF, the power company ...)

Electricity supplies

Syndicat énergie Cambrésis | Published October 2, 2015
Winner
GDF Suez
cpvs
31682000, 65300000

Supply and delivery of electricity and related services to various municipalities and public or private organizations Nord-Pas-de-Calais. The notice involves the establishment of a framework agreement with several operators. At least three (3) economic operators (subject to a sufficient number of candidates to tender). The contracting authority is the SIDEC, coordinator of a control group of 84 members. All information may be requested from the SIDEC as coordinator. The duration of the framework agreement is three years and a half (3.5) years of its notification (September 2015-March 2019), a period covering the duration of the subsequent contracts. Estimated value of the supply of electricity, routing and related services excluding VAT valued at 1.89 million euros for 3 years. This value is estimated for all of the lots: in accordance with French regulations for the purchase of energy actual consumption of electricity will be recognized in the end market. The period of electricity supply will be three (3) years from 1.1.2016. The rocker Management period subsequent contracts in the previous quarter will supply period. At the stage of the framework agreement, the estimated duration of the subsequent supply of electricity markets should be three (3) years (01.01.2016 to 31.12.2018). The duration of the subsequent market with an estimated 39 months: 01.10.2015 to 31.12.2015: Toggle period and optimization Turpe. 01.01.2016 to 31.12.2018: period of supply of electricity. Start: 01.10.2015 End: 31.12.2018.

Sewage work

Ville de Saint Martin-de-Belleville | Published July 28, 2015  -  Deadline September 7, 2015
cpvs
45232420, 45232411, 45232423

This consultation relates to the construction of the new wastewater treatment plant Les Menuires - Val Thorens. This operation aims to design and build a new wastewater treatment plant to replace the current plant is obsolete, to meet the new receiving environment protection requirements. This new unit will be built on a site close to the current station and for ensuring an effluent treatment continuity during construction. This contract should thus allow: - the construction of a water treatment plant capable of adapting to very high load variations induced by seasonal tourism: 4800 kg BOD5 / J Winter High Season against 225 kg BOD5 / J Lower season while respecting the requirements for the protection of the natural environment - the implementation of water treatment systems, sludge and air within a completely enclosed building, adapted to the environmental and climatic constraints - Insertion architectural treatment of the building within its environment. The completion of this transaction should be adapted to high stress involved by the mountainous tourist site context. There are two possible additional benefits (Pse) that candidates are required to meet the conditions specified in the tender documents: - pSE no1: Implementation of a material and energy recovery on the sludge die - pSE no2: Specific Treatment noble architectural cladding facades.

Electricity supplies

Syndicat intercommunal énergies Loire | Published July 7, 2015  -  Deadline August 24, 2015
cpvs
31682000

It will result for each lot, the conclusion of a subsequent contract, the SIEL, as coordinator, will ensure implementation. This Framework Agreement is: #The consumption of member local to the optional jurisdiction "Maintenance of public lighting" SIEL. SIEL holds public lighting contracts for the delivery points that communities (municipalities or groups of municipalities), adhering to the optional jurisdiction, have transferred to the Union. The services must necessarily adapt to the changing needs of these communities, in particular in response to the calls of powers and the positive or negative changes in the number of delivery points. This provision also applies to communities that join in the future the optional jurisdiction "Maintenance of public lighting" #The electricity supply, as a single contract for communities or members of public bodies to purchase #Groupement department Loire ", from existing delivery points and uses identified at the launch date of the Framework Agreement listed, for information, in the appendix of the PAC and the future points created during the term of the framework agreement and subsequent contracts. The services must necessarily adapt to the changing needs of the various communities or organizations members of the group, in particular to respond to the calls of powers and the positive or negative changes in the number of delivery points. The Framework Agreement also provides: - Balance Responsible of the mission, in accordance with Article L 321-15 of the Code of energy and the management of affiliation agreements. - The user role for import transactions. - Access to the public electricity distribution network and its use for all PDL of each of 5 lots.

Construction work

Centre hospitalier de l'Ouest Guyanais | Published February 11, 2015
Winner
Infructueux
cpvs
45000000

Call for applications for new construction of a building to host the New Hospital for hospital in western Guiana Centre Franck Joly in Saint-Laurent-du-Maroni. Work surface in 26,000 square meters out technical rooms and 270 parking spaces. Land area 74,000 m2. Type U 2nd category. 257 beds and places. The hospital will be equipped with a computer system for telemedicine, patient record management and media management. The building is developed on 4 levels and is divided into 5 buildings as follows: - Building A: lobby and Administration - Building B: medicine and surgery center (consultation, accommodation, and outpatient surgery HDJ) - Building C: child-woman pole (consultation, accommodation and neonatology) - Building D: technical center (sterilization, pharmacy, mortuary, emergency, imaging, laboratory, hemodialysis, UDM, obstetric block 6 rooms, 5 operating theaters ISO 5, Wake and resuscitation, endoscopy) - Building E: Logistics Unit (production and self cooking, shopping, laundry, local energy). - Building F: Security building.

Construction work

Centre hospitalier de l'Ouest Guyanais | Published January 9, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Bouygues énergies et services</OFFICIALNAME></ORGANISATION><POSTAL_CODE>78063</POSTAL_CODE><COUNTRY VALUE="FR"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
45000000

Call for Applications: Recovery of Lots 2 and 3 for the construction of a new building to house the New Hospital CHOG Franck Joly in Saint-Laurent-du-Maroni. SDO 26,000 square meters out technical rooms and 270 parking spaces. Land area 74,000 square meters. Type U 2nd category. 257 beds and places. The hospital will be equipped with a computer system for telemedicine, patient record management and media management. The building is developed on 4 levels and is divided into 5 buildings as follows: - Building A: Lobby and Administration - pack B: Pole medicine and surgery (consultation, accommodation, and outpatient surgery HDJ) - pack C : child-woman Pole (consultation, accommodation and Neonatology) - Bldg D: Technical Pole (sterilization, pharmacy, mortuary, emergency, imaging, laboratory, hemodialysis, UDM, obstetric block 6 rooms, 5 operating theaters ISO 5, revival and resuscitation, endoscopy) - pack E: Logistics Cluster (kitchen production and self, shops, laundry, local energy) - pack F: Safety Building.

Transfer and processing of waste the waste st savior montagut

sictom du moyen eyrieux | Published December 1, 2014  -  Deadline December 15, 2014
cpvs

transfer and waste treatment the waste from St Sauveur de Montagut These are: Cartons are baled and remain the property of SICTOM, they will be sold by Ets floor on behalf of SICTOM. des bulky household waste or banal des rubble from households for which the union will entrust 10m3 tipper 2 reinforced series, the provider, one will be at the receiving station, the other serving to avoid rotations vacuum will be in the custody of the provider .. - Lot 2 "Transfer and metals processing and battery" The benefit to the company requested the owner of Lot 2, applies to all waste metal component, ferrous or non-ferrous and the accumulator batteries. Metal 1.Déchets: It is the same for industrial waste, various mechanical parts, motors, pumps, fencing, electrical cables, pipes, etc ... The company should indicate the sector and quantities evaluation method and provide a statement to SICTOM quarterly. 2.Batteries Accumulator: This concerns the motor vehicle batteries lead, except for the battery alarms, fences ... As for metal waste, the company will send a monthly statement to SICTOM .. - Lot 3 "Transferring and processing of wood and plants" The provision sought the company of Lot 3 concerns wood waste (excluding all treated wood: chipboard, laminates, melamine ...) and green waste or plants for energy recovery.

Masts

CIVIS | Published October 21, 2017  -  Deadline November 28, 2017
cpvs
44212250, 45112500, 31500000, 45223210

CIVIS wishes to carry out lighting modernization work at the Michel Volnay stadium in Saint-Pierre.

The purpose of this contract is to define all the works and services of the miscellaneous roadworks necessary for the realization of the lighting modernization works of the Michel Volnay stadium in Saint Pierre for the CIVIS.

The work to be carried out includes in a non-exhaustive way:

- excavations for the passage of networks and earthworks for foundations,

- foundations for lighting masts,

- searches for the passage of the different networks,

- the implementation of the sleeves for the passage of flexible networks,

- the surface treatment works for refurbishment after works,

- the borders.

The main objective of the operation is to replace the stadium lighting in order to have a safe, modern playground lighting system with optimized operating costs, both in terms of energy consumption and on that of maintenance.

The replacement of the lighting of the main parking lot is also provided, the masts and the anchor masts of the masts supporting this lighting also having structural defects.

Finally, additional safety-related interventions (bringing the security lighting of the stands into compliance) are included in the scope of the work.

The subject of this contract is the metal construction of a shelter for the on-site generator.

rehabilitation market and residentialisation in occupied areas - Exterior spaces - 447 units of the city's Courtille in Saint-Denis.

OPH Plaine Commune Habitat | Published February 25, 2016  -  Deadline April 4, 2016
cpvs
45000000

This contract is for the work to be performed on the outdoor areas, as part of the rehabilitation and environment residentialisation occupied housing 447 of the city's Courtille in Saint-Denis.

The cited "the Courtille" consists of five buildings with four, ten and sixteen floors.

this contract was part of a market launched in November 2015 (OJEU Ref. no2015 / s 236-427211 of 05.12.2015), and initially devolved into 3 lots:

no1 lot Envelope buildings.

Lot no2: Interior Body state buildings.

Lot # 3: Outdoor spaces.

Lot No. 3 with fl declared unsuccessful for reasons of public interest, the need still to meet, it is the subject of this consultation.

the market is composed of a firm phase and a conditional phase, which consists of:

Tc no1: supply and implementation of a lean concrete slab above the future email.

the strengthening of the decision conditional phase is taken by the person representing the contracting authority and notified to the company.

the conditional phase will be strengthened if fiscal conditions of the operation permit and no later than 1 January 2017, with a period of maximum variation of 6 months.

Two possible additional benefits are imposed on candidates, under this market:

- Pse 1: Creating scales channels for B1-B2 buildings

- Pse 2: Protection of green spaces by Ganivelle.

the contracting authority shall authorize the presentation of technical, economic and operational variants especially for the improvement of energy performance, the savings on the project and reducing delays.

Administrative variants are not permitted.

the contract includes a clause for insertion of a minimum of 1950 hours which compliance is mandatory.

the market is treated in the overall price. A mandatory site visit is planned.

Construction work

OPH Plaine Commune Habitat | Published December 5, 2015  -  Deadline January 15, 2016
cpvs
45000000

This contract is for the rehabilitation and residentialisation mid occupied housing 447 of the city's Courtille in Saint-Denis. The city "The Courtille" is composed of 5 buildings with 4, 10 and 16 floors. The market is alloti. It devolves into 3 lots: Lot No 1: Envelope buildings. Lot No 2: Interior Body state buildings. Lot No 3: Outdoor space. Lot No. 2 consists of a firm phase and two conditional phases, which consist respectively Tc No. 1: Create two smooth facade railing; Tc # 2: Flipping halls 1 and 2 of B2 building. Lot No. 3 consists of a firm phase and a conditional phase, which consists of: Tc # 1: supply and implementation of a lean concrete slab above future email. The strengthening of the conditional phase decision is taken by the person representing the contracting authority and notified to the company. Each conditional phase will be strengthened if fiscal conditions for the operation permit and no later than 01/01/2017, with a maximum variation of 6 months. 2 possible additional benefits are imposed on candidates in respect of lot No. 3 of this contract: Pse # 1: Protecting green space by a wooden ganivelle; Pse No. 2: Protection of green spaces by a wood smooth. The contracting authority shall authorize the presentation of technical, economic and operational variants including for improving the energy performance, the savings on the project and reducing delays. Administrative variants are not permitted. The market has an integration clause concerning a minimum: Lot 1: 5400 h. Lot 2: 5700 h. Lot 3: 1950 h. With which compliance is mandatory. The market is treated overall price. A mandatory site visit is planned.

Architectural and related services

Harmonie Habitat | Published August 18, 2015
Winner
In Situ Architectur et Environnement
cpvs
71200000

Habitat harmony in Loire-Atlantique occupies one of the first places in the social field by managing nearly 6000 homes. In order to provide the most relevant answers for housing for families, especially the most vulnerable, Harmony Habitat target its development on human sizes operations, integrating into the urban and social context defined by the municipalities and communities. Each individual or group program into nine or rehabilitation is studied and implemented to meet the needs and demands of the people, expressed by the elected representatives. Habitat Harmony company launched an operation in the town of Fay-de-Bretagne in Loire-Atlantique of building a nursing home (residential homes for elderly dependents) 66 seats (64 permanent and 2 temporary) and a EHPA (residential homes for the aged) 17 dwellings, estimated floor area of ​​4600 m2. The proposed architecture will build on the environmental quality and initiated resulted in contract charges.Elle should allow to reduce the level of total expenses of residents, improve housing comfort through a comprehensive approach to architectural quality conception to realization. The energy performance of the whole will comply with the RT 2012. The work program provides for the construction of buildings, but also the realization of outdoor facilities, connection to public space ... to name the Masters team called to carry out this operation, a restricted tender subject of a project management contract was launched. Note: Harmonie Habitat reserves the right not to proceed or postpone the operation in case they would not get in the expected time government grants or loans for its economic feasibility.

Project management is to restructure about 41 dwellings and creation suélévation 31 studios located 2-4, avenue Jean Moulin 93200 Saint-Denis

batiplaine societe de coordination | Published July 23, 2015  -  Deadline August 25, 2015
cpvs
71221000

project management contract awarded by negotiated procedure under Articles 8-12, 33 and 30-32 of Decree No. 2005-1742 of 30 December 2005 and 2005-649 order of 6 June 2005 this market project management is to rehabilitate 41 homes and creation of 31 studios located suélévation 2-4, avenue Jean Moulin 93200 SAINT-DENIS. This operation aims to obtain certification Habitat Heritage and Environment, objective C energy label for the construction and M & E profile "" A "" with respect for the RT2012 - 10% for the extension. this heritage consists of a building R + 5 buried parking, built in 1998. travauxde the rehabilitation will include the following interventions: - envelope of existing buildings (roofs, facades, insulation, etc.) - and lobbies Common area (renovation and security) - Housing (intervention in wet rooms, up to electrical standards, etc.) Estimated total cost of the work: 5,372,000 euro (s) ht, namely: - to rehabilitate = 3.612 million euro (s) ht - for elevation = 1.76 million euro (s) ht The work will be done in part, in occupied areas, project management team will have to integrate, to this end, the required skills. The work will take place in occupied areas, the project management team will integrate this purpose, the skills required. "The Master Team work will be entrusted with a project management basic mission without contest which will include: - a mission of technical and architectural element diagnosis - a basic mission prime contractor for rehabilitation within the meaning of The Mop law Bâtiplaine company acts delegated project quality on behalf of: oph Community common plain 32-38, Bld Jules Guesde BP 116-93204 saint denis Cedex social residences of France 3, avenue de la Seine 94200 Ivry sur Seine.

Architectural services for buildings

Bâtiplaine Société de Coordination | Published July 25, 2015  -  Deadline August 25, 2015
cpvs
71221000

Project management contract awarded by negotiated procedure under Articles 8-12, 33 and 30-32 of Decree No. 2005-1742 of 30.12.2005 and Ordinance 2005-649 of 6.6.2005. This project management market is to rehabilitate 41 homes and suélévation in creating studios located 2-4 31 avenue Jean Moulin 93200 Saint-Denis. This operation aims at obtaining certification habitat heritage and environment, energy label objective c for construction and H & amp; E profile "" a "" with respect for the RT2012 - 10% for the extension. This heritage consists of a building R + 5 buried parking, built in 1998. travauxde the rehabilitation will include the following interventions: - envelope of existing buildings (roofs, facades, insulation, etc.) - and lobbies Common area (renovation and security) - Housing (intervention in wet rooms, up to electrical standards, etc.) total estimated value of the works: € 5,372,000 VAT, namely: - to rehabilitate = € 3,612,000 HT - for heightening = € 1,760,000 HT Work will be done in part, in occupied areas, project management team will have to integrate, to this end, the required skills. The work will take place in occupied areas, the project management team will integrate this purpose, the skills required. "The Master Team work will be entrusted with a project management basic mission without contest which will include: - a mission of technical and architectural element diagnosis - a basic mission prime contractor for rehabilitation within the meaning of The Mop law Bâtiplaine company acts delegated project quality on behalf of: OPH Community Plaine Commune 32-38 bd Jules Guesde BP 116-93204 Saint Denis Cedex social residences France 3 Allée de la Seine 94200 Ivry-sur-Seine.

Heating works

Commune de Saint-Germain-en-Laye | Published November 18, 2016
Winner
Dalkia
cpvs
45232141, 09123000, 09135100, 50721000

This framework agreement is executed in part by the purchase order issuance. The benefits are:

Benefit 1: Conduct of heating with fuel supply and incentives.

Benefit 2: driving electric heating and district heating without energy supply.

Benefit 3: work.

Benefits 3 (maintenance) will purchase order object passed in application of Article 78-I. al. 3, 78.II and 80 of Decree No 2016-360 of 25.3.2016 relating to the procurement no minimum and no maximum annual amount.

A site visit is compulsory: a visit from a sample of facilities will be held Wednesday, June 8 and Wednesday, 06/15/2016 at 9:00. Candidates should make an appointment with management of buildings tel. January 30. 8

Categories
  FranceBoussy-saint-antoine - Show all cities
Saint-louis (10)Saint-etienne (9)Saint-chamond (7)- (5)Saint-brieuc (5)Loire-atlantique (4)Saint-denis (4)Saint-denis-de-pile (4)Saint-priest-en-jarez (4)Saint-étienne (4)Vienne (4)Saint-dizier (3)Saint-nazaire (3)Boissy saint léger (2)Bourg-saint-maurice (2)Gard (2)Hérouville-saint-clair (2)Labastide st pierre (2)La chapelle-saint-luc (2)Marcy-l'étoile (2)Puy-de-dôme (2)Saint pierre (2)Saint ouen (2)Saint-apollinaire (2)Saint-herblain (2)Saint-ismier (2)Saint-malo (2)Saint-pierre (2)Saint-pierre (2)Arrastél (1)Bas-rhin,haut-rhin,moselle (1)Basse terre guadeloupe (1)Bouches-du-rhône (1)Bourg saint maurice (1)Clichytél (1)Estrées-saint-denis (1)Gauchin le gal (1)Gironde (1)Luce (1)Landes (1)Loire-atlantique,maine-et-loire,mayenne,sarthe,vendée (1)Marcy l'etoile (1)Marcy-l'etoile (1)Mont saint aignan (1)Neuville-saint-remy (1)Nîmes adresse internet : http://www (1)Oloron-sainte-marie (1)Paris la défense 8 (1)Piton saint leu (1)Roullet st estephe (1)Ramonville st agne (1)Rivière-salée mq (1)Roannetél (1)Saint denis de pile (1)Saint etienne (1)Saint quentin (1)Saint-gingolph (1)Saint-maixent-l'ecole (1)St julien en genevois (1)St nicolas de la grafe (1)St pryve st mesmin (1)Saint hilaire de riez (1)Saint leu (1)Saint maurice l'exil (1)Saint pantaléon de larche (1)Saint pol sur ternoise (1)Saint berthevin (1)Saint herblain (1)Saint maur des fossés (1)Saint priest en jarez (1)Saint-amand-les-eaux (1)Saint-avold (1)Saint-contest (1)Saint-denis ; tél (1)Saint-fulgent (1)Saint-genis-laval (1)Saint-genis-pouilly (1)Saint-germain-du-puy (1)Saint-germain-en-laye (1)Saint-girons (1)Saint-jean-d'angély (1)Saint-juéry (1)Saint-laurent-blangy (1)Saint-laurent-du-maroni (1)Saint-loubès (1)Saint-mandé (1)Saint-nazaire cédex (1)Saint-paul (1)Saint-peray (1)Saint-pierre-des-corps (1)Saint-pourçain-sur-sioule (1)Saint-rémy-lès-chevreuse (1)Saint-saulve (1)Saint-sauveur-de-montagut (1)Saint-sébastien-sur-loire (1)Saint-thibault-des-vignes (1)Saint-thibéry (1)Saint-vincent-de-tyrosse (1)Saint-yrieix-la-perche (1)