Public tenders for energy in Bouches-du-rhne France

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyFrancebouches-du-rhne

Supply of spare parts for Trifyl's energy recovery equipment

Trifyl | Published July 27, 2018  -  Deadline September 13, 2018
cpvs
42000000

Supply of spare parts for Trifyl's energy recovery equipment

DBD-2016-16 | Energy audits instrumented of an administrative building and a college

Département / Conseil départemental du Val-de-Marne | Published October 24, 2016  -  Deadline November 25, 2016
cpvs
71314300

Energy audits instrumented of an administrative building and a college

MI-SGAMI69-DI-2016-034 | Work energy housing rehabilitation of the barracks Giboulot AURILLAC (15)

Ministère de l'Intérieur | Published September 23, 2016  -  Deadline November 3, 2016
cpvs
09310000

Energy rehabilitation of housing barracks Giboulot AURILLAC (15)

DBD-2016-23 | ASSISTANCE MISSION TO PROJECT MANAGEMENT "ENVIRONMENT / ENERGY" AND "TECHNICAL LOTS" FOR RECONSTRUCTION OF NURSERY PARK THE BELL A ORLY

Département / Conseil départemental du Val-de-Marne | Published October 17, 2016  -  Deadline November 16, 2016
cpvs
71335000

ASSISTANCE MISSION TO PROJECT MANAGEMENT "ENVIRONMENT / ENERGY" AND "TECHNICAL LOTS" FOR RECONSTRUCTION OF NURSERY PARK THE BELL A ORLY

Conducting an energy audit and a feasibility study for the installation of an automatic wood boiler on Saint-Pierre-de-Trivisy (Tarn 81)

syndicat mixte trifyl | Published August 28, 2015  -  Deadline September 28, 2015
cpvs

Conducting an energy audit and a feasibility study for the installation of an automatic wood boiler on Saint-Pierre-de-Trivisy

Electricity, heating, solar and nuclear energy

Institut national des sciences appliqu | Published December 11, 2015
Winner
GDF-Suez
cpvs
09300000

Framework agreement: Supply of electricity and ancillary services.

Energy performance of university hospitals Henri Mondor composed sites: Henri-Mondor-Albert Chenevier, Emile Roux, Joffre, Dupuytren, Georges Clemenceau, Creteil

hopitaux universitaires henri-mondor | Published March 4, 2015  -  Deadline April 7, 2015
cpvs

ENERGY PERFORMANCE DIAGNOSIS OF UNIVERSITY HOSPITALS HENRI MONDOR Composed sites: Henri Mondor Albert Chenevier, Emile Roux, Joffre, Dupuytren, Georges Clemenceau

Supply and delivery of electrical energy to Pierrefeu-du-Var

Ville de pierrefeu du var | Published November 9, 2015  -  Deadline November 23, 2015
cpvs
31682000

market supply and transport of electricity

High-performance renovation of public buildings and use of renewable biomass and solar photovoltaic energy

Commune de saint laurent du bois | Published June 16, 2017  -  Deadline July 7, 2017
cpvs

Performance Renovation of Public Buildings and Recourse to Renewable Energies Biomass and Solar Photovoltaic

Equipment for swimming pools

Ville de Saint-Laurent-du-Var | Published November 18, 2017
Winner
SA Baudin Chateauneuf mandataire du groupement
cpvs
43324100

Rehabilitation and energy improvement of the sunflower pool.

Design-Realization to design and carry out the rehabilitation and energy improvement of the sunflower pool.

Technical assistance services

Syndicat mixte TRIFYL | Published April 2, 2016
Winner
Société GIRUS
cpvs
71356200

Project ownership assistance for the setting up of a processing unit of residual household waste for energy and material recovery.

Technical assistance services

Syndicat mixte Trifyl | Published November 25, 2015  -  Deadline January 4, 2016
cpvs
71356200

Material mastery assistance for the establishment of a processing unit of residual household waste for energy and material recovery.

Providing a range of heat recovery equipment produced by a central production of energy from biogas Labessiere-Candeil

syndicat mixte trifyl | Published July 6, 2015  -  Deadline August 13, 2015
cpvs
44622100

providing a set of heat recovery equipment produced by a central power generation from biogas (heat exchangers - Connection - Orc turbine).

Commissioning of heating installations

Commune de Saint-Germain-du-Puy | Published May 6, 2017
Winner
Engie Cofely
cpvs
50721000

Contract for the supply of energy (P1), maintenance (P2), and total guarantee (P3) for heating, hot water for swimming pools and domestic hot water for the main communal buildings Of Saint-Germain-du-Puy.

Operation as full guarantee of heating and domestic hot water installations, including energy supply (P1), routine maintenance (P2) and total guarantee (P3).

Commissioning of heating installations

Commune de Saint-Germain-du-Puy | Published November 18, 2016  -  Deadline December 16, 2016
cpvs
50721000

energy supply delivery market (P1), routine maintenance (P2) and total guarantees (P3) for heating, hot water in swimming pools and hot water of the main municipal buildings Saint Germain du Puy.

Machinery for the heat treatment of materials

Inst natio sciences appliquees rouen | Published May 12, 2017  -  Deadline May 22, 2017
cpvs
42940000

The public contract concerns the supply of a secondary vacuum tube furnace for the thermal treatment of materials in the framework of the Center for Experimental Innovation in Materials and Energy (Ciemme) and funded through an agreement Partnership with Rouen Métropole for the implementation of the CIEMME Platform.

Machinery for the heat treatment of materials

Inst natio sciences appliquees Rouen | Published April 29, 2017  -  Deadline May 22, 2017
cpvs
42940000

The public contract concerns the supply of a secondary vacuum tubular furnace for the thermal treatment of materials in the framework of the CIEmme project for an innovation center for expertise in materials and energy mechanics and financed by means of an agreement Partnership with Rouen Métropole for the implementation of the CIEMME platform.

Project management on sketch for the construction of Port Camargue Sea school in Grau Du Roi

regie autonome de port camargue | Published September 9, 2015  -  Deadline October 9, 2015
cpvs
71221000

operation is located in Port Camargue (30) - Centurion Avenue. Operation program: demolition and new construction. Brief project description: Interior spaces (building): Home Premises and administration, local food, local entertainment, local hosting. outdoor spaces: Patio entertainment room, patio dining, water park space. Estimated useful building area: m2 1986 projected budget work: 3.3 million euro (s) Ht Missions entrusted to the supervisor: Basic MOP Law 93-1268 missions following the decree of November 29, 1993 VISA and participation the synthesis of cell quantitative FGPD + + + ssi Project Manager Mission. Missions Studies law on water and energy supply study are to be provided by the prime contractor in the framework of its Pc mission. The contract may include an incentive clause.

Call for nominations: revival of lots 5 and 6 for new construction of a building to house the new hospital to the hospital of West Guiana Franck Joly in Saint-Laurent-du-Maroni.

Centre hospitalier de l'Ouest Guyanais | Published November 12, 2015
Winner
AMC Biomédical
cpvs
45000000

Call for applications: revival of Lots 5 and 6 for new construction of a building to house the new hospital to the hospital of West Guiana Franck Joly in Saint-Laurent-du-Maroni. - Work surface in 26,000 m2 excluding technical rooms and 270 parking spaces - land area 74 000 m2, - type U 2nd category - 257 beds and places. The hospital will be equipped with a computer system for telemedicine, patient records management and media management. The building is developed on 4 levels and is divided into 5 buildings as follows: - Building A: lobby and Administration - Building B: medicine and surgery center (consultation, accommodation, outpatient surgery and HDJ) - Building C: child-woman pole (consultations, accommodation and neonatology) - Building D: technical center (sterilization, pharmacy, mortuary, emergency, imaging, laboratories, hemodialysis, UDM, 6 obstetric block rooms, 5 operating theaters ISO 5 Wake and resuscitation, endoscopy) - building E: Logistics Unit (production and self cooking, shopping, laundry, local energy), - Building F: Security building.

Construction work

Centre hospitalier de l'Ouest Guyanais | Published February 11, 2015
Winner
Infructueux
cpvs
45000000

Call for applications for new construction of a building to host the New Hospital for hospital in western Guiana Centre Franck Joly in Saint-Laurent-du-Maroni. Work surface in 26,000 square meters out technical rooms and 270 parking spaces. Land area 74,000 m2. Type U 2nd category. 257 beds and places. The hospital will be equipped with a computer system for telemedicine, patient record management and media management. The building is developed on 4 levels and is divided into 5 buildings as follows: - Building A: lobby and Administration - Building B: medicine and surgery center (consultation, accommodation, and outpatient surgery HDJ) - Building C: child-woman pole (consultation, accommodation and neonatology) - Building D: technical center (sterilization, pharmacy, mortuary, emergency, imaging, laboratory, hemodialysis, UDM, obstetric block 6 rooms, 5 operating theaters ISO 5, Wake and resuscitation, endoscopy) - Building E: Logistics Unit (production and self cooking, shopping, laundry, local energy). - Building F: Security building.