Public tenders for flow-meter in United Kingdom

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
Energyflow meterUnited Kingdom

Heat Flow Meter

 | Published October 27, 2017  -  Deadline November 10, 2017
cpvs

High Quality Heat Flow Meter.

The CobBauge project sets out to optimise the performance of the earth building technique known as ‘Cob’ in the UK and ‘Bauge’ in France.

An integral part of the project is the ability to measure the thermal conductivity of different earth mixes, in order to improve this aspect of cob building.

The project team are looking to procure a high quality Heat Flow Meter the basic requirements & performance specification are stated within appendix B.

We would like to invite you to submit a fixed price quotation, excluding VAT, for the following goods, (carriage included), via this electronic tendering platform In-Tend.
Please show a breakdown of all costs associated with the delivery, installation, commissioning, training, running and ongoing after sales support that the UoP should budget for in relation to the Heat Flow Meter, (HFM) offered under this RFQ.
No costs other than those shown on your quotation will apply.

Heat Flow Meter

University Of Plymouth | Published October 26, 2017  -  Deadline November 10, 2017
cpvs
38000000

High Quality Heat Flow Meter. Full details can be found in the document via: https://in-tendhost.co.uk/plymouthuni The CobBauge project sets out to optimise the performance of the earth building technique known as 'Cob' in the UK and 'Bauge' in France. An integral part of the project is the ability to measure the thermal conductivity of different earth mixes, in order to improve this aspect of cob building. We would like to invite a fixed price quotation, excluding VAT, via our electronic tendering platform In-Tend. https://in-tendhost.co.uk/plymouthuni

Modification of the line connecting the gasifier to the engine (valves, gas flow meter and pipework)

Aston University | Published May 12, 2015  -  Deadline May 18, 2015
cpvs

EBRI invites you to submit a formal written quotation for the improvement of the interface between the gasifier and the CHP engine. The supplier should be able to provide all required materials and install some valves, a gas flowmeter and modify the pipework as necessary (DN100), in order to fit these new items in the current pipe located at the EBRI plant.

GB-Bristol: Supply of Flow Meter Turbines for Spearfish Torpedo Test and Measurement Equipment

Ministry of Defence, Weapons, Other | Published November 8, 2017  -  Deadline November 29, 2017
cpvs
71320000

1, Description: Defence Munitions Beith hereafter referred to as the 'Authority' has a requirement for the Supply of three (3) varieties of Flow Meter Turbines which form a key component of the Spearfish Torpedo Test and Measuring Equipment. The Authority has provided a full Statement of Requirements including full specifications and NATO Stock Numbers within the invitation to Tender (ITT) pack. Tenderers must submit a request to the designated Commercial Officer Jack Morgan (Jack.morgan163@mod.gov.uk) to receive the Technical Drawings SESM/14/011, SESM/14/012 and SESM/14/013 as referenced within the Statement of Requirements via email. The remainder of the ITT documents are available via the instructions below at section 5 2, Key Criteria: • Supplier must be ISO 9001-2008 Certified • Each Flow Meter Turbine shall be Calibrated and Certified to ISO17025 Traceable to National Standards. 3, Clarification Questions: Clarification questions may be submitted to the designated Commercial Officer up until the clarification question deadline as contained within the Section 1.1.5 of the ITT, all questions will be answered by the deadline also set out in Section 1.1.5. Tenders must be received before the submission deadline to be considered for this requirement. All Clarification questions will be anonymous, however the Authority's answers to clarification questions will be shared with all potential tenderers which have requested electronic copies of the Technical Drawings SESM/14/011, SESM/14/012 and SESM/14/013 via email for the purpose of fair and equal treatment of all interested parties. 4, Suppliers must read through this set of instructions and follow the process to respond to this opportunity: The information and/or documents for this opportunity are available on https://www.contracts.mod.uk/delta. You must register on this site to respond, if you are already registered you will not need to register again, simply use your existing username and password. Please note there is a password reminder link on the homepage. Suppliers must log in, go to your Response Manager and add the following Access Code: BYBPG55P63. Please ensure you follow any instruction provided to you here. The deadline for submitting your response(s) is 29/11/2017 12:00. Please ensure that you allow yourself plenty of time when responding to this invite prior to the closing date and time, especially if you have been asked to upload documents. If you experience any difficulties please refer to the online Frequently Asked Questions (FAQ's) or the User Guides or contact the MOD DCO Helpdesk by emailing - support@contracts.mod.uk or call 0800 282 324.

The provision of swimming pool plant maintenance and repair.

Aberdeenshire Council | Published June 30, 2015
Winner
Aqua Leisure Ltd
cpvs
43324100, 50511000, 50512000

The provision of swimming pool plant maintenance and repair to include: — inspect all pipework for leaks repair if required, operate valves remove and lubricate if valves are not free, — isolate filter pump and clean strainer basket, inspect condition grease o, ring and remove any corrosion build up, — check operation of pumps and flow rate dismantle and inspect impellor if required, — check calorifier and controls for operation; inspect all motorised valves for wear and tear. Test operation of thermostats, re- calibrate if required, — inspect filter pressure gauges and flow meter, clean flow meter if required, check mercury level and top up if necessary, test pressure gauges on and off line, — check media quality and quantity and filter inner walls and pipework, — check chemical control unit using signal generators calibrate if necessary, — check and clean ph and all probes, check leads for defects, — check hypo dosing pump, remove wet end, inspect diaphragm, seal plates, balls, foot valve and discharge nipple. Replace faulty parts clean down and re- assemble, — check operation of agitator, remove chlorine build up on shaft and check wear on proppellor, — Inspect condition of hypo/day bund tanks for defects, remove and clean sediment from base of day tank if required.

NW1715 Electromagnetic Flow Meters.

Northumbrian Water Limited | Published August 22, 2017
cpvs
<span> Yes

This contract is for the supply of electromagnetic flow meters for the whole of NWL's area of supply. The products covered within the contract include mains powered flow meters in sizes ranging from 25mm to 2 000 mm and battery powered flow meters in sizes ranging from 40mm to 500mm. Please note that this is a contract award notice and the tender has already been completed.

NW911 Electromagnetic flow meters.

Northumbrian Water Ltd. | Published March 31, 2012
cpvs
38421110

The supply of electromagnetic flow meters, including mains powered flow meters in sizes ranging from 25 mm to 2 000 mm, and battery powered flow meters in sizes ranging from 50 mm to 400 mm.

Maintenance of EasiHeat Systems, Boilers, Flow Meters and Steam System Conditioning.

Maidstone and Tunbridge Wells NHS Trust | Published July 16, 2014
cpvs
50700000, 50721000

Maidstone & Tunbridge Wells NHS Trust is seeking to award a five year contract for the pre-planned and reactive maintenance of EasiHeat plate heat exchangers, flow meters, boilers and steam system conditioning. This contract will be awarded as one lot and bidders must be able to maintain all the equipment.

The Provision of Swimming Pool Plant Maintenance and Repair

Aberdeenshire Council | Published June 25, 2015
Winner
Aqua Leisure Ltd
cpvs
43324100, 50511000, 50512000

The Provision of Swimming Pool Plant Maintenance and Repair to include: Inspect all pipework for leaks repair if required, operate valves remove and lubricate if valves are not free. Isolate filter pump and clean strainer basket, inspect condition grease o, ring and remove any corrosion build up. Check operation of pumps and flow rate dismantle and inspect impellor if required. Check calorifier and controls for operation; inspect all motorised valves for wear and tear. Test operation of thermostats, re- calibrate if required. Inspect filter pressure gauges and flow meter, clean flowmeter if required , check mercury level and top up if necessary, test pressure gauges on and off line Check media quality and quantity and filter inner walls and pipework. Check chemical control unit using signal generators calibrate if necessary. Check and clean ph and all probes, check leads for defects. Check hypo dosing pump, remove wet end, inspect diaphragm, seal plates, balls, foot valve and discharge nipple. Replace faulty parts clean down and re- assemble. Check operation of agitator, remove chlorine build up on shaft and check wear on proppellor. Inspect condition of hypo/day bund tanks for defects, remove and clean sediment from base of day tank if required. CPV: 43324100, 50511000, 50512000.

UK SBS PR16163 Hydro-Met Monitoring Networks for African Cities

UK SHARED BUSINESS SERVICES LIMITED | Published August 22, 2016  -  Deadline September 6, 2016
cpvs
38290000

Currently meteorological and hydrological monitoring falls under separate agencies in Africa, monitoring and data dissemination varies considerably between locations, and rarely are data considered in a system-based approach. Similarly, resources for new high resolution equipment are limited. Within this capital spend project we aim to establish monitoring that provides high resolution information to support meteorological services (e.g. through rain gauge installation) and catchment scale hydrology monitoring (e.g. through flow meter installation) in a single network for four urban locations in Africa. The main focus of Hydro-Met is to establish a number of monitoring networks and associated data that will support the work of 2 FCFA projects (AMMA-2050 and HyCristal) and on building capacity for local hydrological and meteorological agencies in the form of equipment, data and training. The networks will also provide data to other FCFA projects and the wider user community during the initial operational period of 2017 to 2019. After this period the equipment will be handed over to operational partners in the four countries to develop their operational monitoring capacity. The closing date for this tender is 09th September 2016 If you have any clarifications regarding this tender, please go through the Crown Commercial Esourcing suite. Do not contact the buyer directly

Thermal Analysis Equipment for Thermal Energy Research accelerator (T-ERA) Laboratory

School of Engineering | Published November 19, 2016  -  Deadline December 5, 2016
cpvs
38000000, 38410000, 38432000

The University of Warwick , School of Engineering, Thermal Analysis Equipment . The requirement consists of 5 lots as follows-

Lot 1 - Xenon Flash (or similar) analyser for thermal conductivity, diffusivity measurement
Lot 2 - Calorimeter
Lot 3 - Dilatometer/Thermomechanical analyser
Lot 4 - Heat Flow Meter
Lot 5 - High Pressure Simultaneous Thermal Analyser (TG and DSC)

Please refer to http://in-tendhost.co.uk/universityofwarwick for further information. You will be able to download the full tender documents from this site. Any queries in relation to this requirement should be directed to the University of Warwick via the correspondence functionality of the In-tend system. Failure to do so may result in queries being excluded from the procedure.

All queries must be sent via In-tend Correspondence and not directly to University staff.

NOTE: The University of Warwick is not a contracting authority for the purposes of the Public Contracts Regulations 2015 (as amended) and its procurement activities are not subject to the Public Contracts Regulations 2015 or the obligations under the European Public Procurement Directives, including the European Remedies Directive. Advertisement of any contract in the Official Journal of the European Union or Contracts Finder is at the sole discretion of the University and is undertaken on a voluntary basis with no implied obligation to comply with the procurement legislation.

All bids must be received by midday 5th December, 2016

KF330 - Armagh DAP

Northern Ireland Water | Published July 29, 2013  -  Deadline August 30, 2013
cpvs

The contract comprises the following elements of work:

The provision and laying of:
• 300mm to 1200 mm diameter sewers (including lateral connections and manholes) and 280mm OD diameter rising main in traffic sensitive, heavily congested roads in Armagh city.
• 1050mm diameter sewer to 1200mm diameter twin sewers in fields.

Combined Sewer Overflows upgrades and closures.

Sewer rehabilitation works will include desilting, cleaning, patch repairs, removal of roots and intrusions and installation of CIPP liners.

The upgrade of Newry Road WwPS
Works will include all temporary and permanent works for:
• Reinforced concrete wet well including provision of screen
• Reinforced concrete valve chamber
• Provision of a reinforced concrete storm tank complete with screened overflow to river via headwall structure
Flow meter chamber
• Insulated GRP control kiosk including Mechanical, Electrical and Instrumentation Specification and system integration requirements .
• Pillar jib crane
• Demolition and decommissioning of the existing WwPS and all ancillaries of the existing installation
• M&E installation and commissioning of new WwPS, including training and input to O&M Manuals

Upgrade of various Unsatisfactory Intermittent Discharges ( UIDs) at WwPSs including ancilliary works and screens.
 

Thermal Analysis Equipment for Thermal Energy Research accelerator (T-ERA) Laboratory

University of Warwick | Published February 22, 2017
Winner
SemiMetrics Ltd
cpvs
38000000, 38410000, 38432000

The University of Warwick, School of Engineering, Thermal Analysis Equipment. The requirement consists of 5 lots as follows:

Lot 1 — Xenon Flash (or similar) analyser for thermal conductivity, diffusivity measurement;

Lot 2 — Calorimeter;

Lot 3 — Dilatometer/Thermo-mechanical analyser;

Lot 4 — Heat Flow Meter;

Lot 5 — High Pressure Simultaneous Thermal Analyser (TG and DSC).

Please refer to http://in-tendhost.co.uk/universityofwarwick for further information. You will be able to download the full tender documents from this site. Any queries in relation to this requirement should be directed to the University of Warwick via the correspondence functionality of the In-tend system. Failure to do so may result in queries being excluded from the procedure.

All queries must be sent via In-tend Correspondence and not directly to University staff.

Note: The University of Warwick is not a contracting authority for the purposes of the Public Contracts Regulations 2015 (as amended) and its procurement activities are not subject to the Public Contracts Regulations 2015 or the obligations under the European Public Procurement Directives, including the European Remedies Directive. Advertisement of any contract in the Official Journal of the European Union or Contracts Finder is at the sole discretion of the University and is undertaken on a voluntary basis with no implied obligation to comply with the procurement legislation.

All bids must be received by midday 5.12.2016.

Thermal Analysis Equipment for Thermal Energy Research accelerator (T-ERA) Laboratory

University of Warwick | Published November 22, 2016  -  Deadline December 5, 2016
cpvs
38000000, 38410000, 38432000

The University of Warwick, School of Engineering, Thermal Analysis Equipment. The requirement consists of 5 lots as follows:

Lot 1 — Xenon Flash (or similar) analyser for thermal conductivity, diffusivity measurement.

Lot 2 — Calorimeter.

Lot 3 — Dilatometer/Thermomechanical analyser.

Lot 4 — Heat Flow Meter.

Lot 5 — High Pressure Simultaneous Thermal Analyser (TG and DSC).

Please refer to http://in-tendhost.co.uk/universityofwarwick for further information. You will be able to download the full tender documents from this site. Any queries in relation to this requirement should be directed to the University of Warwick via the correspondence functionality of the In-tend system. Failure to do so may result in queries being excluded from the procedure.

All queries must be sent via In-tend Correspondence and not directly to University staff.

NOTE: The University of Warwick is not a contracting authority for the purposes of the Public Contracts Regulations 2015 (as amended) and its procurement activities are not subject to the Public Contracts Regulations 2015 or the obligations under the European Public Procurement Directives, including the European Remedies Directive. Advertisement of any contract in the Official Journal of the European Union or Contracts Finder is at the sole discretion of the University and is undertaken on a voluntary basis with no implied obligation to comply with the procurement legislation.

All bids must be received by midday 5.12.2016.

Water Tank Replacement (2)

National Waiting Times Centre Board | Published January 22, 2016
Winner
Ritmac
cpvs
391000

Supply and replacement of 2 Qty Water Tanks at Golden Jubilee National Hospital.
Specification
Scope of Works
To replace the 2no. Existing 20 year old water tanks and with new water tanks.
The propose works are summarised below:
- Strip-out of any water pipe work as required serving existing water tanks (main pipe run to remain). Retain the flow meter for re-use.
- To remove 2no. Water tanks and dispose of water tanks.
- Supply & install of 2no. 5380x3880x3040 or similar GRP insulated water tanks, nominal capacity 52500 litres. Tank supplied c/w ball valve, access panels/covers, access rung ladder, cage/handrails, screened overflow, warning pipe, manual drain valve, screened vent & level switches.
- Installation of new mains water 4” copper pipe work and WRAS approved butterfly valves to supply the tanks. Existing water meters to be re-installed.
- Installation of tank feed water 6” WRAS approved butterfly valves/pipework/fittings to connect into the existing main supply to building.
- Thermal insulation in PIB & Grey PVC valve mattresses or similar
- There is existing trace heating on the pipe work serving the tanks. It is assumed that this is in good working order and intend on reusing.
- Chlorination of the tank & pipe work to be carried on completion.
- Specialist contractor to freeze the existing 6”main pipe work serving the redundant tanks and install 6” isolation valve using WRAS approved compression flange adaptor. (Note: There will be no interruption of water supply to building. The existing 2no. Newer tanks will continue to serve the building).
Options/Provisional Sums:
See below details of additional options to be considered
- Install of new trace heating and electrical power supplies.
- Supply 1no. Temperature sensors in each tank (BMS Compatible)
For site visit or further info please contact Andy. Gallagher 0141 951 5169

Water Tank Repalcement (2)

National Waiting Times Centre Board | Published December 24, 2015  -  Deadline January 13, 2016
cpvs
391000

Supply and replacement of 2 Qty Water Tanks at Golden Jubilee National Hospital. Specification Scope of Works To replace the 2no. Existing 20 year old water tanks and with new water tanks. The propose works are summarised below: - Strip-out of any water pipe work as required serving existing water tanks (main pipe run to remain). Retain the flow meter for re-use. - To remove 2no. Water tanks and dispose of water tanks. - Supply & install of 2no. 5380x3880x3040 or similar GRP insulated water tanks, nominal capacity 52500 litres. Tank supplied c/w ball valve, access panels/covers, access rung ladder, cage/handrails, screened overflow, warning pipe, manual drain valve, screened vent & level switches. - Installation of new mains water 4” copper pipe work and WRAS approved butterfly valves to supply the tanks. Existing water meters to be re-installed. - Installation of tank feed water 6” WRAS approved butterfly valves/pipework/fittings to connect into the existing main supply to building. - Thermal insulation in PIB & Grey PVC valve mattresses or similar - There is existing trace heating on the pipe work serving the tanks. It is assumed that this is in good working order and intend on reusing. - Chlorination of the tank & pipe work to be carried on completion. - Specialist contractor to freeze the existing 6”main pipe work serving the redundant tanks and install 6” isolation valve using WRAS approved compression flange adaptor. (Note: There will be no interruption of water supply to building. The existing 2no. Newer tanks will continue to serve the building). Options/Provisional Sums: See below details of additional options to be considered - Install of new trace heating and electrical power supplies. - Supply 1no. Temperature sensors in each tank (BMS Compatible) For site visit or further info please contact Andy. Gallagher 0141 951 5169

Hydrotherapy Pools (Dosing, Filtration & Water Testing)

NHS Wales Procurement Services | Published April 9, 2015  -  Deadline April 27, 2015
cpvs
24962000, 42912350

Hydrotherapy Pool Locations Serennu Nevill Hall Ysbyty Ystrad Fawr The following checks are carried out at each of the above pools during a 6 monthly service visit (where the relevant equipment is installed). Filtration and Plant Carry out a general check of all plant to ensure there are no leaks. Check the strainers are sealing properly and that there is no requirement to replace “O” rings. Check pumps are running correctly and there is no overheating or vibration present. Switch off plant, and check the re-start of all plant works correctly. Check all safety features and alarms are working correctly. *Check the operation of balance tank sensors to ensure correct operation. *Open balance tank and check that it is clean and free from deposit notify management of corrective action. Check operation of UV sterilization and supply and replace lamp, quartz and wiper as per manufacturers’ recommendation. Check the operation of all valves. *Check the flow meter and its operation. *Undertake a backwash of the filters and record all readings. Check the filters are operating correctly. *Check the automatic air release valves. Check the pressure gauges. *Check the heat exchangers and booster pump. Check all pipe work and supports. Chemical Dosing Check and calibrate the control panels. Supply and replace pH probe annually Supply and replace Chlorine copper electrode annually Check Chlorine dosing system and rectify faults. Check acid dosing system and rectify faults. Check PAC dosing system and rectify faults. Check the operation of dosing pumps. Check operation of multi function valves. Check dosing lines. Check day tanks. Check bulk tanks. Check sampling stations. Check dosing electrical and float interlocks. Water Quality Complete a full set of water tests and report findings Calculate Langelier Index Compile service report for records Additional Attend quarterly meetings at Serennu Engineer helpline Same day and weekend call outs * Items that are not relevant to all pools or not checked every visit or that can only be checked when pool operational conditions allow.

Respiratory Solutions.

NHS Supply Chain acting as agent for NHS Business Services Authority | Published July 12, 2014
cpvs
33157810, 33170000, 33171000, 33171100, 33171110, 33171200, 33171210, 33172000, 33157100, 33157000

Oxygen Therapy Anesthetic Resuscitation and Respiratory Products covering facemasks nasal cannula nebulisation products oxygen tubing venture barrels sterile water humidification products catheters and connectors air cushion anesthetic facemasks manual resuscitators re-breathing bags CPR masks carbon dioxide absorbers corrugated tubing resuscitation dummy / mannequin anatomical anesthetic facemasks compressor nebulisor spirometer bacterial viral filter metered doser inhaler spacer peak flow meter mouthpieces mucus clear device inspiratory physiotherapy carbon monoxide monitor respiration sensor infant resuscitation and high flow respiratory therapy system . Precise quantities are unknown. It is anticipated that initial expenditure will be in the region of GBP 10 000 000 to GBP 20 000 000 in the first year of this Framework Agreement however this is approximate only and the values may vary depending on the requirements of those bodies purchasing under the Framework Agreement. The estimated value over the total Framework Agreement term will be in the region of GBP 40 000 000 to GBP 80 000 000.

Hydrotherapy Pools (Dosing, Filtration & Water Testing)

NHS Wales Procurement Services | Published March 8, 2016
Winner
Sterling Hydrotech Ltd
cpvs

Hydrotherapy Pool Locations
Serennu
Nevill Hall
Ysbyty Ystrad Fawr
The following checks are carried out at each of the above pools during a 6 monthly service visit (where the relevant equipment is installed).
Filtration and Plant
Carry out a general check of all plant to ensure there are no leaks.
Check the strainers are sealing properly and that there is no requirement to replace “O” rings.
Check pumps are running correctly and there is no overheating or vibration present.
Switch off plant, and check the re-start of all plant works correctly.
Check all safety features and alarms are working correctly.
*Check the operation of balance tank sensors to ensure correct operation.
*Open balance tank and check that it is clean and free from deposit notify management of corrective action.
Check operation of UV sterilization and supply and replace lamp, quartz and wiper as per manufacturers’ recommendation.
Check the operation of all valves.
*Check the flow meter and its operation.
*Undertake a backwash of the filters and record all readings.
Check the filters are operating correctly.
*Check the automatic air release valves.
Check the pressure gauges.
*Check the heat exchangers and booster pump.
Check all pipe work and supports.
Chemical Dosing
Check and calibrate the control panels.
Supply and replace pH probe annually
Supply and replace Chlorine copper electrode annually
Check Chlorine dosing system and rectify faults.
Check acid dosing system and rectify faults.
Check PAC dosing system and rectify faults.
Check the operation of dosing pumps.
Check operation of multi function valves.
Check dosing lines.
Check day tanks.
Check bulk tanks.
Check sampling stations.
Check dosing electrical and float interlocks.
Water Quality
Complete a full set of water tests and report findings
Calculate Langelier Index
Compile service report for records
Additional
Attend quarterly meetings at Serennu
Engineer helpline
Same day and weekend call outs
* Items that are not relevant to all pools or not checked every visit or that can only be checked when pool operational conditions allow.

The Provision of Swimming Pool Plant Maintenance and Repair.

Aberdeenshire Council | Published August 7, 2013  -  Deadline September 18, 2013
cpvs
43324100, 50511000, 50512000

The Provision of Swimming Pool Plant Maintenance and Repair to include: Inspect all pipework for leaks repair if required, operate valves remove and lubricate if valves are not free. Isolate filter pump and clean strainer basket, inspect condition grease o, ring and remove any corrosion build up. Check operation of pumps and flow rate dismantle and inspect impellor if required. Check calorifier and controls for operation; inspect all motorised valves for wear and tear. Test operation of thermostats, re- calibrate if required. Inspect filter pressure gauges and flow meter, clean flowmeter if required , check mercury level and top up if necessary, test pressure gauges on and off line. Check media quality and quantity and filter inner walls and pipework. Check chemical control unit using signal generators calibrate if necessary. Check and clean ph and all probes, check leads for defects. Check hypo dosing pump, remove wet end, inspect diaphragm, seal plates, balls, foot valve and discharge nipple. Replace faulty parts clean down and re- assemble. Check operation of agitator, remove chlorine build up on shaft and check wear on proppellor. Inspect condition of hypo/day bund tanks for defects, remove and clean sediment from base of day tank if required. NOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at http://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=273202