Invitation to submit a tender - PURCHASE AND MAINTENANCE GAS FLOW METER - Simplified negotiated procedure with publication

BELGOPROCESS NV | Published February 17, 2016  -  Deadline March 18, 2016
cpvs
38341000, 38341200

This contract is for the purchase, installation and maintenance of a "stand alone" low level alpha / beta gas flow meter.

Invitation to submit offers - Station Rochefort rehabilitation of pumping - Negotiated procedure with direct advertising

INASEP | Published March 31, 2015  -  Deadline May 20, 2015
cpvs
45232152, 45232423, 45317100

The purpose of this contract is in the rehabilitation of pumping Rochefort treatment plant: - New dry pumps: current pumps date from 1982 to end of life and the parts are no longer available from the supplier ( model is no longer manufactured). - Replacement of valves: current valves are old and of type "double wing", they are particularly sensitive to waste surplus pumped following the abandonment of the coarse bar screen, they will be replaced by more suitable valves our applications. - Replacement valves: current valves "Butterfly" will be replaced by more reliable knife gate valves and less prone to blockages due to stringy and waste. - Replacement of the flowmeter biological line currently down, adding a flow meter on the storm line.

13SC327 Deliveries of relaxants and flow meters for the transport of medical O2 in ambulance vehicles of Defense.

MRMP-S – direction générale material resources – division marchés publics – section "support systems" | Published January 15, 2014
Winner
Dräger Medical BelgiumHeide 10Wemmel 1780
cpvs
33150000, 33157000

Multi-year assignment in two lots of questions which may supply relaxants and flow meters for the transport of medical oxygen in the ambulance vehicles of Defense.

SWDE ​​- contract of dataloggers and related software, autonomous electromagnetic flowmeters, flow meters with built-in datalogger autonomous and powered electromagnetic flowmeters

Société wallonne des eaux (S.W.D.E.) | Published December 2, 2014  -  Deadline January 9, 2015
cpvs
38300000, 38421000

This contract is for the provision of staggered dataloggers and related software, autonomous electromagnetic flowmeters, flow meters with integrated datalogger autonomous and powered electromagnetic flowmeters.

Adaptation of ventilation and dehumidification

ONDRAF | Published September 3, 2014  -  Deadline October 1, 2014
cpvs
45331000, 45331200, 45331210, 45331211

To provide the 151X building a ventilation system that will maintain the concentration of Rn in the standard limit and evacuate the exhaust air into the atmosphere in a controlled manner through this market is to absolute filters. The relative humidity in the casemates of 151X storage building can not exceed 60% and that in order to prevent corrosion. This market consists of 2 lots: lot 1 a.The includes construction of local art (including the vent stack) and all activities related thereto. For installation of the extraction system and the electrical panel, it should build a new plant room of about 70 m2 (planning permit required). It must also be provided with a double door in order to allow access to large units. b.The Lot 2 includes the installation of HVAC, control and power in the project on the adaptation of ventilation and dehumidification as well as all activities that result. For ventilation bunkers, it is planned to install an exhaust system consisting of a pre-filter, a HEPA filter and an exhaust fan. Valves for constant air flow will be placed in the extraction channels so that the flow rates by pillbox may already be set from the investment (plus any adjustment of the air flow necessary thereafter). The exhaust air will pass through the chimney and will be released into the atmosphere (additional points of discharge should be reported and / or subject to authorization). The intake of air into the bunkers will not be controlled (via cracks and openings). The ventilation is not performed redundantly and no vacuum is obtained in the building. The blow nozzles will be extended. Measurements of the temperature and humidity are automatically entered by casemate in the central control (the values ​​are continually updated in trends). The radiomonitoring by existing bunker will be integrated with extraction channels. A Supplemental radiomonitoring will be placed in the new fireplace. A new automatic settings are set to the extraction system. The exhaust fan shall be provided with a flow meter that will set the frequency controller on the fan depending on the desired flow rate. The new automatic setting and the extraction system will be powered by the network N. It is appropriate to provide for an additional power supply 25kVA for the new electrical panel with auto feeding and extraction system. The setting (Siemens S7 PLC type) is not performed redundantly. The control panel settings will be placed in the control room of the building 151X. Moreover, the setting must be linked to Active Factory system. Lighting and electrical outlets will be installed, connected and tested in the equipment room.

CORRECTION NOTICE # 1 Works bypass clear waters and modernization of secondary pumping stations # 3 and # 5 main and pumping station No. 8 Provisional

Association Intercommunale pour le Démergement et l'Epuration des communes de la Province de Liège | Published June 18, 2014  -  Deadline June 25, 2014
cpvs
45310000

The company studied the overall engineering GREISCH includes: 1. Démergement The company "modernization secondary pumping station démergement No. 5 (DIHEC 2013/12)," which is to modernize the electromechanical and to retrofit the pumping station, corresponding in particular to the work below: a. replacing pumps démergement, aged approximately 50 years, by pumps 150 l / s; b. installing a pump 70 l / s, driving the water from one or the other of the sumps in the pressure pipe made of a prior contract; c. replacement of pipes and valves located between the entrance to the station and catch basins; d. replacement of medium voltage electrical installations, the installation of two new dual-voltage transformers (15kV / 6,3 kV) and installation of new circuit breakers to connect the new cables laid; e. replacement of low voltage, or the realization of a new main switchboard and control panel electrical installations; f. replacement of domestic electrical installations, renewal of the counter, auxiliary table, lighting, sockets, heating, etc.. ; g. the placement of a telecommunications system control and alarm; h. refurbishment of the building; 2 The company purification "Derivation clear waters suppressed by the secondary pumping station démergement No. 3 Seraing - Part 2." (62063/01/C134) to modernize the electromechanical pump station - Part sanitation, corresponding in particular to the work below. a. installing a pump 40 l / s, driving the water from one or the other of the sumps in the pressure pipe made of a prior contract; b. installation of equipment necessary for the operation of this pump (electrical panel, piping, flow meter, surge vessel, etc. 3 business démergement "Seraing - Pumping Station No. 3 - Electro - Modernisation - 1st batch.. and Pumping Station No. 8 Provisional "(62063/01/P006) to modernize the electromechanical pump station # 3 - Part bis sanitation and build the pumping station No. 8 provisional, including matching For work below the pumping station # 3:... has replacement pumps démergement, aged about 70 years, by pumps 150 l / s, b replacement of pipes and valves located between entrance to the station and catch basins c construction of a new building, incorporating a new cab medium voltage and a technical room with surge vessel;. replacement of medium voltage electrical installations or installation. MV equipment in the new building (including two new dual voltage transformers - 15kV / 6,3 kV) and demolition of cubicles MT located at the bottom of the plot; e. replacement of low voltage, or the realization of a new main switchboard and control panel electrical installations; f. replacement of domestic electrical installations, or renewal of the counter, auxiliary table, lighting, sockets, heating, etc.. ; g. placing a remote control system and an alarm; h. refurbishment of the building. For temporary pumping station No. 8, the works include the rehabilitation sump pumping an old cellar of the Meuse water supply for the metal industry (including large-Work, electromechanical, power, telecommunications ) and the completion of a massive winnowing.

Diversion works clear waters and modernization of secondary pumping stations No. 3 and No. 5 and Main Pumping Station No. 8 Provisional

Association Intercommunale pour le Démergement et l'Epuration des communes de la Province de Liège | Published May 21, 2014  -  Deadline June 25, 2014
cpvs
45310000

The company studied the overall engineering GREISCH includes: 1. Démergement The company "modernization secondary pumping station démergement No. 5 (DIHEC 2013/12)," which is to modernize the electromechanical and to retrofit the pumping station, corresponding in particular to the work below: a. replacing pumps démergement, aged approximately 50 years, by pumps 150 l / s; b. installing a pump 70 l / s, driving the water from one or the other of the sumps in the pressure pipe made of a prior contract; c. replacement of pipes and valves located between the entrance to the station and catch basins; d. replacement of medium voltage electrical installations, the installation of two new dual-voltage transformers (15kV / 6,3 kV) and installation of new circuit breakers to connect the new cables laid; e. replacement of low voltage, or the realization of a new main switchboard and control panel electrical installations; f. replacement of domestic electrical installations, renewal of the counter, auxiliary table, lighting, sockets, heating, etc.. ; g. the placement of a telecommunications system control and alarm; h. refurbishment of the building; 2 The company purification "Derivation clear waters suppressed by the secondary pumping station démergement No. 3 Seraing - Part 2." (62063/01/C134) to modernize the electromechanical pump station - Part sanitation, corresponding in particular to the work below. a. installing a pump 40 l / s, driving the water from one or the other of the sumps in the pressure pipe made of a prior contract; b. installation of equipment necessary for the operation of this pump (electrical panel, piping, flow meter, surge vessel, etc. 3 business démergement "Seraing - Pumping Station No. 3 - Electro - Modernisation - 1st batch.. and Pumping Station No. 8 Provisional "(62063/01/P006) to modernize the electromechanical pump station # 3 - Part bis sanitation and build the pumping station No. 8 provisional, including matching For work below the pumping station # 3:... has replacement pumps démergement, aged about 70 years, by pumps 150 l / s, b replacement of pipes and valves located between entrance to the station and catch basins c construction of a new building, incorporating a new cab medium voltage and a technical room with surge vessel;. replacement of medium voltage electrical installations or installation. MV equipment in the new building (including two new dual voltage transformers - 15kV / 6,3 kV) and demolition of cubicles MT located at the bottom of the plot; e. replacement of low voltage, or the realization of a new main switchboard and control panel electrical installations; f. replacement of domestic electrical installations, or renewal of the counter, auxiliary table, lighting, sockets, heating, etc.. ; g. placing a remote control system and an alarm; h. refurbishment of the building. For temporary pumping station No. 8, the works include the rehabilitation sump pumping an old cellar of the Meuse water supply for the metal industry (including large-Work, electromechanical, power, telecommunications ) and the completion of a massive winnowing.

SWDE ​​- Production - Sector C - Limburg - Replacement motorized valves to the chamber 7 Goé

Société wallonne des eaux (S.W.D.E.) | Published November 27, 2015  -  Deadline January 8, 2016
cpvs
31720000, 45200000

The contract includes all activities and all supplies "turnkey" for the maintenance of the chamber 7 facilities, namely the replacement of several motorized valves and manual (DN1100, DN600, DN300, ...) ; The replacement of a venturi with an electromagnetic flowmeter (DN700); Logistics and handling for installation and commissioning of equipment to replace (valves and electromagnetic flowmeter); Modification / adaptation of pipes; The adaptation of the civil engineering and construction for the installation of new facilities; The adaptation of the electrical installation and automation; The update of remote management ABB; All security measures necessary for carrying out the work; The states and their places récolements; The site installation logistics and security; The cuts and repairs to the roof waterproofing; The maintenance work according to the laws and regulations during the execution of the work; technical receptions, commissioning equipment; As indicated in the various special specifications; The ensemble's commissioning with all constraints that result.

Repair and maintenance services

RW-SpW-DGO2-DGHI-direction de la gestion hydrologique intégrée | Published October 31, 2015  -  Deadline December 2, 2015
cpvs
50000000

This service contract includes all supplies, services and trips needed for maintenance, retention perfect condition, repair, adaptation and installation of measuring devices, acquisition data, remote transmission of alarms and equipping stations on the hydrological monitoring of rivers in the Walloon Region. The stations are to maintain distributed throughout the Walloon region with the exception of a few specific stations in the regions or neighboring countries. The stations may include, among others: - the gauges, - rain gauges, - ultrasonic flowmeter, - Pressure sensors ... All these stations are so transmitted via different types of local transmission systems and via switched telephone lines or by GPRS and GSM networks to the technical center in the direction of integrated management hydrology located PEREX Centre, Rue del 'Greete 22-5020 Daussoulx. Maintenance of the means of remote transmission, visualization and tele-transmitted data management of operational center is also part of this market.

Public service contract for maintenance and troubleshooting the network of hydrological telemetry Wacondah.

RW-SpW-DGO2-DGHI-Direction de la Gestion Hydrologique Intégrée | Published October 23, 2014  -  Deadline December 1, 2014
cpvs
50000000

This service contract includes all supplies, services, and travel necessary for maintenance, retention perfect working order, repair, adjustment and installation of measuring devices, acquisition Data, data transmission and fitted alarms hydrological monitoring stations on the rivers of the Walloon Region. Stations to maintain are distributed throughout the Walloon Region with the exception of a few specific stations in the regions or neighboring countries. Stations may include, among others: * the * rain gauges gauges * ultrasonic flowmeter sensors * Pressure ... All these stations are remotely transmitted via different types of local systems and transmission over telephone lines or switched by GPRS and GSM technology to the center of the Directorate for Integrated Hydrological Management Centre located in PEREX networks, Via del 'Greete 22-5020 Daussoulx. Maintenance of telecommunications means, viewing and management the uploaded data operations center is also part of this contract.

Invitation to submit an offer - LEGLISE - LOT LE10 - WITRY PUMPING STATION - HYDRAULIC WORK, ELECTROMECHANICAL, ELECTRICITY, PROGRAMMING, SUPERVISION - Direct negotiated procedure with advertisement

AIVE | Published June 22, 2017  -  Deadline September 20, 2025
cpvs
41110000, 45232100, 45232152

Pumping station of Basseille - Replacement of an existing pump unit. - Connection of the supply line to Louftémont on pump discharge, replacement and installation of valves.- Installation of a flowmeter on each discharge branch, installation of Pressure switch, pressure sensor and level, incl. Pipe fitting. - Wiring, connection of the equipment to be installed in the market, installation of an intrusion detector. Note: wiring of the existing and tertiary equipment remains in place. - Replacement General Low Voltage board, installation of soft starters, automatic and emergency operation, control via HMI. - Automation, regulation, control and monitoring of plant operation - Secure high-speed network communication, supervision, alarm transmission and operating reports - Secure access to the discharge chamber, metal joinery.Chémont reservoir- Installation of a continuous level measurement.Chateau d'eau de Louftémont- Installation of a hydraulic servo valve on the filling line.