Substation Protection & Automation latest

Turku Energia Sähköverkot Oy | Published December 13, 2016  -  Deadline February 3, 2017
Turku Energy Electricity Networks Ltd will renew three medium voltage switchgear substation protection and automation systems. Turnkey includes medium voltage switchgear protection and automation systems as a total rebuild. The acquisition also included the necessary civil works and demolition. The acquisition will form a functional whole electric station with the use of the remaining components and systems. Protective relays must be a microprocessor-based sensor specific combination packages with relesuojaus-, measuring, controlling, position indication and Hai-riötallennustoiminnot is connected to the same corporate entity. Medium voltage switchgear remains of cells, which do not come to install the new relays. demolition of the old relays these fields is included in the purchase. Switchgear doors will be new or old doors are left to fill gaps. Switchgear should be clean in appearance and uniform. Acquisition includes 1 piece telecom industry station / substation Turku Energy Electricity Networks Ltd will renew three medium voltage switchgear substation protection and automation systems.

Electricity distribution and control apparatus

Turku Energia Sähköverkot Oy | Published December 14, 2016  -  Deadline February 3, 2017

Turku Energy Electricity Networks Ltd will renew three medium voltage switchgear substation protection and automation systems.

Turnkey includes medium voltage switchgear protection and automation systems as a total rebuild. The acquisition also included the necessary civil works and demolition. The acquisition will form a functional whole electric station with the use of the remaining components and systems.

Protective relays must be a microprocessor-based sensor specific combination packages with relesuojaus-, measuring, controlling, position indication and Hai-riötallennustoiminnot is connected to the same corporate entity.

Medium voltage switchgear remains of cells, which do not come to install the new relays. demolition of the old relays these fields is included in the purchase. Switchgear doors will be new or old doors are left to fill gaps. Switchgear should be clean in appearance and uniform.

Acquisition includes 1 piece telecom industry station / substation.

Organisation of architectural design contests

Turun Ylioppilaskyläsäätiö | Published January 19, 2017

Turku Student Village Foundation organizes two student housing blocks of the design of the architectural competition.

The competition is organized architecture of an invited competition in accordance with the principles of the construction design competition in which participants of competition are selected from among the minimum requirements to eligible registered.

Design solutions will be the urban landscape, architecturally and functionally high-quality and viable. The design of the solution must meet the technical and economic, energy-saving and life-cycle financial goals in a fair, appropriate and feasible.

The final amount of the construction takes shape further planning and change the formula of competition. assessed the extent of the competition new construction projects shall not exceed:

August 1 000 - 12 000 m²;

October 2 000 and 20 000 m².

The region 2 is pending before the town plan change / 9/2010 formula ID "Silence of the hill," diario number 13664-2009.

The results of the contest will serve as the basis for the status change in the formula are prepared. Architecture complain about the competition, participants are invited to participate in the contest in the two regions, but the restoration of areas design competitions are held and settled in parallel separate competition.

Architectural Competition

Turun Ylioppilaskyläsäätiö | Published January 18, 2017
Turku Student Village Foundation organizes two student housing blocks of the design of the architectural competition. The competition is organized architecture of an invited competition in accordance with the principles of the construction design competition in which participants of competition are selected from among the minimum requirements to eligible registered. Design solutions will be the urban landscape, architecturally and functionally high-quality and viable. The design of the solution must meet the technical and economic, energy-saving and life-cycle financial goals in a fair, appropriate and feasible. The final amount of the construction takes shape further planning and change the formula of competition. assessed the extent of the competition new construction projects shall not exceed: 1. of 8 000 - 12 000 m² October 2 000 20 000kem² area 2 is pending before the town plan change / 9/2010 formula ID "Silence of the hill," diario number 13664-2009. The results of the contest will serve as the basis for the status change in the formula are prepared. Architecture complain about the competition, participants are invited to participate in the contest in the two regions, but the restoration of areas design competitions are held and settled in parallel separate competition. Turku Student Village Foundation organizes two student housing blocks of the design of the architectural competition. The competition is organized architecture of an invited competition in accordance with the principles of the construction design competition in which participants of competition are selected from among the minimum requirements to eligible registered.