Public tenders for energy in Salo Finland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Solar energy

Salon kaupunki | Published September 11, 2015
Winner
Salo Energia c/o Areva Group Oy
cpvs
09330000

Supply of solar energy is oriented around the provision of Salon Upper Secondary School.

Energy consumption monitoring system

Salon kaupunki | Published November 23, 2017  -  Deadline December 14, 2017
cpvs
48614000, 48000000

Salon City's facility services are inviting offers from the Energy Consumption Monitoring Service. The acquisition includes the establishment of a consumption monitoring system and a tracking service for a period of 3 years. After the contract period, the contract will continue for an indefinite period of time, with the contract being terminated for three (3) months by the subscriber and six (6) months for the service provider. Salon City's facility services are inviting offers from the Energy Consumption Monitoring Service. The acquisition includes the establishment of a consumption monitoring system and a tracking service for a period of 3 years. After the contract period, the contract will continue for an indefinite period of time, with the contract being terminated for three (3) months by the subscriber and six (6) months for the service provider.

Contract solar energy supply of Salon Upper Secondary School

Salon kaupunki | Published September 8, 2015
cpvs
09330000

Supply of solar energy is oriented around the provision of Salon Upper Secondary School.

Electricity, heating, solar and nuclear energy

Salon kaupunki | Published October 17, 2017  -  Deadline November 14, 2017
cpvs
09300000

The contract period starts on 1 June 2019.

Salon Kaukolämpö Oy has in Perniö Metalantie 1 a 3 MW bio-boiler and 2 x 2 MW oil boilers and a biofuel warehouse with a surface area of ​​270 m2 and a 50 m3 oil tank.

The plant has a 0.7 MW bio-boiler and 0.895 MW light oil boiler and a biofuel storage tank of 120 lm3 and a 14 m3 oil tank.

The proportion of treewood must be at least 70%.

The district heating network has a peak power of 1 MW.

The biofuel used can be 100% wood chips (hullwood).

Energy production and management of the heating plant.

The amount of energy that is based on invoicing is counted from the biomass energy meter.

As an exception, the devices for bio-cogeneration equipment, which are negotiated separately.

The non-VAT price (EUR / MWh) of the offer will be issued for the period 1 June 2019 to 31 May 2022, option period 1.6.2022 - 31.5.2025.

Electricity, heating, solar and nuclear energy

Salon kaupunki | Published October 21, 2017  -  Deadline November 14, 2017
cpvs
09300000

Salon Kaukolämpö Oy will apply for your supply of biofuels and the management of biomass heating plants for Perniö and Pertteli biomass heating plants. The contract period starts on 1 June 2019.

Purchase of biofuel supply and heat treatment facilities

Salon kaupunki | Published October 15, 2017  -  Deadline November 14, 2017
cpvs
09300000

The district heating network has a peak power of 1 MW. Energy production and management of the heating plant

Loss of electrical power supply

Caruna Oy | Published January 19, 2015
Winner
Energiakolmio Oy
cpvs
65000000

The agreement applies to both Caruna Ltd (Business ID: 1618314-7) and Caruna Espoo Oy (Business ID: 2059588-1) regional and distribution losses of electric energy procurement: - the physical loss of electricity supply (the interval 1.1.2016-31.12. 2019), - loss power procurement risk management (period 1.4.2015-31.12.2019).

Connecting Kuusjoki school, kindergarten and geothermal Kuusjokitalon

Salon kaupunki | Published June 13, 2017  -  Deadline July 4, 2017
cpvs
45210000

Dimensioning is 530MWh, hot water consumption ka 1075 m3 / year, from which hot water for approximately 25 MWh / year. Deferred demand peak is about 210 ... 220MWh, when the hot water is buffered. Heat pumps: -yhteisteho 170-180 kW (B0W35) IV, Kuusjokitalo and school Underfloor heating hot water radiator system The contract also includes demolition and removal of old equipment. If the plan is modified, the offer will be included to give an outline of an alternative well field. - Thermal wells of 12 x 260 m (with active 12x256m), the collector of 2x45mm turbo collector of 5mm - Geothermal fluid Altia naturetin -17 ° C (wt% of 28%) or the like - the collection and removal drilling waste - installation of horizontal piping to a collecting well (experimental wells coupling including) - The technical state of the frame tube end seals If necessary, around the horizontal tubes of fine soil. Automation: the heating system connected to the building automation system via such a way that the secondary controls are also ADR control. Geothermal systems installed in separate energy measurements, which provides the actual COP coefficient of the system. Other Considerations: Licenses: Geothermal power plants in the autumn break is coupled weeks 42 weeks. Dimensioning is 530MWh, hot water consumption ka 1075 m3 / year, from which hot water for approximately 25 MWh / year. Deferred demand peak is about 210 ... 220MWh, when the hot water is buffered. Heat pumps: -yhteisteho 170-180 kW (B0W35) IV, Kuusjokitalo and school Underfloor heating hot water radiator system The contract also includes demolition and removal of old equipment. If the plan is modified, the offer will be included to give an outline of an alternative well field. - Thermal wells of 12 x 260 m (with active 12x256m), the collector of 2x45mm turbo collector of 5mm - Geothermal fluid Altia naturetin -17 ° C (wt% of 28%) or the like - the collection and removal drilling waste - installation of horizontal piping to a collecting well (experimental wells coupling including) - The technical state of the frame tube end seals If necessary, around the horizontal tubes of fine soil. Automation: the heating system connected to the building automation system via such a way that the secondary controls are also ADR control. Geothermal systems installed in separate energy measurements, which provides the actual COP coefficient of the system. Other Considerations: Licenses: Geothermal power plants in the autumn break is coupled weeks 42 weeks.

Perniön Wuori castle kindergarten structural, electrical and HVAC engineering contracting

Salon kaupunki | Published November 27, 2015  -  Deadline December 16, 2015
cpvs
71000000

Salon City area services, request quotes for a new kindergarten building to be built in Perniö structural, electrical, and HVAC planning under this invitation to tender and its annexes. Salon in the city is to be the year 2016-2017 during the construction of a new kindergarten building Perniö According to this invitation to tender annexed to the principal drawings. The building will have day-care facilities for about 140 children in such a way that child care spaces are divided into four traditional day-care department and the buildings will also have functions of pre-school education, as well as a variety of päivähoidollisiin half-day group and club activities. Heating system is hydronic floor heating. The ventilation system is a mechanical exhaust / supply air system with heat recovery. The building is connected to the district heating network. The construction project will be implemented during 2016 - 2017 period. Tenders for the contract to be drawn up a plan documents must be completed by 03.29.2016. Overview of the energy efficiency target date for class A (ET max. 140kWh / gross m2 / s). NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.
  • 1