Public tenders for electricity in Szombathely Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity

Szombathely Megyei Jogú Város Önkormányzata | Published April 7, 2017
Winner
MVM Partner Zrt.
cpvs
09310000

8.918 million kWh. Compared to the total quantity -30% tolerance.

Electricity supply Szombathely Municipality and for institutions.

8.918 million kWh. relative to the total quantity - 30% tolerance.

Electricity

Szombathely Megyei Jogú Város Önkormányzata | Published February 25, 2015  -  Deadline April 13, 2015
cpvs
09310000

On the basis of commercial electricity purchase contract Szombathely Municipality and institutions.

NOTICE TO INITIATE PROCESS - "Electricity purchasing 2015"

SZOVA Szombathelyi Vagyonhasznosító és Városgazdálkodási Zrt. | Published July 29, 2015  -  Deadline August 17, 2015
cpvs
09310000

Full supply, consumer agenda without electricity transmission service agreement

Contract award notice - "Electricity purchasing 2015"

SZOVA Szombathelyi Vagyonhasznosító és Városgazdálkodási Zrt. | Published October 16, 2015
Winner
MVM Partner Zrt.
cpvs
09310000

Full supply, consumer agenda without electricity transmission services contract Total quantity or scope: Contracting authority reserves the right to 1.6 GWh, compared to the specified maximum quantities, depending on the application - a 20% rate separate charge depart. (quantitative tolerance band)

Electricity

Szombathely Megyei Jogú Város Önkormányzata | Published November 8, 2016  -  Deadline December 13, 2016
cpvs
09310000

8.918 million kWh. Compared to the total fuel - 30% tolerance.

Information - EEOP 2015-4.10.0 / U Szombathely Szombathely City owned 3785/33. hrsz.-U Olad Tanuszoda thermal and heat pump technology and solar panels for the electricity needs of ...

Szombathely Megyei Jogú Város Önkormányzata | Published November 16, 2015
cpvs
45310000, 09331000

Subject: Szombathely Szombathely City owned and implemented by the EEOP 2015-4.10.0 / U 3785/33 project. hrsz.-U Olad Tanuszoda thermal and heat pump technology and the preparation and implementation works of solar panels for electricity export plans for the needs Quantity: technical document sent as an attachment in accordance with the call.

Notes - EEOP 2015-4.10.0 / U project - Szombathely Szombathely owned by 3785/33. hrsz.-U Olad Tanuszoda thermal and heat pump technology and solar panels for electricity needs ... II.

Szombathely Megyei Jogú Város Önkormányzata | Published November 25, 2015
Winner
KG INVEST 2008 KFT.
cpvs
45310000, 09331000

Subject: Szombathely Szombathely City owned and implemented by the EEOP 2015-4.10.0 / U 3785/33 project. Preparation and implementation works hrsz. II-U Olad Tanuszoda thermal and heat pump technology and solar panels plans to export electricity needs. The amount of technical documentation submitted as an attachment to the notice in accordance.

Szombathely, Wesselényi u. Building at number 4 in the heartwood for offices, and the establishment of service areas

Szombathelyi Egészségügyi és Kulturális Intézmények Gazdasági Ellátó Szervezete | Published July 17, 2015
Winner
B-Söv Kf.
cpvs
45315100

Szombathely, Wesselényi u. Building at number 4 in the heartwood for offices, service areas and the establishment of a mezzanine floor of the existing building formerly of Szombathely City medical duty work. Other recovery occurred since 2004, but will now also work in medical service. The conversion or refurbishment 93.45 m2 area on the north side, the south side affects 195.95 m2 area. - Façade doors and windows (windows) replacing (26 pcs) - Replacing (11 pieces) as needed interior doors - the room in groups other than hardwood floors premises replacing all housing, offices laminate flooring (200 m2), the other rooms ceramic tiles (about 110 m2), tiles (about 90 m2) - Development of the total room ceiling (about 300 m2) - all spaces Painting (1,100 m2) - the outer facade of the osztópárkányig will be renovated, insulation fitted (approximately 285 m2) - 2 Except piece of engineering existing boiler is fully renovated - the building electricity completely renovated, as well as IT and other low-voltage network will be converted.

Change management contract

Szombathelyi Evangélikus Diakóniai Központ | Published December 2, 2015
Winner
„Thermo Épgép Kft.” Építőipari Szolgáltató és Kereskedelmi Kft.
cpvs
45321000, 45421100, 45331100, 45331210, 45316000, 45261215, 09331000

Details of the project is to quantify the Grant Contract by: Monitoring indicators: Target (cumulative) achieving Date (cumulative values).... 10.31.2015 / 10.31.2016 / 10.31.2017 / 31.10.2018 / 10.31.2019. - The reduction in greenhouse gas emissions [t / y] (Change Goal 333.77): 333.77 / 667.54 / 1 001.31 / 1 335.08 / 1 668.85 - an increase of renewable energy sources (electricity production) [GWh / year] (target value change: 0.0736) 0.0736 / 0.1472 / 0.2208 / 0.2944 / 0.3680 - The growth of renewable energy sources [GJ / year] (change the target value: 686.630 ): 686.630 / 1 373.260 / 2 059.890 / 2 746.520 / 3 433.150 - through increased energy efficiency savings year-old primary (primary) energy production [GJ / year] (change Goal 3 545.63): 3 545.63 / 7091, 26/10 636.89 / 182.52 14/17 Main 728.15, informative volumes: Thermal major quantities of 1,800 m2 with 10 cm EPS 390 m2 and 5 cm facade insulation XPS 435 m2 15 cm glass wool insulation slab 3580 m2 15 cm rock wool roof insulation and windows replacement main quantities: - 275 pieces of door and window replacement Heating modernization major quantities of: 1 x 65 kW condensing gas boiler Lighten upgrading main quantities: - 5 pcs 11W energy saving bulb, - 188 pieces 15W energy saving lamp, - 362 pieces of fluorescent lamp fluorescent Ventilation main volumes: the main volumes of 6 to 1000 m3 / h to 480 Pa performance talajhőt utilizing heat recovery ventilation Solar system - major quantities of 100 pieces of solar collector (flat collector) Solar - 263 pieces of 240-watt solar panel Detailed technical content and quantitative data included in the documentation (working drawings, technical specifications, unpriced budget).

Contract award procedure

Szombathelyi Evangélikus Diakóniai Központ | Published May 18, 2015
Winner
„Thermo Épgép Kft.” Építőipari Szolgáltató és Kereskedelmi Kft.
cpvs
45321000, 45421100, 45331100, 45331210, 45316000, 45261215, 09331000

Details of the project is to quantify the Grant Contract by: Monitoring indicators: Target (cumulative) achieving Date (cumulative values).... 2015.10.31 / 2016.10.31 / 2017.10.31 / 2018.10.31 / 2019.10.31. - The reduction of greenhouse gas emissions [t / y] (Change Goal 333.77): 333.77 / 667.54 / 1 001.31 / 1 335.08 / 1 668.85 - an increase of renewable energy sources (electricity production) [GWh / year] (target value change: 0.0736) 0.0736 / 0.1472 / 0.2208 / 0.2944 / 0.3680 - The growth of renewable energy sources [GJ / year] (change the target value: 686.630 ): 686.630 / 1 373.260 / 2 059.890 / 2 746.520 / 3 433.150 - through increased energy efficiency savings year-old primary (primary) energy production [GJ / year] (change Goal 3 545.63) 545.63 3/7091, 26/10 636.89 / 182.52 14/17 Main 728.15, informative volumes: Thermal principal amounts of 1800 m2 with 10 cm EPS 390 m2 and 5 cm facade insulation XPS 435 m2 15 cm glass wool insulation slab 3580 m2 15 cm rock wool roof insulation, window replacement main quantities: - 275 pieces of door and window replacement Heating modernization major quantities of: 1 x 65 kW condensing gas boiler Lighten modernization major quantities: - 5 pcs 11W energy saving bulb - 188 pieces 15W energy saving lamp, - 362 pieces of fluorescent lamp fluorescent Ventilation major quantities: the major quantities of 6 to 1000 m3 / h, 480 Pa performance talajhőt utilizing heat recovery ventilation Solar system - major quantities of 100 pieces of solar collector (flat collector) Solar - 263 pieces of 240-watt solar panel Detailed technical content and quantitative data included in the documentation (working drawings, technical specifications, unpriced budget). 4200 m2. The estimated value calculation: According to the Grant Contract Estimated value of construction works (during the construction project eligible costs of the project, according to the Grant Contract): 320,466,400 HUF Net Reserve for the sum of: 0 HUF

"Government efforts to improve accessibility SIOP Window 3.3.1 / A-12 / 2-2013-0020 Koszeg, Jurisich space 6."

Vas Megyei Kormányhivatal | Published December 17, 2014
Winner
Bereczki Kft.
cpvs
45215222

"Providing equal access to public services: accessibility of the Iron County Government Office", and SIOP 3.3.1 / A-12/2. within the framework of code project, the Koszeg, Jurisics space Government Window under 6 accessibility works of construction 'Quantities: - Mechanical demolition 2, 6 m, 1 KLT - Heating installation works 32 cases, 3 KLT, one system - Air conditioning installation works 74 m, KLT 4, 1, 1 system - Architectural and structural breakdowns 36 m3, 72.37 m2 - Temporary side facilities and other costs KLT 1 - Cleaning 201.66 m2, m3 7, two KLT - Field 0.153 m3 of concrete and reinforced concrete work, 31 76 m2 - 10 m2 Plastering - interior Siding 188.1 m2 and 29.53 m - Covering outer space of 6.72 m2, 0.3 m - placing 2 Front doors - Internal doors and placing 3 - Disposal of Metal Structures 1 9 m - Colour 1059.19 m2 - placing frames with 29 - Vanity Items placing 8 - Low voltage distribution equipment, Cabinets Item 4 - Structures 3180 FM 120 - Cables 1841 m - Fittings 155 pieces of one item - Installation materials and other items 56, 25 items, 50 Spot - Lighting 58 pieces - Weak current system Item 3 - Weak current rack 800x800x42U, 2 7-inch socket line 1U, cable entry 3 patch panel complete with 6 Cabel manegmenttel, fully wired, commissioning , negotiation, execution plan making system, complete with tool 3kVA Rackmount UPS - structured Cat5e network cable 2x4x0,5 mm2 - RJ45 / RJ45 network connector structured 45x45, prapetcsatornába, wiring, complete - RJ45 / RJ45 network connector recessed structured, baying frame, wiring, complete - structured RJ45 network connector 45x45, prapetcsatornába, wiring, complete - Demolition work building electricity Item 4 - Documenting 7 results

Change Treaty - the square in front of St. Martin's Church renovation of administrative licensing, to obtain the building permit full and complete implementation plans, to ensure the technical management planning.

Szombathely Megyei Jogú Város Önkormányzata | Published December 9, 2015
Winner
Litkei Építésziroda Kft.
cpvs
71220000

Subject square in front of St. Martin's Church renovation of administrative licensing, to obtain the building permit full and complete implementation plans, to ensure the technical management planning. Quantity: planning tasks: Preparatory works: - Concept Plan Preparation: accurate demarcation of the areas to be renovated. - Utility genplán Preparation: In parallel with the concept plan and in accordance with the preparation of combined utility development proposal (un genplán.) Based on the utility service providers of investors and professional consultations, the renovation, induce and newly-built utility lines realignment of boundaries and construction works chronology determination. - Design base map preparation: Preparation Planning basemap supplementing the existing geodetic measurement. Making full preparation of design documentation for building permit before St. Martin's Church Square in the Design task of renovating the historic environment (road and housing construction, utility construction documentation) for approval and implementation plans. The discipline-specific design work by authorized personnel, with the necessary expertise to perform. Major design tasks: - preparing the square in front of Saint Martin's church renewal of the authorization and detailed design documentation in a way that accessibility of the square next to the square and institutions with a motor vehicle to be insured. - On Street furniture, equipment and other elements of the preparation of the plaza building permit and detailed design documentation. - Preparation of rainwater drainage plan approval and construction documentation. - Preparing Public lighting and electricity network and export licensing terv¬doku¬mentációjának. - Landscaping and automatic irrigation network construction plan preparation of construction documentation. - The surveillance system of export licensing and design documentation can not be made only on the general plan should be included in the new location for an existing camera, if necessary move. Other Services: - preparation of site plans called for forming - preparation of utility reconstruction, replacements, new wiring (drinking water, storm water, sewage, gas, heating, telecommunications) permit and construction plans. Other design tasks: - Design of respect to get involved in the planning areas of the necessary contributions, especially the owners of the affected areas, managers of public utility service providers. According to the provisions of Government Decree and the relevant European directives, as well as taking into account those Hungarian harmonizing regulations and standards, in compliance with environmental regulations in force in the construction plan your products! Customer further planning in respect of the right to have an opinion and approval. The presentation of the plans, answer questions, at least 2 hours duration are available. If due to inefficiency or remedy procurement procedure for the execution of works to be repeated, the technical content and the evaluation of the budget must be carried out again, the opinion reiterates be given until after the effective procurement process construction contracts will take place. - If, during the intermediate and follow-up audits on issues concerning the project documents prepared by the Planning arise inspectors on behalf of the Director is required to be available by the end of the project monitoring obligation tolerance period. All coverages plan some budget chapters form is required. The Customer is entitled to the design documentation and preparatory work to monitor, to ask for the work done lots of information, relating to the design and documentation point of view to take a stand on issues important to them. The purpose of authorization shall be made according to official plans, specialized authorities and utility operators demand copies.

Information on the outcome - SIOP-2.2.6-12 / 1B-2013-0014 - "integration of outpatient and inpatient care Markusovszky the University Teaching Hospital in Szombathely and Körmend premises" - to carry out construction works of Körmend site

Markusovszky Egyetemi Oktatókórház | Published May 29, 2015
Winner
ZÁÉV Építőipari Zrt.
cpvs
45000000, 45100000, 45200000, 45300000, 45400000

A contract to the SIOP-2.2.6-12 / ID No. 1B-2013-0014, "the integration of outpatient and inpatient care Markusovszky the University Teaching Hospital in Szombathely and Körmend premises" Körmendi site required by implementation of the project construction work at SIOP 2.2.6- 12 / 1B 2013-0014 of SEQ ID NO needed to carry out "outpatient and inpatient care Markusovszky integration of the University Teaching Hospital in Szombathely and Körmend premises" in implementation of the project implementation works as follows: No. 5. below) for the builder. Technically parts of the building organically linked, discussions took place during the planning, but also a necessary co-ordination in the implementation of tasks for the development of the two areas, especially in the front, building engineering, building electricity, and especially to meet the fire regulations. Building Contracting perform evacuation, pass empty Contractor. Architecture: The ground floor of the farm building was constructed in the central part locker room, laboratory block and two medical rooms. (1310m2) I was raised housed in the specialized outpatient, patient recruitment and blood collection office space associated with the premises. (1370m2) in the II-th (775m2) and III-th floor (720m2) in the chronic internal medicine department, IV.-th floor (720m2) and was placed in the surgical department. VI floor (268m2) and mechanical engineering (565m2) loft is located. The building total net usable area of ​​6563m2. The building is full accessibility of reality. Building services engineering, ventilation and air conditioning technology: within the projected water pipes building: under the base lines utility tunnel and the respective levels ceiling, moving above the ceiling, the take-off established for this purpose a vertical shaft, the branch lines are also under the canopy, above the ceiling or in the water equipment downtime than szerelendőek wall. The rainwater evacuation of the building will be constructed separately from the waste water, the use of existing connections. Fresh air ventilation systems control is carried out on the basis of the supply air temperature. Total heat demand: 471 kW. The demand for cooling room of the hospital provide top level specially designed for this purpose compact chillers to be installed. The exhaust air is blown over the roof to the outside. Operating rooms and air-conditioning system serving the premises of the room environment carried out by central air handling units on the roof synth engine casing. The upper and lower operating theaters suction, exhaust service spaces the upper used. Building wiring, weak power: The offices were designed for patient call system areas of the hotel is modern nurse call systems. The HVAC equipment with its own automatic, error signal indicating failure must tableau the dispatcher center. The building gets a new lightning protection equipment to reduce the harmful effects of lightning pulses harmonized surge suppression system will be installed. Issued in the framework of the process design tasks quantities in short, for the facade program: 2750 m2 of facade window installation: 730 m2 Elevator renovations or installation: floor area affected 3 Total net refurbishment 6563 m2 Operating remodeling and renovation: 3 Option items: Office No ARCHITECTURE OPTION 1 TOTAL (aluminum doors and windows surcharge) OPTION 2 TOTAL TARKETT premium grade PVC jacket: OPTION 3 OPTION TOTAL glass cloth wallpaper wall coating 4. All Ages classroom ceiling 5. OPTION TOTAL southwest front ground floor - IV. floor area between wall screens a total of 1-2 as facade cladding design plan premium Architecture Options: ALL ELECTRICAL POWER SUPPLY BUILDING Building wiring option Medical Services Medical Devices gas 6: 225th § (1) and 6: 226th § rules apply.

Information - Pool construction and related engineering and medical technology equipment installation related to the SIOP-2.2.4-09 / 1-2010-0016 identification number project

Markusovszky Egyetemi Oktatókórház | Published October 7, 2015
Winner
Fertődi Építő és Szolgáltató Zrt.
cpvs
45000000, 45212212, 43324100, 45310000, 45332200, 45350000, 33100000

Swimming pool construction and related engineering and medical technology equipment installation related to the SIOP-2.2.4-09 / 1-2010-0016 identification number of "supporting infrastructure development in the Structure Variation Markusovszky Hospital" project on the following key parameters detailed documentation in accordance with the plan: Introduction at No. 5, the hospital, the new EU under construction. It plans to build the building basement spa pool. All products and inventory should be taken when installing the application on the basis of technical specifications and qualification requirements and the design documentation in particular. The size and structural data may exclusively and only the structural design documentation. A description of the customer's destination, the new EU. It plans to build a building basement spa pool where part of the hospital for patients as weight bath, water gymnastics and other treatments can be provided. The land and the parameters for the planned structure by As these are not changed, they will not be repeated herein. The structural, HVAC, electrical, lightning protection against noise and vibration control solutions, the way the energy requirements of Supporting structure, building engineering, building electricity, lightning protection: structural, HVAC, building electrical solutions include industry-specific construction plan documentation. Protection against noise and vibration: a) airborne sound insulation against airborne sound insulation solutions against the new EU. When you enable the building have been identified, these spa pool construction design does not change this. establishing protection b) Impact sound insulation against sound is not required. The accessibility of transport routes in the accessibility plan prepared by the general contractor. Description Specifications Typical data pools full regional data for the pool area includes a chapter spaces statements. Further details of the buildings function: medical building, hospital admissions Basin basement floor line: + -0.00 m basement floor line designed pool area: + -0.78 m floor line designed walkways around the pool. M +0.83, +1.28 m, + 1,95 m pool designed floor line: +0.15 m, + 0.65 Building Physics is generally part of the computing power in the building permit design documentation, it will not be repeated here. Layers statements limiter devices in the spa pool construction plan documentation with projected layer orders of pool. The Foundation works substructure designed spa pool the EU. building existing base plate is placed in the upper plane of new primitives are not made. On-site work and builder of prefabricated structures, monolithic reinforced concrete elements. wall structures and monolithic. export outlets are constructed according to a static plan. Masonry bricklayers and other structures) and other load-bearing walls of masonry structures and incorporate into the planned ramp pedestals and support of road users around the pool to 20 mm thick. louvre stone masonry designed. b) In other cases, the interior partitions partitions mounted structures, according to the original construction plan. c) chimneys and vents in the pool area dehumidification, fresh air supply and exhaust air terminals, systems engineering takes place, which includes the engineering construction plan. Plastering, rabicolás All élképzésnél necessary vakolóprofil or élképzőprofil use. Thermal Insulation Finishing structures a) in the case of the outer wall of the pool area designed facade insulation does not change, we must be prepared according to the original licensee and construction plan. b) placement of floor space the floor of the pool is not designed for thermal insulation. Insulation against rainwater pool area designed for rainwater insulation is not involved, does not change, we must be prepared according to the original licensee and implementation plans. Insulation against ground water in the pool area designed for insulation against water in the ground is not involved, does not change, we must be prepared according to the original licensee and construction plan. Use insulation against water spreadable insulation on the side walls of the pool must be kept under the full height of the proposed wall. Wall and floor coverings, non-slip flooring in space engineering resin coating. Forklifts structures. windows and doors in the inner walls of windows and doors megépítéeni other cases must be based on the original plan. Lakatos, plastic and aluminum structures a) plastic and aluminum structures of plastic and aluminum structures must be made according to the original construction plan. b) Ancillary mechanical structures of the finished item is then only screwed
  • 1