Debreceni Egyetem | Published October 26, 2017  -  Deadline November 29, 2017
cpvs
09310000

DEK-488/2017: Purchase contract for the purchase of electricity for the University of Debrecen.

DEK-488/2017: Contract for Purchase of Electricity for the University of Debrecen.

Acquisition of electricity in the amount of 17 186 744 kWh on 1.1.2018. - 31.12.2018. between. During the contract period, a deviation of + 20% compared to the contract quantity is possible (according to point II.2.11).

Details are included in the technical documentation (2018 Electricity Supply Technical Data, University of Debrecen Quarterly Measurement Data 2016).

Electricity

Debreceni Egyetem | Published March 8, 2017
Winner
MVM Partner Zrt.
cpvs
09310000

DEK-transporting electricity contract 369_Adásvételi subject of Reason Part of bidding for the exclusion of the University of Debrecen: the agreement with the so-called full supply electricity purchase contracts, contracting can obtain electricity is only on the basis of a source (a contractor). contracting electricity consumption sites use the same nature, hence there is no technical reason that would require parts of the bidding. full board without contracting the so-called consumer-based broadcast schedule enters into a power purchase agreement, the electricity demand of places that use a commercial licensee shall ensure, so portions of the bid is not applicable.

Purchases of electricity 16 million kWh for a period of 12 months. During the contract period with respect to the contractual quantity + 20% tolerance.

Electricity

Debreceni Egyetem | Published November 12, 2016  -  Deadline December 16, 2016
cpvs
09310000

DEK-369_Adásvételi transport contract for electricity subject of the University of Debrecen.

Part of the reason for exclusion from bidding: the agreement with the so-called full supply electricity purchase contracts, contracting can obtain electricity from a single source (a contractor) is exclusively based.

contracting electricity consumption sites use the same nature, hence there is no technical reason that would require parts of the bidding. full board without contracting the so-called consumer-based broadcast schedule enters into a power purchase agreement, the electricity demand of places that use a commercial licensee shall ensure, so portions of the bid is not applicable.

Delivery of DEK-369_ electricity purchase and sale contract for the subject of the University of Debrecen.

Purchases of electricity 16 million kWh for a period of 12 months. During the contract period with respect to the contractual quantity + 20% tolerance.

The details (University of Debrecen quarter-hour measurements of technical data 01.01.2015 2017 Annual electricity supply,.. - 31.12.2015) the technical documentation.

Electricity

Debreceni Vagyonkezelő Zrt. | Published December 16, 2015
Winner
MVM Partner Zrt.
cpvs
09310000

. Electricity sales contract in Debrecen Property Management Inc. 7 member companies: -... Ltd. Debrecen Waterworks - Company DKV Debreceni Transport - Debrecen Heat Supply Company - Civis House, Inc. - Kft Debrecen City Television - Spa Debrecen Kft... - DV Parking Ltd, as well. - Phoenix Event Management Nonprofit Kft. - Debrecen Sport Centre Nonprofit Kft. - MSE. - Hungary Sport and Lifestyle Development Cluster Ltd. for the Hungarian electricity transmission network is constantly available, the use of local connection Obtaining adequate quality characteristics of electricity (for the purchase of commercial relationship) 01/01/2016. (0:00) and 12.31.2016. Within the framework of full supply electricity purchase contract with no scheduling commitments for the period (24:00), which includes the accounting system of user charges.

Electricity

Debreceni Egyetem | Published November 10, 2017  -  Deadline November 29, 2017
cpvs
09310000

DEK-488/2017: Purchase contract for the purchase of electricity for the University of Debrecen.

Electricity

Debrecen Megyei Jogú Város Önkormányzata | Published October 12, 2016  -  Deadline November 14, 2016
cpvs
09310000

The contracting 01.01.2017. (0:00) - 12.31.2017. Purchase of providing electrical energy needs for the period (24:00) electricity a total of 14,828,708 kWh + amounts to 50%, which includes the quantities received used and contracting Debrecen Municipality of contracting the administrative area of ​​public lighting use electricity as well (public lighting amount of energy use in kWh 6,379,927 + 50%).

Electricity

Debreceni Vagyonkezelő Zrt. | Published September 22, 2016  -  Deadline October 26, 2016
cpvs
09310000

The contracting entity (s) 01.01.2017. (0:00) - 12.31.2017. providing electrical energy needs for the period (24:00) electricity purchase of a total number of 27.4 GWh + 40% Contracting (k) Use existing locations: 1049 pcs.

Electricity

Debreceni Vagyonkezelő Zrt. | Published October 3, 2015  -  Deadline November 16, 2015
cpvs
09310000

The electric power sales contract with the Debreceni Holding Company. 7 member companies, DKV Debreceni Transport Debrecen Heat Supply Civis House Debrecen City Television Spa Debrecen DV Parking Ltd, Ltd., Ltd., Ltd., Ltd., Ltd. (Debrecen Waterworks Co... ) and Phoenix Event Management Nonprofit Debrecen Sport Centre Nonprofit MSE Hungary Sport and Lifestyle Development Cluster sourcing Kft., the Hungarian electricity transmission network is constantly available and appropriate use local connection characteristics of quality electricity, Ltd., Ltd. (trading relationship with purchase) 01/01/2016. (0:00) -31.12.2016. Within the framework of full supply without electricity, scheduling commitments for the period (24:00) sale and purchase agreement, which includes the accounting system of user charges.

Electricity

Debrecen Megyei Jogú Város Önkormányzata | Published January 15, 2016
Winner
Magyar Áramszolgáltató Kft.
cpvs
09310000

Debrecen Municipality and institutions for the acquisition of the Hungarian electricity transmission network is constantly available and appropriate use of the local connection quality characteristics of electricity (for the purchase of commercial relationship) 01/01/2016. (0:00) and 12.31.2016. Framework, full board without scheduling obligation based power purchase agreement for the period (24:00), which includes the accounting system of user fees (fees for use of the system enforced by the network licensees contracting (s) via the trader opposite).

Electricity

Debrecen Megyei Jogú Város Önkormányzata | Published September 29, 2017  -  Deadline November 6, 2017
cpvs
09310000

The Local Government and Institutions of Debrecen County State and the Főnix Event Organizer Public Nonprofit Ltd., the MODEM Modern Debrecen Art Outstanding Nonprofit Nonprofit Ltd. and the Debrecen Youth Service Provider Nonprofit Ltd. - collectively for the contracting entities - the continuously available, purchase of electricity of adequate quality for the connection characteristics of the use sites (purchased in commercial terms) 1.1.2018. (0:00) - 31.12.2018. (24:00), in the case of a full supply-based electricity purchase contract without scheduling obligation, which includes the settlement of system usage fees and re-invoicing at constant prices (system license fees are enforced by network licensees through the trader (s) against).

Bernadett Paróczai.

Registration number 00176.

The purchase of a contracting electric energy includes 50% option.

The conditions for purchasing electricity and the detailed requirements for the subject of public procurement are contained in the draft contract as part of the call for tenders.

The number of uses (POD identifiers) involved in the procurement and the amount of electricity consumed per calendar year (kWh) are given in the tender dossier.

The exact technical requirements for the subject of public procurement are set out in the specifications of the tender dossier.

The bidder must declare the agreement on the balance sheet contract concluded with the system operator or, in the absence thereof, the conclusion of an agreement authorizing the balancing officer in the name of the licensor on behalf of the licensee.

Penalty Penalty: Winning Contractor does not commence the delivery of electricity at the time of the entry into force of the Contract or fails to comply with the Contractual Obligation and Declaration as stipulated in the Contract, or ceases after the commencement of the delivery, the amount of the penalty for damages payable by the Contractor to the Contractual Daily HUF 50,000 (calculated on the calendar days of the breach of the contract).

The performance of the Contract shall be deemed to be ineffective if the successful tenderer who has been awarded a contract by the date of entry into force of the Contract is liable to be overdue for more than 30 days or if the goods already commenced are suspended for 30 days beyond reasonable time and if the contractor He terminated the contract.

A caller is required to provide a performance guarantee.

Electricity

Debreceni Egyetem | Published January 12, 2016
Winner
MVM Partner Zrt.
cpvs
09310000

DEK-302nd The transportation contract for the sale of electricity to the University of Debrecen 1.1.2016-31.12.2016. the context of the total electricity supply for the period based commercial contract.

Electricity

Debreceni Egyetem | Published October 30, 2015  -  Deadline December 11, 2015
cpvs
09310000

DEK-302 transport of electricity purchase and sale contract for the University of Debrecen 1.1.2016- 12.31.2016. the context of the total electricity supply for the period based commercial contract.

Electricity

Debreceni Egyetem | Published January 10, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>MVM Partner Zrt.</OFFICIALNAME></ORGANISATION><ADDRESS>Szentendrei út 207–209.</ADDRESS><TOWN>Budapest</TOWN><POSTAL_CODE>1031</POSTAL_CODE><COUNTRY VALUE="HU"/><PHONE>+36 13042338</PHONE><FAX>+36 12019164</FAX></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
09310000

DEGF 124_Adásvételi-transporting electricity contract for the University of Debrecen 1.1.2015-31.12.2015. the context of the total electricity supply for the period based commercial contract.

Construction work for electricity power lines

E.ON Tiszántúli Áramhálózati Zrt. | Published April 6, 2017  -  Deadline May 15, 2017
cpvs
45231400, 45231300

MV / LV Electrical Power Cord carrying out construction works on the basis of contractual relations framework agreement.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 2004 km network of medium voltage network, 2508 km of LV network and 1406 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 2992 km network of medium voltage network, 3084 km of LV network and 2182 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 3072 km network of medium voltage network, 3260 km of LV network and 2235 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 2946 km network of medium voltage network, 3435 km of LV network and 2176 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 3299 km network of medium voltage network, 3323 km of LV network and 2496 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 3240 km network of medium voltage network, 3567 km of LV network and 2538 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 2386 km network of medium voltage network, 2966 km of LV network and 1955 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 1830 km network of medium voltage network, 2197 km of LV network and 1432 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 2165 km network of medium voltage network, 2443 km of LV network and 1698 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 3666 km network of medium voltage network, 3744 km of LV network and 3073 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 3672 km network of medium voltage network, 3417 km of LV network and 3039 pieces of MV / LV transformer station.

the performance of sub-tasks set out in the Offer documentation from compiled based on electricity demand networking. The amount covered 4644 km network of medium voltage network, 4398 km of LV network and 4121 pieces of MV / LV transformer station.

"Full supply of electricity sales contract."

Debrecen Megyei Jogú Város Önkormányzata | Published October 9, 2014  -  Deadline November 21, 2014
cpvs
09000000

Electricity sales contract for the procurement of the Hungarian electricity transmission network is constantly available, use the appropriate connectivity in places of power quality (with the purchase of commercial relationship) 01/01/2015. (00:00) - 31/12/2015. Full supply of electricity without, scheduling commitments for the period (24:00) Under sale and purchase agreement, which includes the system charges the full accounts - ie, the contracting authority has these charges (k) to pay for network licensees are invoiced - as well. "Electricity trader Select year 2015 - Delhi MJ City")

DEGF 124_Adásvételi-transporting electricity contract for the University of Debrecen 01/01/2015. - 31.12.2015. the context of the total electricity supply for the period based commercial contracts.

Debreceni Egyetem | Published October 15, 2014  -  Deadline December 1, 2014
cpvs
09310000

DEGF 124_Adásvételi-transporting electricity contract for the University of Debrecen 01/01/2015. - 31.12.2015. the context of the total electricity supply for the period based commercial contracts.

Electricity

Debreceni Vagyonkezelő Zrt. | Published October 20, 2015  -  Deadline November 16, 2015
cpvs
09310000

Villamos energia

"Reconstruction Rehabilitation of electricity distribution network" - information

Kenézy Gyula Kórház és Rendelőintézet | Published January 15, 2016
Winner
Bauviv Kft.
cpvs
45315300

Reconstruction Rehabilitation of electricity distribution network "Bartók portal" We need to solve the main distribution standard and enhanced full-fledged network, altered to meet consumer demands separation. The proposed separation is conducted as follows: Normal power feeders: • Part I of the main distributor • Building IV. The main part of the building distributor • Department of Neurosurgery • Obstetrics (RESERVE) • Other buildings (RESERVE) Advanced network branches: • I part of the building main distributor (loop) • IV. The main part of the building distributor (loop) • Department of Neurosurgery • Obstetrics • Backlight • Breakfast • • Former child class children had contagious • Porta • Spare taps • I • Circle Line Circle Line II. Instead of DIL sínbontó be designed and installed in motor circuit breaker. New modern automatic transfer switch must be designed and installed. Power factor correction equipment demolished the existing equipment, PCB capacitors tatalmú be treated properly documented as hazardous waste, and the new equipment is installed and working. It part of the building main distribution building new 4x150mm2 circuit power cord is recommended (Bartók main distribution - I. part of the building main distributor. - IV part of the building main distribution - Bartók main distributor) for enhanced supply for the increased taps to be the distributor to provide automatic switching between normal and increased supply. ARC. part of the building main distribution building new 4x150mm2 circuit power cord is recommended (Bartók main distribution - I. part of the building main distributor. - IV part of the building main distribution - Bartók main distributor) for enhanced supply for the increased taps to be the distributor to provide automatic switching between normal and increased supply. ARC. B. Bartok part of the building facing the street entrance area in front step existing cable laying depth is not correct. Lowering the existing cables, revenue would be needed. Sinti distributors: distributors of plans are available, they should be integrated into tangible design documentation. In tangible energy development to be designed, installed and commissioned the new floor plan hubs. The existing distribution equipment MA synth-type 5x16mm2 5x25mm2 and aluminum cables uniformly 5x25 NYY copper cables to be replaced. It is necessary architectural and engineering interventions

Building institutions in Debrecen Operating Institution Center operated by remote monitoring system for energy consumption

Debreceni Intézményműködtető Központ | Published December 4, 2015
Winner
SATRAX Kft.
cpvs
45350000, 45315100

Building institutions in Debrecen Operating Institution Center operated by remote monitoring system for energy consumption. The main technical parameters: 14 institutions with the means equipment which are suitable for hot and cold water, electricity, solar electricity produced and measured in the district heating consumption quantities of digitization and transmission of digitized data to a central data collection server. Local institutions in line with the specifics of your application must be installed separately next to the current collector communicator meters, which processes and converts the measured data in a consistent format. Each of the 14 institutions each export documentation must be prepared, every institution is required to install the necessary GPRS communication antenna, power-strong new cabinet, with metering installation material. The contractor is also responsible for the preparation of construction plans and preparation of necessary documentation after the institution implementing the system up-conversion, il-letve personnel designated by the Contracting 3x4 teaching hours extent.

South Industrial Park Debrecen electrical design work - information

Debrecen Megyei Jogú Város Önkormányzata | Published June 10, 2016
Winner
MVM OVIT Országos Villamostávvezeték Zrt. és VILL-KORR HUNGÁRIA Villamosipari Kft. közös ajánlattevők;Elionor Mérnökiroda Kft.
cpvs
71321000, 71323100, 71220000, 71322000

Debrecen Déli Ipari Park elektromos tervezési munkái vonatkozásában vagyoni értékű jogok korlátlan, teljes körű megszerzését is magában foglaló engedélyezési és kiviteli tervdokumentációinak elkészítése tervezési szerződés keretében az alábbi részajánlattételi körökben:
1. részajánlattételi kör:
Debrecen Déli Ipari Park 132/ középfeszültségű (132/22 kV-os) alállomás létesítéséhez szükséges engedélyezési és kiviteli tervdokumentáció elkészítése az ajánlati dokumentáció részét képező tervezési programban foglaltak alapján, 6 db 132 kV-os távvezetéki mező, 3 db NAF/KÖF transzformátor mező, 26 db KÖF kapcsoló-berendezés mező és 1 db sínbontó mező tervezésével. A tervezéssel érintett terület a 0507/78-81-89 hrsz-ú ingatlanok, valamint a Debrecen OVIT 220/132/22/11 kV-os, a Debrecen MGM 132/11 kV-os és a Debrecen Délkeleti 132/11 kV-os állomás.
Nyertes Ajánlattevő feladata a létesítmény megvalósításához szükséges engedély(ek) beszerzése. A tervezési díj tartalmazza az engedély(ek) beszerzése során fizetendő díjakat is.
Az engedélyezési tervdokumentációt papír alapon 10 példányban és 1 példány elektronikus, szerkeszthető formában köteles nyertes Ajánlattevő leszállítani.
A kiviteli tervdokumentációt papír alapon 5 példányban és 1 példány elektronikus, szerkeszthető formátumban köteles nyertes Ajánlattevő leszállítani.
Az átadott tervdokumentációk tartalmának és digitális formázásának (méret, felbontás) meg kell felelnie az átadáskor hatályos 312/2012. Kormányrendelet 8. mellékletében, a 306/2011. (XII.23.) és a 191/2009. (IX.15.) Kormányrendeletben foglaltaknak, úgy, hogy az minden további átalakítás, kiegészítés nélkül benyújtható legyen az ÉTDR rendszeren keresztül engedélyezésre. A tervdokumentáció tartalmazza az árazott/árazatlan költségvetést is elektronikus, szerkeszthető formátumban. A költségvetést méret és mennyiség számítással kell alátámasztani.
2. részajánlattételi kör:
Engedélyes tervdokumentáció műszaki részének valamint a komplett engedélyes és kiviteli tervdokumentációjának elkészítése a Debrecen OVIT - Délkelet I.-II. (T-MGM, T-Létavértes) távvezeték felhasítása a Debrecen Déli Ipari terület 132/ középfeszültségű (132/22 kV-os) transzformátorállomásba vonatkozásában az ajánlati dokumentáció részét képező tervezési programban foglaltak alapján, 2 darab kettős rendszerű 132 kV-os nagyfeszültségű távvezeték tervezésével 1,7 km hosszban (3,4 km). A tervezéssel érintett terület a Déli Ipari terület ellátására az ipari övezeten belül új transzformátor állomás építése szükséges 132/22 kV-os transzformációval a 0507/78-81-89 hrsz-ú ingatlanokon. Az Ipari parkot Keletről a 47 számú főközlekedési út, Északról a Debreceni Repülőtér határolja.
Nyertes Ajánlattevőnek nem feladata az engedély beszerzése.
Az engedélyes tervdokumentáció műszaki részét valamint a komplett engedélyes és kiviteli tervdokumentációt papír alapon 6 példányban és 1 példány elektronikus, szerkeszthető formátumban köteles nyertes Ajánlattevő leszállítani.
Az átadott tervdokumentációk tartalmának és digitális formázásának (méret, felbontás) meg kell felelnie az átadáskor hatályos 306/2011. (XII.23.) és a 191/2009. (IX.15.) Kormányrendeletben foglaltaknak. A tervdokumentáció tartalmazza az árazott/árazatlan költségvetést is elektronikus, szerkeszthető formátumban. A költségvetést méret és mennyiség számítással kell alátámasztani.
Ajánlatkérő felhívja az Ajánlattevők figyelmét, hogy a fenti adatok tájékoztató jelleggel szerepelnek, a további információkat, a részletes feladatleírást, az ajánlatkérő elvárásait, a beszerzéssel kapcsolatos háttér információkat az ajánlati dokumentáció részletezi.