Call +44 800 9755 164

Public tenders for energy in Odense Denmark

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Gas-production plant construction work

NGF Nature Energy Månsson A/S | Published October 11, 2016
cpvs
45255800, 45253700

NGF Nature Energy Månsson A / S, Biogas Plant.

Construction work for school buildings

Odense Kommune | Published December 24, 2015  -  Deadline February 1, 2016
cpvs
45214200

Building and renovation work for Odense Municipality's energy renovation project Energy Lean 2016. There must be carried out energy-saving measures amounting to around 95 municipal buildings within the areas of carpentry, roofing, electricity, plumbing and ventilation.

NGF Nature Energy Korskro A/S.

NGF Nature Energy Korskro A/S | Published January 26, 2016  -  Deadline February 10, 2016
cpvs
45255800, 45253700

The tender is for 1 Biogas Plant, producing biogas from animal manure and other biowaste with a mass distribution of 75 % to 25 % respectively. The produced biogas is to be upgraded to natural gas quality in a separate Biogas Upgrading Plant (not part of this tender) and distributed in the Danish natural gas grid.

The contract type will be ‘turn key’ including delivery of a complete and fully functional biogas plant, from weighing in and receiving stations for biomasses to delivery of the produced biogas to the upgrading plant and facilities for delivery of residual products to trucks for further use or disposal. The contract will cover civil, mechanical, electrical and any other relevant work, from engineering to commissioning of the complete plant.

NGF Nature Energy Maansson A/S, Biogas Plant.

NGF Nature Energy Månsson A/S | Published April 29, 2015  -  Deadline May 19, 2015
cpvs
45255800, 45253700

The tender is for one Biogas Plant, producing biogas from animal manure and other biowaste with a mass distribution of 75 % to 25 % respectively. The produced biogas is to be upgraded to natural gasquality in a separate Biogas Upgrading Plant (not part of this tender) and distributed in the Danish natural gasgrid. The contract type will be “turn key” including weighing in and receiving station for feedstock to delivery of the produced biogas to the upgrading plant and facilities for delivery of residual products to trucks for further use or disposal. The contract will cover civil, mechanical and electrical and any other relevant work,from engineering to commissioning of the complete plant.

Electricity distribution and related services

Fjernvarme Fyn Fynsværket A/S | Published February 25, 2017
Winner
Cassin Networks ApS
cpvs
65300000, 09323000, 09324000

The agreement concerns the reporting of energy savings (not subject to/exempted from the directive).

The agreement concerns the reporting of energy savings pursuant to The Danish Executive Order on Energy Savings in Network and Distribution undertakings.

Electricity distribution and related services

Fjernvarme Fyn Produktion A/S | Published April 11, 2017
Winner
Cassin Networks ApS
cpvs
65300000, 09323000, 09324000

The agreement concerns the reporting of energy savings (not subject to/exempted from the directive).

The agreement concerns the reporting of energy savings pursuant to The Danish Executive Order on Energy Savings in Network and Distribution undertakings.

Energy meters 2015 / S 083-148405

Fjernvarme Fyn A/S | Published April 29, 2015  -  Deadline May 29, 2015
cpvs
38551000, 38550000, 38552000

Energy meters Framework agreement for the purchase of district heating meters incl. First-time verification as well as equipment for remote reading of these.

Energy labeling of residential buildings

ODENSE KOMMUNE | Published August 29, 2016  -  Deadline September 29, 2016
cpvs
71600000

Odense Municipality wants completed energy labeling of municipal rental housing, including 134 dwellings. The homes include townhouses, detached houses and apartments in blocks of flats.
Questions to the material, as well as the submission of tenders should be directed to the material specified contact:
Torben Chr. Andersen, mail: tca@odense.dk
Procedure:
To participate in the task inserted this link into your internet browser: http://permalink.mercell.com/61090262.aspx Here you register the task by pressing the icon at the top: "Sign your interest." If you are not a licensee of Mercell Denmark A / S must fill out a registration of your company. This registration is required for your continued participation and is at no cost.
After sending the registration you have access to all files and information about the task. You will receive login codes to www.mercell.dk within normal working hours and can then send your offer / request.

Construction work for school buildings 2015 / S 249-453503

ODENSE KOMMUNE | Published December 24, 2015  -  Deadline February 1, 2016
cpvs
45214200

Building and renovation work for Odense Municipality's energy renovation project Energy Lean 2016. There must be carried out energy-saving measures amounting to around 95 municipal buildings within the areas of carpentry, roofing, electricity, plumbing and ventilation.

Gas-production plant construction work

NGF Nature Energy Korskro A/S | Published December 7, 2016  -  Deadline December 30, 2016
cpvs
45255800

The agreement includes the establishment of 3 pieces. for storage tanks in concrete for liquid degassed biomass in the construction of the biogas plant Nature Energy Korskro A / S. The agreement also includes the design of the tanks incl. base plates, etc.

Energy meters

Fjernvarme Fyn A/S | Published December 12, 2015
cpvs
38551000, 38552000, 38550000

Purchase of MID approved district heating meters for billing and associated components.

Energy meters

Fjernvarme Fyn A/S | Published April 29, 2015  -  Deadline May 29, 2015
cpvs
38551000, 38550000, 38552000

Framework agreement for the purchase of district heating meters incl. First-time verification as well as equipment for remote reading of these.

Energy Management System to Lillebaelt Academy

Erhvervsakademiet Lillebælt // CVR:31684307 | Published March 1, 2017  -  Deadline March 13, 2017
cpvs
71314200

53634630
Mail: eand@eal.dk

Cranes

Fjernvarme Fyn A/S | Published April 13, 2017
cpvs
42414100, 42414200, 51511400, 51511110, 42420000

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city center. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant. To successfully do this, the size of the straw needs to be reduced to maximum 50 mm.

This call for tender addresses Lot M1. The purchase includes a traffic control system, 2 fully automatic overhead travelling cranes with weight and moisture measurement, straw bale conveyors, fire dampers, straw bale distribution system, conveyors with weigh system for straw bales, all necessary sensors and scanners to create a safe and fully automatic handling system, without the need for any personal interaction, and all necessary auxiliary systems.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city center. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant.

This call for tender addresses Lot M1. The purchase includes a traffic control system, two fully automatic overhead travelling cranes with weight and moisture measurement, straw bale conveyors, fire dampers, straw bale distribution system, conveyors with weigh system for straw bales, all necessary sensors and scanners to create a safe and fully automatic handling system, without the need for any personal interaction, and all necessary auxiliary systems.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Milling machines

Fjernvarme Fyn A/S | Published April 21, 2017  -  Deadline April 27, 2017
cpvs
42623000, 42417100, 42514000, 42417200, 03114100, 44163100

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant. To successfully co-fire the straw the size of the straw needs to be reduced to a size below 50 mm.

This call for tender addresses LOT M2. The purchase includes four identical straw preparation lines each consisting of equipment for transport of the strawbales, string removal, debaling, hammermills for size reduction and a pneumatic conveying system, incl. necessary auxiliary systems.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Milling machines

Fjernvarme Fyn A/S | Published March 28, 2017  -  Deadline April 27, 2017
cpvs
42623000, 42417100, 42514000, 42417200, 03114100, 44163100

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant. To successfully co-fire the straw the size of the straw needs to be reduced to a size below 50 mm.

This call for tender addresses LOT M2. The purchase includes four identical straw preparation lines each consisting of equipment for transport of the strawbales, string removal, debaling, hammermills for size reduction and a pneumatic conveying system, incl. necessary auxiliary systems.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant. To successfully co-fire the straw the size of the straw needs to be reduced to a size below 50 mm.

The mechanical equipment to accomplish this is divided into 3 lots:

1. LOT M1 — covers the straw logistics, storage and handling of the straw within the storage building and initial parts of the straw preparation building.

2. LOT M2 — Consists of the straw preparation lines, for size reduction of the straw, and a pneumatic conveying system.

3. LOT M3 — Involves the conversion of the old coal burners to also be able to co-fire straw.

This call for tender addresses LOT M2. The purchase includes four identical straw preparation lines each consisting of equipment for transport of the strawbales, string removal, debaling, hammermills for size reduction and a pneumatic conveying system, incl. necessary auxiliary systems.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Parts of furnace burners, furnaces or ovens

Fjernvarme Fyn A/S | Published March 28, 2017  -  Deadline April 27, 2017
cpvs
42390000, 09111000, 03114100, 51130000, 51135100

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant.

This call for tender addresses LOT M3. The purchase includes modifying 4 identical coal-fired burners to be able to co-fire with straw. The burners must still be able to fire with coal when no straw is available. The works include relocation of oil lance, potential relocation and extension of ignition lance, removal of old core pipe, installation of new and larger core pipe, expansion pipe and an emergency shutdown valve. The above-mentioned works must include all necessary auxiliary systems. The systems must be tied in to the pneumatic transport system, which is not part of this lot.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant. To successfully co-fire the straw the size of the straw needs to be reduced to a size below 50 mm.

The mechanical equipment to accomplish this is divided into 3 lots:

1. LOT M1 — covers the straw logistics, storage and handling of the straw within the storage building and initial parts of the straw preparation building;

2. LOT M2 — Consists of the straw preparation lines, for size reduction of the straw, and a pneumatic conveying system;

3. LOT M3 — Involves the conversion of the old coal burners to also be able to co-fire straw.

This call for tender addresses LOT M3. The purchase includes modifying 4 identical coal-fired burners to be able to co-fire with straw. The burners must still be able to fire with coal when no straw is available. The works include relocation of oil lance, potential relocation and extension of ignition lance, removal of old core pipe, installation of new and larger core pipe, expansion pipe and an emergency shutdown valve. The above-mentioned works must include all necessary auxiliary systems. The systems must be tied in to the pneumatic transport system, which is not part of this lot.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Cranes

Fjernvarme Fyn A/S | Published March 28, 2017  -  Deadline April 27, 2017
cpvs
42414100, 42414200, 51511400, 51511110, 42420000

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant. To successfully do this, the size of the straw needs to be reduced to maximum 50 mm.

This call for tender addresses LOT M1. The purchase includes a traffic control system, 2 fully automatic overhead travelling cranes with weight and moisture measurement, straw bale conveyors, fire dampers, straw bale distribution system, conveyors with weigh system for straw bales, all necessary sensors and scanners to create a safe and fully automatic handling system, without the need for any personal interaction, and all necessary auxiliary systems.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Fjernvarme Fyn power station is located in Odense, a few kilometres from the city centre. Fjernvarme Fyn consists of a coal fired CHP unit, a straw-fired CHP unit and an incineration plant.

Fjernvarme Fyn intends to co-fire up to 15 % straw on energy basis on their coal-fired plant. To successfully do this, the size of the straw needs to be reduced to maximum 50 mm.

The mechanical equipment to accomplish this is divided into 3 lots:

1. LOT M1 — covers the straw logistics, storage and handling of the straw within the storage building, and initial parts of the straw preparation building for distribution of straw bales between 4 preparation lines.

2. LOT M2 — Consists of the straw preparation lines, for size reduction of the straw, and a pneumatic conveying system.

3. LOT M3 — Involves the conversion of the old coal burners to also be able to co-fire straw.

This call for tender addresses LOT M1. The purchase includes a traffic control system, two fully automatic overhead travelling cranes with weight and moisture measurement, straw bale conveyors, fire dampers, straw bale distribution system, conveyors with weigh system for straw bales, all necessary sensors and scanners to create a safe and fully automatic handling system, without the need for any personal interaction, and all necessary auxiliary systems.

The purchase includes design, manufacturing, supply, installation, testing, commissioning and documentation.

Projektledelse og –dokumentation 2016/S 009-010797

Syddansk Universitet | Published January 14, 2016  -  Deadline February 17, 2016
cpvs
71248000, 71541000, 72224000, 75112100

The University of Southern Denmark is lead partner of the European Union's ‘Baltic Sea Region Programme 2014-2020’ project entitled ‘Power Electronics for Green Energy Efficiency’ (hereinafter ‘Green PE’ project). The project's official start date is 1.3.2016. The start date of this contract is at 7.3.2016. Project duration is 36 months until 28.2.2019. The maximum extension and deadline for completion of all works and returns is the 31.5.2019. The Contracting Authority wishes to enter into a framework agreement relating to the purchase of the supply of Project Management Services for the ‘Green PE’ project. Project partners (PP) are: — PP 1: University of Southern Denmark, Denmark; — PP 2: Business Development and Technology Transfer Corporation of Schleswig Holstein, Germany; — PP 3: Renewable Energy Hamburg, Germany; — PP 4: Christian-Albrechts-Universität zu Kiel, Germany; — PP 5: Acreo Swedish ICT, Sweden; — PP 6: University of Latvia, Latvia; — PP 7: Latvian Technological Center, Latvia; — PP 8: University of Tartu, Estonia; — PP 9: Kaunas University of Technology, Lithuania; — PP 10: Applied Research Institute for Prospective Technologies, Lithuania; — PP 11: Warsaw University of Technology, Poland; — PP 12: NATEK Power Systems AB, Sweden; — PP 13: Banke Accessory drives, Denmark; — PP 14: Kaunas Science and Technology Park, Lithuania; — PP 15: CLEAN, Denmark; — PP 16: Polish Chamber of Commerce for Electronics and Telecommunications, Poland; — PP 17: Sustainable Smart Houses in Småland, Sweden; — PP 18: Ubik Solutions OÜ, Estonia. The project management provider will also be expected to work in close collaboration with the Project Steering Committee (PSC), all project participants, and stakeholders in order to fulfil the tasks as detailed below: 1. Implementation of a project management system among the project partners and the Interreg administration; 2. Supervision of goal-achievement at work package and general project level to support the foreseen steering group for project steering and decision-making; 3. Evaluation of the financial status to support the steering group for project steering and decision-making; 4. Planning, preparation and realisation of the joint project; 5. Coordination and preparation of the official reports (consisting of activity and financial report) to be submitted to the Interreg administration by the Lead partner; 6. Organisation of the 1st level control in accordance with the regulations of the European Union; 7. Central office and information centre for all project partners (e.g. administrative and financial questions) with frequent information of all partners about news, current developments and status of the whole project; 8. Conception of a communication plan, steering and carrying out of the communication plan (e.g. leaflets, newsletters, presentations); 9. Conception, maintenance and updating of project website (not the technical development, not the graphic design); 10. Documentation of meeting minutes of the steering group and project outputs.

Tanks

NGF Nature Energy Biogas A/S | Published February 26, 2015  -  Deadline March 12, 2015
cpvs
44611000, 38436500

Offering includes complete delivery and assembly of small decentralized collection tanks on the farms that supply manure for Nature Energy's existing and future biogas plant in Denmark, but who do not already have established a collection tank for continuous collection of fresh manure.